PWS_draft_AMO_19-222_TCM-RA-AMO-19-0222.pdf
PDF 737 KB Posted
- Solicitation number
- W9124G-19-R-0222
About this file
Draft PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage_Determination.pdf | ||
| PWS_draft.pdf | ||
| Price_Schedule.pdf | ||
| Questions_and_Answers_.pdf | ||
| WDOL_WGD._19-R-0222.__Fort_Rucker_TCM-R.pdf | ||
| Price_Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Draft
PERFORMANCE WORK STATEMENT (PWS)
TCM Reconnaissance and Attack
Technical Support for Weapons and Munitions Development Effort
1.0 MISSION OBJECTIVE: This contract is to provide on-site technical support to TCM
Recon/Attack, Ft Rucker AL, U.S. Army Aviation Center of Excellence (USAACE), for aviation weapons and munitions support. Technical support of these major Army weapons system capabilities requires extensive and diverse technical expertise. The weapons/munitions will be used on all Army Aviation manned and unmanned platforms managed by TCM-RA so the contract personnel will also need a broad knowledge of the aviation platforms. The fleets of both
UAS and Apache aircraft are continuously undergoing modification, modernization, and upgrades in all configurations, including expanding weapon system capabilities. Continued growth and integration of unmanned aircraft system with manned systems is changing how the
Army fights, including when and how targets are engaged, and with a variety of munition solutions. Required contractor support includes providing technical program management, milestone support, financial management expertise, logistics, engineering programmatic expertise, schedule and cost analysis and other functional support of the DoD life-cycle acquisition program review process as well as other initiatives for all current and future weapons/munitions systems to include Joint Air to Ground Missile (JAGM), HELLFIRE Family of Missiles, Longbow HELLFIRE, HYDRA Family of Rockets, Viper Strike, Griffin, Advanced
Precision Kill Weapon System (APKWS), Small Guided Munitions, future smart weapons, future smart rockets, digital launchers for rockets and missiles, and guided missile programs in general. This effort will include travel, interface, review and analysis of effort of the system prime Contractors, Subcontractors, government laboratories, and SETA Contractors. The effort also includes support for development of user requirements documents, warfighting analysis, and participation in Initial Operational Test and Evaluation (IOT&E) programs, Limited User Tests
(LUTs), Advanced Warfighting Experiments (AWEs) and Advanced Concepts and Technology
Demonstrations (ACTDs). The assessment of weapon / munition development for reconnaissance, attack, and UAS systems, the integration of the weapons/munitions onto aviation platforms, and the development/analysis of future enhancements will require a continuous, on-going effort during this task order.
1.1 PERIOD OF PERFORMANCE: The period of performance shall be for one (1) Base
Year of 12 months and four (4) 12-month option years.
1.2 Level of Effort: The labor threshold level of effort (LOE) will be for 1920 hrs (1 CME) with the option to increase the LOE as identified in paragraph 1.3.
1.3 Optional Labor Increase: Within each performance year (base and option years) additional labor may be required to support ongoing and known efforts for which the priority has been elevated, or new and emerging requirements that were not forecasted at the time this PWS was developed. The Optional Labor Increase will be exercised as an optional Contract Line Item
(CLIN) within each performance year that is not funded. This optional CLIN will only be funded if the requiring government activity deems it necessary, and then only to the amount necessary to satisfy the requirement necessitating execution, not to exceed two (2) additional
Contractor Man-Year Equivalents (CME) of effort. In other words, the amount of Optional
Additional Labor over the current threshold requirement (1 CME) executed in any given performance year could range anywhere between zero additional to up to two (2) CMEs.
