This document is a sources sought notice issued by the Mission and Installation Contracting Command Fort Bragg seeking capability statements from interested small businesses for pumping and cleaning of grease traps and septic tanks located on Fort Bragg, North Carolina. The conceptual acquisition strategy is to establish a single firm-fixed price contract with a thirty-day phase-in period, an eleven-month base period, and include four twelve-month option periods. Interested sources are requested to submit no more than two pages addressing their company information, socioeconomic status, percentage of work to be performed as prime contractor, relevant experience in the past three years, office locations, permanent staff size, and capabilities to fulfill the requirement by September 27, 2019. The government will consider all comments for a potential future solicitation.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Base Operations
Pumping and Cleaning of Grease traps and Septic tanks
3/27/2019
Table of Contents
INTRODUCTION
Background Objectives Climatic Conditions
1.4 Facility Access
1.5 Traffic Flow
1.6 Drainage
1.7 Restoration of Landscape Damage
1.8 Dust Suppression
2.0 REQUIREMENTS
2.1 Description of Services
2.1.1 Non-Personal Services
2.1.2 General Information
2.1.3 Place of Performance and Hours of Operation
2.1.4 Federal Holidays
2.1.5 Travel/Temporary Duty
2.1.6 Emergency Services
2.1.7 Contract Administration and management
2.1.8 COR/ACOR Functions
2.1.9 Quality Control (QC)
2.1.10 Subcontract Management
2.1.11 Contractor Employees
2.1.12 Business Relations ................................. Error! Bookmark not defined.
2.2 Work Management
2.2.1 Coordination
2.2.2 General Fund Enterprise Business System (GFEBS)
2.3 As-Builts and Geospatial Information System (GIS)
2.3.1 Maintain As-Builts
2.3.2 Real Property Records Updates
2.3.3 GIS
2.3.4 GIS Support Services
2.3.5 GIS Files
2.3.6 Other Documents
2.4 Historic Property or Archaeological Site
2.4.1 Repair and Replacement
2.5 Special Requirements
2.5.1 Security
2.5.2 Security Training
2.5.3 Safety
2.5.4 Training, Physical Requirements, or other Expertise Required
2.5.5 Environmental Requirements
2.5.6 Contingency Plans
2.6 Job Order Contract (JOC) Quality Assurance (QA)/Inspection Support
2.6.1 Project Support
3.0 PERFORMANCE REQUIREMENTS AND STANDARDS
3.1 High Level Objectives (HLO)
3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs)
3.2 Transition
3.3 Contractor Manpower Reporting Application (CMRA)
3.3.1 Reporting Labor Hours
4.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS) MATRIX
4.1 Quality Assurance .............................................. Error! Bookmark not defined.
4.2 Quality Control Plan (QCP)
5.0 COMMON LEVELS OF SERVICE (CLS)
6.0 DELIVERABLES
7.0 RELATED DOCUMENTS
7.1 Definitions and Acronyms
7.1.1 Definitions
7.1.2 Acronyms
7.2 Applicable Directives, Publications
7.3 Technical Exhibit (TE)
7.4 Government-Furnished Material (GFM)/Property (GFP)/Equipment (GFE) Error!
Bookmark not defined.
7.4.1 Utilities ........................................................ Error! Bookmark not defined.
7.3 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE) .. Error!
Bookmark not defined.
7.5.1 Contractor-Furnished Material and Responsibilities .. Error! Bookmark not defined.
7.5.2 Contractor-Furnished Items ......................... Error! Bookmark not defined.
7.5.3. Contractor Facilities .................................... Error! Bookmark not defined.
7.6 U.S. Department of Labor (DOL) Wage Determination (WD) .. Error! Bookmark not defined.
Introduction. This is a non-personnel services contract to provide pumping and cleaning of septic tanks, grease traps, field latrines, and lift stations at Fort Bragg, Simmons and Pope Army Airfield, Linden Oaks and Camp Mackall, North Carolina. The Government will not exercise any supervision or control over the contract service providers performing the services herein. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor personnel. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS.
