W9124C22R0013 Test Sprinkler PWS with Attachments(1).docx

DOCX document 358 KB Posted

Attached to
Fire Sprinkler Alarm Maintenance and Service
Solicitation number
W9124C-22-R-0013
Issued by

About this file

This performance work statement outlines fire sprinkler and alarm system maintenance, inspection, and testing service requirements for multiple buildings at Fort Jackson in South Carolina. The contractor will be responsible for providing both scheduled and emergency response services, complying with all applicable codes and regulations, and utilizing specified checklists. Response times of within five business days for routine service calls, within four hours for urgent repairs, and within one hour for emergencies are required. The contractor must also attend safety and coordination meetings, submit documentation and complete testing/inspection tasks by defined deadlines while complying with all installation security and safety policies. The proposed acquisition is for a small business set-aside firm-fixed-price contract with one base year and four one-year option periods.

The related federal contract opportunity posting provides details on an upcoming solicitation for the requirements outlined in the performance work statement. The government intends to issue a request for proposal as a 100% small business set-aside with a NAICS code of 561621 and size standard of $20 million. The period of performance will include one base year and four one-year options. The solicitation is targeted to publish on January 8, 2022 and will be posted on SAM.gov. Interested parties should monitor for the issuance and respond accordingly.

View the file

Other files

File Type Posted
W9124C22R0013 Sprinkler Fire Panel PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment "A" Building List

Installation
Asset No.
Asset
Street
City
zip
Sprinkler
Fire Alarm
1
Fort Jackson
4575
McWethy Troop Medical Clinic
Stuart Street
Fort Jackson
29207
Yes
Simplex 4100U
2
Fort Jackson
1890
Physical Examination Station
Washington Road
Fort Jackson
29207
Yes
Simplex 4002
3
Fort Jackson
4590
Caldwell Dental Clinic
Strom Thurmond Blvd
Fort Jackson
29207
Yes
Simplex 4010
4
Fort Jackson
4323
Oliver Dental Clinic
Hill Street
Fort Jackson
29207
Yes
Simplex 4100U
5
Fort Jackson
5330
Hagen Dental Clinic
Moseby Street
Fort Jackson
29207
Yes
Simplex 4020
6
Fort Jackson
D2445
Vet Facility
Knight Road
Fort Jackson
29207
Yes
EST-3
7
Fort Jackson
4500
Moncrief Army Community Hospital
Stuart Street
Fort Jackson
29207
Yes
EST-3
8
Fort Jackson
4503
Boiler Plant
Stuart Street
Fort Jackson
29207
No
EST-3
9
Fort Jackson
4504
Chiller Plant
Stuart Street
Fort Jackson
29207
No
EST-3
10
Fort Jackson
2498
Vet Admin
Knight Road
Fort Jackson
29207
No
EST-3

DPW maintains all Monacos

Contract covers Sprinkler and Fire Alarm in all Bldgs except the Fire Alarm in Bldg. 4500

Outbuildings Device Testing List

This contract includes, but is not limited to, the following devices.

Type
Total Sprinkler Flow/Tamper
Total Fire Alarm
Building

Duct Smoke Detector

2
4590

Heat Detector

6
4590

Photo Smoke Detector

35
4590

Pull Station-Single Action

6
4590

Alarm Indicating device

30
4590

Fire Alarm Panel

1
4590
Control Valve (PIV)
1
Backflow (OS&Y)
2
City Connection
1
Inspectors test
3
Alarm received flow test
1
Type
Total Sprinkler Flow/Tamper
Total Fire Alarm
Building

Duct Smoke Detector

2
4323

Heat Detector

4
4323

Photo Smoke Detector

1
4323

Pull Station-Single Action

5
4323

Alarm Indicating device

14
4323

Fire Alarm Panel

1
4323
Control Valve (PIV)
1
Backflow (OS&Y)
2
City Connection
1
Inspectors test
3
Alarm received flow test
1
Type
Total Sprinkler Flow/Tamper
Total Fire Alarm
Building

