SEE ADDENDUM
(No Collect Calls)
W9124D18T0060 13-Jul-2018
b. TELEPHONE NUMBER
502-624-7165
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 24 Jul 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9124D9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MATTHEW P JUDD
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0011067940
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MISSION AND INSTALLATION CONTRACTING CMD
MICC FORT KNOX
BLDG 1109B STE 373
199 6TH AVE
FORT KNOX KY 40121-5720
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W22PES 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF PUBLIC WORKS
DIRECTORATE OF PUBLIC WORKS
1110A 125TH 6TH AVENUE
FORT KNOX KY 40121-5719
TEL: 501-624-7887 FAX:
FAX:
TEL: 502-624-2153 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
X
SIZE STANDARD:
$36,500,000
NAICS:
237120
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF134
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9124D18T0060
Section SF 30 - BLOCK 14 CONTINUATION PAGE
OFFERORS SHALL COMPLETE THE FOLLOWING INFORMATION:
DUNS NUMBER: ________________________________
FED TAX ID#: ________________________________
CAGE CODE: ________________________________
POINT OF CONTACT: ________________________________
PHONE NO: ________________________________
FAX NO: ________________________________
E-MAIL ADDRESS: ________________________________
Quoters Please Note:
1. Offerors must complete blocks 17a, 17b, 30a, 30b and 30c on page 1, SF Form 1449. Contractors are reminded to complete and return all required certifications contained in this solicitation.
2. Offerors must submit any questions regarding this solicitation in writing to the Contract Specialist. Questions shall be received by the Contract Specialist no later than 11:00 a.m. (Eastern Time) on 19 July 2018 to allow a written response prior to the quote due date. No remarks or written responses to questions by government personnel shall change or qualify any of the terms or conditions of this RFQ. The solicitation can only be changed by a formal written amendment issued by Mission and Installation Contracting Command (MICC) Center -Fort Knox, Kentucky.
Questions concerning this RFQ shall emailed to matthew.p.judd..civ@mail.mil.
3. All offerors shall be registered in the System for Award Management (SAM) to be eligible for award of a contract. Offerors shall ensure SAM registration is active and shall not assume that CCR information automatically migrated to the SAM system. The official SAM website is https://www.sam.gov/portal/public/SAM/. Contractors are encouraged to complete SAM registration as soon as possible The government may not delay award for the purpose of allowing a contractor time to register in SAM.
4. Amendments: All amendments will be posted to the Federal Business Opportunities website (FedBizOpps) at http://www.fbo.gov. Contactors shall monitor the website for any amendments and acknowledge those amendments, as required.
5. Quote shall contain the following:
-Completed and signed page 1 of the solicitation (SF 1449) -Completed page 3 of the solicitation (Continuation Sheet) -Completed pricing schedule-all CLIN(s) -Complete all representations and certifications included herein -Acknowledge amendments, if applicable
6. Electronic/email copies will be accepted. Offeror may e-mail quote to Matthew Judd at matthew.p.judd..civ@mail.mil.. NO FAX COPIES WILL BE ACCEPTED. Quote must be received by the Contracting Specialist prior to the date and time set in order to be considered for this award.
7. AWARD. The award of any contract issued hereunder will be made in the aggregate to the lowest-priced responsive, responsible quoter who includes the following:
A. Quotes submitted on a basis other than F.O.B. destination will be rejected as nonresponsive.
B. Quoters shall submit all unit prices to the whole penny; any fractions will be rounded to the next higher whole penny per unit for evaluation and award purposes.
C. Failure to submit a quote on all items may render the quote non-responsive.
BASE PERIOD TOTAL AMOUNT FOR LINE ITEMS 0001 THRU 0024 IS
FIRST OPTION TOTAL AMOUNT FOR LINE ITEMS 1001 THRU 1024 IS
SECOND OPTION TOTAL AMOUNT FOR LINE ITEMS 2001 THRU 2024 IS
THIRD OPTION TOTAL AMOUNT FOR LINE ITEMS 3001 THRU 3024 IS
FOURTH OPTION TOTAL AMOUNT FOR LINE ITEMS 4001 THRU 4024 IS
OVERALL TOTAL AMOUNT FOR LINE ITEMS 0001 THRU 4024 IS
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 140 Miles
LEAK SURVEY
FFP
GAS LEAK SURVEY, CATHODIC PROTECTION TESTING, CATHODIC
PROTECTION INSTALLATION, REPAIR AND MAINTENANCE ON THE
GAS DISTRIBUTION SYSTEM AT FORT KNOX, KY DURING THE BASE
PERIOD OF 01 AUGUST 2018 THROUGH 31 JULY 2019.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011067940
PSC CD: Z1MB
NET AMT
0002 3,200 Each
INSPECT RISERS, TEST PIPE, REPAIR
FFP
INSPECT RISERS, TEST PIPE, AND REPAIR IF NEEDED DURING PERIOD
OF PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT..
FOB: Destination
0003 150 Each
LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 UNDERGROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0004 30 Each
LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 UNDERGROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0005 10 Each
LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 ABOVE GROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0006 5 Each
LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 ABOVE GROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0007 40 Each
5 POUND ANODE
FFP
PROVIDE AND INSTALL 5 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0008 30 Each
9 POUND ANODE
FFP
PROVIDE AND INSTALL 9 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0009 20 Each
17 POUND ANODE
FFP
PROVIDE AND INSTALL 17 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0010 5 Each
LOCATE CONTACTS
FFP
LOCATE UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0011 5 Each
CLEAR CONTACTS
FFP
CLEAR UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0012 5 Each
LOCATE RISER
FFP
LOCATE RISERS IN PROTECTED AREA DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0013 5 Each
BOND COUPLING
FFP
BOND INSULATION COUPLINGS OF ALL SIZES DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0014 5 Each
LOCATE PIPE
FFP
LOCATE PIPE IN PROTECTED AREA DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0015 40 Each
REPLACE DIELECTRIC UNIONS
FFP
REPLACE DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0016 20 Each
INSTALL DIELECTRIC UNIONS
FFP
INSTALL DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0017 300 Each
RISER PREVENTATIVE MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON RISERS DURING PERIOD
OF PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0018 5 Each
TEST STATIONS
FFP
INSTALL TEST STATIONS DURING PERIOD OF PERFORMANCE 01
AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE WITH ATTACHED
PERFOMANCE WORK STATEMENT.
FOB: Destination
0019 200 Square
Foot
CONCRETE
FFP
SAW CUT & REPLACE CONCRETE REMOVED FOR TESTING PURPOSES
DURING PERIOD OF PERFORMANCE 01 AUGUST 2018 THRU 31 JULY
2019, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
FOB: Destination
0020 200 Square
ASPHALT PAVEMENT
SAW CUT & REPLACE ASPHALT PAVEMENT REMOVED FOR TESTING
PURPOSES DURING PERIOD OF PERFORMANCE 01 AUGUST 2018 THRU
31 JULY 2019, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
FOB: Destination
0021 150 Each
GAS MAIN
FFP
TEST GAS MAIN & RECORD FINDINGS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
FOB: Destination
0022 15 Each
REGULATOR STATIONS MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON REGULATOR STATIONS
DURING PERIOD OF PERFORMANCE 01 AUGUST 2018 THRU 31 JULY
2019, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
FOB: Destination
0023 1 Each
PAYMENT & PERFORM BOND
FFP
CONTRACTOR WILL PROVIDE PAYMENT & PERFORMANCE BOND
DURING PERIOD OF PERFORMANCE 01 AUGUST 2018 THRU 31 JULY
2019.
FOB: Destination
0024 1 Each
CONTRACTOR MANPOWER REPORTING
FFP
AS DIRECTED BY THE SECRETARY OF THE ARMY IN ACCORDANCE
WITH THE GUIDANCE PROVIDED HEREIN DURING PERIOD OF
PERFORMANCE 01 AUGUST 2018 THRU 31 JULY 2019
FOB: Destination
1001 140 Miles
OPTION LEAK SURVEY
FFP
GAS LEAK SURVEY, CATHODIC PROTECTION TESTING, CATHODIC
PROTECTION INSTALLATION, REPAIR AND MAINTENANCE ON THE
GAS DISTRIBUTION SYSTEM AT FORT KNOX, KY DURING THE BASE
PERIOD OF 01 AUGUST 2019 THROUGH 31 JULY 2020.
1002 3,200 Each
OPTION INSPECT RISERS, TEST PIPE, REPAIR
FFP
INSPECT RISERS, TEST PIPE, AND REPAIR IF NEEDED DURING PERIOD
OF PERFORMANCE 01 AUGUST 2019 THROUGH 31 JULY 2020, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT..
1003 150 Each
OPTION LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 UNDERGROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
1004 30 Each
OPTION LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 UNDERGROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2019THRU 31 JULY 2020, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
1005 10 Each
OPTION LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 ABOVE GROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
1006 5 Each
OPTION LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 ABOVE GROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
1007 40 Each
OPTION 5 POUND ANODE
FFP
PROVIDE AND INSTALL 5 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1008 30 Each
OPTION 9 POUND ANODE
FFP
PROVIDE AND INSTALL 9 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1009 20 Each
OPTION 17 POUND ANODE
FFP
PROVIDE AND INSTALL 17 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1010 5 Each
OPTION LOCATE CONTACTS
FFP
LOCATE UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1011 5 Each
OPTION CLEAR CONTACTS
FFP
CLEAR UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1012 5 Each
OPTION LOCATE RISER
FFP
LOCATE RISERS IN PROTECTED AREA DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1013 5 Each
OPTION BOND COUPLING
FFP
BOND INSULATION COUPLINGS OF ALL SIZES DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1014 5 Each
OPTION LOCATE PIPE
FFP
LOCATE PIPE IN PROTECTED AREA DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1015 40 Each
OPTION REPLACE DIELECTRIC UNIONS
FFP
REPLACE DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1016 20 Each
OPTION INSTALL DIELECTRIC UNIONS
FFP
INSTALL DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1017 300 Each
OPTION RISER PREVENTATIVE MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON RISERS DURING PERIOD
OF PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
1018 5 Each
OPTION TEST STATIONS
FFP
INSTALL TEST STATIONS DURING PERIOD OF PERFORMANCE 01
AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE WITH ATTACHED
PERFOMANCE WORK STATEMENT.
1019 200 Square
OPTION CONCRETE
SAW CUT & REPLACE CONCRETE REMOVED FOR TESTING PURPOSES
DURING PERIOD OF PERFORMANCE 01 AUGUST 2019 THRU 31 JULY
2020, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
1020 200 Square
OPTION ASPHALT PAVEMENT
SAW CUT & REPLACE ASPHALT PAVEMENT REMOVED FOR TESTING
PURPOSES DURING PERIOD OF PERFORMANCE 01 AUGUST 2019 THRU
31 JULY 2020, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
1021 150 Each
OPTION GAS MAIN
FFP
TEST GAS MAIN & RECORD FINDINGS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
1022 15 Each
OPTION REGULATOR STATIONS MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON REGULATOR STATIONS
DURING PERIOD OF PERFORMANCE 01 AUGUST 2019 THRU 31 JULY
2020, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
1023 1 Each
OPTION PAYMENT & PERFORM BOND
FFP
CONTRACTOR WILL PROVIDE PAYMENT & PERFORMANCE BOND
DURING PERIOD OF PERFORMANCE 01 AUGUST 2019 THRU 31 JULY
2020.
1024 1 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
AS DIRECTED BY THE SECRETARY OF THE ARMY IN ACCORDANCE
WITH THE GUIDANCE PROVIDED HEREIN DURING PERIOD OF
PERFORMANCE 01 AUGUST 2019 THRU 31 JULY 2020
2001 140 Miles
OPTION LEAK SURVEY
FFP
GAS LEAK SURVEY, CATHODIC PROTECTION TESTING, CATHODIC
PROTECTION INSTALLATION, REPAIR AND MAINTENANCE ON THE
GAS DISTRIBUTION SYSTEM AT FORT KNOX, KY DURING THE BASE
PERIOD OF 01 AUGUST 2020 THROUGH 31 JULY 2021.
2002 3,200 Each
OPTION INSPECT RISERS, TEST PIPE, REPAIR
FFP
INSPECT RISERS, TEST PIPE, AND REPAIR IF NEEDED DURING PERIOD
OF PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT..
2003 150 Each
OPTION LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 UNDERGROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
2004 30 Each
OPTION LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 UNDERGROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
2005 10 Each
OPTION LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 ABOVE GROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
2006 5 Each
OPTION LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 ABOVE GROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
2007 40 Each
OPTION 5 POUND ANODE
FFP
PROVIDE AND INSTALL 5 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2008 30 Each
OPTION 9 POUND ANODE
FFP
PROVIDE AND INSTALL 9 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2009 20 Each
OPTION 17 POUND ANODE
FFP
PROVIDE AND INSTALL 17 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2010 5 Each
OPTION LOCATE CONTACTS
FFP
LOCATE UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2011 5 Each
OPTION CLEAR CONTACTS
FFP
CLEAR UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2012 5 Each
OPTION LOCATE RISER
FFP
LOCATE RISERS IN PROTECTED AREA DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2013 5 Each
OPTION BOND COUPLING
FFP
BOND INSULATION COUPLINGS OF ALL SIZES DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2014 5 Each
OPTION LOCATE PIPE
FFP
LOCATE PIPE IN PROTECTED AREA DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2015 40 Each
OPTION REPLACE DIELECTRIC UNIONS
FFP
REPLACE DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2016 20 Each
OPTION INSTALL DIELECTRIC UNIONS
FFP
INSTALL DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2017 300 Each
OPTION RISER PREVENTATIVE MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON RISERS DURING PERIOD
OF PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
2018 5 Each
OPTION TEST STATIONS
FFP
INSTALL TEST STATIONS DURING PERIOD OF PERFORMANCE 01
AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE WITH ATTACHED
PERFOMANCE WORK STATEMENT.
2019 200 Square
SAW CUT & REPLACE CONCRETE REMOVED FOR TESTING PURPOSES
DURING PERIOD OF PERFORMANCE 01 AUGUST 2020 THRU 31 JULY
2021, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
2020 200 Square
SAW CUT & REPLACE ASPHALT PAVEMENT REMOVED FOR TESTING
PURPOSES DURING PERIOD OF PERFORMANCE 01 AUGUST 2020 THRU
31 JULY 2021, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
2021 150 Each
OPTION GAS MAIN
FFP
TEST GAS MAIN & RECORD FINDINGS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
2022 15 Each
OPTION REGULATOR STATIONS MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON REGULATOR STATIONS
DURING PERIOD OF PERFORMANCE 01 AUGUST 2020 THRU 31 JULY
2021, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
2023 1 Each
OPTION PAYMENT & PERFORM BOND
FFP
CONTRACTOR WILL PROVIDE PAYMENT & PERFORMANCE BOND
DURING PERIOD OF PERFORMANCE 01 AUGUST 2020 THRU 31 JULY
2021.
2024 1 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
AS DIRECTED BY THE SECRETARY OF THE ARMY IN ACCORDANCE
WITH THE GUIDANCE PROVIDED HEREIN DURING PERIOD OF
PERFORMANCE 01 AUGUST 2020 THRU 31 JULY 2021
3001 140 Miles
OPTION LEAK SURVEY
FFP
GAS LEAK SURVEY, CATHODIC PROTECTION TESTING, CATHODIC
PROTECTION INSTALLATION, REPAIR AND MAINTENANCE ON THE
GAS DISTRIBUTION SYSTEM AT FORT KNOX, KY DURING THE BASE
PERIOD OF 01 AUGUST 2021 THROUGH 31 JULY 2022.
3002 3,200 Each
OPTION INSPECT RISERS, TEST PIPE, REPAIR
FFP
INSPECT RISERS, TEST PIPE, AND REPAIR IF NEEDED DURING PERIOD
OF PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
3003 150 Each
OPTION LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 UNDERGROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
3004 30 Each
OPTION LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 UNDERGROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
3005 10 Each
OPTION LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 ABOVE GROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
3006 5 Each
OPTION LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 ABOVE GROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
3007 40 Each
OPTION 5 POUND ANODE
FFP
PROVIDE AND INSTALL 5 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3008 30 Each
OPTION 9 POUND ANODE
FFP
PROVIDE AND INSTALL 9 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3009 20 Each
OPTION 17 POUND ANODE
FFP
PROVIDE AND INSTALL 17 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3010 5 Each
OPTION LOCATE CONTACTS
FFP
LOCATE UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3011 5 Each
OPTION CLEAR CONTACTS
FFP
CLEAR UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3012 5 Each
OPTION LOCATE RISER
FFP
LOCATE RISERS IN PROTECTED AREA DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3013 5 Each
OPTION BOND COUPLING
FFP
BOND INSULATION COUPLINGS OF ALL SIZES DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3014 5 Each
OPTION LOCATE PIPE
FFP
LOCATE PIPE IN PROTECTED AREA DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3015 40 Each
OPTION REPLACE DIELECTRIC UNIONS
FFP
REPLACE DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3016 20 Each
OPTION INSTALL DIELECTRIC UNIONS
FFP
INSTALL DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3017 300 Each
OPTION RISER PREVENTATIVE MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON RISERS DURING PERIOD
OF PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
3018 5 Each
OPTION TEST STATIONS
FFP
INSTALL TEST STATIONS DURING PERIOD OF PERFORMANCE 01
AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE WITH ATTACHED
PERFOMANCE WORK STATEMENT.
3019 200 Square
SAW CUT & REPLACE CONCRETE REMOVED FOR TESTING PURPOSES
DURING PERIOD OF PERFORMANCE 01 AUGUST 2021 THRU 31 JULY
2022, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
3020 200 Square
SAW CUT & REPLACE ASPHALT PAVEMENT REMOVED FOR TESTING
PURPOSES DURING PERIOD OF PERFORMANCE 01 AUGUST 2021 THRU
31 JULY 2022, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
3021 150 Each
OPTION GAS MAIN
FFP
TEST GAS MAIN & RECORD FINDINGS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
3022 15 Each
OPTION REGULATOR STATIONS MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON REGULATOR STATIONS
DURING PERIOD OF PERFORMANCE 01 AUGUST 2021 THRU 31 JULY
2022, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
3023 1 Each
OPTION PAYMENT & PERFORM BOND
FFP
CONTRACTOR WILL PROVIDE PAYMENT & PERFORMANCE BOND
DURING PERIOD OF PERFORMANCE 01 AUGUST 2021 THRU 31 JULY
2022.
3024 1 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
AS DIRECTED BY THE SECRETARY OF THE ARMY IN ACCORDANCE
WITH THE GUIDANCE PROVIDED HEREIN DURING PERIOD OF
PERFORMANCE 01 AUGUST 2021 THRU 31 JULY 2022
4001 140 Miles
OPTION LEAK SURVEY
FFP
GAS LEAK SURVEY, CATHODIC PROTECTION TESTING, CATHODIC
PROTECTION INSTALLATION, REPAIR AND MAINTENANCE ON THE
GAS DISTRIBUTION SYSTEM AT FORT KNOX, KY DURING THE BASE
PERIOD OF 01 AUGUST 2022 THROUGH 31 JULY 2023.
4002 3,200 Each
OPTION INSPECT RISERS, TEST PIPE, REPAIR
FFP
INSPECT RISERS, TEST PIPE, AND REPAIR IF NEEDED DURING PERIOD
OF PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT..
4003 150 Each
OPTION LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 UNDERGROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
4004 30 Each
OPTION LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 UNDERGROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
4005 10 Each
OPTION LOCATE AND VERIFY CLASS 2&3 LEAK
FFP
LOCATE AND VERIFY CLASS 2&3 ABOVE GROUND LEAK DURING
PERIOD OF PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
4006 5 Each
OPTION LOCATE AND VERIFY CLASS 1 LEAK
FFP
LOCATE AND VERIFY CLASS 1 ABOVE GROUND LEAK DURING PERIOD
OF PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
4007 40 Each
OPTION 5 POUND ANODE
FFP
PROVIDE AND INSTALL 5 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4008 30 Each
OPTION 9 POUND ANODE
FFP
PROVIDE AND INSTALL 9 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4009 20 Each
OPTION 17 POUND ANODE
FFP
PROVIDE AND INSTALL 17 POUND ANODE DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4010 5 Each
OPTION LOCATE CONTACTS
FFP
LOCATE UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4011 5 Each
OPTION CLEAR CONTACTS
FFP
CLEAR UNDERGROUND CONTACTS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4012 5 Each
OPTION LOCATE RISER
FFP
LOCATE RISERS IN PROTECTED AREA DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4013 5 Each
OPTION BOND COUPLING
FFP
BOND INSULATION COUPLINGS OF ALL SIZES DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4014 5 Each
OPTION LOCATE PIPE
FFP
LOC PIPE UNPROTECTED AREA DURING PERIOD OF PERFORMANCE 01
AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE WITH ATTACHED
PERFOMANCE WORK STATEMENT.
4015 40 Each
OPTION REPLACE DIELECTRIC UNIONS
FFP
REPLACE DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4016 20 Each
OPTION INSTALL DIELECTRIC UNIONS
FFP
INSTALL DIELECTRIC UNIONS UP TO 1-1/2" DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4017 300 Each
OPTION RISER PREVENTATIVE MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON RISERS DURING PERIOD
OF PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN
ACCORDANCE WITH ATTACHED PERFOMANCE WORK STATEMENT.
4018 5 Each
OPTION TEST STATIONS
FFP
INSTALL TEST STATIONS DURING PERIOD OF PERFORMANCE 01
AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE WITH ATTACHED
PERFOMANCE WORK STATEMENT.
4019 200 Square
SAW CUT & REPLACE CONCRETE REMOVED FOR TESTING PURPOSES
DURING PERIOD OF PERFORMANCE 01 AUGUST 2022 THRU 31 JULY
2023, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
4020 200 Square
SAW CUT & REPLACE ASPHALT PAVEMENT REMOVED FOR TESTING
PURPOSES DURING PERIOD OF PERFORMANCE 01 AUGUST 2022 THRU
31 JULY 2023, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
4021 150 Each
OPTION GAS MAIN
FFP
TEST GAS MAIN & RECORD FINDINGS DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023, IN ACCORDANCE
WITH ATTACHED PERFOMANCE WORK STATEMENT.
4022 15 Each
OPTION REGULATOR STATIONS MAINTENANCE
FFP
PERFORM PREVENTATIVE MAINTENANCE ON REGULATOR STATIONS
DURING PERIOD OF PERFORMANCE 01 AUGUST 2022 THRU 31 JULY
2023, IN ACCORDANCE WITH ATTACHED PERFOMANCE WORK
STATEMENT.
4023 1 Each
OPTION PAYMENT & PERFORM BOND
FFP
CONTRACTOR WILL PROVIDE PAYMENT & PERFORMANCE BOND
DURING PERIOD OF PERFORMANCE 01 AUGUST 2022 THRU 31 JULY
2023.
