Amendment 0001 Shall be acknowledged and return with bid package.

View the file

Other files for this federal contract opportunity

Other files attached to Provide networking construction for Network Enterprise Center, Fort, newest first.
File Type Posted
Amendment_0008_NEC_Construction.pdf PDF
Amendment_0007_W9124D15B0011.pdf PDF
Conformed_SF_1442_NEC_Construction_dtd_020316_FBO.pdf PDF
FBO_Questions_ _Answers_W9124D15B0011_NEC_Construction_dtd_020316_FBO.pdf PDF
Amendment_0006_W9124D15B0011.pdf PDF
Amendment_0005_W9124D15B0011.pdf PDF
Amendment_0004_W9124D15B0011.pdf PDF
Amendment_0002_W9124D15B0011.pdf.doc DOC document
Attachment_I_General_Decision_Numbers_-_W9124D15-B-0011.pdf PDF
SF_1442_IFB_W9124D15B0011.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010700852

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Provide Netw ork Construction and Supplies for the Netw orking Enterprise Center (NEC) located at Fort Knox, Kentucky.

The follow ing is added and made apart of the solicitation and any aw ard therefore of:

A. BIDDER INSTRUCTIONS changed to read as follow s: 1. Bidders shall submit any questions regarding this solicitation in w riting to the contracting officer. Questions must be received by the contracting officer no later than FROM: 4:00 p.m.(Eastern Time) on 4 December 2015 TO: 4:00 p.m.(Eastern Time) on 4 January 2016.

B. Bidders shall replace and supply its pricing per Techincal Exhibit 1 Material, Supplies & Equipment List as provided herein.

C. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Dec-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124D-15-B-0011

X 9B. DATED (SEE ITEM 11)

18-Dec-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Dec-2015

CODE

MISSION AND INSTALLATION CONTRACTING CMD

MICC FORT KNOX

BLDG 1109B STE 373

199 6TH AVE

FORT KNOX KY 40121-5720

W9124D 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124D-15-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

TECHNICAL EXHIBIT 1

MATERIAL, SUPPLIES & EQUIPMENT LIST FOR BASE PERIOD

GROUP I BUILDING CONSTRUCTION)

Item Est. Qty U/I U/P TOTAL Backboard, 2" x 2" x .75" 15 EA $_______ $___________ Backboard, 4" x 4" x .75 " 10 EA $_______ $___________ Patch panel - CAT 6 - Black - 12 port (568A/B Compatible), Horizontal, AT66PNL12

10 EA

Patch panel - CAT 6 - Black - 24 port (568A/B Compatible), Horizontal, AT66PNL 24

Patch Panel - CAT 6 - Black - 48 ports (568A/B Compatible), Horizontal, AT66PNL 48

Patch Panel - CAT 6 - Black - 96 ports (568A/B Compatible), Horizontal, AT66PNL 96

Allentell, CAT6-EZ-RJ45 Modular Plug Connector AT66EZ04 100 BG $_______ $___________ 1000ft CAT 6A Plenum CMP ETL Listed Ethernet Cable C6AP-4064WH, 10G, 4-Pair, 23

80 BX

Equipment Rack, 19" x 6' 10 EA $_______ $___________ Allentell, Duplex Faceplate ATT0409 500 EA $_______ $___________ 4-1/8" Long x 2-1/2" Wide x 1-7/8" Deep, Oversized Handy Box 400 EA $_______ $___________ EMT 1/2" includes MNT hardware 7,000 FT $_______ $___________ EMT 3/4" includes MNT hardware 7,000 FT $_______ $___________ EMT 1" includes MNT hardware 7,000 FT $_______ $___________ EMT 2" includes MNT hardware 7,000 FT $_______ $___________ Wiremold, includes MNT hardware 4,000 FT $_______ $___________ Wiremold - V5748 - Electrical Outlet & Switch Boxes Shape: Rectangle Material: Steel

