W9124D-17-T-0014,_Graphic_Wrap.pdf
PDF 369 KB Posted
- Attached to
- GRAPHIC WRAP SERVICES Federal contract opportunity
- Solicitation number
- W9124D-17-T-0014
About this file
Graphic Wrap Service Solicitation
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9124D-17-T-0014 11-Jan-2017
b. TELEPHONE NUMBER
502.624.6751
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 09 Feb 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9124D9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JOHN P HAARALA
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0010818026
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MISSION AND INSTALLATION CONTRACTING CMD
MICC FORT KNOX
BLDG 1109B STE 373
199 6TH AVE
FORT KNOX KY 40121-5720
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W73RGS 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
US ARMY MISSION SUPPORT BATTALION
U.S. ARMY MISSION SUPPORT BATTALIO
185 9TH CAVALRY REGIMENT AVE
FORT KNOX KY 40121-2725
TEL: FAX:
FAX:
TEL: 502-624-2153 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
541850
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF110
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9124D-17-T-0014
Section SF 30 - BLOCK 14 CONTINUATION PAGE
OFFEROR SHALL COMPLETE THE FOLLOWING INFORMATION:
DUNS NUMBER: ______________________________________________
CAGE CODE _______________________________________________
FED TAX ID#: _________________________________________________
PHONE NO: _________________________________________________
FAX NO: ________________________________________________
E-MAIL ADDRESS: _________________________________________________
PROMPT PAYMENT TERMS:
NOTES:
1. Questions concerning this request for quotes shall be submitted in writing to the contract specialist no later than 1:00 PM on 06 February 2017 in order to allow a written response prior to the due date of 9 February 2017. No remarks or written responses to questions by government personnel shall change or qualify any of the terms or conditions of this request for quotes (RFQ). The RFQ can only be changed by a formal written amendment issued by Mission and Installation Contracting Command (MICC) Center – Fort Knox. Questions concerning this RFQ shall be e-mailed to John Haarala at john.p.haarala.civ@mail.mil.
2. Amendments, if any, will be posted to the FEDBIZOPPS. It is the Contractor’s responsibility to check for and acknowledge amendments.
3. All contractors wishing to do business with the government shall possess a valid DUNS number and shall be registered in the System for Award Management (SAM).
Contractors can register online at https://www.sam.gov. Offeror's SAM registration shall be active in order to be eligible for award. Proposals containing a name and address (Block 17a of SF1449) different from that registered in SAM may be deemed ineligible for award.
4. Quotes shall be e-mailed to john.p.haarala.civ@mail.mil no later 09 February 2017 at 11:00 AM (Fort Knox local time) as specified for receipt (see block 8 on the SF1449, or the latest issued amendment).
5. Offeror shall submit with its quote all information required under this solicitation.
Failure to submit the required documents may render the quote non-responsive and the quote may not be accepted or considered.
6. The government anticipates the award of a Firm Fixed Price, Requirements Type Contract to provide graphic wrap services located at Fort Knox, Kentucky from 10 February 2017, or date of contract award, whichever is later, through to 09 February 2018, with two option years.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 20 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED SEMI - TRACTORS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018.
FOB: Destination
PURCHASE REQUEST NUMBER: 0010818026
NET AMT
0002 20 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED SEMI- TRACTORS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0003 2 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED TRUCK- STRAIGHT WITH BOX (DRASH AND
STEM TRUCKS) IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017
THROUGH 09 FEB 2018
0004 2 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED TRUCK- STRAIGHT WITH BOX (DRASH AND
STEM TRUCKS) IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017
THROUGH 09 FEB 2018
0005 19 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXPANDABLE/ SEMI-TRAILERS IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB
0006 19 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXPANDABLE/SEMI-TRAILERS IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB
0007 3 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED F-350/DODGE 3500 TRUCKS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0008 3 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED F-350/DODGE 3500 TRUCKS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0009 2 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 28 FOOT AAT TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0010 2 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 28 FOOT AAT TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0011 1 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED OCC TRAILERS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0012 1 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED OCC TRAILERS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0013 1 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXTREME TRUCK TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0014 1 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXTREME TRUCK TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0015 1 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED F650 EXTREME TRUCK IN ACCORDANCE WITH
THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0016 1 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED F650 EXTREME TRUCK IN ACCORDANCE WITH
THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0017 1 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED FORD F450 TRUCK IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0018 1 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED FORD F450 TRUCK IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0019 1 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT MOTIV TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0020 1 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT MOTIV TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0021 3 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT AMERICAN HAULER SILVER HAWK
TRAILERS IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017
THROUGH 09 FEB 2018
0022 3 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT AMERICAN HAULER SILVER HAWK
TRAILERS IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017
THROUGH 09 FEB 2018 .
