W91247-17-B-A006_Questions_and_Answers.pdf

PDF 50 KB Posted

Attached to
Repair Damaged Basket Ball Court
Solicitation number
W91247-17-B-A006
Issued by

About this file

W91247-17-B-A006 Questions and Answers

View the file

Other files

File Type Posted
Abstract_of_Offers_(20170724).pdf PDF
W91247-17-B-A-006_Drawing.pdf PDF
W91247-17-B-A006_Amendment_0001.pdf PDF
W91247-17-B-A006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers W91247-17-B-A006

Damaged Basketball court

Q1. What is the extent of floor markings to be applied? (center court logo, border color, foul lines for all baskets, volley ball lines)

A1. Center court logo (DFMWR will provide artwork), NCAA basketball lines (full court (black) and two half courts (red), border color to be blue), Volleyball (full court (white)).

Q2. Are the scoring station hookups (receptacle and scoreboard connections) to be adjusted for the new floor height or removed?

A2. To be removed by contractor. Any other floor inserts will need to be adjusted to meet the new floor elevation and be completely flush with the floor surface.

Q3. How long can the court be out of service for construction?

A3. 180 days is the duration of the contract.

Q4. Are the existing aluminum thresholds to be reused?

A4. New thresholds to be installed by contractor.

Q5. Is the VAT at the main entrance door to be repaired?

A5. No.

Q6. Is there a location in the building that the bleachers could be stored?

A6. There are no place in the building to store the bleachers, but the customer will provide guidance on the bleachers storage.

Q7. Do you have any drawing of the space where this basketball court is with dimensions?

A7. A overall dimension drawing has been incorporated into Section J with amendment 01.

Q8. It appears that a Payment Bond is required. Can you confirm this?

A8. Yes, see FAR 52.228-12 and FAR 52.228-13.

Q9. Is a Bid Bond required?

A9. Yes, see FAR 52.228-12 and FAR 52.228-13.

Q10. Para. 1.1 Scope states that ADA access will be provided at all doors. Para. 5. Specific Tasks does not discuss the ADA access. Is this a requirement and if so does it require door replacement, access ramps, railing, etc?

A10. The ADA access only applies to interior doors. All exterior doors will remain as they are with respect to ADA compliance. The interior doors are expected to have a transition that is at the same elevation on both sides as they currently are. Therefore not requiring any ramp, railings or door replacements.

File details come from the government source that posted it. Updated .