W9124C22R0013 Test Sprinkler PWS with Attachments(1).docx
DOCX document 358 KB Posted
- Attached to
- Fire Sprinkler Alarm Maintenance and Service
- Solicitation number
- W9124C-22-R-0013
About this file
This performance work statement outlines fire sprinkler and alarm system maintenance, inspection, and testing service requirements for multiple buildings at Fort Jackson in South Carolina. The contractor will be responsible for providing both scheduled and emergency response services, complying with all applicable codes and regulations, and utilizing specified checklists. Response times of within five business days for routine service calls, within four hours for urgent repairs, and within one hour for emergencies are required. The contractor must also attend safety and coordination meetings, submit documentation and complete testing/inspection tasks by defined deadlines while complying with all installation security and safety policies. The proposed acquisition is for a small business set-aside firm-fixed-price contract with one base year and four one-year option periods.
The related federal contract opportunity posting provides details on an upcoming solicitation for the requirements outlined in the performance work statement. The government intends to issue a request for proposal as a 100% small business set-aside with a NAICS code of 561621 and size standard of $20 million. The period of performance will include one base year and four one-year options. The solicitation is targeted to publish on January 8, 2022 and will be posted on SAM.gov. Interested parties should monitor for the issuance and respond accordingly.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9124C22R0013 Sprinkler Fire Panel PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment "A" Building List
| Installation |
| Asset No. |
| Asset |
| Street |
| City |
| zip |
| Sprinkler |
| Fire Alarm |
| 1 |
| Fort Jackson |
| 4575 |
| McWethy Troop Medical Clinic |
| Stuart Street |
| Fort Jackson |
| 29207 |
| Yes |
| Simplex 4100U |
| 2 |
| Fort Jackson |
| 1890 |
| Physical Examination Station |
| Washington Road |
| Fort Jackson |
| 29207 |
| Yes |
| Simplex 4002 |
| 3 |
| Fort Jackson |
| 4590 |
| Caldwell Dental Clinic |
| Strom Thurmond Blvd |
| Fort Jackson |
| 29207 |
| Yes |
| Simplex 4010 |
| 4 |
| Fort Jackson |
| 4323 |
| Oliver Dental Clinic |
| Hill Street |
| Fort Jackson |
| 29207 |
| Yes |
| Simplex 4100U |
| 5 |
| Fort Jackson |
| 5330 |
| Hagen Dental Clinic |
| Moseby Street |
| Fort Jackson |
| 29207 |
| Yes |
| Simplex 4020 |
| 6 |
| Fort Jackson |
| D2445 |
| Vet Facility |
| Knight Road |
| Fort Jackson |
| 29207 |
| Yes |
| EST-3 |
| 7 |
| Fort Jackson |
| 4500 |
| Moncrief Army Community Hospital |
| Stuart Street |
| Fort Jackson |
| 29207 |
| Yes |
| EST-3 |
| 8 |
| Fort Jackson |
| 4503 |
| Boiler Plant |
| Stuart Street |
| Fort Jackson |
| 29207 |
| No |
| EST-3 |
| 9 |
| Fort Jackson |
| 4504 |
| Chiller Plant |
| Stuart Street |
| Fort Jackson |
| 29207 |
| No |
| EST-3 |
| 10 |
| Fort Jackson |
| 2498 |
| Vet Admin |
| Knight Road |
| Fort Jackson |
| 29207 |
| No |
| EST-3 |
DPW maintains all Monacos
Contract covers Sprinkler and Fire Alarm in all Bldgs except the Fire Alarm in Bldg. 4500
Outbuildings Device Testing List
This contract includes, but is not limited to, the following devices.