0023 2 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT CARGO TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018.
0024 2 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT CARGO TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0025 2 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED MOBILE FITNESS TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018.
0026 2 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED MOBILE FITNESS TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB 2018
0027 1 Each
MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT MULE SEMI-TRAILER IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB
2018.
0028 1 Each
REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT MULE SEMI-TRAILER IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB
0029 2 Each
CONTRACTOR MANPOWER REPORTING
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED MOBILE FITNESS TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
1001 20 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED SEMI - TRACTORS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1002 20 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED SEMI- TRACTORS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1003 2 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED TRUCK- STRAIGHT WITH BOX (DRASH AND
STEM TRUCKS) IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2018
THROUGH 09 FEB 2019
1004 2 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED TRUCK- STRAIGHT WITH BOX (DRASH AND
STEM TRUCKS) IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2018
THROUGH 09 FEB 2019
1005 19 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXPANDABLE/ SEMI-TRAILERS IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB
1006 19 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXPANDABLE/SEMI-TRAILERS IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB
1007 3 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED F350/DODGE 3500 TRUCKS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1008 3 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED F350/DODGE 3500 TRUCKS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1009 2 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 28 FOOT AAT TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1010 2 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 28 FOOT AAT TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1011 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED OCC TRAILERS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1012 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED OCC TRAILERS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1013 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXTREME TRUCK TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1014 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXTREME TRUCK TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1015 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED F650 EXTREME TRUCK IN ACCORDANCE WITH
THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1016 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED F650 EXTREME TRUCK IN ACCORDANCE WITH
THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1017 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED FORD F450 TRUCK IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1018 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED FORD F450 TRUCK IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1019 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED FORD 32 FOOT MOTIV TRAILER IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB
1020 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED FORD 32 FOOT MOTIV TRAILER IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB
1021 3 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT AMERICAN HAULER SILVER HAWK
TRAILERS
IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB
1022 3 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT AMERICAN HAULER SILVER HAWK
TRAILERS IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2018
THROUGH 09 FEB 2019.
1023 2 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT CARGO TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019.
1024 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT CARGO TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
1025 2 Each
OPTION MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED MOBILE FITNESS TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
1026 2 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED MOBILE FITNESS TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
1027 1 Each
OPTION MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT MULE SEMI-TRAILER IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB
1028 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT MULE SEMI-TRAILER IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB
1029 1 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
CONTRACTOR MANPOWER REPORTING IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2018 THROUGH 09 FEB 2019
2001 20 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED SEMI - TRACTORS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2002 20 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED SEMI- TRACTORS IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2003 2 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED TRUCK- STRAIGHT WITH BOX (DRASH AND
STEM TRUCKS) IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2019
THROUGH 09 FEB 2020
2004 2 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED TRUCK- STRAIGHT WITH BOX (DRASH AND
STEM TRUCKS) IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2019
THROUGH 09 FEB 2020
2005 19 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXPANDABLE/ SEMI-TRAILERS IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB
2006 19 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXPANDABLE/SEMI-TRAILERS IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB
2007 3 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED F350/DODGE 3500 TRUCKS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2008 3 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED F350/DODGE 3500 TRUCKS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2009 2 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 28 FOOT AAT TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2010 2 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 28 FOOT AAT TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2011 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED OCC TRAILER IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2012 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED OCC TRAILER IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2013 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXTREME TRUCK TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2014 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED EXTREME TRUCK TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2015 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED F650 EXTREME TRUCK IN ACCORDANCE WITH
THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2016 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED F650 EXTREME TRUCK IN ACCORDANCE WITH
THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2017 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED FORD F450 TRUCK IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2018 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED FORD F450 TRUCK IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2019 1 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT MOTIV TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2020 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT MOTIV TRAILER IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020
2021 3 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT AMERICAN HAULER SILVER HAWK
TRAILERS IN ACCORDANCE WITH THE PERFORMANCE WORK
STATEMENT INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2019
THROUGH 09 FEB 2020.
