This document contains questions and answers related to solicitation W9124A22R0019 for repair of facility building 41410 on Fort Huachuca in Arizona. The solicitation is a firm fixed-price, lowest price technically acceptable contract to be awarded on an all-or-none basis to the offeror meeting all terms and conditions. The work includes routing new 12-strand fiber optic cable on existing poles to a maintenance hole, providing as-built site plans showing underground utilities, and revising the statement of objectives. Proposals are due by August 11, 2022. The solicitation is set aside for small businesses and issued by the Department of the Army Materiel Command Army Contracting Command in Aberdeen, Maryland.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Repair Building 41410
12 August 2022
1. SOO 4.01.25 states to route the new 12 strand fiber on the existing poles to the “closest Government fiber splice point”. Please provide the location of this splice point.
Answer: There are two access points for the underground fiber network. One access point is a hand hole and one access point is a man-hole/maintenance hole. The contractor shall provide one new four-inch diameter SCH 40 PVC conduit to MH-27 for the 12 strands. Multiple drawings (4) are provided showing the path from the maintenance hole to building 22324, along Augur.
2. On page 6 of 43 of the B08 Amendment 0001 Solicitation W9124A22R0019
Section F Proposal Preparation Item No. 3, the instruction states that the Technical Proposal and schedule are limited to 15 pages. Does the 15 pages include the Price Summary with CLIN, or could it be a separate section of the Proposal and excluded from the 15-page maximum count?
Answer: The price summary is a separate section of the proposal.
3. Are as-built site plans available for review? We are looking to review where existing utilities, cistern location and Fire Line pressures are located.
Answer: Two plan sheets will be provided. One plan sheet shows underground communications and the other plan sheet shows all other underground utilities. The existing underground storm water detention tank for Building 41408 is south west of the facility. No work is planned for this separate system due to its’ location to the facility.
4. Are there any changes to the Statement of Objectives (SOO).
Answer: Yes there will be a revised SOO.
JAY.ROBERT.LEE.JR.12 Digitally signed by
20861569 Project Manager
JAY.ROBERT.LEE.JR.1220861569
Date: 2022.08.03 17:30:52 -07'00'
File details come from the government source that posted it. Updated .