| Type |
| Total Sprinkler Flow/Tamper |
| Total Fire Alarm |
| Building |
Duct Smoke Detector
| 2 |
| 4590 |
Heat Detector
| 6 |
| 4590 |
Photo Smoke Detector
| 35 |
| 4590 |
Pull Station-Single Action
| 6 |
| 4590 |
Alarm Indicating device
| 30 |
| 4590 |
Fire Alarm Panel
| 1 |
| 4590 |
| Control Valve (PIV) |
| 1 |
| Backflow (OS&Y) |
| 2 |
| City Connection |
| 1 |
| Inspectors test |
| 3 |
| Alarm received flow test |
| 1 |
| Type |
| Total Sprinkler Flow/Tamper |
| Total Fire Alarm |
| Building |
Duct Smoke Detector
| 2 |
| 4323 |
Heat Detector
| 4 |
| 4323 |
Photo Smoke Detector
| 1 |
| 4323 |
Pull Station-Single Action
| 5 |
| 4323 |
Alarm Indicating device
| 14 |
| 4323 |
Fire Alarm Panel
| 1 |
| 4323 |
| Control Valve (PIV) |
| 1 |
| Backflow (OS&Y) |
| 2 |
| City Connection |
| 1 |
| Inspectors test |
| 3 |
| Alarm received flow test |
| 1 |
| Type |
| Total Sprinkler Flow/Tamper |
| Total Fire Alarm |
| Building |
Duct Smoke Detector
| 13 |
| 4575 |
Heat Detector
| 2 |
| 4575 |
Photo Smoke Detector
| 13 |
| 4575 |
Pull Station-Single Action
| 6 |
| 4575 |
Alarm Indicating device
| 1 |
| 4575 |
Fire Alarm Panel
| 1 |
| 4575 |
| Control Valve (PIV) |
| 1 |
| Backflow (OS&Y) |
| 2 |
| City Connection |
| 1 |
| Butterfly |
| 1 |
| Inspectors test |
| 1 |
| Alarm received flow test |
| 4 |
| Type |
| Total Sprinkler Flow/Tamper |
| Total Fire Alarm |
| Building |
Duct Smoke Detector
| 1 |
| 1890 |
Heat Detector
| 3 |
| 1890 |
Photo Smoke Detector
| 1 |
| 1890 |
Pull Station-Single Action
| 12 |
| 1890 |
Alarm Indicating device
| 14 |
| 1890 |
Fire Alarm Panel
| 1 |
| 1890 |
| Control Valve (PIV) |
| 1 |
Outbuildings Device Testing List
This contract includes, but is not limited to, the following devices.
| Backflow (OS&Y) |
| 2 |
| Control Valve (Butterfly) |
| 0 |
| City Connection |
| 1 |
| Inspectors test |
| 1 |
| Alarm received flow test |
| 1 |
| Supervised Tamper Signals |
| 3 |
| Type |
| Total Sprinkler Flow/Tamper |
| Total Fire Alarm |
| Building |
Duct Smoke Detector
| 1 |
| 2445 |
Heat Detector
| 3 |
| 2445 |
Photo Smoke Detector
| 1 |
| 2445 |
Pull Station-Single Action
| 4 |
| 2445 |
Alarm Indicating device
| 14 |
| 2445 |
Fire Alarm Panel
| 1 |
| 2445 |
| Control Valve (PIV) |
| 1 |
| Backflow (OS&Y) |
| 2 |
| Control Valve (Butterfly) |
| 1 |
| City Connection |
| 1 |
| Inspectors test |
| 1 |
| Alarm received flow test |
| 1 |
| Supervised Tamper Signals |
| 4 |
| Type |
| Total Sprinkler Flow/Tamper |
| Total Fire Alarm |
| Building |
Duct Smoke Detector
| 1 |
| 5330 |
Heat Detector
| 0 |
| 5330 |
Photo Smoke Detector
| 4 |
| 5330 |
Pull Station-Single Action
| 3 |
| 5330 |
Alarm Indicating device
| 80 |
| 5330 |
| Fire Control Panel (LOC,MNS,FACP,FAAP) |
| 4 |
| 5330 |
| Control Valve (PIV) |
| 1 |
| Backflow (OS&Y) |
| 2 |
| Control Valve (Butterfly) |
| 1 |
| City Connection |
| 1 |
| Inspectors test |
| 1 |
| Alarm received flow test |
| 1 |
| Supervised Tamper Signals |
| 4 |
| Type |
| Total Sprinkler Flow/Tamper |
| Total Fire Alarm |
| Building |
Duct Smoke Detector
| 0 |
| 4503 |
Heat Detector
| 1 |
| 4503 |
Photo Smoke Detector
| 1 |
| 4503 |
Pull Station-Single Action
| 2 |
| 4503 |
Alarm Indicating device
| 5 |
| 4503 |
Fire Alarm Panel
| 1 |
| 4503 |
| Type |
| Total Sprinkler Flow/Tamper |
| Total Fire Alarm |
| Building |
Duct Smoke Detector
| 1 |
| 4504 |
Heat Detector
| 2 |
| 4504 |
Outbuildings Device Testing List
This contract includes, but is not limited to, the following devices.
