DRAFTCampbell-Refuse&RecyclePRS.pdf

PDF 96 KB Posted

Attached to
Ft Campbell Refuse & Recycle Collection Federal contract opportunity
Solicitation number
W91248-18-R-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Bragg

About this file

DRAFT Performance Requirement Summary (PRS)

View the file

Other files for this federal contract opportunity

Other files attached to Ft Campbell Refuse & Recycle Collection, newest first.
File Type Posted
DRAFTTechnicalExhibits_1&_2.pdf PDF
DRAFTPerformanceWorkStatement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – Performance Requirements Summary (PRS)

The Government Contracting Officer’s Representative (COR) will receive complaints from customers, validate and pass them to the Contractor’s Project Manager for correction.

100% inspection means inspecting the requirement every time it occurs

REQUIRED

SERVICE

PARAGRAPH

PERFORMANCE

STANDARD

MINIMUM

ACCEPTABLE

STANDARDS

(MAS)

SURVEILLANCE

METHOD

PAYMENT

DEDUCTION

FOR

EXCEEDING

PERFORMANCE

REQUIREMENTS

Emptying Post

Refuse

Containers

5.1.2

Containers are emptied IAW service frequency requirements

No more than

10% of containers not being serviced according to stated frequency schedule

Random inspections and customer complaints

10%

Emptying of

Post Recycle

5.2.3

Containers are emptied IAW frequency requirements

No more than

10% of containers not being serviced according to stated frequency schedule

Random inspections and customer complaints

10%

Operation of

Convenience

Center

5.3

6 days per week operation and customer satisfaction

Provide ample containers for all materials identified in this contract. No overflow or non-availability of any container in the

Convenience

Center

Random inspections and customer complaints

10%

Data

Management

5.7.2

5.7.5

Submit all reports complete, in the correct format, and on time

Data may not contain more than 3% of incorrect, inaccessible, or inappropriate information

Review and analysis of reports to insure all performance requirements are met

5%

Special Events 5.1.4

5.2.5

Adequate containers for specified requirements

Specified number and type of containers are provided in the specified locations

Inspection before and after special event

5%

Container

Cleaning

5.1.9

5.2.7 cleaned to avoid odors and vectors

95% of all containers to be void of odors.

No evidence of vectors

Random inspections and customer complaints

10%

Reports 5.2.4

5.5.1

5.7.7

Monthly/Annual reporting

100% of reports are required

Report submitted within 5 days of the end of the reporting month

10%

Project

Management

1.5.1 Project Manager

to be available during hours of operation and be responsible for overall performance and coordination

Available 100% of the time during operating hours.

Must meet all requirements of the contract

95% of the time

Response to issues within 2 hours of notification

5%

Quality

Control

1.8.1

1.8.2

1.8.3

Maintain the

Quality Control program. Submit and update the

Quality Control

Plan for refuse and recycle collection as well as operation of the

Convenience

Center

No more than

5% of non compliance with the elements of the

Quality Control

Plan

Random inspection of elements of the

QC plan.

Customer complaints related to elements of the

QC plan

10%

Refuse/Recycle

Work Plan

5.7.1

Develop a

Refuse/Recycle

Work plan indicating location, size, type, and service frequency for each type of solid waste collected

Compliance with Work Plan

95% of the time. Submit an updated

No more than 5% variance with the

Work Plan.

Submit updated quarterly

1%

Collection of

Bulky Waste

5.1.3 Provide labor and

equipment to pick up bulky items

Pick up bulky items on call

Inspection of locations with bulky items on the day of no-call service

REQUIRED

SERVICE

PARAGRAPH

PERFORMANCE

STANDARD

MINIMUM

ACCEPTABLE

STANDARDS

(MAS)

SURVEILLANCE

METHOD

PAYMENT

DEDUCTION

FOR

EXCEEDING

PERFORMANCE

REQUIREMENTS

Clean Up

Around

Containers

5.1.5 Clean Up of

extraneous materials within

15 feet of container

100% clean up at time of service

Random inspections and customer complaints

1%

Refuse/Recycle

Containers

4.1.1

5.1.2

Provide the number of containers required for collection of solid waste

Meet 100% of the requirement for containers to avoid overflow of solid waste containers

Random inspections and customer complaints

1%

Physical

Appearance

1.5.3

4.1.1

4.3.1

Vehicles to be compliant with state and federal standards.

Contractors to meet specifications for color and physical condition.

Personnel uniforms are as approved by the

Government

Not less than

95% compliance with the requirements for vehicles, containers, equipment, and personnel uniforms

Random inspections and customer complaints

File details come from the government source that posted it. Updated .