400 EA

12 Port Fiber Patch Panel 12 Coupling 20 EA $_______ $___________ Fiber Patch Panel 24 coupling 20 EA $_______ $___________ Fiber Patch Panel 48 coupling 12 EA $_______ $___________ Fiber Patch Panel 72 coupling 8 EA $_______ $___________ Fiber Patch Panel 144 coupling 8 EA $_______ $___________ LC Coupler, 12 pack 100 EA $_______ $___________ Horizontal Cable Management 100 EA $_______ $___________ 12 "x 12" x 12" Lockable Pull Box 15 EA $_______ $___________ Lockbox Hinge & Hasp Door, 4" x 6" x 3.5" 100 EA $_______ $___________ SM Fiber Termination, includes S/S SM LC Connector type, connector 400 EA $_______ $___________ Siemon 66 Block, 50-Strip Punch Down Block" 50 EA $_______ $___________ Leviton 110 Style Rack Mount Wiring Panel Kit with C5 Clips Punch-down block

50 EA

Wiremold Tele-Power Pole AMDTP-4 Power Strip 20 EA $_______ $___________ Leviton Flush mount wallplate - RJ-11 - Ivory High-impact plastic - 1 port 50 EA $_______ $___________ Leviton QuickPort Modular Furniture Faceplate with ID Window Faceplate - Black - 2 ports

100 EA

CONT. GROUP I BUILDING CONSTRUCTION)

Item Description Est. Qty U/I U/P TOTAL Vertical Cable Manager 300 EA $______ $_________ 12 IN Wide Straight Cable Ladder Runway - 6 FT 500 FT $______ $_________ Wall Mount Equipment Cabinet 20 EA $______ $_________

ISP FIBER OPTIC CABLE P.O.R 7,000 FT $1.00 $7,000.00

NOTE: Dollar amount established as an estimated value and shall be used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile and will be paid at the market rate effective at the time the delivery order is written.

ISP COPPER CABLE 25-300 PR P.O.R. 7,000 FT $1.00 $7,000.00

used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile

TOTAL $14,000.00

CONT. TECHNICAL EXHIBIT 1

MATERIAL, SUPPLIES & EQUIPMENT LIST

FOR BASE PERIOD

GROUP II (GROUND CONSTRUCTION)

Item Description Est. Qty U/I Unit Price Total Price Class 5 Pole by Machine Dig 2 EA $_______ $__________ Anchor & Guy by Machine Dig 10 EA $_______ $__________ Concrete Encased Conduit 2-4 in. Materials Included 500 FT $_______ $__________ Concrete Encased Conduit 4-4 in. Materials Included 500 FT $_______ $__________ Sand Encased Conduit 2-4 in. Materials Included 1,000 FT $_______ $__________ Sand Encased Conduit 4-4 in. Materials Included 500 FT $_______ $__________ Non Encased Conduit Between Existing Manholes 2-4" 500 FT $_______ $__________ Non Encased Conduit Between Existing Manholes 4-4" 500 FT $_______ $__________ F&I Bore/Push, Steel Conduit Galv 1-4” 500 FT $_______ $__________ 16" Steel Casing with 6-4" PVC 50 FT $_______ $__________ Handhole 4' x 4' 5 EA $_______ $__________ Manhole 12' x 6' x 7' 3 EA $_______ $__________ Manhole Cable Hook 7.5" 10 EA $_______ $__________ Manhole Cable Hook 14" 10 EA $_______ $__________ F&I Load Coil w/Case 100 Coils 3 EA $_______ $__________ F&I Load Coil w/ 50 Coils 5 EA $_______ $__________ Vault Splice 25 pair 10 EA $_______ $__________ Vault Closure 6" K&B 5 EA $_______ $__________ Vault Closure 9" K&B 5 EA $_______ $__________ 4 Way 1" Innerduct 1,000 FT $_______ $__________ Innerduct 1" Orange 1,000 FT $_______ $__________ Fiber Optic Splice Tray 20 EA $_______ $__________ Messenger 6.6M Material Only 1,000 FT $_______ $__________ Messenger 16M Material Only 1,000 FT $_______ $__________ Silt Fence 4,000 LF $_______ $__________ F&I Bldg Entrance Terminal 25 Pair Loaded 25 EA $_______ $__________ F&I Bldg Entrance Terminal 50 Pair Loaded 25 EA $_______ $__________ F&I Bldg Entrance Terminal 100 Pair Loaded 25 EA $_______ $__________ Seed and Straw 4,000 LF $_______ $__________ Provide CAD Drawings 50 EA $_______ $__________