Photo Smoke Detector
| 2 |
| 4504 |
Pull Station-Single Action
| 2 |
| 4504 |
Alarm Indicating device
| 5 |
| 4504 |
Fire Alarm Panel
| 1 |
| 4504 |
| Type |
| Total Sprinkler Flow/Tamper |
| Total Fire Alarm |
| Building |
Duct Smoke Detector
| 1 |
| 2498 |
Heat Detector
| 1 |
| 2498 |
Photo Smoke Detector
| 8 |
| 2498 |
Pull Station-Single Action
| 2 |
| 2498 |
Alarm Indicating device
| 10 |
| 2498 |
Fire Alarm Panel
| 1 |
| 2498 |
Attachment "C" Fire Pump Test Sheet
100Hose Suction
PSI
Discharge
PSI
Pitot
PSI
GPM
Total GPM
RPM
NET PSI
Churn 32,32 504,504 22,28,24 430,433,472
Sprinkler Demand
| 1000 | 1770 | 65 | Combined Curve |
| 1500 | 1770 | 43 | System/Presure/Flow Factory/Presure/FlowMACH Fire Pump 15 Jul 2011 |
e P S I
Flow GPM Sprinkler Demand Log. (System/Presure/Flow) Combined Curve Log. (System/Presure/Flow) Factory/Presure/Flow Poly. (System/Presure/Flow) System/Presure/Flow
| P |
| 130 |
r
| e |
| 120 |
s u
| r |
| 100 |
Attachment "D" Quarterly Flow and Tamper Work Sheet for Building 4500 Main drain Valve PSI
| Device # | Device Description | Checked Confirm Shut Open |
| 1 | ||
| 06 05 0135 | ||
| Waterflow Penthouse Level Center |
| 2 |
| 06 05 0136 |
| Valve Tamper Center Penthouse |
| 3 |
| 06 05 0137 |
| Waterflow Penthouse Level West |
| 4 | |
| 06 05 0138 | |
| Valve Tamper West | Penthouse |
| 5 |
| 06 04 0154 |
| Valve Tamper 12th FlrEast Stair #4 |
| 6 |
| 06 04 0131 |
| Valve Tamper 12th FlrEast Stair #4 |
| 7 |
| 06 04 0130 |
| Waterflow 12th Floor East Stair #4 |
| 8 |
| 06 02 0132 |
| Waterflow 11th Floor East Stair #4 |
| 9 |
| 06 02 0133 |
| Valve Tamper 11th FlrEast Stair #4 |
| 10 |
| 05 04 0131 |
| Waterflow 10th Floor East Stair #4 |
| 11 |
| 05 04 0132 |
| Valve Tamper 10th FlrEast Stair #4 |
| 12 |
| 05 02 0132 |
| Waterflow 9th Floor East Stair #4 |
| 13 |
| 05 02 0133 |
| Valve Tamper 9th Flr East Stair #4 |
| 14 |
| 04 05 0132 |
| Waterflow 8th Floor East Stair #4 |
| 15 |
| 04 05 0133 |
| Valve Tamper 8th Flr East Stair #4 |
| 16 |
| 04 04 0132 |
| Waterflow 7th Floor East Stair #4 |
| 17 |
| 04 04 0133 |
| Valve Tamper 7th Flr East Stair #4 |
| 18 |
| 04 02 0133 |
| Waterflow 6th Floor East Stair #4 |
| 19 |
| 04 02 0134 |
| Valve Tamper 6th Flr East Stair #4 |
| 20 |
| 03 04 0128 |
| Waterflow 5th Floor East Stair #4 |
| 21 |
| 03 04 0129 |
| Valve Tamper 5th Flr East Stair #4 |
| 22 |
| 03 02 0136 |
| Waterflow 4th Floor East Stair #4 |
| 23 |
| 03 02 0137 |
| Valve Tamper 4th Flr East Stair #4 |
| 24 |
| 02 05 0158 |
| Waterflow 3rd Tower Stair #4 |
| 25 |
| 02 05 0159 |
| Valve Tamper 3rd Flr Tower Stair #4 |
| 26 |
| 02 03 0136 |
| Waterflow Grnd TowerStair #4 |
| 27 |
| 02 03 0137 |
| Valve Tamper Grnd TwrStair #4 |
| 28 |
| 01 04 0140 |
| Waterflow 2 Basement Sterile Room |
| 29 |
| 06 04 0132 |
| Waterflow 12th Floor West Stair #3 |
| 30 |
| 06 04 0133 |
| Valve Tamper 12th FlrWest Stair #3 |
| 31 |
| 06 02 0134 |
| Waterflow 11th Floor West Stair #3 |
| 32 |
| 06 02 0135 |
| Valve Tamper 11th FlrWest Stair #3 |
| 33 |
| 05 04 0133 |
| Waterflow 10th Floor West Stair #3 |
| 34 |
| 05 04 0134 |
| Valve Tamper 10th FlrWest Stair #3 |
| 35 |
| 05 02 0134 |
| Waterflow 9th Floor West Stair #3 |
| 36 |
| 05 02 0135 |
| Valve Tamper 9th Flr West Stair #3 |
| 37 |
| 04 05 0134 |
| Waterflow 8th Floor West Stair #3 |
Quarterly Flow and Tamper Work Sheet for Building 4500 Main drain Valve PSI
| Device # | Device Description | Checked Confirm Shut Open |
| 38 | ||
| 04 05 0135 | ||
| Valve Tamper 8th Flr West Stair #3 |
| 39 |
| 04 04 0134 |
| Waterflow 7th Floor West Stair #3 |
| 40 |
| 04 04 0135 |
| Valve Tamper 7th Flr West Stair #3 |
| 41 |
| 04 02 0135 |