Background.
Grease traps are located outside of buildings and are constructed of concrete. Covers on the grease traps are either hinged or removable steel plates, except for the hospital mess hall which has a 2 feet' x 2feet' x 4inches" concrete slab cover. The grease traps are located adjacent to the building listed and are approximately 25 feet from a paved or improved surface.
Septic tanks are located at facilities remote from the cantonment area of Fort Bragg.
The Contractor shall have to remove the earth cover to obtain access to septic tanks.
The Contractor shall replace the earth cover after cleaning is completed and prior to departing the work area. The earth cover does not have to be compacted or tamped.
Septic tank covers are concrete slabs of varying sizes. Field latrines are located in the range areas of Fort Bragg and Camp Mackall.
Field latrines are of the pit or vault type. The Contractor shall notify Chief, Range Control, Building A-1308, telephone (910) 432-2900/6772, at least two (2) days prior to scheduled cleaning of field latrines for escort and accessibility to latrines. Locations and Frequency of Cleaning.
The location and pumping frequency of the grease traps, Septic tanks, field latrines and lift stations are specified in Technical Exhibit 1, Schedule of Services.
Objectives. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the publications in Section 7, Related Documents.
The grease traps at buildings 8-3684 and F-1243, Child Development Centers are located within the building. The Contractor is responsible for scheduling contract work to cause the least disturbance and maximum safety of building occupants. In addition, the Contractor shall be responsible for any cleanup caused by the pumping and cleaning operation. The contractor shall provide pumping and cleaning of septic tanks, grease traps, field latrines, and lift stations at Fort Bragg, Simmons and Pope Army Airfield, Linden Oaks and Camp Mackall, North Carolina. Provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform pumping and cleaning of septic tanks, grease traps, field latrines, and lift stations.
Climatic Conditions. The average annual rainfall is (46) inches; with the wettest months being (May - August). The average annual snowfall is (0.1) inches, with snowfall expected during the period of (December - March). The average frost-free period (growing season) during the year is about (360) days. The first killing frost may be expected about (December), and the last killing frost generally occurs in (March). The average annual maximum and minimum temperatures are approximately (22) and (97) degrees Fahrenheit, respectively. Monthly normal temperatures ranged from a low of
(22) degrees in the month of (January) to a high of (97) degrees in the month of (July).
Summer temperatures often reach (97) degrees Fahrenheit, while sub-freezing weather is common during the winter months.
1.4 Facility Access. N/A
1.5 Traffic Flow. The Contractor shall maintain the free flow of traffic during surfaced area maintenance.
1.6 Drainage. N/A
1.7 Restoration of Landscape Damage. Reserve Trees or other landscape features damaged by the Contractor’s operations shall be restored at no additional cost to the Government. The COR/ACOR will decide the method of restoration for trees or whether damaged trees will be removed.
1.8 Dust Suppression. N/A
2.0 Requirements.
2.1 Description of Services. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform pumping and cleaning of septic tanks, grease traps, field latrines, and lift stations as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract Fort Bragg, Simmons and Pope Army Airfield, Linden Oaks and Camp Mackall, North Carolina has number of septic tanks, grease traps, and field latrines that the contractor shall provide pumping and cleaning for.
2.1.1 Non-Personal Services. The personnel rendering the services are not subject;
either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.2 General Information.
2.1.2.1 Period of Performance (PoP). The period of performance shall be for a one (1) month Phase-In Period, one (1) Base period of 12 months, (4) 12-month option periods and one (1) month Phase-Out Period. The PoP consists of 5 years and 0 months. The PoP is as follows:
Phase-in period 1 December 2019 to 31 December 2019 Base Period 1 January 2020 to 31 December 2020 Option Period I 1 January 2021 to 31 December 2021 Option Period II 1 January 2022 to 31 December 2022 Option Period III 1 January 2023 to 31 December 2023 Option Period IV 1 January 2024 to 31 December 2024 Phase out period 1 December 2024 to 31 December 2024
2.1.3 Place of Performance and Hours of Operation.
2.1.3.1 Place of Performance. The work to be performed under this contract will be performed at the locations listed in Technical Exhibit (TE).