F&I EMT 2" 1,000 FT $_______ $__________

F&I Backboard 4' x 4' 10 EA $_______ $__________ F&I Backboard 2' x 2' 10 EA $_______ $__________ 66 Block 50 EA $_______ $__________ Rack Mnt RF45 110 Block 50 EA $_______ $__________ Extended Copper up to 100 Pair 500 FT $_______ $__________ MB 100 Aerial Splice Case 20 EA $_______ $__________ MB200 Aerial Splice Case 10 EA $_______ $__________ Provide Redline Drawings 5 EA $_______ $__________ Total $__________

CONT. GROUP II (GROUND CONSTRUCTION).

Item Description Est. Qty U/I Unit Price Total Price OSP COPPER CABLE PE89 25-300 PR P.O.R. 1 Lot $7,000 $1.00 $7,000.00 NOTE: Dollar amount established as an estimated value and shall be used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile

OSP FIBER OPTIC CABLE P.O.R. 1 Lot $7,000 $1.00 $7,000.00 used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile

Cost for Performance and Payment Bonds for Group I and Group II 1 LS $___________

GROUP III Miscellaneous Material NOTE: Requirement not separately listed per this pricing schedule when required to complete a job. When an individual item exceeds $3000.00, contractor shall provide three quotes or obtain Contracting Officer approval for a waiver. Invoices listing individual items and pricing shall be furnished with the survey.

Dollar amount established (i.e. $20,000) is an estimated value and is included in the proposal computation listed below. The amount shall not be construed as a firm obligation for payment.

JB

$20,000.00

Bidder shall provide its mark-up fee percentage to provide ISP fiber optic cable, ISP copper cable and miscellaneous materials for the base period, Base Period Amount for materials, supplies and equipment. $_______________

Mark-up Fee Percentage _________

Total Amount (Base Year Technical Exhibit #1) times (Mark-up Fee Percent)$____________

The Units of Issue (U/I) utilized in the above pricing schedule are as follows:

EA = Each HR = Hour FT = Foot LS = Lump Sum LT = Lot POR = Price On Request

FOR FIRST OPTION PERIOD

Backboard, 2" x 2" x .75" 15 EA $_______ $___________ Backboard, 4" x 4" x .75 " 10 EA $_______ $___________ Patch panel - CAT 6 - Black - 12 port (568A/B Compatible), Horizontal, AT66PNL12

(568A/B Compatible), Horizontal, AT66PNL 24

(568A/B Compatible), Horizontal, AT66PNL 48

(568A/B Compatible), Horizontal, AT66PNL 96

1000ft CAT 6A Plenum CMP ETL Listed Ethernet Cable C6AP-4064WH, 10G, 4-Pair, 23

Allentell, Duplex Faceplate ATT0409 500 EA $_______ $___________ 4-1/8" Long x 2-1/2" Wide x 1-7/8" Deep, Oversized Handy Box 400 EA $_______ $___________ EMT 1/2" includes MNT hardware 7,000 FT $_______ $___________ EMT 3/4" includes MNT hardware 7,000 FT $_______ $___________ EMT 1" includes MNT hardware 7,000 FT $_______ $___________ EMT 2" includes MNT hardware 7,000 FT $_______ $___________ Wiremold, includes MNT hardware 4,000 FT $_______ $___________ Wiremold - V5748 - Electrical Outlet & Switch Boxes Shape: Rectangle Material: Steel

Fiber Patch Panel 24 coupling 20 EA $_______ $___________ Fiber Patch Panel 48 coupling 12 EA $_______ $___________ Fiber Patch Panel 72 coupling 8 EA $_______ $___________ Fiber Patch Panel 144 coupling 8 EA $_______ $___________ LC Coupler, 12 pack 100 EA $_______ $___________ Horizontal Cable Management 100 EA $_______ $___________ 12 "x 12" x 12" Lockable Pull Box 15 EA $_______ $___________ Lockbox Hinge & Hasp Door, 4" x 6" x 3.5" 100 EA $_______ $___________ SM Fiber Termination, includes S/S SM LC Connector type, connector 400 EA $_______ $___________ Siemon 66 Block, 50-Strip Punch Down Block" 50 EA $_______ $___________ Leviton 110 Style Rack Mount Wiring Panel Kit with C5 Clips Punch-down block

Leviton Flush mount wallplate - RJ-11 - Ivory High-impact plastic - 1 port 50 EA $_______ $___________ Leviton QuickPort Modular Furniture Faceplate with ID Window Faceplate - Black - 2 ports

Vertical Cable Manager 300 EA $______ $_________ 12 IN Wide Straight Cable Ladder Runway - 6 FT 500 FT $______ $_________ used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile

FOR FIRST OPTION PERIOD

GROUP II (GROUND CONSTRUCTION)

Item Description Est. Qty U/I Unit Price Total Price Class 5 Pole by Machine Dig 2 EA $_______ $__________ Anchor & Guy by Machine Dig 10 EA $_______ $__________ Concrete Encased Conduit 2-4 in. Materials Included 500 FT $_______ $__________ Concrete Encased Conduit 4-4 in. Materials Included 500 FT $_______ $__________ Sand Encased Conduit 2-4 in. Materials Included 1,000 FT $_______ $__________ Sand Encased Conduit 4-4 in. Materials Included 500 FT $_______ $__________ Non Encased Conduit Between Existing Manholes 2-4" 500 FT $_______ $__________ Non Encased Conduit Between Existing Manholes 4-4" 500 FT $_______ $__________ F&I Bore/Push, Steel Conduit Galv 1-4” 500 FT $_______ $__________ 16" Steel Casing with 6-4" PVC 50 FT $_______ $__________ Handhold 4' x 4' 5 EA $_______ $__________ Manhole 12' x 6' x 7' 3 EA $_______ $__________ Manhole Cable Hook 7.5" 10 EA $_______ $__________ Manhole Cable Hook 14" 10 EA $_______ $__________ F&I Load Coil w/Case 100 Coils 3 EA $_______ $__________ F&I Load Coil w/ 50 Coils 5 EA $_______ $__________ Vault Splice 25 pair 10 EA $_______ $__________ Vault Closure 6" K&B 5 EA $_______ $__________ Vault Closure 9" K&B 5 EA $_______ $__________ 4 Way 1" Inner duct 1,000 FT $_______ $__________ Inner duct 1" Orange 1,000 FT $_______ $__________ Fiber Optic Splice Tray 20 EA $_______ $__________ Messenger 6.6M Material Only 1,000 FT $_______ $__________ Messenger 16M Material Only 1,000 FT $_______ $__________ Silt Fence 4,000 LF $_______ $__________ F&I Bldg Entrance Terminal 25 Pair Loaded 25 EA $_______ $__________ F&I Bldg Entrance Terminal 50 Pair Loaded 25 EA $_______ $__________ F&I Bldg Entrance Terminal 100 Pair Loaded 25 EA $_______ $__________ Seed and Straw 4,000 LF $_______ $__________ Provide CAD Drawings 50 EA $_______ $__________

F&I EMT 2" 1,000 FT $_______ $__________

F&I Backboard 4' x 4' 10 EA $_______ $__________ F&I Backboard 2' x 2' 10 EA $_______ $__________ 66 Block 50 EA $_______ $__________ Rack Mint RF45 110 Block 50 EA $_______ $__________ Extended Copper up to 100 Pair 500 FT $_______ $__________ MB 100 Aerial Splice Case 20 EA $_______ $__________ MB200 Aerial Splice Case 10 EA $_______ $__________

CONT. GROUP II (GROUND CONSTRUCTION)

OSP COPPER CABLE PE89 25-300 PR P.O.R. 1 Lot $7,000 $1.00 $7,000.00 NOTE: Dollar amount established as an estimated value and shall be used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile

GROUP III Miscellaneous Material NOTE: Requirement not separately listed per this pricing schedule when required to complete a job. When an individual item exceeds $3000.00, contractor shall provide three quotes or obtain Contracting Officer approval for a waiver. Invoices listing individual items and pricing shall be furnished with the survey.

