QA - 8-5-2022.docx

DOCX document 12 KB Posted

Attached to
Outdoor LED Display 2 Requirement Federal contract opportunity
Solicitation number
W9124A22R0024
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

View the file

Other files for this federal contract opportunity

Other files attached to Outdoor LED Display 2 Requirement, newest first.
File Type Posted
B08 Weinstein Signs Project Requirements.pdf PDF
B08 Thunderbird Signs Project Requirements.pdf PDF
B08 W9124A22R0024 - RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.Is the contractor responsible for extending power, from the nearest breaker box, to the location where the Digital Signs will be mounted or will the govt provide the power?
2.Is the contractor responsible for extending an Ethernet connection, from the building network switch, to the location where the Digital Signs will be mounted or will the govt provide the Ethernet connection?

ANSWER: That is no for both, DPW is going to get the power and Ethernet to the closest wall, The contractor will do the power connection and Ethernet from the closest outlets.

Work orders are open to complete the electricity part and the data conduit with DPW.

As for the size the 4 X 8 will be preferable with a 4mm pitch.”