| Waterflow 6th Floor West Stair #3 |
| 42 |
| 04 02 0136 |
| Valve Tamper 6th Flr West Stair #3 |
| 43 |
| 03 04 0133 |
| Waterflow 5th Floor West Stair #3 |
| 44 |
| 03 04 0134 |
| Valve Tamper 5th Flr West Stair #3 |
| 45 |
| 03 02 0138 |
| Waterflow 4th Floor West Stair #3 |
| 46 |
| 03 02 0139 |
| Valve Tamper 4th Flr West Stair #3 |
| 47 |
| 02 05 0160 |
| Waterflow 3rd Tower Stair #3 |
| 48 |
| 02 05 0161 |
| Valve Tamper 3rd Flr Tower Stair #3 |
| 49 |
| 02 03 0134 |
| Waterflow Grnd Tower Stair #3 |
| 50 |
| 02 03 0135 |
| Valve Tamper Grnd TwrStair #3 |
| 51 |
| 01 04 0142 |
| Waterflow 1 Basement Stair #3 |
| 52 |
| 01 04 0143 |
| Valve Tamp 1 BasementStair #3 |
| 53 |
| 01 04 0144 |
| Waterflow 2 Basement Stair #3 |
| 54 |
| 01 04 0145 |
| Valve Tamp 2 BasementStair #3 |
| 55 |
| 01 02 0139 |
| Waterflow Basement Soiled Linen 1-70 |
| 56 |
| 01 02 0140 |
| Valve Tamper BasementSoiled Linen 1-70 |
| 57 | |
| 01 02 0141 | |
| Low Air Basement | Soiled Linen 1-70 |
| 58 |
| 01 02 0142 |
| Waterflow Basement Med Storage 1-93 |
| 59 |
| 01 02 0143 |
| Valve Tamper BasementMed Storage 1-93 |
| 60 |
| 01 04 0135 |
| Valve Tamper BasementPump Room 1-114 |
| 61 |
| 01 04 0148 |
| Valve Tamp 1 BasementPump Room 1-114 |
| 62 |
| 01 04 0149 |
| Valve Tamp 2 BasementPump Room 1-114 |
| 63 |
| 01 04 0150 |
| Valve Tamper BasementPump Room 1-114 PC3 |
| 64 |
| 01 04 0151 |
| Valve Tamper BasementPump Room PC4 |
| 65 |
| 01 04 0132 |
| Valve Tamper BasementCompressor Room 1-110 |
| 66 |
| 01 04 0138 |
| Waterflow 1 Basement Sterile Room |
| 67 |
| 01 04 0139 |
| Valve Tamp 1 BasementSterile Room |
| 68 |
| 01 04 0141 |
| Valve Tamp 2 BasementSterile Room |
| 69 |
| 02 04 0132 |
| Waterflow 3rd Clinic Stair #2 |
| 70 |
| 02 04 0133 |
| Valve Tamper 3rd Flr Clinic North Stair #2 |
| 71 |
| 02 02 0165 |
| Waterflow Grnd Floor Clinic North Stair #2 |
| 72 |
| 02 02 0166 |
| Valve Tamper Grnd FlrClinic North Stair #2 |
| 73 |
| 01 02 0133 |
| Waterflow Basement North Stair #2 |
| 74 |
| 01 02 0134 |
| Valve Tamper BasementNorth Stair #2 |
Quarterly Flow and Tamper Work Sheet for Building 4500 Main drain Valve PSI
| Device # | Device Description | Checked Confirm Shut Open |
| 75 | ||
| 01 02 0135 | ||
| Waterflow Basement NucMed 1-9 East |
| 76 |
| 01 02 0136 |
| Valve Tamper BasementNucMed 1-9 East |
| 77 |
| 01 02 0137 |
| Waterflow Basement Center Stair #6 |
| 78 |
| 01 02 0138 |
| Valve Tamper BasementCenter Stair #6 |
| 79 |
| 02 02 0167 |
| Waterflow Grnd Floor Clinic South Stair #1 |
| 80 |
| 02 02 0168 |
| Valve Tamper Grnd FlrSouth Stair #1 |
| 81 | |
| 02 02 0169 | |
| Waterflow 3rd Flr | Clinic South Stair #1 |
| 82 |
| 02 04 0177 |
| Valve Tamper 3rd Flr Clinic South Stair #2 |
| 83 |
| 02 02 0170 |
| Valve Tamper 3rd Flr Clinic South Stair #1 |
| 84 |
| 01 02 0145 |
| Backflow #1 3rd FloorSouth Side |
| 85 |
| 01 02 0146 |
| Backflow #2 3rd FloorSouth side |
| 86 | |
| 01 02 0147 | |
| PIV 3rd Floor | South Side |
| 87 | |
| 01 04 0166 | |
| PIV Ground Floor | North Side Parking |
| 88 |
| 01 04 0167 |
| Backflow 1 Grnd FloorNorth Side Parking |
| 89 |
| 01 04 0168 |
| Backflow 2 Grnd FloorNorth Side Parking |
| 90 |
| 03 02 0140 |
| Waterflow 4th Floor Kitchen Stair #5 |
| 91 |
| 03 02 0141 |
| Valve Tamper 4th Flr Kitchen Stair #5 |
| 92 |
| 02 05 0154 |
| Waterflow 3rd J-Sect Stair #5 |
| 93 |
| 02 05 0155 |
| Valve Tamper 3rd Flr J-SectStair #5 |
| 94 |
| 02 05 0151 |
| Waterflow 3rd J-Sect Riser Room |
| 95 |
| 02 05 0152 |
| Valve Tamp 3rd J-SectRiser Room |
| 96 |
| 02 05 0153 |
| Low Air 3rd J-Sect Riser Room |
| 97 |
| 02 05 0156 |
| Waterflow 3rd J-Sect Conference Room 3-259 |
| 98 |
| 02 05 0157 |