2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from 0730 – 1600 hours, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours.
2.1.4 Federal Holidays. The Contractor’s performance shall not be required on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
2.1.4.1 The Contractor shall provide Pumping and Cleaning service within 2 hours of notification of a priority 1 outside the normal hours of operation as required, including holidays, to support the Directorate of Public Works (DPW) mission. Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the KO. The Program Manager shall be available after normal hours to serve as the central point of contact for Contractor operations.
Contractor personnel shall not be scheduled for overtime work.
2.1.4.2 Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:
a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or
b. Reschedule the work on any day mutually satisfactory.
2.1.4.3 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the KO/COR immediately. The Contractor shall resume operations upon KO/COR notification.
2.1.5 Travel/Temporary Duty. N/A
2.1.6 Emergency Services.
2.1.6.1 The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR/ACOR immediately, not later than (NLT) two (2) hours of the incident.
2.1.6.2 The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.
2.1.7 Contract Administration and management.
2.1.7.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. The KO and COR/ACOR will meet quarterly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Government and signed by both the Program Manager and the KO. The written minutes will be distributed within five (5) workdays after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.
2.1.7.2 Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.1.7.3 The following provides the roles and their respective authority during the performance of the contract:
2.1.7.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO.
In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO.
Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. All submittals and plans will have to be approved by the KO.
2.1.7.3.2 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.
2.1.7.3.2.1 COR Authority. A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.1.7.3.3. COR/ACOR Functions. The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;
maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.
2.1.8 The Contractor, contractor employees, or subcontractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.1.9 Quality Control (QC). Quality Control is the responsibility of the Contractor.
The Contractor shall provide a Quality Control Plan (QCP) ten (10) calendar days after contract is awarded. The Contractor shall provide and maintain a QCP that is acceptable to the KO. Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within five (5) business days prior to implementation.
2.1.9.1 The Contracting Officer Representative Tracking (CORT) Tool (https://wawf.eb.mil/xhtml/auth/home/home.xhtml#) shall be used for nomination, tracking, documentation, and management of CORs IAW DoDI 5000.72, DFARS 201.602-2 and PGI 201.602-2.
2.1.10 Subcontract Management. N/A
2.1.11 Contractor Employees.
2.1.11.1 Key Personnel. Key personnel shall not be added to or removed from the contract without express acknowledgement of the COR. Any changes to the working status of these key personnel shall be transmitted (in writing) to the KO/COR within ten
(10) work days of the proposed change. If, for any reason, any of the key personnel becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days the contractor shall promptly replace personnel with personnel who possess qualifications equal to or better than that of the original employee. The contractor shall ensure all key personnel terminated or released from employment under this contract are replaced within ten (10) work days of the termination.
2.1.11.1.1 The follow are considered key personnel by the Government: The Contractor shall provide a Program Manager (PM) and Alternate Program Manager (APM) who is responsible for the performance of the work under this contract. The Program Manager and Alternate Program Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The APM shall meet or exceed https://wawf.eb.mil/xhtml/auth/home/home.xhtml the same qualifications as the PM. The name of the PM and APM, who shall act for the Contractor when the PM is absent, shall be designated in writing by the Contractor and provided to the KO and COR at the post award conference. The PM or APM shall be available between 0700-1600 hours, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons. Contractor personnel performing work under this contract shall have and maintain a Contractor’s provided identification card at time of the contract start date and for the life of the contract. The Program Manager and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
2.1.11.1.2 Certain administrative personnel will require a Common Access Card (CAC) to access Government systems. CAC permits installation access to all contract employees. These persons shall have, at a minimum, a favorable National Agency Check (NAC).
2.1.11.1.2.1 If a CAC is provided, the CAC shall be worn at all times when performing work under this contract, to include attending Government meetings and conferences.