Duct Smoke Detector

13
4575

Heat Detector

2
4575

Photo Smoke Detector

13
4575

Pull Station-Single Action

6
4575

Alarm Indicating device

1
4575

Fire Alarm Panel

1
4575
Control Valve (PIV)
1
Backflow (OS&Y)
2
City Connection
1
Butterfly
1
Inspectors test
1
Alarm received flow test
4
Type
Total Sprinkler Flow/Tamper
Total Fire Alarm
Building

Duct Smoke Detector

1
1890

Heat Detector

3
1890

Photo Smoke Detector

1
1890

Pull Station-Single Action

12
1890

Alarm Indicating device

14
1890

Fire Alarm Panel

1
1890
Control Valve (PIV)
1

Outbuildings Device Testing List

This contract includes, but is not limited to, the following devices.

Backflow (OS&Y)
2
Control Valve (Butterfly)
0
City Connection
1
Inspectors test
1
Alarm received flow test
1
Supervised Tamper Signals
3
Type
Total Sprinkler Flow/Tamper
Total Fire Alarm
Building

Duct Smoke Detector

1
2445

Heat Detector

3
2445

Photo Smoke Detector

1
2445

Pull Station-Single Action

4
2445

Alarm Indicating device

14
2445

Fire Alarm Panel

1
2445
Control Valve (PIV)
1
Backflow (OS&Y)
2
Control Valve (Butterfly)
1
City Connection
1
Inspectors test
1
Alarm received flow test
1
Supervised Tamper Signals
4
Type
Total Sprinkler Flow/Tamper
Total Fire Alarm
Building

Duct Smoke Detector

1
5330

Heat Detector

0
5330

Photo Smoke Detector

4
5330

Pull Station-Single Action

3
5330

Alarm Indicating device

80
5330
Fire Control Panel (LOC,MNS,FACP,FAAP)
4
5330
Control Valve (PIV)
1
Backflow (OS&Y)
2
Control Valve (Butterfly)
1
City Connection
1
Inspectors test
1
Alarm received flow test
1
Supervised Tamper Signals
4
Type
Total Sprinkler Flow/Tamper
Total Fire Alarm
Building

Duct Smoke Detector

0
4503

Heat Detector

1
4503

Photo Smoke Detector

1
4503

Pull Station-Single Action

2
4503

Alarm Indicating device

5
4503

Fire Alarm Panel

1
4503
Type
Total Sprinkler Flow/Tamper
Total Fire Alarm
Building

Duct Smoke Detector

1
4504

Heat Detector

2
4504

Outbuildings Device Testing List

This contract includes, but is not limited to, the following devices.

Photo Smoke Detector

2
4504

Pull Station-Single Action

2
4504

Alarm Indicating device

5
4504

Fire Alarm Panel

1
4504
Type
Total Sprinkler Flow/Tamper
Total Fire Alarm
Building

Duct Smoke Detector

1
2498

Heat Detector

1
2498

Photo Smoke Detector

8
2498

Pull Station-Single Action

2
2498

Alarm Indicating device

10
2498

Fire Alarm Panel

1
2498

Attachment "C" Fire Pump Test Sheet

100Hose Suction

PSI

Discharge

PSI

Pitot

PSI

GPM

Total GPM

RPM

NET PSI

Churn 32,32 504,504 22,28,24 430,433,472

Sprinkler Demand

1000177065Combined Curve
1500177043System/Presure/Flow Factory/Presure/FlowMACH Fire Pump 15 Jul 2011

e P S I

Flow GPM Sprinkler Demand Log. (System/Presure/Flow) Combined Curve Log. (System/Presure/Flow) Factory/Presure/Flow Poly. (System/Presure/Flow) System/Presure/Flow

P
130

r

e
120

s u

r
100

Attachment "D" Quarterly Flow and Tamper Work Sheet for Building 4500 Main drain Valve PSI