| Valve Tamp 3rd J-SectConference Room 3-259 |
| 99 |
| 02 04 0134 |
| Waterflow Clinic RoofMechanical Room |
| 100 |
| 02 04 0135 |
| Valve Tamper Clinic Roof Mechanical Room |
| 101 |
| 03 04 0130 |
| Waterflow 5th FloorPArts Area 5-8A |
| 102 |
| 03 04 0131 |
| Valve Tamper 5th Flr Parts Area 5-8A |
| 103 | |
| 03 04 0132 | |
| Low Air 5th Floor | Parts Area 5-8A |
| 104 |
| 03 04 0135 |
| Waterflow 5th Floor West Storage 5-1A |
| 105 |
| 03 04 0136 |
| Valve Tamper 5th Flr West Storage 5-1A |
| 106 | |
| 03 04 0137 | |
| Low Air 5th Floor | West Storage 5-1A |
Waterflow Monaco XMTR Relay
Valve Tamper Monaco XMTR Relay
| 109 | |
| 01 04 0146 | |
| Pump Run Basement | Pump Room 1-114 |
| 110 |
| 01 04 0147 |
| Pump Trouble BasementPump Room 1-114 |
Fire pump main drain test. Return to original (nonflowing) pressure less than two sec.
Quarterly Flow and Tamper Work Sheet for Building 4500 Main drain Valve PSI Device # Device Description Checked Confirm Shut Open Deficiency Notes
*** (77) 01 02 0137 Gage psi same as (99) 02 04 0134 & (75) 01 02 0135 Gage psi same as (73) 01 02 0133 &
(58) 01 02 0142 Gage same as (79) 02 02 167 & (28) 01 04 0140 Gage same as (66) 01 04 0138 T indicates tested and I indicates inspected - Light red 1st and 3rd Quarter light blue 2nd and 4th quarter
Attachment “E”
The last standpipe test was done April 2016. A copy of the prior testing results below.
Attachment “F” Testing Protocols
1. Arrive at the building to do the work.
2. Make personal contact with NCOIC and have them announce over public address system that you will be testing the fire alarm system and will announce when the testing is complete.
6. Ask the NCOIC to use his / her phone to call fire department.
7. Call Fort Jackson Fire Department (FJFD) dispatcher at 751-4142 and tell him / her what you are doing, and you will call when testing is complete. Ask dispatcher to monitor alarm signals received from building.
8. Perform fire alarm and sprinkler testing.
9. Notify NCOIC that testing is complete. Have him / her make announcement.
10. Call FJFD dispatcher and inform them that test is complete. Verify that they received signals through the Monaco transmitter. Record this on your report.
11. Leave a copy of pm documentation at fire alarm panel, and send me a copy for our file.
12. If repairs are required, call us during testing if it’s something minor that can be done during the same visit. If it is something major, you may contact me later so we can discuss repairs and cost.
Phone numbers (all are 803-751-XXXX) FJFD Dispatcher 4142 / 7217 Bldg. 1890 PES NCIOC
SFC Brisco 6251 Front Desk
2021 / 3105
Bldg. 4323 Oliver DC NCIOC
SGT Salley 4226 Front Desk
6418 / 6679
Bldg. 4575 TMC NCIOC
SSG Dinkins 6383
Front Desk
6789 / 4733 / 7444
Bldg. 4590 Caldwell DC NCOIC
SSG McCall 5278
Front Desk
5178 / 5529 / 6017
Bldg. 5330 Hagen DC
NCIOC SGT Blash 7380 Front Desk 6211 / 3255 / 4091 Bldg. 4555 Sick Quarters Bldg. 2500 Warehouse Bldg. 2445 Vet Clinic
Attachment "G" Safety Requirments for an Impaired System
Fire & Life Safety System Impairment Permit/Tag (Please attach tag to Fire Department Connection or Fire Alarm Annunciator/Control Panel)
Building Name: Type of system impaired: Reason for impairment: Extent of impairment: Date system shutoff: Expected date of restoration: Impairment authorized by:
Schedule B Impairment Worksheet
Core Information Today’s date:
Bldg:
Type of system impaired:
Extent of impairment:
Reason for impairment:
Date impairment to begin: Estimated completion date:
Person(s) conducting work:
Person responsible for mounting impairment tag:
Firewatch required? If yes, number of persons:
Reminders Area inspected and risks determined?