Unless otherwise specified in the contract, contractor personnel shall wear their CAC in a conspicuous place on the front of exterior clothing and above the waist, except when safety or health reasons prohibit such placement or when being used for computer access.
2.1.11.1.2.2 The contractor shall develop, maintain, and provide to the COR an updated personnel roster by the end of each month, which shall include names and positions of all contractor personnel as well as indicating which employees were issued CAC or other forms of Government identification cards. The contractor shall submit initial personnel roster to the KO and COR/ACOR within ten (10) calendar days after contract award, and daily to the COR/ACOR thereafter.
2.1.11.1.2.3 The Contractor shall immediately report any lost CAC or Government issued identification cards to the COR and Military and/or DoD police agencies. The contractor shall immediately collect the CAC and other Government issued forms of identification upon termination of employee, or at the end of the contract performance period. The CAC and other Government issued forms of identification shall be returned to the COR within one (1) hour of employee termination, or at the end of contract performance period, whichever comes first. (The following is IAW PARC Policy Alert 14-33, Homeland Security Presidential Directive 12 (HSPD-12) issued 31 Dec 13.) Final payment may be delayed if contractor fails to comply with these requirements.
2.1.11.1.3 All Contractor employees performing work under this contract shall be legal U.S. citizens unless the provision of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non- U.S. citizen to perform the required support. The Contractor shall immediately remove any employee that is not a legal U.S. citizen. The Contractor personnel shall be able to communicate clearly in the English language. Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements. They shall have a command of both the written and spoken English language to properly clearly, and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.
2.1.11.1.4 Qualification Standards. N/A
2.1.11.1.5 Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
2.1.11.1.5.1 All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties, are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials.
IAW PARC Policy Alert 14-33, Homeland Security Presidential Directive 12 (HSPD-12) issued 31 Dec 13.
2.1.11.1.6 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. It is essential that all contractor personnel meet the highest standards of professionalism and personal integrity. The contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal prescribed drugs or any other incapacitating agents. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
2.1.11.1.7 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.
2.1.11.2 OCI N/A
2.1.11.2.1 The term “contractor” herein used in section 2.1.11.1.8, Organizational Conflict of Interest, means: (a) the organization (hereinafter referred to as "it" or "its") entering into this agreement with the Government; (b) all business organizations with which it may merge, join or affiliate now or in the future and in any manner whatsoever, or which hold or may obtain, by purchase or otherwise, direct or indirect control of it; (c) it’s parent organization, if any and any of its present or future subsidiaries, associates, affiliates, or holding companies, and; (d) any organization or enterprise over which it has direct or indirect control now or in the future.
2.1.11.2.2 The term "proprietary information" for purposes of section 2.1.11.1.8, Organizational Conflict of Interest, means any information considered so valuable by its owners that it is held secret by them and their licensees. Information furnished voluntarily by the owner without limitations on its use, or which is available without restrictions from other sources, is not considered proprietary.
2.1.11.3 Organizational Conflicts of Interest Examples. The following examples illustrate situations in which organizational conflicts of interest may arise. These examples are not all inclusive.
2.1.11.3.1 Biased Ground Rules. This type of conflict may arise in situations where a company sets the ground rules for a future competition. For example, when a Contractor develops requirements then competes to provide products or services to satisfy those requirements, thus obtaining a competitive advantage.
2.1.11.3.2 Impaired Objectivity. This type of conflict may exist where a Contractor’s obligations under a contract require objectivity, but another role of the Contractor casts doubt on its ability to be truly objective. An example of this type of conflict is where a Contractor’s work under one contract entails evaluating itself, its affiliates, or its competitors under a separate contract.
2.1.11.3.3 Unequal Access to Information. This type of conflict may arise when a contractor has access to nonpublic or proprietary information as part of its performance under a contract that gives it an unfair advantage in a competition for a later contract.