Device #Device DescriptionChecked Confirm Shut Open
1
06 05 0135
Waterflow Penthouse Level Center
2
06 05 0136
Valve Tamper Center Penthouse
3
06 05 0137
Waterflow Penthouse Level West
4
06 05 0138
Valve Tamper WestPenthouse
5
06 04 0154
Valve Tamper 12th FlrEast Stair #4
6
06 04 0131
Valve Tamper 12th FlrEast Stair #4
7
06 04 0130
Waterflow 12th Floor East Stair #4
8
06 02 0132
Waterflow 11th Floor East Stair #4
9
06 02 0133
Valve Tamper 11th FlrEast Stair #4
10
05 04 0131
Waterflow 10th Floor East Stair #4
11
05 04 0132
Valve Tamper 10th FlrEast Stair #4
12
05 02 0132
Waterflow 9th Floor East Stair #4
13
05 02 0133
Valve Tamper 9th Flr East Stair #4
14
04 05 0132
Waterflow 8th Floor East Stair #4
15
04 05 0133
Valve Tamper 8th Flr East Stair #4
16
04 04 0132
Waterflow 7th Floor East Stair #4
17
04 04 0133
Valve Tamper 7th Flr East Stair #4
18
04 02 0133
Waterflow 6th Floor East Stair #4
19
04 02 0134
Valve Tamper 6th Flr East Stair #4
20
03 04 0128
Waterflow 5th Floor East Stair #4
21
03 04 0129
Valve Tamper 5th Flr East Stair #4
22
03 02 0136
Waterflow 4th Floor East Stair #4
23
03 02 0137
Valve Tamper 4th Flr East Stair #4
24
02 05 0158
Waterflow 3rd Tower Stair #4
25
02 05 0159
Valve Tamper 3rd Flr Tower Stair #4
26
02 03 0136
Waterflow Grnd TowerStair #4
27
02 03 0137
Valve Tamper Grnd TwrStair #4
28
01 04 0140
Waterflow 2 Basement Sterile Room
29
06 04 0132
Waterflow 12th Floor West Stair #3
30
06 04 0133
Valve Tamper 12th FlrWest Stair #3
31
06 02 0134
Waterflow 11th Floor West Stair #3
32
06 02 0135
Valve Tamper 11th FlrWest Stair #3
33
05 04 0133
Waterflow 10th Floor West Stair #3
34
05 04 0134
Valve Tamper 10th FlrWest Stair #3
35
05 02 0134
Waterflow 9th Floor West Stair #3
36
05 02 0135
Valve Tamper 9th Flr West Stair #3
37
04 05 0134
Waterflow 8th Floor West Stair #3

Quarterly Flow and Tamper Work Sheet for Building 4500 Main drain Valve PSI

Device #Device DescriptionChecked Confirm Shut Open
38
04 05 0135
Valve Tamper 8th Flr West Stair #3
39
04 04 0134
Waterflow 7th Floor West Stair #3
40
04 04 0135
Valve Tamper 7th Flr West Stair #3
41
04 02 0135
Waterflow 6th Floor West Stair #3
42
04 02 0136
Valve Tamper 6th Flr West Stair #3
43
03 04 0133
Waterflow 5th Floor West Stair #3
44
03 04 0134
Valve Tamper 5th Flr West Stair #3
45
03 02 0138
Waterflow 4th Floor West Stair #3
46
03 02 0139
Valve Tamper 4th Flr West Stair #3
47
02 05 0160
Waterflow 3rd Tower Stair #3
48
02 05 0161
Valve Tamper 3rd Flr Tower Stair #3
49
02 03 0134
Waterflow Grnd Tower Stair #3
50
02 03 0135
Valve Tamper Grnd TwrStair #3
51
01 04 0142
Waterflow 1 Basement Stair #3
52
01 04 0143
Valve Tamp 1 BasementStair #3
53
01 04 0144
Waterflow 2 Basement Stair #3
54
01 04 0145
Valve Tamp 2 BasementStair #3
55
01 02 0139
Waterflow Basement Soiled Linen 1-70
56
01 02 0140
Valve Tamper BasementSoiled Linen 1-70
57
01 02 0141
Low Air BasementSoiled Linen 1-70
58
01 02 0142
Waterflow Basement Med Storage 1-93
59
01 02 0143
Valve Tamper BasementMed Storage 1-93
60
01 04 0135
Valve Tamper BasementPump Room 1-114
61
01 04 0148
Valve Tamp 1 BasementPump Room 1-114
62
01 04 0149
Valve Tamp 2 BasementPump Room 1-114
63
01 04 0150
Valve Tamper BasementPump Room 1-114 PC3
64
01 04 0151
Valve Tamper BasementPump Room PC4
65
01 04 0132
Valve Tamper BasementCompressor Room 1-110
66
01 04 0138
Waterflow 1 Basement Sterile Room
67
01 04 0139
Valve Tamp 1 BasementSterile Room
68
01 04 0141
Valve Tamp 2 BasementSterile Room
69
02 04 0132
Waterflow 3rd Clinic Stair #2
70
02 04 0133
Valve Tamper 3rd Flr Clinic North Stair #2
71
02 02 0165
Waterflow Grnd Floor Clinic North Stair #2
72
02 02 0166
Valve Tamper Grnd FlrClinic North Stair #2
73
01 02 0133
Waterflow Basement North Stair #2
74
01 02 0134
Valve Tamper BasementNorth Stair #2

Quarterly Flow and Tamper Work Sheet for Building 4500 Main drain Valve PSI

Device #Device DescriptionChecked Confirm Shut Open
75
01 02 0135
Waterflow Basement NucMed 1-9 East
76
01 02 0136
Valve Tamper BasementNucMed 1-9 East
77
01 02 0137
Waterflow Basement Center Stair #6
78
01 02 0138
Valve Tamper BasementCenter Stair #6
79
02 02 0167
Waterflow Grnd Floor Clinic South Stair #1
80
02 02 0168
Valve Tamper Grnd FlrSouth Stair #1
81
02 02 0169
Waterflow 3rd FlrClinic South Stair #1
82
02 04 0177
Valve Tamper 3rd Flr Clinic South Stair #2
83
02 02 0170
Valve Tamper 3rd Flr Clinic South Stair #1
84
01 02 0145
Backflow #1 3rd FloorSouth Side
85
01 02 0146
Backflow #2 3rd FloorSouth side
86
01 02 0147
PIV 3rd FloorSouth Side
87
01 04 0166
PIV Ground FloorNorth Side Parking
88
01 04 0167
Backflow 1 Grnd FloorNorth Side Parking
89
01 04 0168
Backflow 2 Grnd FloorNorth Side Parking
90
03 02 0140
Waterflow 4th Floor Kitchen Stair #5
91
03 02 0141
Valve Tamper 4th Flr Kitchen Stair #5
92
02 05 0154
Waterflow 3rd J-Sect Stair #5
93
02 05 0155
Valve Tamper 3rd Flr J-SectStair #5
94
02 05 0151
Waterflow 3rd J-Sect Riser Room
95
02 05 0152
Valve Tamp 3rd J-SectRiser Room
96
02 05 0153
Low Air 3rd J-Sect Riser Room
97
02 05 0156
Waterflow 3rd J-Sect Conference Room 3-259
98
02 05 0157
Valve Tamp 3rd J-SectConference Room 3-259
99
02 04 0134
Waterflow Clinic RoofMechanical Room
100
02 04 0135
Valve Tamper Clinic Roof Mechanical Room
101
03 04 0130
Waterflow 5th FloorPArts Area 5-8A
102
03 04 0131
Valve Tamper 5th Flr Parts Area 5-8A
103
03 04 0132
Low Air 5th FloorParts Area 5-8A
104
03 04 0135
Waterflow 5th Floor West Storage 5-1A
105
03 04 0136
Valve Tamper 5th Flr West Storage 5-1A
106
03 04 0137
Low Air 5th FloorWest Storage 5-1A

Waterflow Monaco XMTR Relay

Valve Tamper Monaco XMTR Relay

109
01 04 0146
Pump Run BasementPump Room 1-114
110
01 04 0147
Pump Trouble BasementPump Room 1-114

Fire pump main drain test. Return to original (nonflowing) pressure less than two sec.

Quarterly Flow and Tamper Work Sheet for Building 4500 Main drain Valve PSI Device # Device Description Checked Confirm Shut Open Deficiency Notes

*** (77) 01 02 0137 Gage psi same as (99) 02 04 0134 & (75) 01 02 0135 Gage psi same as (73) 01 02 0133 &

(58) 01 02 0142 Gage same as (79) 02 02 167 & (28) 01 04 0140 Gage same as (66) 01 04 0138 T indicates tested and I indicates inspected - Light red 1st and 3rd Quarter light blue 2nd and 4th quarter

Attachment “E”

The last standpipe test was done April 2016. A copy of the prior testing results below.

Attachment “F” Testing Protocols

1. Arrive at the building to do the work.

2. Make personal contact with NCOIC and have them announce over public address system that you will be testing the fire alarm system and will announce when the testing is complete.

6. Ask the NCOIC to use his / her phone to call fire department.

7. Call Fort Jackson Fire Department (FJFD) dispatcher at 751-4142 and tell him / her what you are doing, and you will call when testing is complete. Ask dispatcher to monitor alarm signals received from building.

8. Perform fire alarm and sprinkler testing.

9. Notify NCOIC that testing is complete. Have him / her make announcement.

10. Call FJFD dispatcher and inform them that test is complete. Verify that they received signals through the Monaco transmitter. Record this on your report.

11. Leave a copy of pm documentation at fire alarm panel, and send me a copy for our file.

12. If repairs are required, call us during testing if it’s something minor that can be done during the same visit. If it is something major, you may contact me later so we can discuss repairs and cost.

Phone numbers (all are 803-751-XXXX) FJFD Dispatcher 4142 / 7217 Bldg. 1890 PES NCIOC

SFC Brisco 6251 Front Desk

2021 / 3105

Bldg. 4323 Oliver DC NCIOC

SGT Salley 4226 Front Desk

6418 / 6679

Bldg. 4575 TMC NCIOC

SSG Dinkins 6383

Front Desk

6789 / 4733 / 7444

Bldg. 4590 Caldwell DC NCOIC

SSG McCall 5278

Front Desk

5178 / 5529 / 6017

Bldg. 5330 Hagen DC

NCIOC SGT Blash 7380 Front Desk 6211 / 3255 / 4091 Bldg. 4555 Sick Quarters Bldg. 2500 Warehouse Bldg. 2445 Vet Clinic

Attachment "G" Safety Requirments for an Impaired System

Fire & Life Safety System Impairment Permit/Tag (Please attach tag to Fire Department Connection or Fire Alarm Annunciator/Control Panel)

Building Name: Type of system impaired: Reason for impairment: Extent of impairment: Date system shutoff: Expected date of restoration: Impairment authorized by:

Schedule B Impairment Worksheet

Core Information Today’s date:

Bldg:

Type of system impaired:

Extent of impairment:

Reason for impairment:

Date impairment to begin: Estimated completion date:

Person(s) conducting work:

Person responsible for mounting impairment tag:

Firewatch required? If yes, number of persons:

Reminders Area inspected and risks determined?

Prohibitions involved?

Building evacuated? Impairment tag issued?

Notifications Has facilities mechanic been notified of the impairment? campus police

Has monitoring company, if any, been notified of the impairment?

Has the maintenance supervisor for the affected building been notified of the impairment?

Restoration Has the affected system been inspected and tested operational?

Has the impairment tag been removed?

Has the campus police been notified of the restoration, if a fire alarm system?

Has the fire alarm monitoring company(if any) been notified of the restoration?

Has the maintenance supervisor for the affected building been notified of the restoration?

Schedule C

Firewatch Log Sheet

Date Name(s) Time Area Checked

Please return this form to Fire Protection Manager at Facilities Management.

TECHNICAL EXHIBIT 2 DELIVERABLES SCHEDULE

Deliverable
Frequency
# of Copies
Medium/Format
Submit To

IAW PWS 1.6.11

Key Personnel; The Contractor shall provide at least two points of contact within the company to interface with the COR on issues concerning sprinkler maintenance, inspection, and testing service.

Names, business address, phone numbers and hours of operation are the minimum information requirement. The Contractor shall also provide an afterhours name and telephone for emergency contact. Contractor shall provide a point of contact information for 24 hours a day/ 7 days a week emergency service.

Once, before the 1st day of work performance and additionally within 3 days of changes to key personnel or staffing arrangements that may affect the accuracy of the initial document.
One (1) hard copy and one (1) electronic copy.
Word/Excel
The COR.

IAW PWS 1.6.18

Installation Access; “The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all

IAW section 1.6.18 PWS.
IAW section

1.6.18 PWS

IAW section 1.6.18 PWS
IAW section 1.6.18 PWS
Deliverable
Frequency
# of Copies
Medium/Format
Submit To

personal identity verification requirements as directed by DoD, HQDA, and/or local policy.”

IAW PWS 5.1-5.2

Basic Services; Attachments A-G of this PWS.

Weekly, Quarterly Annually and as specified by applicable codes and regulations and at the time of service.
1 Digitally signed copy (email) or 1 hard copy
IAW Attachments A-G of the PWS.
Submit to Inspectors: Wendell Fralix, Doug Driggers

Howard Dowd

IAW PWS 5.6

“All bids for this contract must include a firm and binding hourly rate for each of the three type calls, routine, urgent, and emergency.”

Included with the Bid.
1 Digital Copy (email)
Word/Excel
As stated in the RFQ.

IAW PWS 5.7;

A statement shall be provided by the contractor agreeing to allow the inspection of these facilities by the Government.

Before the first day of the contract.
1 Digitally signed copy (email) or 1 hard copy
Word/Excel
Submit to Inspectors: Wendell Fralix, Doug Driggers

Howard Dowd

IAW PWS 5.10; The Contractor shall provide the Government with all trace documentation of the waste disposal, upon request.

Upon request
1 Hard Copy

Or 1 Digital Copy (email)

In Writing and IAW South Carolina Hazardous Waste Management Regulations, as regulated by the South Carolina Department of Health and Environmental Control
Submit to Inspectors: Wendell Fralix, Doug Driggers

Howard Dowd

Deliverable
Frequency
# of Copies
Medium/Format
Submit To

IAW PWS 5.11;

Material Safety Data Sheets (MSDS) on all applicable substances brought on site.

Stated twice in PWS; 5.11 & 5.16.3.1

Should be listed as SDS Initially, once with all substances expected to be brought on site for routine maintenance and repairs. Upon arrival with any new substance and as requested. All SDS’s shall be kept by the contractor in accordance with

EM 385-1-1.

Electronic Copies, Hard Copies when requested.
Per OSHA

Standards and Regulations.

Submit to COR.

IAW PWS 5.13.2

Test documentation gathered at time of service will be turned over to the site inspectors.

At the time of service.
1 Hard Copy

Or 1 Digital Copy (email)

As directed by the specified PWS for the test being performed.
Submit to Inspectors: Wendell Fralix, Doug Driggers

Howard Dowd

IAW PWS 5.14.1;

Submission of a work plan is required.

Prior to beginning the project.
1 Digital Copy (email)
Word/Excel and IAW PWS 5.14.1.
Submit to COR.

IAW PWS 5.15.1;

“The Contractor will need to provide a signed copy of our pre-construction safety agreement at this meeting.”

At the pre-contract and safety training meeting approximately 2 weeks before the start of contract.
1 Hard Copy

Or 1 Digital Copy (email)

Word/Excel
Submit to COR.

IAW PWS 5.21

Contractor Manpower Reporting (CMR)

IAW PWS 5.21

Contractor Manpower Reporting (CMR)

IAW PWS 5.21

Contractor Manpower Reporting (CMR)

IAW PWS 5.21

Contractor Manpower Reporting (CMR)

IAW PWS 5.21

Contractor Manpower Reporting (CMR)

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

(IAW = In Accordance With) (PWS=Performance Work Statement)

Performance Standard
Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Incentives/ Disincentives

PRS #1

IAW Part 5 section 5.1 of the PWS; The Contractor shall provide sprinkler maintenance, inspection, and testing service for the MAHC. Contractor shall provide both scheduled and emergency service to MAHC’s Fire Sprinkler System (FSS) as described within this PWS. The Service to the specified equipment shall meet or exceed all applicable regulatory and manufacturer's requirements.