Prohibitions involved?
Building evacuated? Impairment tag issued?
Notifications Has facilities mechanic been notified of the impairment? campus police
Has monitoring company, if any, been notified of the impairment?
Has the maintenance supervisor for the affected building been notified of the impairment?
Restoration Has the affected system been inspected and tested operational?
Has the impairment tag been removed?
Has the campus police been notified of the restoration, if a fire alarm system?
Has the fire alarm monitoring company(if any) been notified of the restoration?
Has the maintenance supervisor for the affected building been notified of the restoration?
Schedule C
Firewatch Log Sheet
Date Name(s) Time Area Checked
Please return this form to Fire Protection Manager at Facilities Management.
TECHNICAL EXHIBIT 2 DELIVERABLES SCHEDULE
| Deliverable |
| Frequency |
| # of Copies |
| Medium/Format |
| Submit To |
IAW PWS 1.6.11
Key Personnel; The Contractor shall provide at least two points of contact within the company to interface with the COR on issues concerning sprinkler maintenance, inspection, and testing service.
Names, business address, phone numbers and hours of operation are the minimum information requirement. The Contractor shall also provide an afterhours name and telephone for emergency contact. Contractor shall provide a point of contact information for 24 hours a day/ 7 days a week emergency service.
| Once, before the 1st day of work performance and additionally within 3 days of changes to key personnel or staffing arrangements that may affect the accuracy of the initial document. |
| One (1) hard copy and one (1) electronic copy. |
| Word/Excel |
| The COR. |
IAW PWS 1.6.18
Installation Access; “The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all
| IAW section 1.6.18 PWS. |
| IAW section |
1.6.18 PWS
| IAW section 1.6.18 PWS |
| IAW section 1.6.18 PWS |
| Deliverable |
| Frequency |
| # of Copies |
| Medium/Format |
| Submit To |
personal identity verification requirements as directed by DoD, HQDA, and/or local policy.”
IAW PWS 5.1-5.2
Basic Services; Attachments A-G of this PWS.
| Weekly, Quarterly Annually and as specified by applicable codes and regulations and at the time of service. |
| 1 Digitally signed copy (email) or 1 hard copy |
| IAW Attachments A-G of the PWS. |
| Submit to Inspectors: Wendell Fralix, Doug Driggers |
Howard Dowd
IAW PWS 5.6
“All bids for this contract must include a firm and binding hourly rate for each of the three type calls, routine, urgent, and emergency.”
| Included with the Bid. |
| 1 Digital Copy (email) |
| Word/Excel |
| As stated in the RFQ. |
IAW PWS 5.7;
A statement shall be provided by the contractor agreeing to allow the inspection of these facilities by the Government.
| Before the first day of the contract. |
| 1 Digitally signed copy (email) or 1 hard copy |
| Word/Excel |
| Submit to Inspectors: Wendell Fralix, Doug Driggers |
Howard Dowd
IAW PWS 5.10; The Contractor shall provide the Government with all trace documentation of the waste disposal, upon request.
| Upon request |
| 1 Hard Copy |
Or 1 Digital Copy (email)
| In Writing and IAW South Carolina Hazardous Waste Management Regulations, as regulated by the South Carolina Department of Health and Environmental Control |
| Submit to Inspectors: Wendell Fralix, Doug Driggers |
Howard Dowd
| Deliverable |
| Frequency |
| # of Copies |
| Medium/Format |
| Submit To |
IAW PWS 5.11;
Material Safety Data Sheets (MSDS) on all applicable substances brought on site.
Stated twice in PWS; 5.11 & 5.16.3.1
Should be listed as SDS Initially, once with all substances expected to be brought on site for routine maintenance and repairs. Upon arrival with any new substance and as requested. All SDS’s shall be kept by the contractor in accordance with
EM 385-1-1.
| Electronic Copies, Hard Copies when requested. |
| Per OSHA |
Standards and Regulations.
Submit to COR.