Dollar amount established (i.e.$20,000) is an estimated value and shall be used in proposal computation. The amount shall not be construed as a firm obligation for payment.

1 Lot

$20,000

TOTAL

Bidder shall provide its mark-up fee percentage for requirement to provide ISP fiber optic cable, ISP copper cable and miscellaneous material. for first option period.

First Option Period amount for materials, supplies and equipment. $_______________

Mark-up Fee Percentage _________

Total Amount (First Option Period Technical Exhibit #1) times (Mark-up Fee Percent)$____________

HR = Hour FT = Foot LS = Lump Sum

FOR SECOND OPTION PERIOD

Backboard, 2" x 2" x .75" 15 EA $_______ $___________ Backboard, 4" x 4" x .75 " 10 EA $_______ $___________ Patch panel - CAT 6 - Black - 12 port (568A/B Compatible), Horizontal, AT66PNL12

(568A/B Compatible), Horizontal, AT66PNL 24

(568A/B Compatible), Horizontal, AT66PNL 48

(568A/B Compatible), Horizontal, AT66PNL 96

1000ft CAT 6A Plenum CMP ETL Listed Ethernet Cable C6AP-4064WH, 10G, 4-Pair, 23

Allentell, Duplex Faceplate ATT0409 500 EA $_______ $___________ 4-1/8" Long x 2-1/2" Wide x 1-7/8" Deep, Oversized Handy Box 400 EA $_______ $___________ EMT 1/2" includes MNT hardware 7,000 FT $_______ $___________ EMT 3/4" includes MNT hardware 7,000 FT $_______ $___________ EMT 1" includes MNT hardware 7,000 FT $_______ $___________ EMT 2" includes MNT hardware 7,000 FT $_______ $___________ Wiremold, includes MNT hardware 4,000 FT $_______ $___________ Wiremold - V5748 - Electrical Outlet & Switch Boxes Shape: Rectangle Material: Steel

Fiber Patch Panel 24 coupling 20 EA $_______ $___________ Fiber Patch Panel 48 coupling 12 EA $_______ $___________ Fiber Patch Panel 72 coupling 8 EA $_______ $___________ Fiber Patch Panel 144 coupling 8 EA $_______ $___________ LC Coupler, 12 pack 100 EA $_______ $___________ Horizontal Cable Management 100 EA $_______ $___________ 12 "x 12" x 12" Lockable Pull Box 15 EA $_______ $___________ Lockbox Hinge & Hasp Door, 4" x 6" x 3.5" 100 EA $_______ $___________ SM Fiber Termination, includes S/S SM LC Connector type, connector 400 EA $_______ $___________ Siemon 66 Block, 50-Strip Punch Down Block" 50 EA $_______ $___________ Leviton 110 Style Rack Mount Wiring Panel Kit with C5 Clips Punch-down block

Leviton Flush mount wallplate - RJ-11 - Ivory High-impact plastic - 1 port 50 EA $_______ $___________ Leviton QuickPort Modular Furniture Faceplate with ID Window Faceplate - Black - 2 ports

Vertical Cable Manager 300 EA $______ $_________ 12 IN Wide Straight Cable Ladder Runway - 6 FT 500 FT $______ $_________ used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile

FOR SECOND OPTION PERIOD

GROUP II (GROUND CONSTRUCTION)

