QA - 8-5-2022.docx
DOCX document 12 KB Posted
- Attached to
- Outdoor LED Display 2 Requirement Federal contract opportunity
- Solicitation number
- W9124A22R0024
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 Weinstein Signs Project Requirements.pdf | ||
| B08 Thunderbird Signs Project Requirements.pdf | ||
| B08 W9124A22R0024 - RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| 1. | Is the contractor responsible for extending power, from the nearest breaker box, to the location where the Digital Signs will be mounted or will the govt provide the power? |
| 2. | Is the contractor responsible for extending an Ethernet connection, from the building network switch, to the location where the Digital Signs will be mounted or will the govt provide the Ethernet connection? |
ANSWER: That is no for both, DPW is going to get the power and Ethernet to the closest wall, The contractor will do the power connection and Ethernet from the closest outlets.
Work orders are open to complete the electricity part and the data conduit with DPW.
As for the size the 4 X 8 will be preferable with a 4mm pitch.”