In addition, the Contractor is responsible for the performance of monthly Fire (FSS) tests as outlined in Attachments A-G and IAW all applicable NFPA codes and regulations for the equipment listed below, including their ancillary components, parts, and devices, etc. In conjunction with completing the specified service IAW applicable NFPA rules and regulations; The attached eight checklists of this PWS shall be performed on the specified equipment.

The contractor supplied Fire sprinkler maintenance, inspection, and testing service in accordance with the PWS 5.1.

The contractor supplied both scheduled and emergency fire sprinkler maintenance, inspection, and testing services to the sprinkler piping, fire pump, associated equipment, and Fire Sprinkler System (FSS) which met or exceeded all regulatory and manufacturer requirements.

The contractor utilized and submitted completed checklists as specified in attachments A-G of the PWS.

The contractor performed the scheduled and preventative maintenance IAW applicable Federal, State and Local codes and regulations.

The contractor was present during the performance of each monthly Fire Systems Test (FSS) as outlined in Attachments A-G of the PWS.

Zero Deviation from Standard

In the event that the performance threshold is not met; The Contractor shall re-perform and/or complete within 30 days of a written corrective action, any and all tasks related to non- performance issues at no cost to the Federal Government.

In the event that the Performance Threshold has not been satisfactorily met after the 30 days, the Federal Government may at their discretion;

1. Issue a time extension of the notice to complete the corrective action or

2. Hire a 3rd party to complete the corrective action and deduct the cost from the Contractors monthly payment.

PRS #2

IAW PWS 1.6.4; The contractor is responsible for conducting business, between the hours of 0730-1530 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings section The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

The contractor conducted business between the hours or 0730-1530 and maintained an adequate workforce for the uninterrupted performance of all tasks defined within PWS-1.6.4.
Zero Deviation from Standard

PRS #3

IAW PWS 1.6.9; The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

In accordance with PWS 1.6.9; The contractor, at no cost to the government, attended contractor performance meeting and took appropriate action to resolve outstanding issues that they were apprised of.
Zero Deviation from Standard
Monthly Payment may be withheld until documentation has been provided.

PRS #4

IAW PWS 1.6.11 Key Personnel; The Contractor shall provide at least two points of contact within the company to interface with the COR on issues concerning sprinkler maintenance, inspection, and testing service. Names, business address, phone numbers and hours of operation are the minimum information requirement. The Contractor shall also provide an afterhours name and telephone for emergency contact. Contractor shall provide a point of contact information for 24 hours a day/ 7 days a week emergency service.

In Accordance with PWS section 1.6.11 the contractor provided two points of contact within the company to interface with the COR on issues concerning sprinkler maintenance, inspection, and testing service.

The Contractor also provided an after- hours name and telephone number for a 24 hours a day/7days a week emergency contact.

Zero Deviation from Standard

PRS #5

IAW PWS 1.6.12 Identification of Contractor Employees; All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

In Accordance with PWS section 1.6.12 Identification of Contractor Employees; The contractor and their employees appropriately disclosed and identified themselves as contractors while in communication with Government personnel and ensured that all documents or reports produced were marked as contractor products.
Zero Deviation from Standard

PRS #6

IAW PWS 1.6.18; The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office.

The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy.

In accordance with PWS section 1.6.18; The contractor and all associated subcontractors’ employees complied with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative).

The contractor provided all information required for background checks to meet installation access requirements.

The contractor workforce complied with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy.

Zero Deviation from Standard
Contractor employees who fail to meet facility access and local security policies and procedures will be denied access to the worksite. Denial or removal of any contractor employee shall not affect the contractor obligations of the specified work performance and/or work schedule as outlined in the PWS. Under no circumstances shall the Federal Government be liable for costs incurred by the contractor for employees who are denied access to the worksite.

PRS #7

IAW PWS 5.5; The Contractor shall be responsible for emergency calls that the government staff is unable to respond per PWS 5.5.

In accordance with PWS section 5.5; The Contractor responded to emergency calls that the government staff was unable to respond to.
Zero Deviation from Standard

PRS #8

IAW PWS 5.6; The Contractor is responsible for responding to all facility calls for non- scheduled service. Non- scheduled service shall be broken into the categories of routine, urgent and emergency. Routine service calls shall require an on-site response within 5 business days of receiving the trouble call (excluding all federal holidays). The on-site response time for urgent repairs shall be within 4 hours of receiving the trouble call. The on-site response time for emergency calls (total equipment failure) shall be within 1 hour of receiving the trouble call. The Contractor is responsible for responding to all service calls. All bids for this contract must include a firm and binding hourly rate for each of the three type calls, routine, urgent, and emergency.

IAW with section PWS 5.6 The Contractor provided categories of routine, urgent and emergency calls and related response times and hourly rates.

The contractor met and or exceeded routine, urgent and emergency calls within the specified response times and hourly rates.

Zero Deviation from Standard for urgent and emergency calls.

PRS #9

IAW PWS 5.8; The annual Automatic Transfer Switch & Generator testing is not part of this PWS and will be performed by an 3rd party authorized ASCO service provider.

The fire pump testing is part of this PWS and shall be tested in conjunction with the June generator test which is normally done at 1700 hours on the first Thursday of each month.

It is the obligation of the contractor to ensure that qualified technicians are on site and capable of performing the fire pump test simultaneously with the generator testing.

The contractor tested the fire pump in conjunction with the June generator test.
Zero Deviation from Standard
Failure to complete the fire pump testing in conjunction with the generator and automatic transfer switch testing may result in rescheduling and retesting all components simultaneously. The contractor shall be liable for all costs incurred by retesting due to failure of to perform the fire pump testing at the scheduled time. These costs may include, but are not limited to, the fire pump, generator, and automatic transfer switch testing.

These costs, if incurred, will be deducted from the contractor’s monthly payment.

Retesting shall be at no cost to the Federal Government.

PRS #10

IAW PWS 5.11; The Contractor shall supply the clinic with Safety Data Sheets (SDS) on all applicable substances brought on site.

IAW the PWS 5.11; The Contractor provided the clinic with Safety Data Sheets (SDS) on all applicable substances brought on site.
Zero Deviation from Standard
Any substance not identifiable and/or without an approved SDS shall be removed from site immediately. Any costs incurred shall be deducted from the

contractor’s monthly invoice.

PRS #11

IAW PWS 5.15.1; The Contractor will be required to attend a pre-contract meeting and safety training approximately 2 weeks prior to the start of work. The Contractor will need to provide a signed copy of the governments pre-construction safety agreement at this meeting. A copy of the pre- construction safety agreement is available in electronic Word format upon request.

IAW the PWS 5.15.1 the Contractor attended a pre-contract meeting and safety training. The Contractor provided a signed copy of our pre-construction safety agreement at this meeting.
Zero Deviation from Standard
IAW PWS 5.15.5 Contractors will be required to wear visitor badges and sign in and out while working in the building. The Contractor shall notify one of the personnel listed in paragraph 5.14.1 each day prior to beginning work.
IAW PWS 5.15.5 the contractors wore visitor badges and signed in and out while working in the building.

The Contractor notified one of the personnel listed in paragraph 5.14.1 each day prior to beginning work.

Zero Deviation from Standard

IAW PWS 5.18 OCCUPATIONAL SAFETY AND HEALTH: The Contractor shall comply with the Occupational Safety and Health Act (OSHA) as well as applicable EM 385 1-1 rules and regulations. The Contractor shall be responsible for ensuring adherence to all applicable Installation, State of South Carolina, and Federal rules and regulations.

The Contractor has complied with all applicable regulations of the Occupational Safety and Health Act (OSHA).

The Contractor has complied with all applicable rules and regulations of the Army Corp of Engineers EM 385 1-1

Zero Deviation from Standard
Failure to comply with all safety rules and regulations as specified in the PWS will result in removal of contractor personnel from the installation until such time as the contractor can demonstrate that compliance to the rules and regulations can be met.