Class 5 Pole by Machine Dig 2 EA $_______ $__________ Anchor & Guy by Machine Dig 10 EA $_______ $__________ Concrete Encased Conduit 2-4 in. Materials Included 500 FT $_______ $__________ Concrete Encased Conduit 4-4 in. Materials Included 500 FT $_______ $__________ Sand Encased Conduit 2-4 in. Materials Included 1,000 FT $_______ $__________ Sand Encased Conduit 4-4 in. Materials Included 500 FT $_______ $__________ Non Encased Conduit Between Existing Manholes 2-4" 500 FT $_______ $__________ Non Encased Conduit Between Existing Manholes 4-4" 500 FT $_______ $__________ F&I Bore/Push, Steel Conduit Galv 1-4” 500 FT $_______ $__________ 16" Steel Casing with 6-4" PVC 50 FT $_______ $__________ Handhole 4' x 4' 5 EA $_______ $__________ Manhole 12' x 6' x 7' 3 EA $_______ $__________ Manhole Cable Hook 7.5" 10 EA $_______ $__________ Manhole Cable Hook 14" 10 EA $_______ $__________ F&I Load Coil w/Case 100 Coils 3 EA $_______ $__________ F&I Load Coil w/ 50 Coils 5 EA $_______ $__________ Vault Splice 25 pair 10 EA $_______ $__________ Vault Closure 6" K&B 5 EA $_______ $__________ Vault Closure 9" K&B 5 EA $_______ $__________ 4 Way 1" Innerduct 1,000 FT $_______ $__________ Innerduct 1" Orange 1,000 FT $_______ $__________ Fiber Optic Splice Tray 20 EA $_______ $__________ Messenger 6.6M Material Only 1,000 FT $_______ $__________ Messenger 16M Material Only 1,000 FT $_______ $__________ Silt Fence 4,000 LF $_______ $__________ F&I Bldg Entrance Terminal 25 Pair Loaded 25 EA $_______ $__________ F&I Bldg Entrance Terminal 50 Pair Loaded 25 EA $_______ $__________ F&I Bldg Entrance Terminal 100 Pair Loaded 25 EA $_______ $__________ Seed and Straw 4,000 LF $_______ $__________ Provide CAD Drawings 50 EA $_______ $__________

F&I EMT 2" 1,000 FT $_______ $__________

F&I Backboard 4' x 4' 10 EA $_______ $__________ F&I Backboard 2' x 2' 10 EA $_______ $__________ 66 Block 50 EA $_______ $__________ Rack Mnt RF45 110 Block 50 EA $_______ $__________ Extended Copper up to 100 Pair 500 FT $_______ $__________ MB 100 Aerial Splice Case 20 EA $_______ $__________ MB200 Aerial Splice Case 10 EA $_______ $__________

CONT. GROUP II (GROUND CONSTRUCTION)

OSP COPPER CABLE PE89 25-300 PR P.O.R. 1 Lot $7,000 $1.00 $7,000.00 NOTE: Dollar amount established as an estimated value and shall be used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile used in proposal computation. The amount shall not be construed as a firm obligation for payment. Material contained in this item is volatile

GROUP III Miscellaneous Material NOTE: Requirement not separately listed per this pricing schedule when required to complete a job. When an individual item exceeds $3000.00, contractor shall provide three quotes or obtain Contracting Officer approval for a waiver. Invoices listing individual items and pricing shall be furnished with the survey.

Dollar amount established (i.e.$20,000) is an estimated value and shall be used in proposal computation. The amount shall not be construed as a firm obligation for payment.

1 Lot

$20,000

TOTAL

Bidder shall provide its mark-up fee percentage for requirement to provide ISP fiber optic cable, ISP copper cable and miscellaneous material. for second option period.

Second Option Period Amount for materials, supplies and equipment. $_______________

Mark-Up Fee Percentage _________

Total Amount (Second Option Period Technical Exhibit #1) times (Mark-up Fee Percent)$____________

HR = Hour FT = Foot LS = Lump Sum

TOTALS FOR MATERIAL, SUPPLIES & EQUIPMENT LIST

BASE PERIOD ESTIMATED TOTAL AMOUNT FOR GROUPS I, II, III AND MARK-UP IS

FIRST OPTION ESTIMATED TOTAL AMOUNT FOR GROUP I, II, III AND MARK-UP IS

SECOND OPTION ESTIMATED TOTAL AMOUNT FOR GROUP I, II, III AND MARK-UP IS

File details come from the government source that posted it. Updated .