IAW PWS 5.13.2
Test documentation gathered at time of service will be turned over to the site inspectors.
| At the time of service. |
| 1 Hard Copy |
Or 1 Digital Copy (email)
| As directed by the specified PWS for the test being performed. |
| Submit to Inspectors: Wendell Fralix, Doug Driggers |
Howard Dowd
IAW PWS 5.14.1;
Submission of a work plan is required.
| Prior to beginning the project. |
| 1 Digital Copy (email) |
| Word/Excel and IAW PWS 5.14.1. |
| Submit to COR. |
IAW PWS 5.15.1;
“The Contractor will need to provide a signed copy of our pre-construction safety agreement at this meeting.”
| At the pre-contract and safety training meeting approximately 2 weeks before the start of contract. |
| 1 Hard Copy |
Or 1 Digital Copy (email)
| Word/Excel |
| Submit to COR. |
IAW PWS 5.21
Contractor Manpower Reporting (CMR)
IAW PWS 5.21
Contractor Manpower Reporting (CMR)
IAW PWS 5.21
Contractor Manpower Reporting (CMR)
IAW PWS 5.21
Contractor Manpower Reporting (CMR)
IAW PWS 5.21
Contractor Manpower Reporting (CMR)
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
(IAW = In Accordance With) (PWS=Performance Work Statement)
| Performance Standard |
| Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”) |
| Incentives/ Disincentives |
PRS #1
IAW Part 5 section 5.1 of the PWS; The Contractor shall provide sprinkler maintenance, inspection, and testing service for the MAHC. Contractor shall provide both scheduled and emergency service to MAHC’s Fire Sprinkler System (FSS) as described within this PWS. The Service to the specified equipment shall meet or exceed all applicable regulatory and manufacturer's requirements.
In addition, the Contractor is responsible for the performance of monthly Fire (FSS) tests as outlined in Attachments A-G and IAW all applicable NFPA codes and regulations for the equipment listed below, including their ancillary components, parts, and devices, etc. In conjunction with completing the specified service IAW applicable NFPA rules and regulations; The attached eight checklists of this PWS shall be performed on the specified equipment.
The contractor supplied Fire sprinkler maintenance, inspection, and testing service in accordance with the PWS 5.1.
The contractor supplied both scheduled and emergency fire sprinkler maintenance, inspection, and testing services to the sprinkler piping, fire pump, associated equipment, and Fire Sprinkler System (FSS) which met or exceeded all regulatory and manufacturer requirements.
The contractor utilized and submitted completed checklists as specified in attachments A-G of the PWS.
The contractor performed the scheduled and preventative maintenance IAW applicable Federal, State and Local codes and regulations.
The contractor was present during the performance of each monthly Fire Systems Test (FSS) as outlined in Attachments A-G of the PWS.
Zero Deviation from Standard
In the event that the performance threshold is not met; The Contractor shall re-perform and/or complete within 30 days of a written corrective action, any and all tasks related to non- performance issues at no cost to the Federal Government.
In the event that the Performance Threshold has not been satisfactorily met after the 30 days, the Federal Government may at their discretion;
1. Issue a time extension of the notice to complete the corrective action or
2. Hire a 3rd party to complete the corrective action and deduct the cost from the Contractors monthly payment.
PRS #2
IAW PWS 1.6.4; The contractor is responsible for conducting business, between the hours of 0730-1530 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings section The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
| The contractor conducted business between the hours or 0730-1530 and maintained an adequate workforce for the uninterrupted performance of all tasks defined within PWS-1.6.4. |
| Zero Deviation from Standard |
PRS #3
IAW PWS 1.6.9; The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
| In accordance with PWS 1.6.9; The contractor, at no cost to the government, attended contractor performance meeting and took appropriate action to resolve outstanding issues that they were apprised of. |
| Zero Deviation from Standard |
| Monthly Payment may be withheld until documentation has been provided. |
PRS #4
IAW PWS 1.6.11 Key Personnel; The Contractor shall provide at least two points of contact within the company to interface with the COR on issues concerning sprinkler maintenance, inspection, and testing service. Names, business address, phone numbers and hours of operation are the minimum information requirement. The Contractor shall also provide an afterhours name and telephone for emergency contact. Contractor shall provide a point of contact information for 24 hours a day/ 7 days a week emergency service.
In Accordance with PWS section 1.6.11 the contractor provided two points of contact within the company to interface with the COR on issues concerning sprinkler maintenance, inspection, and testing service.
The Contractor also provided an after- hours name and telephone number for a 24 hours a day/7days a week emergency contact.
Zero Deviation from Standard
PRS #5
IAW PWS 1.6.12 Identification of Contractor Employees; All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
| In Accordance with PWS section 1.6.12 Identification of Contractor Employees; The contractor and their employees appropriately disclosed and identified themselves as contractors while in communication with Government personnel and ensured that all documents or reports produced were marked as contractor products. |
| Zero Deviation from Standard |
PRS #6
IAW PWS 1.6.18; The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office.
The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy.
In accordance with PWS section 1.6.18; The contractor and all associated subcontractors’ employees complied with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative).
The contractor provided all information required for background checks to meet installation access requirements.
The contractor workforce complied with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy.
| Zero Deviation from Standard |
| Contractor employees who fail to meet facility access and local security policies and procedures will be denied access to the worksite. Denial or removal of any contractor employee shall not affect the contractor obligations of the specified work performance and/or work schedule as outlined in the PWS. Under no circumstances shall the Federal Government be liable for costs incurred by the contractor for employees who are denied access to the worksite. |
PRS #7
IAW PWS 5.5; The Contractor shall be responsible for emergency calls that the government staff is unable to respond per PWS 5.5.
| In accordance with PWS section 5.5; The Contractor responded to emergency calls that the government staff was unable to respond to. |
| Zero Deviation from Standard |
PRS #8
IAW PWS 5.6; The Contractor is responsible for responding to all facility calls for non- scheduled service. Non- scheduled service shall be broken into the categories of routine, urgent and emergency. Routine service calls shall require an on-site response within 5 business days of receiving the trouble call (excluding all federal holidays). The on-site response time for urgent repairs shall be within 4 hours of receiving the trouble call. The on-site response time for emergency calls (total equipment failure) shall be within 1 hour of receiving the trouble call. The Contractor is responsible for responding to all service calls. All bids for this contract must include a firm and binding hourly rate for each of the three type calls, routine, urgent, and emergency.
IAW with section PWS 5.6 The Contractor provided categories of routine, urgent and emergency calls and related response times and hourly rates.
The contractor met and or exceeded routine, urgent and emergency calls within the specified response times and hourly rates.
Zero Deviation from Standard for urgent and emergency calls.
PRS #9
IAW PWS 5.8; The annual Automatic Transfer Switch & Generator testing is not part of this PWS and will be performed by an 3rd party authorized ASCO service provider.
The fire pump testing is part of this PWS and shall be tested in conjunction with the June generator test which is normally done at 1700 hours on the first Thursday of each month.
It is the obligation of the contractor to ensure that qualified technicians are on site and capable of performing the fire pump test simultaneously with the generator testing.
| The contractor tested the fire pump in conjunction with the June generator test. |
| Zero Deviation from Standard |
| Failure to complete the fire pump testing in conjunction with the generator and automatic transfer switch testing may result in rescheduling and retesting all components simultaneously. The contractor shall be liable for all costs incurred by retesting due to failure of to perform the fire pump testing at the scheduled time. These costs may include, but are not limited to, the fire pump, generator, and automatic transfer switch testing. |
These costs, if incurred, will be deducted from the contractor’s monthly payment.
Retesting shall be at no cost to the Federal Government.
PRS #10
IAW PWS 5.11; The Contractor shall supply the clinic with Safety Data Sheets (SDS) on all applicable substances brought on site.
| IAW the PWS 5.11; The Contractor provided the clinic with Safety Data Sheets (SDS) on all applicable substances brought on site. |
| Zero Deviation from Standard |
| Any substance not identifiable and/or without an approved SDS shall be removed from site immediately. Any costs incurred shall be deducted from the |
contractor’s monthly invoice.
PRS #11
IAW PWS 5.15.1; The Contractor will be required to attend a pre-contract meeting and safety training approximately 2 weeks prior to the start of work. The Contractor will need to provide a signed copy of the governments pre-construction safety agreement at this meeting. A copy of the pre- construction safety agreement is available in electronic Word format upon request.
| IAW the PWS 5.15.1 the Contractor attended a pre-contract meeting and safety training. The Contractor provided a signed copy of our pre-construction safety agreement at this meeting. |
| Zero Deviation from Standard |
| IAW PWS 5.15.5 Contractors will be required to wear visitor badges and sign in and out while working in the building. The Contractor shall notify one of the personnel listed in paragraph 5.14.1 each day prior to beginning work. |
| IAW PWS 5.15.5 the contractors wore visitor badges and signed in and out while working in the building. |
The Contractor notified one of the personnel listed in paragraph 5.14.1 each day prior to beginning work.
Zero Deviation from Standard
IAW PWS 5.18 OCCUPATIONAL SAFETY AND HEALTH: The Contractor shall comply with the Occupational Safety and Health Act (OSHA) as well as applicable EM 385 1-1 rules and regulations. The Contractor shall be responsible for ensuring adherence to all applicable Installation, State of South Carolina, and Federal rules and regulations.
The Contractor has complied with all applicable regulations of the Occupational Safety and Health Act (OSHA).
The Contractor has complied with all applicable rules and regulations of the Army Corp of Engineers EM 385 1-1
| Zero Deviation from Standard |
| Failure to comply with all safety rules and regulations as specified in the PWS will result in removal of contractor personnel from the installation until such time as the contractor can demonstrate that compliance to the rules and regulations can be met. |
image1.png