Overtime will not be considered as an alternative to Optional Labor Increase. The Optional
Labor Increase CLIN does not automatically renew with the execution of the next contract performance year. The agreed upon labor category rates in the awarded contract for each performance year in which the Optional Labor Increase CLIN is executed will prevail as the rate for the additional CME(s). An increase to travel requirements may be required to support the additional CME(s) and will be documented in the Optional Labor Increase CLIN. Contractor personnel qualifications for Optional Labor Increase CMEs remain consistent with the qualifications outlined in paragraph 3.0 below. Performance Requirements for Optional Labor
Increase CMEs remain consistent with the requirements outlined in paragraph 2.0 below. Upon execution of Optional Labor Increase CLIN the contractor will have 15 working days to fill the position(s) based on level of effort funded.
2.0 PERFORMANCE REQUIREMENTS: The contractor shall provide the technical and analytical support described herein to the TCM-RA Office and the USAACE Capabilities
Development and Integration Directorate (CDID). The contractor shall also provide necessary support for coordination with program participants, planning, studies/analyses, preparation of schedules, briefings, presentations, reviews, and other technical and analytical support necessary to support the fielding of systems/digitization efforts involving any of the capabilities associated with TCM-RA managed programs. The following efforts, or specific tasks, are required to support these programs by collecting and analyzing the operational, doctrinal, and technical issues of Army interoperability and future Aviation systems. This support shall include the analysis of operational deficiencies, doctrinal voids, and a technical analysis that results in recommendations and corrective actions which include a schedule of major/significant milestones. Government retains approval and acceptance authority for any analysis, feasibility studies, and strategies developed under this contract as well as decision authority for course of action selection, approval and implementation. In addition, the Government is responsible for approving all work products the contractor provides in connection with this PWS.
2.1 Operational Assessment / Support
2.1.1 The contractor shall provide technical support in the development and authoring of Joint
Capabilities Integration and Development System (JCIDS) requirements documents, to include
Initial Capability Documents (ICD), Capability Development Documents (CDD), and Capability
Production Documents (CPD) for current and future TCM-RA managed programs.
2.1.2 The contractor shall analyze, evaluate, provide recommended revisions and/or generate for
Government approval/signature draft technical documentation such as letters of agreement, memoranda of understanding, Operational Mode Summary I Mission Profile (OMS/MP), Operational and Organizational Plans, Joint Capabilities Integration Development System
(JCIDS) documents, system specifications, Test and Evaluation Master Plans, and training documentation.
2.1.3 The Contractor shall provide support to current and future TCM-RA managed platform and weapon / munition systems, potential system upgrades and improvements, advanced weapon concepts, technical documentation, technical performance, systems engineering, systems integration, advanced technology demonstrations, weapon system guidance and control, interfaces, cost-trade studies, multi-mode seeker technology, warhead and fuze technology, propulsion technology, and integration with current and evolving launch platforms, to include all airframes and ground/naval systems and integration with command and control systems of the digitized force. The Contractor shall support Chemical, Biological, Radiological, and Nuclear requirements to include traceability, analysis and support to test and evaluation. The contractor shall provide technical expertise during the transition of systems. The contractor shall perform analysis, facilitate coordination, and provide technical input in the initial deployment and acceptance of Training Aids and Devices that provide weapon / munition training. The contractor shall plan, facilitate coordination, recommend, and/or provide technical liaison between TCM-RA and supported installations or locations (i.e., Fort Eustis, Ft. Hood, Fort
Campbell, Fort Stewart, Korea, and Germany) for integration of weapons/munitions training systems into unit operations.
2.1.4 The contractor shall identify capability gaps and assist in development and evaluate recommended system requirements to determine technical feasibility and/or functional adequacy for current and future weapons / munitions components / systems related to TCM-RA managed platforms and associated missions.
2.1.5 Contractor support shall include the analysis of operational deficiencies, doctrinal voids, and a technical analysis that results in recommendations and corrective actions which include a schedule of major/significant milestones. This support is required to establish strategic and detailed plans of the path ahead, identify current critical needs along with associated future requirements.
2.1.6 The contractor shall participate in planning and organizing capability/requirement meetings with government and industry personnel. These meetings may include JCIDS document reviews, and participate in program In-Process Reviews (IPRs), Integrated Product Team (IPT) meetings, Process Action Teams (PATs), symposiums, reviews, working group sessions, and associated meetings/functions that foster exchange of user requirement information. This shall include preparation of presentation slides, information papers and tracking/coordination of any resultant action items. The contractor shall provide support to the TCM-RA government representative for at appropriate weapons / munitions related meetings.
2.1.7 The contractor shall determine any weapon / munition interoperability requirements for supporting reconnaissance and attack systems in the conduct of their missions, and support future participation by Army Aviation in the weapon / munition modernization process. The contractor shall assist in the development of aviation's system-of-systems architecture, to include system integration, communication-electronics and network technology for aviation as a part of Army
Aviation’s overall scheme to support future battlefield communications. Support shall include identification of operational, technical, and integration issues in execution of the fielding and produce products that advance programs through development milestones. The Government is responsible for approving all work products the contractor provides in connection with this PWS.
2.2 Systems Engineering
2.2.1 The contractor shall provide seasoned expertise for operational capability management support of weapons and associated munition systems in the areas of Systems Engineering, Reliability-Availability-Maintainability (RAM), Operator and Maintainer Training, and Logistics
Supportability.
2.2.2 The contractor shall provide technical expertise to facilitate human factors engineering, product assurance, manufacturing science and technology (MS&T), and value engineering in all specialty areas.
2.2.3 The contractor shall provide technical engineering expertise for operational support systems and major items. The contractor shall provide technical expertise during the transition of systems. The contractor shall perform analysis, facilitate coordination, and provide technical input in the initial deployment and acceptance of Training Aids and Devices that utilize weapons
/ munitions to anticipated locations.
2.2.4 The Contractor shall support validation and verification activities in all aspects of missile and rocket systems engineering toward assessing meeting documented user requirements, including seekers, guidance sections, warheads and fuzes, rocket motors, control actuation systems, launchers, platform integration, tactical communication software/firmware, and modeling and simulation. The Contractor shall support analysis, preparation, and review of safety related documents and studies.
2.2.5 The Contractor shall provide program, technical, and logistical (RAM) management and support for requirements definition, integration and strategic planning. The effort will include technical planning, requirements traceability, Joint Capabilities Integration and Development
System (JCIDS) documentation development and staffing, and technical reviews including PDR and CDRs. The Contractor shall provide support to requirements trades studies and requirements traceability. The Contractor shall support weapons lethality and effects estimation and analysis, conduct cost- trade off studies, risk-assessment and conduct analysis of technology maturation.
The Contractor shall provide support to Analysis of Alternative (AoA) documentation and other analyses that indicate the viability of a particular product for development and procurement.
2.2.6 The Contractor shall support integration of weapons / munitions on all TCM-RA managed platforms including, but not limited to, the Gray Eagle and Shadow UAS and the Apache helicopter. The Contractor shall conduct studies and analyses on potential integration of future munitions to include Viper Strike, Griffin and several variants of smart rockets, drop / glide weapons or other missiles onto TCM-RA managed aviation platforms.
2.2.7 The contractor shall assist in the development of and evaluate recommended system requirements to determine technical feasibility and/or functional adequacy for current and future weapons and munitions related to the Army Aviation manned and unmanned reconnaissance and attack fleets.
2.2.8 The contractor shall establish and / or provide recommended technical / test requirements, specifications, acceptance criteria and measuring programs consistent with validating meeting documented user requirements and established design criteria.
2.2.9 The contractor shall provide technical expertise for timely consideration and integration of latest technological advances and military materiel requirements as these factors relate to fielded manned attack/reconnaissance and UAS platforms, and their associated / changing missions.
2.3 Test and Evaluation / Analytical Support
2.3.1 The Contractor shall provide test and evaluation (T&E) management expertise to assist in the mitigation of program T&E risks. The contractor shall establish and/or provide recommended technical/test requirements, specifications, acceptance criteria and measuring programs consistent with design criteria. Contractor shall support T&E program development, coordination, implementation, and execution; support to testing to include procedures, controls, monitoring, direction, and execution; test evaluation for analysis and study of test data/information obtained from test events; test planning to define, allocate, resource, and schedule T&E events; test reporting to disseminate test data/information; and T&E meetings as
T&E Working-Level Integrated Product Teams (WIPT), technical meetings, T&E strategy discussions, and sub-working groups.
2.3.2 The contractor shall provide TCM-RA support for coordination with weapon / munition program participants, including planning, studies/analyses, preparation of schedules, briefings, presentations, reviews, and other technical and analytical support necessary to support the integration and fielding of current and future weapon and munition systems. The contractor shall also plan, develop, or conduct analysis programs or studies to establish the feasibility of systems/ subsystems/components in meeting requirements and/or adequacy of design.
2.3.4 The contractor will participate in IPTs and advisory boards pertaining to planning, analysis, conduct of studies, preparation of briefings, presentations, reviews, training, reports, maintaining databases and any other data management support necessary to support the development and fielding of systems where capabilities are managed by TCM-RA.
2.3.5 The contractor shall provide expertise and advice to TCM-RA, as well as the aviation workforce, associated with the formalization, conduct and improvement of diverse acquisition actions, business processes and activities necessary for weapon / munition development and procurement. The contractor shall also provide input in coordination with program participants, planning, studies/analyses, preparation of schedules, and analytical support necessary to support the fielding of new systems whose capabilities are managed by TCM-RA.
3.0 CONTRACTOR PERSONNEL QUALIFICATIONS:
3.1 Contractor Personnel General Qualifications. Capability Development and Integration
Directorate (CDID) and subordinate Directorates operate in a highly complex DoD combat development and acquisition process which requires highly specialized process knowledge as well as Army Aviation skill sets typical of mid-senior grade military civilians and Soldiers.
Experiential combat insights these personnel may have learned during the recent combat operations are crucial in developing the right requirements for the Aviation Warfighter. All contractors shall have been previously rated Army Aviators, Unmanned Aircraft Operators, or aviation maintenance specialists and have an extensive working knowledge/understanding of
Aviation operations and employment, the JCIDS Process, CONOPS Development, CBA Process, and a thorough understanding of the Army and Joint Concepts, especially the Army Concept
Framework. Preference given to rated Army Aviation Officers, Warrant Officers and Senior
Non-commissioned Officers with 10 or more years of operational experience in Aviation positions from company through the strategic planning level of the Army. All positions require knowledge of DOD and Army Aviation transformation, and require persons to have successfully completed the following DAU courses: JCIDS CLR 101, Requirements Management RQM 110, Capabilities Based Assessment CLR 250 and Developing Key Performance Parameters CLR
252. All course certifications required in this PWS are required at proposal submission.
Contractor personnel shall possess good working knowledge of computer operations and associated software and specified web-based applications in order to accomplish all tasks associated with this contract including, but not limited to, Microsoft Windows/Office Suite. The positions listed below require the contractor to have certain minimum qualifications and/or experience as listed in addition to this paragraph as well as meeting the GSA labor category qualifications.
3.2 Minimum Technically Acceptable Qualifications include: Former Army Officer(s) with at least fifteen (15) years of Aviation flight/combat operations experience is required. Experience as a Standardization Instructor Pilot (SIP) in the AH-64D/E or Kiowa Warrior is desired.
Extensive technical experience in the handling and employment of current Army Aviation weapons and munitions (to include Hydra 70 rockets and HELLFIRE missiles) is required.
Attack or Assault Battalion Staff experience desired. Extensive experience working in capability management / combat developments is required. Experience in planning, executing and facilitating Working Groups and Integratedd Product Teams (IPTs). Experience as a Team Lead conducting Aviation studies and/or operational test events with experience in developing capabilities and evaluating technologies. Experience authoring a Joint Requirements Oversight
Council (JROC) approved JCIDS document is required. Participation as a direct team member in an Army Aviation Capability Based Assessment (CBA) for supporting attack or reconnaissance aircraft is preferred.
4.0 MONTHLY REPORT. The contractor shall submit a monthly Status Report IAW DI-
MISC-80368, CDRL A00l and a Contractor’s Progress, Status, and Management report IAW DI-
MGMT-80227, CDRL A003.
4.1 Contractor Manpower Reporting (CMR): The Office of the Assistant Secretary of the Army
(Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September
30. While inputs may be reported any time during the FY, all data shall be reported no later than http://www.ecmra.mil/
October 31 of each calendar year, starting in 2019. Contractors may direct questions to the help desk at: http://www.ecmra.mil/ The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4)
Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments
(including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9)
Estimated data collection cost; (10) Organizational title associated with the Unit Identification
Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11)
Locations where Contractor and sub-Contractors perform the work (specified by zip code in the
United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The
XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website.
The specific formats for the XML direct transfer may be downloaded from the website.
To fulfill this Army reporting requirement, the following COR information is provided:
The Unit Identification Code (UIC) for TCM-RA is: W0U911
The Federal Service Code (FSC) for the COR is: R425.
5.0 TRAVEL: Travel may be required in performance of this PWS. The contractor must receive approval from the COR prior to performing any travel. A trip report is required for all travel
IAW DI-ADMN-81505, CDRL A006.
6.0 SECURITY: The contractor shall provide security at a level necessary to meet the requirements of the tasks requested. The contractors work shall not be above a classification of
Secret.
7.0 GENERAL INFORMATION:
7.1 Contractor Identification:
7.1.1. Pursuant to Fort Rucker Regulation 190-2, Installation Access Control: Contractor employees must obtain a DOD Common Access Card (CAC). CACs will be issued under
Trusted Associate Sponsorship System (TASS) by the COR or designated Trusted Associate
(TA). For identification and security purposes, contractor employees shall wear stated badges at all times, when performing work under this contract. Additional contractor personnel identification is neither required nor recommended. A copy of the policy is available at https://intranet.rucker.army.mil/policy-reg/regulations.
7.1.2 Security Requirements: All contractor personnel assigned to this contract shall be U.S.
citizens. In accordance with (IAW) Army Regulation and Air Force Instructions, all prospective contractors will undergo a verification process to determine the trustworthiness and suitability prior to being granted access to federal property. Limited access with escort may be granted (at the installation’s discretion), for an interim period, while investigations are being conducted.
Contractor, and all associated Subcontractor employees, shall comply with applicable installation, facility and Area Commander installation/facility access; including local security policies and procedures (provided by Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or
Security Office. Should the Force Protection Condition at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
7.1.3 Contractors must ensure an owning relationship is established in the Joint Personnel
Adjudication System (JPAS) for each individual performing duty in support of this performance work statement/task order. Visit Requests shall be sent to the Organization's Security
Management Office (SMO) Code.
7.1.4 Government Issued Common Access Card (CAC): The common access card (CAC) is the
DOD personal identity verification credential. A valid SECRET security clearance is required by all contract personnel that support this PWS. This security clearance meets the background investigation requirement in order to be issued a CAC. The Contractor shall be responsible for notifying the Government when an employee departs and shall return the CAC card issued to the departing employee to the Government COR for proper inactivation.
7.2 The Contractor will be required to access For Official Use Only and classified information up to SECRET level.
7.2.1 Handling or Access to Classified Information: Contractor shall comply with FAR 52.204-
2, Security Requirements. This clause involves access to information classified “Confidential,”
“Secret,” or “Top Secret” and requires contractors to comply with— (1) The Security Agreement
(DD Form 441), including the National Industrial Security Program Operating Manual (DoD
5220.22-M); and any revisions to DOD 5220.22-M, notice which has been furnished to the contractor.
7.2.2 Access to the Secret Internet Protocol Router Network (SIPRNET), Non-Secure Internet
Protocol Router Network (NIPRNET), Secure Telephone Equipment, and Secure Video
Teleconference are required: The contractor shall not access, download, or further disseminate any special access data (i.e. intelligence, NATO, COMSEC, etc.) outside the execution of the defined contract requirements, and/or without the guidance and written permission of the
Contracting Officer. In the event that any special access is required, the Contracting Officer must modify the requirements for the DD Form 254. All classified documents will be returned to the Government upon completion of the contract. All contractor employees, with access to a government info system, must be registered in the ATCTS (Army Training Certification
Tracking System) at commencement of services, and must successfully complete the DOD
Information Assurance Awareness prior to access to the IS and then annually thereafter.
Contractors requiring access to Government IT systems must adhere to the requirement of AR
25-2, Information Technology (IT), Rapid Action Revision (RAR), Issue Date: 23 March 2009, on Government installations. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment. Contractor access to SIPRNET via government accounts is restricted to only sites directly related to meeting the requirements of this contract as validated by the COR and/or the Performance Work Statement (PWS). The contractor will not access
INTELLINK-S while on the SIPRNET without formal access authorization of the COR and
AMSAM-ISI. SIPRNET access via government accounts may not be subcontracted without prior written authorization of the Contracting Officer, COR and AMSAM-ISI in accordance with
National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M, paragraph
9-304.
7.3 Dress and Conduct:
7.3.1 The Contractor shall dress in a manner consistent with the task for which hired and the work being performed. In most cases, “business casual” is appropriate. Clothing must not be excessively revealing, worn out, or ill-fitting.
7.3.2 The Contractor shall, at all times, present a professional demeanor while performing duties on this contract. Behavior which is disruptive, unsafe, disrespectful, offensive, or detrimental to morale shall not be tolerated.
7.3.3 The Contractor employees must identify themselves as Contractor Personnel Supporting the Army Aviation Center of Excellence in all oral and written communications including email.
7.3.4 The Contractor shall ensure that its employees do not allow personal business to interfere with their duty performance.
7.4. Release of Information: The Contractor shall not release any news (including photographs and films, public announcements, or denial or confirmation of same), or Installation-related information on any subject matter within this contract or any phase of any program herein to the media, or any other unauthorized users, without the prior written approval of TCM-RA and the
Public Affairs Office IAW AR 360-1. The Contractor shall request such written approval through COR.
7.5 Vehicle Registration: Contractor shall comply with all applicable requirements of Fort
Rucker, Department of the Army, or Department of Defense Regulations in effect during performance of this contract. Vehicles are no longer registered on post; however, evidence of vehicle ownership and vehicle liability insurance must be presented upon request. It is the responsibility of the Contractor to ensure compliance on the part of its employees with this requirement.
7.6 Anti-terrorism and Operational Security (AT/OPSEC) Requirements: In compliance with
Army directives concerning Operational Security and Anti-terrorism, the following paragraphs shall followed:
7.6.1 AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas, shall complete AT
Level I awareness training within 30 calendar days after contract start date, or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee, and subcontractor employee, (to the COR or to the contracting officer, if a COR is not assigned), within 35 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://atlevel1.dtic.mil/at. AT level I awareness training is an annual requirement based on Fiscal Year as option years are exercised.
7.6.2 AT Awareness Training for Contractor Personnel Traveling Overseas: This standard language text required US-based contractor employees, and associated sub-contractor employees, to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the Combatant Commander with the Installation ATO being the local point of contact.
7.6.3 Utilization of Government OPSEC SOP/Plan. There is no required OPSEC deliverable associated with this contract. However, the Contractor will need to adhere to all OPSEC requirements outlined in the Fort Rucker Reg 380-1, Security Procedures, dated 22 Apr 2015, National Security Decision Directive (NSDD) No. 298, National Operations Security (OPSEC)
Program, dated 22 January 1988, Department of Defense Directive 5205.2, DoD Operations
Security (OPSEC) Program, dated 29 November 1999, and Army Regulation 530-1, Operations
Security (OPSEC), dated 26 Sept 2014. Government Contracting Activity approval is required prior to imposing OPSEC requirements on a subcontractor. The contractor shall designate an
OPSEC Point of Contact. That individual will become OPSEC Level I certified within six months of being appointed.
7.6.4 OPSEC Training for On-Post Contractors. All contractor employees, including subcontractor employees, stationed on Army installations, facilities, or controlled areas to include OCONUS contingency operations areas or designated combat zones shall complete OP
SEC Level 1 training within 90 calendar days of starting work on the contact or effective date of incorporation of this requirement whichever is first. All contractor employees must complete annual OPSEC training. The contractor shall maintain certifications of completion for each affected contractor employee and subcontractor employee for inspection purposes. OPSEC Level
I training is available at https://www.iad.gov/ioss/index.
7.7 Access and General Protection/Security Policy and Procedures: Contractor, and all associated sub-contractors employees, shall comply with applicable installation, facility, and
Area Commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements, to be accomplished by installation
Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
7.8 iWATCH Training: The contractor, and all associated sub-contractors, shall brief all employees on the local iWATCH program (training standards provided by the requiring activity
ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award, and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 35 calendar days after contract award.
7.9 Pursuant to DFARS 252.227-7020 (Rights in Special Works): All works first created, generated, or produced and required to be delivered in task orders under this contract become the property of the Government.
7.10 Pursuant to DFARS 252.227-7000 (Disclosure of Information): The Contractor shall not release to anyone outside the Contractor’s organization, information pertaining to any part of this contract (including associated task orders, products, programs, deliverables), except as provisioned within the clause.
7.11 The contractor is subject to the same annual training a government employees and are required to maintain the currency of this training annually after initial certification accepted by the government. The contractor will provide initial training certificates for designated training other than those listed above to the COR NLT 90 days of contract award.
7.12 TARP Training. Contractor Employees working as an integral part of the Army organization are required to complete annual Threat Awareness training. IAW AR 381-12, Threat Awareness and Reporting Program (TARP), 1 July 2016, contractors will report threat related incident, behavioral indicators, and other matters of CI interest specified in chapter 3, to the FSO, the nearest military CI office, the FBI, or the DSS.
8.0 GOVERNMENT FURNISHED PROPERTY: In order to accomplish the efforts described in this task order, the contractor will be provided access to the data and government files related to normal TCM-RA capability/management efforts. This effort shall be performed on site at Ft
Rucker, AL. Contractor personnel located on site will be provided with government furnished office furniture and data processing equipment, similar to that provided government employees.
The contractor personnel will also be authorized official telephone service including access to the Defense Switched Network (DSN), Secret Internet Protocol Router Network (SIPRNET), and Non-classified (Unclassified but Sensitive) Internet Protocol Router Network (NIPRNET), including remote access to government provided email and network services. Should the government authorize it, a contractor may be provided additional items of GFP such as wireless email and phone service equipment.
9.0 DELIVERABLES The contractor shall provide the following deliverables:
9.1 A00I DI-MGMT-80368 Status Report
9.2 A003 DI-MGMT-80227 Contractor's Progress, Status, and Management Report
9.3 A006 DI-ADMN-81505 Report, Record of Meeting/Minutes
10.0 PERFORMANCE OBJECTIVES/METRICS: The performance objectives, metrics, and incentives discussed below have been established for this task order and are set forth at
Appendix A, Performance Requirements Summary Matrix.
10.1 This performance-based service contract incorporates the following performance objectives:
(1) Delivery of high quality technical performance;
(2) Adherence to task order (TO) schedule, milestone, and delivery requirements; and
(3) Efficient and effective control of labor resources.
It is the contractor's responsibility to employ the necessary resources to ensure accomplishment of these objectives. The Government's assessment of the contractor's performance in achieving these objectives shall utilize the standards, acceptable quality levels, surveillance methods, and performance incentives described in the Performance Requirements Summary matrix set forth in
Appendix A. The performance incentives will be implemented via the Government's past performance assessment conducted in accordance with Part 42 of the Federal Acquisition
Regulation (FAR), as applicable, and the "Task Order Performance" criteria of the annual award term evaluation.
10.2. The performance objectives, standards, and acceptable quality levels shall he applied on a
TO basis with performance incentives to be implemented on an annual basis. The Government will conduct informal interim counseling sessions with the contractor's Program/TO Manager to identify any active TO performance that is not meeting the acceptable quality levels. These sessions will be conducted at least on a quarterly basis in order to provide the contractor a fair opportunity to improve its performance level.
10.3 The Control of Labor Resources criteria will be reflected under the "Cost" category of the performance assessment. Although the criteria of Business Relations and Management of Key
Personnel are not specifically included in the Performance Requirements Summary Matrix, the overall performance assessment will continue to include these criteria.
10.4. The contractor will be notified, in writing, of the Government's determination of its performance level for each performance objective including all instances where the contractor failed to meet the acceptable quality level.
APPENDIX A
PERFORMANCE REQUIREMENTS SUMMARY MATRIX
PERFORMANCE
OBJECTIVE
PERFORMANCE
STANDARD
ACCEPTABLE
QUALITY LEVEL
(AQL)
METHOD OF
SURVEILLANCE
PERFORMANCE
INCENTIVE
High Quality Technical
Performance
TO requirements met with little rework required and with few minor and no significant problems encountered
Performance meets all technical and functional requirements, and is highly responsive to changes in technical direction and/or the technical support environment.
Assessments, evaluations, analyses, recommendations, and related assistance are thorough, reliable, highly relevant to TO requirements, and consist of substantial depth and breadth of subject matter.
Deliverable reports contain all required data and meet all applicable CDRL requirements
Contractor delivery of products and / or services meets all TO requirements.
Performance occurs with no required re-performance / rework at least 80% of the time.
Problems that are encountered are minor and resolved in a satisfactory manner.
Routine inspection of deliverable products / services.
Assignment of performance rating for
QUALITY criteria:
EXCEPTIONAL
Performance and deliverables meet all and exceed many TO requirements. Performance delivered with no required re-performance / rework at least 95% of the time;
problems that are encountered are minor and resolved in a highly effective manner.
VERY GOOD
deliverables meet all and exceed some TO requirements. Performance delivered with no required re-performance / rework at least 90% of time; problems that are encountered are minor and resolved in an effective manner.
SATISFACTORY
deliverables meet all TO requirements. Performance delivered with no required re-performance / rework at least 80% of time; problems that are encountered are minor and resolved in a satisfactory manner.
MARGINAL
Some TO requirements not met and/or performance delivered with re-performance / rework required more than 20% of the time. Problems encountered were resolved in a less than satisfactory manner.
UNSATISFACTORY
Many TO requirements not met. Numerous re-performance / rework required. Substantial problems were encountered and inadequate corrective actions employed.
Adherence to Schedule TO milestones, periods of performance, and/or data submission dates are met or exceeded
Contractor meets TO delivery requirements at least 80% of the time
(excluding govt caused delays)
Routine inspection of deliverable products / services
Assignment of performance rating for
SCHEDULE criteria:
TO milestones / performance dates met or exceeded at least 100% of time (excluding government caused delays) performance dates met or exceeded at least 90% of time (excluding performance dates met or exceeded at least 80% of time (excluding performance dates met less than 80% of time
(excluding government caused delays) performance dates met less than 70% of time
Control of Labor
Resources
Contract labor mix is controlled in efficient and effective manner
Actual TO labor resource mix is maintained within 20% of originally awarded
TO resource mix
Routine inspection of
TO performance, performance / cost reports, payment invoices, etc.
Assignment of performance rating for
COST CONTROL
criteria:
Actual TO resource mix maintained within 10% of originally awarded TO resource mix maintained within 15% maintained within 20% maintained within 25% exceeds 25% of originally awarded TO