2022 3 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 32 FOOT AMERICAN HAULER SILVER HAWK
TRAILERS
IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB
2020.
2023 2 Each
OPTION MFR & INSTALL GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT CARGO TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020.
2024 2 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAP
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT CARGO TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
THE PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020.
2025 2 Each
OPTION MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED MOBILE FITNESS TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
2026 2 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED MOBILE FITNESS TRAILERS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR
2027 1 Each
OPTION MFR & INSTALL GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO MANUFACTURE AND INSTALL GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT MULE SEMI-TRAILER IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB
2028 1 Each
OPTION REMOVAL OF EXISTING GRAPHIC WRAPS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND
EQUIPMENT TO REMOVE PREVIOUSLY APPLIED GRAPHIC WRAPS ON
GOVERNMENT-OWNED 53 FOOT MULE SEMI-TRAILER IN
ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT
INCLUDED HEREIN FOR THE PERIOD OF 10 FEB 2017 THROUGH 09 FEB
2029 1 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
CONTRACTOR MANPOWER REPORTING IN ACCORDANCE WITH THE
PERFORMANCE WORK STATEMENT INCLUDED HEREIN FOR THE
PERIOD OF 10 FEB 2019 THROUGH 09 FEB 2020.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 0025 Destination Government Destination Government 0026 Destination Government Destination Government 0027 Destination Government Destination Government 0028 Destination Government Destination Government
0029 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 1018 Destination Government Destination Government 1019 Destination Government Destination Government 1020 Destination Government Destination Government 1021 Destination Government Destination Government 1022 Destination Government Destination Government 1023 Destination Government Destination Government 1024 Destination Government Destination Government 1025 Destination Government Destination Government 1026 Destination Government Destination Government 1027 Destination Government Destination Government 1028 Destination Government Destination Government 1029 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government 2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 2017 Destination Government Destination Government 2018 Destination Government Destination Government 2019 Destination Government Destination Government 2020 Destination Government Destination Government 2021 Destination Government Destination Government 2022 Destination Government Destination Government 2023 Destination Government Destination Government 2024 Destination Government Destination Government 2025 Destination Government Destination Government
2026 Destination Government Destination Government 2027 Destination Government Destination Government 2028 Destination Government Destination Government 2029 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 10-FEB-2017 TO
09-FEB-2018
N/A US ARMY MISSION SUPPORT
BATTALION
U.S. ARMY MISSION SUPPORT
BATTALIO
185 9TH CAVALRY REGIMENT AVE
FORT KNOX KY 40121-2725
W73RGS
0002 POP 10-FEB-2017 TO
09-FEB-2018
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0011 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0012 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0013 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0014 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0015 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0016 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0017 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0018 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0019 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0020 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0021 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0022 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0023 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0024 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0025 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0026 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0027 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0028 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0029 POP 10-FEB-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 10-FEB-2018 TO
09-FEB-2019
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1011 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1012 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1013 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1014 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1015 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1016 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1017 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1018 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1019 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1020 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1021 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1022 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1023 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1024 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1025 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1026 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1027 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1028 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1029 POP 10-FEB-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 10-FEB-2019 TO
09-FEB-2020
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2009 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2010 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2011 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2012 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2013 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2014 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2015 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2016 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2017 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2018 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2019 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2020 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2021 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2022 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2023 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2024 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2025 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2026 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2027 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2028 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2029 POP 10-FEB-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Items OCT 2016 52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.217-5 Evaluation Of Options JUL 1990 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.222-7007 Representation Regarding Combating Trafficking in Persons JAN 2015 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.204-20 Predecessor of Offeror (JUL 2016)
(a) Definitions. As used in this provision--
Commercial and Government Entity (CAGE) code means--
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;
or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.
Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
(b) The Offeror represents that it [____] is or [____] is not a successor to a predecessor that held a Federal contract or grant within the last three years.
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code: ____ (or mark “Unknown”).
Predecessor legal name: ____.
(Do not use a “doing business as” name).
(End of provision)
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in--
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management database via https://www.acquisition.gov…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .