Solicitation W9124A-23-R-0012- Amendment 0001.pdf
PDF 302 KB Posted
- Attached to
- Manholes Federal contract opportunity
- Solicitation number
- W9124A23R0012
About this file
This document is an amendment to a solicitation for manholes. The amendment changes the salient characteristics from manholes sized at 6x6x6 to 6x8x7, and adds a requirement for four knockouts on each side for 4-inch conduit and a sump on the bottom. The agency is the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The solicitation number is W9124A23R0012 and is requesting manholes that are precast concrete with iron racks, pulling irons, and CI frames and covers. Sizes include 4x4x4 deep and 6x8x7 deep, with delivery required by June 9, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation W9124A-23-R-0012.pdf | ||
| 52.204-24 Need Filled In and Signed-Returned.pdf | ||
| 52.204-26 fill in sign and return.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NETCOM/NEC
2133 CUSHING ST
FT HUACHUDA AZ 85613
0011954142
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of amendment 0001 is to:
1. Change the salient characteristics from 6x6x6 to 6x8x7.
2. Add the description of there should be 4 knockouts on each side for 4-inch conduit and sump on bottom.
3. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9124A23R0012
X 9B. DATED (SEE ITEM 11)
16-May-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-May-2023
CODE
ACC-APG
ACC-APG (C41SR)-600 AUGUR ST, BLDG#22208
FT HUACHUCA AZ 85613
W91RUS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W91RUS
FACILITY CODECODE
EMAIL:TEL:
W9124A23R0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN description has changed from Manholes 6' X 6' X 6' to Manholes 6' X 8' X 7'.
The CLIN extended description has changed from:
Manhole Description for (6’x6’x6’): Electrical underground ducts and manholes,manholes, precast w/iron racks & pulling irons, C.I. frame and cover, 6' x 10' x 7' deep, excludes excavation, backfill and cast in place concrete.
To:
Manhole Description for (6’x8’x7’): Electrical underground ducts and manholes,manholes, precast w/iron racks & pulling irons, C.I. frame and cover, 6' x 10' x 7' deep, excludes excavation, backfill and cast in place concrete.
The following have been modified:
SALIENT CHARACTERISTICS
Require Manholes, precast concrete, with iron racks pulling irons, CI frame and cover will be ready for use, the two sizes needed 4'X4’X4’ deep, and 6’X6’X’6'deep.
Manhole Description for (4’x4’x4’): Electrical underground ducts and manholes, manholes, precast w/iron racks & pulling irons, C.I. frame and cover, 4' x 4' x 4' deep, excludes excavation, backfill and cast in place concrete. (qty 30)
Manhole Description for (6’x8’x7’): Electrical underground ducts and manholes, manholes, precast w/iron racks & pulling irons, C.I. frame and cover, 6' x 6' x 6' deep, excludes excavation, backfill and cast in place concrete. Four knockouts on each side for 4-inch conduit and sump on bottom. (qty 5)
Customer asks equipment delivered on site by 09JUNE23
(End of Summary of Changes)