This is a draft product specification and delivery requirements document for a bulk liquid propane gas (LPG) supply and delivery follow-on contract at U.S. Army Garrison (USAG) Fort Irwin, California. The requirement calls for continuous supply of Odorized Grade HD-5 Liquid Propane Gas conforming to ASTM D1835 and GPA Standard 2140 specifications, delivered via DOT MC-331 cargo tanker vehicles to four government-owned bulk storage tank farms (Langford Lake, Goldstone, MATES, and Grey Eagle). The estimated annual volume is 2,259,447 US net gallons compensated to 60 degrees Fahrenheit, with a total lifecycle volume of 12,426,958.50 gallons over the anticipated 5.5-year period of performance (May 1, 2027 through October 31, 2032), comprising a 12-month base period, four 12-month option periods, and one optional 6-month extension. The contract structure under consideration is either a GSA Multiple Award Schedule Blanket Purchase Agreement or an open-market Indefinite-Delivery, Requirements Contract utilizing Firm-Fixed-Price with Economic Price Adjustment (FFP-EPA) unit pricing tied to the Mont Belvieu Propane Spot Index under FAR Part 12.
The specification mandates strict compliance with ASTM D1835 Grade HD-5 chemical composition standards (minimum 90% propane by liquid volume, maximum 5% propylene, maximum 2.5% butane and heavier hydrocarbons), mandatory ethyl mercaptan odorization at 1.0 pound per 10,000 gallons, and temperature-compensated metering using California Department of Food and Agriculture-certified automatic temperature-compensating flow meters. Deliveries shall occur Monday through Friday between 0700 and 1530 hours Pacific Time, with 24-hour emergency response capability during winter peak seasons. All contractor drivers must be U.S. citizens or authorized legal residents capable of obtaining Defense Biometric Identification System (DBIDS) credentials, possess a valid Class A Commercial Driver's License with Tank Vehicle (N) and Hazardous Materials (H) endorsements, hold a Transportation Worker Identification Credential (TWIC), and maintain current DOT Medical Examiner's Certification and 49 CFR 172.704 HAZMAT training. The seasonal demand profile anticipates approximately 55% of annual volume during winter peak (November–February), 25% during shoulder seasons (March–April, October), and 20% during summer baseline (May–September). The contractor must maintain a local reserve terminal or bulk storage capacity within 50 miles of Fort Irwin and shall bear 100% remediation costs for any off-specification or contaminated propane introduced into government storage vessels. All deliveries require accompanying Certificates of Analysis, temperature-compensated net gallon measurements, and dual signature Bills of Lading from both the contractor driver and Fort Irwin DPW inspector.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20261110_Bulk_LPG_FollowOn_SourcesSought_RFI_TechDescription_Updated.docx | DOCX document | |
| Bulk_LPG_Follow-On_SourcesSought_Tech Description.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bulk LPG Supply Specification | Draft RFI DRAFT — FOR MARKET RESEARCH / SOURCES SOUGHT / GSA eBUY RFI PURPOSES ONLY
PURCHASE DESCRIPTION / COMMERCIAL ITEM DESCRIPTION (CID)
Bulk Liquid Propane Gas (LPG) Supply and Delivery Follow-On U.S. Army Garrison (USAG) Fort Irwin & National Training Center (NTC) Directorate of Public Works (DPW) — Operations & Maintenance Division
DOCUMENT CONTROL & ADMINISTRATIVE SUMMARY
| Field |
| Value |
| Requirement Title |
| Bulk Liquid Propane Gas (LPG) Supply and Delivery Follow-On |
| Purchase Request (PR) Number |
| PR 12507850 (PCF Cabinet: PANMCC-27-P-0000 058792) |
| Requiring Activity |
| Directorate of Public Works (DPW), USAG Fort Irwin, CA 92310 (DoDAAC: W81DBY) |
| Contracting Activity |
| Mission and Installation Contracting Command (MICC) – Fort Irwin, CA (DoDAAC: W9124B) |
| Product / Service Code (PSC) |
| 6830 — Gases: Compressed and Liquefied |
| NAICS Code & Size Standard |
| 324110 — Petroleum Refineries (SBA Size Standard: 1,500 Employees) |
| Acquisition Authority Under Review |
| GSA Multiple Award Schedule (MAS) (RFO FAR Subpart 8.4 / GSAM Subpart 538.71) OR Open-Market Commercial Product Acquisition (RFO FAR Part 12) |
| Contract / Ordering Structure Under Review |
| 5-Year GSA Blanket Purchase Agreement (BPA) / GSA Schedule Order OR Indefinite-Delivery, Requirements Contract (FAR 52.216-21), utilizing either Firm-Fixed-Price (FFP) or Firm-Fixed-Price with Economic Price Adjustment (FFP-EPA) Unit Pricing |
| Anticipated Period of Performance |
| 12-Month Base Period (01 May 2027 – 30 Apr 2028) + Four (4) 12-Month Option Periods (01 May 2028 – 30 Apr 2032) + One (1) 6-Month Extension (01 May 2032 – 31 Oct 2032) |
| Predecessor Contract Reference |
| GSA Delivery Order W9124B-25-F-A049 (GSA Contract GS-07F-070DA) & Contract W9124B-20-C-0005 |
TABLE OF CONTENTS
Right-click and select 'Update Field' to populate the table of contents.
1. SCOPE AND OBJECTIVE
1.1. Scope of Requirement: This Commercial Item Description (CID) / Purchase Description establishes the salient technical characteristics, chemical composition standards, bulk transport and delivery mechanics, metering and invoicing procedures, quality assurance protocols, and installation access/safety requirements for the continuous bulk supply and delivery of Odorized Grade HD-5 Liquid Propane Gas (LPG) to U.S. Army Garrison (USAG) Fort Irwin and the National Training Center (NTC), Fort Irwin, California.
1.2. Operational Objective: Bulk LPG delivered under this contract/order supports mission-essential installation utilities across Fort Irwin cantonment and training facilities, including central heating plants, dining facilities (DFACs), unaccompanied personnel housing (barracks), tactical maintenance facilities, and critical backup power generation systems. The Contractor shall furnish all product, certified bulk transport tankers (DOT MC-331), qualified and background-cleared commercial drivers, pumping/vapor-recovery equipment, certified metering, quality testing certificates, and supervision necessary to perform uninterrupted bulk propane deliveries across a twelve (12)-month Base Period, four (4) twelve (12)-month Option Periods, and an optional six (6)-month extension period.
2. APPLICABLE STANDARDS, PUBLICATIONS, AND CODES
2.1. Mandatory Compliance Standards: All bulk liquid propane gas supplied, transported, transferred, and metered under this contract/order shall strictly conform to the latest active editions of the following industry standards, federal regulations, and State of California codes:
ASTM D1835: Standard Specification for Liquefied Petroleum (LP) Gases (specifically Special-Duty Propane / Grade HD-5).
GPA Midstream Standard 2140: Liquefied Petroleum Gas Specifications and Test Methods (HD-5 Commercial Propane specification).
ASTM D1250 / API MPMS Chapter 11.2.4: Standard Guide for Use of the Petroleum Measurement Tables (Table 24E / Table 24F for temperature volume correction to 60 degrees Fahrenheit).
NFPA 58: Liquefied Petroleum Gas Code (National Fire Protection Association), including Section 7.4.2 maximum liquid volume filling limits.
NFPA 54: National Fuel Gas Code (ANSI Z223.1).
49 CFR Parts 171–180: Pipeline and Hazardous Materials Safety Administration (PHMSA) Hazardous Materials Regulations (HMR), including 49 CFR 173.315 (Compressed gases in cargo tanks and portable tanks) and 49 CFR Part 178 (DOT Specification MC-331 cargo tank motor vehicles).
29 CFR 1910.110: Storage and Handling of Liquefied Petroleum Gases (OSHA).
California Code of Regulations (CCR) Title 8 & Title 13: Cal/OSHA Unfired Pressure Vessel Safety Orders and California Highway Patrol (CHP) Hazardous Materials Transportation Regulations.
California Department of Food and Agriculture (CDFA) — Division of Measurement Standards (DMS): Commercial weighing and liquid-measuring device calibration and seal requirements.
3. SALIENT TECHNICAL CHARACTERISTICS & CHEMICAL COMPOSITION
3.1. Grade HD-5 Chemical Composition and Physical Properties: All LPG delivered to USAG Fort Irwin shall be virgin, unblended Special-Duty Propane (Grade HD-5) conforming to ASTM D1835 and GPA Standard 2140. Refinery waste gas, off-spec refinery streams, or uncertified blends are strictly prohibited. Each shipment shall satisfy the following physical and chemical limits:
| Parameter / Property |
| ASTM / GPA Test Method |
| Mandatory Specification Limit (Grade HD-5) |
| Propane (C3H8) Liquid Volume |
| ASTM D2163 |
| Minimum 90.0% by liquid volume |
| Propylene (C3H6) Liquid Volume |
| ASTM D2163 |
| Maximum 5.0% by liquid volume |
| Butane (C4H10) and Heavier Hydrocarbons |
| ASTM D2163 |
| Maximum 2.5% by liquid volume |
| Methane / Ethane (C2H6) and Lighter Hydrocarbons |
| ASTM D2163 |
| Maximum 1.5% by liquid volume |
| Vapor Pressure at 100F (37.8C) |
| ASTM D1267 or D6897 |
| Maximum 208 psig (1,434 kPa) |
| Volatile Residue (Temperature at 95% Evaporation) |
| ASTM D1837 |
| Maximum -37F (-38.3C) |
| Residual Matter (Evaporation Residue on 100 mL) |
| ASTM D2158 |
| Maximum 0.05 mL |
| Oil Stain Observation |
| ASTM D2158 |
| Pass (No persistent oil ring) |
| Copper Strip Corrosion (1 hr at 100F) |
| ASTM D1838 |
| Maximum ASTM No. 1 |
| Total Sulfur Content (after odorization) |
| ASTM D6667 |
| Maximum 123 ppm by weight (10 grains/100 cu ft) |
| Moisture / Dryness Content |
| ASTM D2713 |
| Pass Valve Freeze Method (No free or entrained water) |
3.2. Mandatory Odorization Standard: Prior to entry onto Fort Irwin, all bulk LPG shall be effectively odorized with commercial-grade ethyl mercaptan (C2H5SH) at a minimum injection ratio of 1.0 pound of ethyl mercaptan per 10,000 gallons of liquid propane (approximately 100 ppm), in strict compliance with 49 CFR 173.315(b)(1) and NFPA 58 Section 4.2.1. The odorant concentration shall produce a distinctive, unmistakable warning odor detectable in air at a concentration not exceeding one-fifth (20%) of the Lower Explosive Limit (LEL) of propane (i.e., detectable at or below 0.4% propane in air).
4. QUANTITY, DEMAND PROFILE, AND ORDERING STRUCTURE
4.1. Estimated Quantities and Ordering Structure: The total estimated annual volume is 2,259,447.00 US net liquid gallons (11,297,235.00 US liquid gallons across the five-year Base and Option periods, and 12,426,958.50 US liquid gallons inclusive of the six-month option under FAR 52.217-8). This estimate is based on historical garrison utility consumption data and is provided for evaluation and planning purposes only.
Depending on the results of ongoing market research on GSA eBuy and SAM.gov, the requirement will be administered either as a GSA Multiple Award Schedule (MAS) Blanket Purchase Agreement (BPA) / Order (GSAM Subpart 538.71) or an Open-Market Indefinite-Delivery, Requirements Contract (FAR 52.216-21), utilizing either Firm-Fixed-Price (FFP) annual unit rates or Firm-Fixed-Price with Economic Price Adjustment (FFP-EPA) unit pricing tied to the Mont Belvieu Propane Spot Index. Note that USAG Fort Irwin anticipates a future Utility Energy Services Contract (UESC) natural gas line conversion that may reduce or conclude bulk propane demand prior to the end of the five-year ordering period; accordingly, the Government does not guarantee a minimum or exact volume and will order only its actual verified operational requirements.
| CLIN |
| Contract Period |
| Period of Performance (POP) |
| Estimated Net Quantity (US Gal at 60F) |
| 0001 |
| Base Period (12 Months) |
| May 01, 2027 – Apr 30, 2028 |
| 2,259,447.00 Gal |
| 1001 |
| Option Period 1 (12 Months) |
| May 01, 2028 – Apr 30, 2029 |
| 2,259,447.00 Gal |
| 2001 |
| Option Period 2 (12 Months) |
| May 01, 2029 – Apr 30, 2030 |
| 2,259,447.00 Gal |
| 3001 |
| Option Period 3 (12 Months) |
| May 01, 2030 – Apr 30, 2031 |
| 2,259,447.00 Gal |
| 4001 |
| Option Period 4 (12 Months) |
| May 01, 2031 – Apr 30, 2032 |
| 2,259,447.00 Gal |
| Subtotal |
| 5-Year Subtotal (Base + 4 Options) |
| May 01, 2027 – Apr 30, 2032 |
| 11,297,235.00 Gal |
| 5001 |
| FAR 52.217-8 Extension (6 Months) |
| May 01, 2032 – Oct 31, 2032 |
| 1,129,723.50 Gal |
| Total |
| Total Evaluated Lifecycle Volume |
| May 01, 2027 – Oct 31, 2032 |
| 12,426,958.50 Gal |
4.2. Seasonal Demand Profile: Fort Irwin experiences extreme Mojave Desert seasonal temperature swings, resulting in a pronounced winter heating peak and summer baseline demand curve. The Contractor shall maintain sufficient fleet, driver, and supply-terminal capacity to support the following approximate seasonal distribution without interruption:
Winter Peak Season (November through February — ~55% of Annual Volume): Approximately 280,000 to 330,000 gallons per month (requiring multiple daily transport loads during cold-weather rotational exercises).