4024 1 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
AS DIRECTED BY THE SECRETARY OF THE ARMY IN ACCORDANCE
WITH THE GUIDANCE PROVIDED HEREIN DURING PERIOD OF
PERFORMANCE 01 AUGUST 2022 THRU 31 JULY 2023
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government
0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 1018 Destination Government Destination Government 1019 Destination Government Destination Government 1020 Destination Government Destination Government 1021 Destination Government Destination Government 1022 Destination Government Destination Government 1023 Destination Government Destination Government 1024 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government
2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 2017 Destination Government Destination Government 2018 Destination Government Destination Government 2019 Destination Government Destination Government 2020 Destination Government Destination Government 2021 Destination Government Destination Government 2022 Destination Government Destination Government 2023 Destination Government Destination Government 2024 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 3011 Destination Government Destination Government 3012 Destination Government Destination Government 3013 Destination Government Destination Government 3014 Destination Government Destination Government 3015 Destination Government Destination Government 3016 Destination Government Destination Government 3017 Destination Government Destination Government 3018 Destination Government Destination Government 3019 Destination Government Destination Government 3020 Destination Government Destination Government 3021 Destination Government Destination Government 3022 Destination Government Destination Government 3023 Destination Government Destination Government 3024 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007 Destination Government Destination Government 4008 Destination Government Destination Government 4009 Destination Government Destination Government 4010 Destination Government Destination Government 4011 Destination Government Destination Government 4012 Destination Government Destination Government 4013 Destination Government Destination Government 4014 Destination Government Destination Government 4015 Destination Government Destination Government 4016 Destination Government Destination Government 4017 Destination Government Destination Government 4018 Destination Government Destination Government 4019 Destination Government Destination Government 4020 Destination Government Destination Government
4021 Destination Government Destination Government 4022 Destination Government Destination Government 4023 Destination Government Destination Government 4024 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-AUG-2018 TO
31-JUL-2019
N/A DIRECTORATE OF PUBLIC WORKS
DIRECTORATE OF PUBLIC WORKS
1110A 125TH 6TH AVENUE
FORT KNOX KY 40121-5719
501-624-7887
W22PES
0002 POP 01-AUG-2018 TO
31-JUL-2019
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0011 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0012 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0013 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0014 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0015 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0016 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0017 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0018 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0019 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0020 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0021 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0022 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0023 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
0024 POP 01-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-AUG-2019 TO
31-JUL-2020
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1011 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1012 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1013 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1014 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1015 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1016 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1017 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1018 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1019 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1020 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1021 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1022 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1023 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
1024 POP 01-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-AUG-2020 TO
31-JUL-2021
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2009 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2010 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2011 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2012 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2013 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2014 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2015 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2016 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2017 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2018 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2019 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2020 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2021 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2022 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2023 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
2024 POP 01-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-AUG-2021 TO
31-JUL-2022
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3004 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3005 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3006 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3007 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3008 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3009 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3010 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3011 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3012 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3013 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3014 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3015 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3016 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3017 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3018 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3019 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3020 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3021 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3022 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3023 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
3024 POP 01-AUG-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-AUG-2022 TO
31-JUL-2023
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4003 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4004 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4005 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4006 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4007 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4008 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4009 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4010 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4011 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4012 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4013 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4014 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4015 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4016 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4017 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4018 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4019 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4020 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4021 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4022 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4023 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
4024 POP 01-AUG-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-16 Preventing Personal Conflicts of Interest DEC 2011 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-2 Security Requirements AUG 1996 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-11 Liquidated Damages--Supplies, Services, or Research and Development
SEP 2000
52.212-1 Instructions to Offerors--Commercial Items JAN 2017 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.222-41 Service Contract Labor Standards MAY 2014 52.222-46 Evaluation Of Compensation For Professional Employees FEB 1993 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-10 Waste Reduction Program MAY 2011 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7005 Oral Attestation of Security Responsibilities NOV 2001 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)
(a) Definitions. As used in this provision--
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in--
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.