2.1.11.4 General Constraints. The provisions of FAR Subpart 9.5, Organizational and Consultant Conflicts of Interest, concerning organizational conflicts of interest govern this contract. Potential conflicts may exist in accordance with FAR 9.505-1, Providing Systems Engineering and Technical Direction, through 9.505-4, Obtaining Access to Proprietary Information. In this regard, the contractor is responsible for identifying any actual or potential organizational conflicts of interest to the KO that arise as the result of performance under this contract. To avoid or mitigate a potential conflict related to performance under this contract, the KO will impose appropriate constraints such as the constraints discussed below. Since it is impossible to foresee all of the circumstances that might give rise to organizational conflicts of interest, the constraints discussed below are not all inclusive and the KO may impose constraints other than, or in addition to, the constraints listed below.
2.1.11.4.1 N/A.
2.1.11.4.2 N/A.
2.1.11.4.3 The contractor agrees that it will neither evaluate nor advise the Government with regard to its own products or activities. The contractor will objectively evaluate or advise the Government concerning products or activities of any prospective competitors
(FAR 9.505-3).
2.1.11.4.4 The Contractor agrees that if it gains access to proprietary information of other companies, it will exercise diligent effort to protect such proprietary information from unauthorized use or disclosure (FAR 9.505-4). In addition, the contractor agrees to protect the proprietary information of other organizations disclosed to the Contractor during performance of this contract with the same caution that a reasonably prudent contractor would use to safeguard highly valuable property. The contractor also agrees that if it gains access to the proprietary information of other companies it will enter into written agreements with the other companies to protect their information from unauthorized use or disclosure for as long as it remains proprietary and to refrain from using the information for any purpose other than that for which it was furnished. The contractor shall provide copies of such agreements to the KO.
2.1.11.4.5 If the contractor, in the performance of this contract, obtains access to plans, policies, reports, studies, financial plans, data or other information of any nature which has not been released or otherwise made available to the public, the contractor agrees that without prior written approval of the KO, it shall not: (a) use such information for any private purpose unless the information has been released or otherwise made available to the public, or (b) release such information unless release is otherwise authorized under the contract or such information has previously been released or otherwise made available to the public by the Government.
2.1.11.5 Non-Disclosure Agreements. The contractor shall obtain from each employee who has access to proprietary information under this contract, a written agreement which shall in substance provide that such employee shall not, during his/her employment by the contractor or thereafter, disclose to others or use for their benefit, proprietary information received in connection with the work under this contract. The contractor will educate its employees regarding the restrictions imposed by FAR 9.505- 4, so that they will not use or disclose proprietary information or data generated or acquired in the performance of this contract, except as provided herein. The Contractor shall provide a list of Contractor personnel that have completed their Non-Disclosure Agreement in ten (10) working days after contract award. The Contractor shall submit their updated list of Non-Disclosure Agreement to the KO and COR in five (5) working days after new contract personnel hire.
2.1.11.6 Training. The contractor shall effectively educate its employees, through formal training, company policy, information directives and procedures, in an awareness of the legal provisions of FAR Subpart 9.5 and its underlying policy and principles, so that each employee will know and understand the provisions of that Subpart and the absolute necessity of safeguarding information from anyone other than the contractor's employees who have a need to know, and the U.S. Government.
2.1.11.7 Additional Constraints. (If applicable) If this contract provides for the issuance of task or delivery orders, such orders may impose additional requirements and/or restrictions relating to 2.1.11.1.8, to include the requirement for the contractor and its subcontractors and employees to furnish the Government with written non-disclosure agreements or statements of no conflict of interest. With regard to any proposal submitted by the contractor, in response to a Request for Task or Delivery Order Proposal, by submitting its proposal the contractor represents that it has disclosed to the KO, prior to the issuance of the task or delivery order, all facts relevant to the existence or potential existence of organizational conflict of interest as that term is used in FAR Subpart 9.5.
2.1.11.8 Conflicts Involving Future Procurements. The award of this contract, task or delivery orders issued under this contract, Government tasking or acquiescence in the contractor’s performance of services hereunder shall not constitute or be interpreted as a determination that the contractor is eligible to participate in future procurements, developmental efforts, implementation efforts, or related activities. Only the KOs for such efforts, applying the rules, principles, and procedures of FAR Subpart 9.5, have the authority to determine whether a conflict exists, in connection with such procurements.
2.1.11.9 Representations and Disclosures.
2.1.11.9.1 The contractor represents that it has disclosed to the KO, prior to award of this contract, all facts relevant to the existence or potential existence of organizational conflict of interest as that term is used in FAR Subpart 9.5.
2.1.11.9.2 The contractor represents that if it discovers an organizational conflict of interest or potential conflict of interest after award of this contract, a prompt and full disclosure shall be made in writing to the KO. This disclosure shall include a description of the action the contractor has taken or proposes to take in order to avoid or mitigate such conflict.
2.1.11.10 Remedies and Waiver
2.1.11.10.1 For breach of any of the above restrictions or for non-disclosure or misrepresentation of any relevant facts required to be disclosed concerning this contract, the Government may terminate this contract for default, disqualify the contractor for subsequent related contractual efforts, and pursue such other remedies as may be permitted by law or this contract. If, however, in compliance with section 1.6.16., the contractor discovers and promptly reports an organizational conflict of interest or the potential thereof subsequent to contract award, the KO may terminate this contract or any task or delivery order issued under this Contract for convenience, if such termination is deemed to be in the best interest of the Government.
2.1.11.10.2 The parties recognize that this clause has potential effects, which will survive the performance of this contract, and that it is impossible to foresee each circumstance to which it might be applied in the future. Accordingly, the contractor may at any time seek a waiver from the cognizant KO by submitting a full written description of the requested waiver and the reasons in support thereof (FAR 9.503).
2.1.12 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the KO and COR/ACOR corrective action plans, timely identification of issues, and effective management of subcontractors within ten (10) working days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.1.13 Data Rights. The Government has unlimited rights to all documents/material produced under this contract to the extent permitted by the data rights clauses. The parties mutually acknowledge their understanding that this is the Government’s intent.
All documents and materials, to include the source codes of any software, produced under this task order shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the contracting officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
2.1.14 Contractor Travel. Travel is not authorized
2.2 Work Management. N/A
2.2.1 Coordination. The Contractor shall schedule and coordinate with the COR/ACOR to minimize disruptions to the facility mission.
2.2.2 General Fund Enterprise Business System (GFEBS). N/A
2.2.2.1 GFEBS Certification. N/A
2.2.2.2 Preventive Maintenance Orders (PMO). N/A
2.2.2.3 Operations Work Orders (OWO). N/A
2.2.2.4 GFEBS Support. N/A
2.2.2.4.1 Database Tasks/Requirements. N/A
2.3 As-Builts and Geospatial Information System (GIS). N/A
2.3.1 Maintain As-Builts. N/A
2.3.1.1 Support. N/A
2.3.1.2 Training. N/A
2.3.2 Real Property Records Updates. N/A
2.3.3 GIS. N/A
2.3.4 GIS Support Services. N/A
2.3.5 GIS Files. N/A
2.3.6 Other Documents. N/A
2.4 Historic Property or Archaeological Site. N/A
2.4.1 Repair and Replacement. N/A
2.5 Special Requirements.
2.5.1 Security. . Contractor personnel shall have within 10 days of the proposal acceptance and must maintain a background check for the duration of the contract.
Contractor personnel shall comply with all applicable security and safety regulations, guidance, and procedures, including local, referenced in this PWS and in effect at the work sites. All personnel must meet requirements IAW DODD 8570.
2.5.1.1 Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. In addition to the changes otherwise authorized by this contract, the COR/ACOR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.
2.5.1.2 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated, a copy shall be submitted to the KO/COR/ACOR within 30 days of contract award.
2.5.1.3 Contractor Vehicle Registration¶. The Contractor shall register all Contractor-owned or operated vehicles and trailers operating on the installation within ten (10) working days of contract start date. The Contractor shall complete all applications with the Provost Marshal Vehicle Registration section located at the main gate of All American entry, Building Number H-1575. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
2.5.1.4 The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or Security Office.
2.5.1.4.1 This contract is not required to have a clearance.
2.5.1.5 Physical Security. N/A
2.5.1.6 Key Control. The contractor shall establish and implement methods of making sure all keys issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards.
No keys issued to the contractor by the Government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately within one (1) hour report any occurrences of lost or duplicate keys/key cards to the KO and COR.
2.5.1.6.1 In the event keys other than master keys are lost or duplicated, the contractor shall, upon direction of the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying.
When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the contractor.
2.5.1.6.2 The contractor shall prohibit the use of Government issued keys by any persons other than Contractor’s personnel. The Contractor shall prohibit the opening of locked areas by contractor personnel to permit entrance of persons other than Contractor personnel engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.
2.5.1.7 Lock Combinations. N/A.
2.5.1.8 The Contractor will be provided a Government furnished on-site staging area for necessary equipment and materials. The Contractor shall secure the area at the close of each work period. The Contractor shall be solely responsible for any loss or damage of equipment and material. The Contractor shall ensure debris of any type will be disposed of according to local policies and directives.
2.5.2 Security Training.
2.5.2.1 iWATCH Training. The Contractor shall brief the local iWATCH program (training standards provided by the RA’s Anti-Terrorism Officer (ATO)) to all of the Contractor’s employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/ACOR. The Contractor shall complete the training within thirty (30) calendar days of contract award and within five (5) calendar days of new employees commencing performance. The Contractor shall submit employee certificates of completion within 30 calendar days after completion of the training to the COR/ACOR
2.5.2.2 Anti-Terrorism Program
2.5.2.2.1 Anti-Terrorism (AT) Level I Training: Contractor personnel performing work under this contract that require access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after commencing performance under this contract. The Contractor shall submit employee certificates of completion within 30 calendar days after completion of the training. AT Level I awareness training is available at the following website: https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf
2.5.2.3 Contractor Employees Requiring Access to Government Information Systems.
IAW PARC Policy Alert 14-3, Homeland Security Presidential Directive 12 (HSPD-12) issued 31 Dec 13). Contractor shall have access to Government-controlled information systems during performance of work under this contract. All contractor employees and associated subcontractors who require access to a Government information system shall be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DoD Information Assurance Awareness prior to access to the information systems. Training shall be required annually after the initial training. Completion certificates shall be submitted to the COR/ACOR within fifteen (15) calendar days from date of contract award.
2.5.2.4 OPSEC Training. Per AR 530-1, Operations Security, the contractor shall complete Level I OPSEC training within (30) calendar days of contract award and annually thereafter. The Contractor shall submit employee certificates of completion within 30 calendar days after completion of the training to the COR/ACOR.
2.5.3 Safety. The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
2.5.3.1 Safety Plan. The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within ten (10) days of commencement of work. Revisions shall be submitted five (5) calendar days prior to the effective date of change.
2.5.3.1.1 Per Army Regulation 385-10, The Army Safety Program and DPW (385) SOP, Safety, Fire Prevention and Accident Reporting Program, the Safety Officer is responsible for office safety awareness and operation.
2.5.3.1.2 Responsibilities include, but are not limited to:
a. Monthly safety classes (proper reporting of an incident, form familiarization)
b. Monthly fire drills (exiting procedures, consolidation, and location of fire
Extinguishers)
c. License inspections
d. Safety Log inspection
The contractor shall provide copies of all documentation for para. 2.5.3.1.2 to the COR/ACOR upon request.
2.5.3.1.3 Any identified deficiencies will be identified and corrected.
2.5.3.2 Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.