Shoulder Season (March through April, and October — ~25% of Annual Volume): Approximately 150,000 to 190,000 gallons per month.
Summer Baseline Season (May through September — ~20% of Annual Volume): Approximately 70,000 to 95,000 gallons per month.
5. DELIVERY MECHANICS & LOGISTICS REQUIREMENTS
5.1. Delivery Destinations and Schedule: Bulk LPG deliveries shall be made F.O.B. Destination directly into four (4) Government-owned, DPW-managed above-ground bulk storage tank farms located within USAG Fort Irwin, CA 92310:
Langford Lake Tank Farm Goldstone Tank Farm Mobilization and Training Equipment Site (MATES) Tank Farm Grey Eagle Tank Farm Each tank farm comprises multiple interconnected horizontal ASME storage vessels ranging from 18,000 to 30,000 gallons individual capacity. All transport vehicles must transit the 37-mile two-lane Fort Irwin Road corridor from Interstate 15 (Barstow, CA) to the installation.
Delivery Window & Reserve Capacity: Routine deliveries shall be performed Monday through Friday between 0700 and 1530 hours Pacific Time, excluding federal holidays, unless emergency or surge weekend/after-hours deliveries are authorized by the Contracting Officer or COR. All scheduled deliveries must arrive within +/- 4 hours of the confirmed DPW scheduling window. Emergency call-out orders during winter peak operations shall be delivered within 24 hours of notification. To mitigate transit risks along the Fort Irwin Road corridor and support winter surge demands, the Contractor shall maintain access to a local reserve terminal or bulk storage capacity within 50 miles of Fort Irwin.
5.2. Cargo Tanker Equipment and Closed-Loop Transfer: All deliveries shall be executed using DOT Specification MC-331 high-pressure steel cargo tank motor vehicles (typically 9,000 to 11,500 water-gallon capacity) equipped with:
Active on-board mechanical or hydraulic liquid transfer pumps (gravity drops or compressor-driven atmospheric venting transfers are prohibited);
Minimum 100 linear feet of hydrostatic-tested, UL/NFPA 58-certified LP-gas liquid transfer hose fitted with standard 2-inch Acme threaded liquid couplings and 1-1/4-inch vapor return couplings compatible with Fort Irwin DPW manifold headers;
Closed-loop vapor equalization connections to prevent fugitive hydrocarbon venting to the atmosphere during offloading; and Operational internal excess-flow valves, remote thermal/pneumatic emergency shut-off systems, and two (2) portable dry-chemical fire extinguishers rated at least 18-B:C.
5.3. Mojave Desert Thermal Expansion & 80.0% Maximum Fill Safety Rule: Ambient summer temperatures at Fort Irwin routinely reach 110F to 120F (43C to 49C). In strict compliance with NFPA 58 Section 7.4.2, Contractor drivers and DPW attendants shall continuously monitor fixed liquid level gauges (rotogauges / slip-tube / float gauges) during transfer and shall never fill any Fort Irwin ASME storage vessel beyond 80.0% of its total water capacity (leaving a minimum 20.0% vapor space for thermal liquid expansion). Any overfill beyond 80.0% shall be immediately safely evacuated by the Contractor into the transport vessel prior to departure at no additional cost to the Government.
6. MEASUREMENT, METERING, AND INVOICING
6.1. Temperature-Compensated Net Gallon Measurement (60F Standard): All bulk LPG delivered and invoiced under this contract/order shall be measured and billed strictly in U.S. Net Liquid Gallons compensated to a standard reference temperature of 60 degrees Fahrenheit (15.6C).
Each delivery vehicle or transfer manifold shall utilize an automatic temperature-compensating (ATC) positive-displacement or Coriolis mass flow meter currently calibrated, certified, and lead-sealed by the California Department of Food and Agriculture (CDFA), Division of Measurement Standards (DMS) (or County Sealer of Weights and Measures).
Where gross gallons are recorded alongside liquid transfer temperature and specific gravity, net billed volume shall be calculated using the Volume Correction Factor (VCF) from ASTM D1250 / API MPMS Chapter 11.2.4 (Table 24E / Table 24F):
Formula: Net Gallons at 60F = Gross Metered Gallons x VCF (at 60F)
6.2. Documentation Accompanying Deliveries (Deliverables): Every individual tanker delivery shall be accompanied by a printed, meter-stamped Bill of Lading (BOL) / Delivery Ticket and quality package provided to the DPW COR or designated receiving inspector prior to driver departure. Each delivery package shall contain:
Delivery Date, Arrival/Departure Time, Vehicle/Trailer Number, and designated Fort Irwin Tank Farm / Vessel ID(s);
Metered Gross Liquid Gallons dispensed and Average Liquid Delivery Temperature (degrees F);
Temperature-Compensated Net Liquid Gallons at 60F (the sole quantity used for WAWF/PIEE invoicing);
Legible signatures and printed names of both the Contractor's CDL Driver and the verifying Fort Irwin DPW Inspector / COR; and Certified refinery/terminal Certificate of Analysis (COA) verifying compliance with ASTM D1835 Grade HD-5 chemical composition and ethyl mercaptan odorization standards.
7. QUALITY ASSURANCE & REJECTION PROTOCOLS
7.1. Government Inspection and Right of Rejection: The Government reserves the right to inspect, sample, and test any shipment prior to, during, or after offloading into Fort Irwin storage vessels in accordance with FAR 52.212-4(a). Any shipment found to be non-conforming—including off-spec propylene/butane content, presence of free water or particulate matter, failure to pass the copper strip corrosion test, or inadequate ethyl mercaptan odorization—shall be immediately rejected at no cost to the Government.
7.2. Contractor Remediation of Contaminated Vessels: If off-specification, un-odorized, or contaminated propane is introduced into any Government storage tank farm due to Contractor error or non-conforming fuel, the Contractor shall bear 100% of the cost and operational responsibility to execute the following remediation steps within 48 hours of notification:
Safely evacuate and pump out all contaminated liquid and vapor from the affected ASME storage vessel(s) and manifold piping using certified recovery equipment;
Transport, flare, or legally dispose of the off-specification product off-post in full compliance with EPA, PHMSA, and California DTSC environmental regulations; and Purge, dry, pressure-test, re-certify the affected Government storage tank(s), and refill the vessel(s) with compliant ASTM D1835 Grade HD-5 propane at the standard contract unit price.
8. FORT IRWIN SITE ACCESS, SECURITY, AND HAZMAT COMPLIANCE
8.1. Installation Access & Pre-Cleared Driver Roster (DBIDS): All commercial HAZMAT transport vehicles must enter and exit USAG Fort Irwin exclusively through the South Gate Access Control Point (ACP) on Fort Irwin Road.
All Contractor drivers and personnel entering the installation must be U.S. citizens or authorized legal residents capable of passing a National Crime Information Center Interstate Identification Index (NCIC-III) background check to obtain a Defense Biometric Identification System (DBIDS) installation access credential.
Pre-Cleared Driver Pool: To prevent gate delays during troop rotations and peak winter heating months, the Contractor shall maintain an active roster of pre-approved, background-cleared primary and backup transport drivers holding active DBIDS installation access credentials throughout the life of the contract.
Gate Inspection Tolerance: All bulk LPG tankers are subject to 100% physical vehicle inspection and Military Working Dog (explosive canine) screening at the South Gate ACP commercial inspection bay. The Contractor's delivery pricing and scheduling shall account for standard 30-to-60-minute security inspection windows without demurrage or detention charges to the Government.
8.2. Driver Licensing and Credentials: Every driver operating a bulk LPG transport vehicle on Fort Irwin shall possess and carry on their person:
A valid Class A Commercial Driver's License (CDL) with active Tank Vehicle (N) and Hazardous Materials (H) endorsements (or combined X endorsement);
A valid Transportation Worker Identification Credential (TWIC) or federally compliant REAL ID credential; and Current DOT Medical Examiner's Certificate and 49 CFR 172.704 HAZMAT training certification (including specialized NFPA 58 cargo tank transfer training).
8.3. Emergency Response and Spill/Release Notification: During all transfer operations, the driver shall remain continuously attendant within 25 feet of the cargo tank transfer controls with unobstructed view of the receiving tank gauges and emergency shut-off valves (ESVs). In the event of an accidental LPG liquid or vapor release, fire, overfill, or equipment failure on the installation, the driver shall immediately activate the emergency shut-off valve (ESV), secure the transfer pump, contact Fort Irwin Central Dispatch at (760) 380-4444, and notify the DPW COR within 15 minutes of any reportable release.