2.5.4 Training, Physical Requirements, or other Expertise Required.
2.5.4.1 The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed in the specific areas required by the State of North Carolina. The Contractor shall ensure employees are certified or licensed in the appropriate Environmental Protection Agency (EPA) areas required. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR/ACOR within prior to employees commencing performance.
2.5.5 Environmental Requirements.
2.5.5.1 Green Procurement. N/A
2.5.5.2 Special Requirements. N/A.
2.5.5.3 Environmental Compliance. The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufactures' recommendations. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance.
2.5.5.4 Spill Plan. The Contractor shall notify the COR/ACOR within one (1) hour, if the Contractor spills or releases any hazardous substances, i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification. The Contractor shall submit a Spill Plan to the KO for approval within thirty (30) days of contract award IAW Spill Prevention Control and Countermeasure Plan.
2.5.6. Contingency Plans. N/A
2.5.6.1 General. The Contractor shall establish, maintain, and implement contingency plans for mobilization, disaster, and labor dispute contingencies. The plans shall assume no Government support to the Contractor workforce. The Contractor shall designate in writing a single contact Designated Contingency Coordinator (DCC) within the Contractor’s organization, within thirty (30) days of contract award, The DCC shall participate and coordinate with the installation contingency and mobilization planning activities. The DCC shall participate in the installation mobilization planning and execution conferences; and shall modify and maintain appropriate Contractor contingency plans to compliment or enhance corresponding installation plans. The Contractor shall submit all plans to the KO for approval within thirty (30) days of contract award.
2.5.6.2 Mobilization Contingency Plan. N/A
2.5.6.3 Disaster Contingency Plan. N/A
2.5.6.4 Dispute Contingency Plan. N/A
2.5.6.5 Plan Updates. The Contractor shall update these plans as changes occur and shall submit a copy of the proposed plan to the KO for approval at least thirty (30) days prior to the proposed effective date of the updated plan.
2.6 Job Order Contract (JOC) Quality Assurance (QA)/Inspection Support. N/A
2.6.1 Project Support. N/A
3.0 Performance Requirements and Standards.
3.1 High Level Objectives (HLO).
3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels
(AQLs).
3.1.1.1 Damage Caused by Contractor. Damages caused by Contractor employees shall be repaired at no cost to the Government. The Contractor shall notify the COR/ACOR immediately or no later than (2) hours once damages have occurred and return the damaged area to its previous condition. The Contractor shall furnish all labor, personnel, materials, and equipment to perform the repair/replacement work.
3.1.1.1.2 Damage Report. The Contractor shall submit a monthly damage report by the 10th of each month to the COR/ACOR that annotates the damage, corrective action, date damage occurred and date corrected.
3.2 Transition (Phase In/Phase Out). The Contractor shall prepare and submit a Phase In/Phase Out Plan within (30) days after receipt of award to be implemented by the Contractor. The Contractor shall have key personnel on board, during the 30 day Phase-In period. The plan shall specify a training program and a date for transferring responsibilities for the work and shall be subject to the KO's approval. The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency.
3.2.1 Phase-In. To minimize any decreases in productivity and to prevent possible negative impact on additional services, the contractor shall have all key personnel on board, during the 30 day phase-in period. During the phase-in period, the contractor shall become familiar with performance requirements, in order to commence full performance of services on the start of the base period of performance. The contractor shall i.e., obtain their CAC or other form of Government identifications, any specific Government training, conducting inventory and transfer of GFP/GFE/GFM during the phase-in period.
3.2.2 Phase-Out: Prior to the completion of this contract, an observation period shall occur, at which time team management personnel of the incoming contractor may observe operations. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of services. The outgoing contractor is ultimately responsible for performing full services IAW the contract, during the phase-out period, and shall not defer any requirements for the purpose of avoiding responsibility or of transferring, such responsibility to the succeeding contractor. The outgoing contractor shall fully cooperate with the succeeding contractor and the Government, so as not to interfere with their work or duties.
3.2.2.1 To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the outgoing contractor shall have all personnel on board during the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .