ARCF2016_SREL_Contract1.map.pdf
PDF 2 MB Posted
- Solicitation number
- W9123820R0005
About this file
This sources sought notice seeks capability statements from potential offerors for the American River Common Features 2016 Sacramento River East Levee Contract 1 project. The U.S. Army Corps of Engineers will use the information gathered to determine an acquisition strategy for the future solicitation. The project involves degrading and reconstructing approximately 3 miles of levee along the Sacramento River East Levee to support construction of both deep mix method and slurry trench cutoff walls. Additional work includes constructing drained stability berms, seepage berms, reusing excavated soils as levee fill, importing additional fill, managing excess soils, removing and replacing paved bike paths and utilities, and restoring disturbed areas. All work must be completed by October 31, 2020 to restore the flood protection line. Capability statements are requested by September 18, 2019 and should demonstrate experience with deep mix method cutoff walls between 102-135 feet deep totaling 355,000 square feet and open trench slurry cutoff walls between 50-85 feet deep totaling 635,000 square feet. The estimated contract value is between $25-100 million to be awarded by February 14, 2020.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1085+00 1090+00
1095+00
1100+00
1105+00
1110+00
1115+00
1120+00
1125+00
1130+00
1135+00
1140+00
1145+00
1150+00
1155+00
1160+00
1165+00
1170+00
1175+00
1180+00
1185+00
1190+00
1195+00
1200+00
1205+00
1210+00
1215+00
1220+00
1225+00
1230+00
1235+00
1240+00
1245+00 1250+00
1255+00 1260+00
1265+00 1270+00
1275+00 1280+00
1285+00
1290+00
1295+00
1300+00
1305+00
1310+00
1315+00
1320+00
1325+00
1330+00
1335+00 1340+00
1345+00 1350+001355+001360+00
1365+00 1370+001375+00
1380+001385+00 1390+00
1395+00 1400+001405+00
1410+00 1415+00
1420+00
1425+00
1430+00
1435+00
1440+00
1445+00
1450+00
1455+00
1460+00
1465+00
1470+00
1475+00
1480+00
1485+00
1490+00
1495+00
1500+00
1505+00
1510+00
1515+00
1520+00
1525+00
1530+00
1535+00
1540+00
1545+00
1550+00
1555+00
1560+00 1565+00
1570+00 1575+00
1580+00 1590+00
1595+00 1600+00
1605+00
1610+00 1615+00
1620+00 1625+00
1630+00 1635+00 1645+00
1650+00 1655+00
1660+00 1665+00
1670+00 1675+00
1680+00
1685+00
Sacramento River
§̈¦5
§̈¦5
£¤50
FR
EE
PO
R
T
BL
VD
MEADOWVIEW RD
24TH
S
T
FLORIN RD
POCKET RD
FRUITRIDGE RD
RI
VE
RS
ID
E
BL
VD
STATIONS: 1094+50 - 1096+75 (225')
WELLS: 4 added to existing BERM: Waterside Levee Reconstruction
STATIONS: 1554+00 - 1570+00 (1550')
CUTOFF: SB to SCCB Wall (-10' to -30')
STATIONS: 1570+00 - 1600+00 (3000')
CUTOFF: SB Cutoff Wall (-20')
STATIONS: 1600+00 - 1640+00 (4000')
CUTOFF: SB Wall to (-20')
STATIONS: 1550+00 - 1554+50 (450')
CUTOFF: SB Wall to (-20' to -30')
STATIONS: 1534+40 - 1550+00 (1560')
CUTOFF: DMM to (-105')
STATIONS: 1291+50 - 1300+80 (930')
CUTOFF: DMM to SB Wall (-65' to -15')
STATIONS: 1282+90 - 1291+50 (860')
CUTOFF: DMM Wall to (-80' to -95')
STATIONS: 1199+00 - 1206+00 (700')
CUTOFF: SB Wall to (-30' to -35')
STATIONS: 1125+52 - 1130+00 (448')
BERM: Seepage Berm STATIONS: 1119+80 - 1125+50 (570')
BERM: SB Wall to -10'
STATIONS: 1117+00 - 1119+80 (280')
BERM: SB Wall to -10'
STATIONS: 1096+75 - 1102+00 (525')
BERM: Thicken Berm, Drained Berm
O 0 2,100 4,200
Feet
Date Saved: 3/18/2019 3:18:57 PM
1 in = 1,250 ft
SREL
CONTRACT 1
ARCF 2016
File details come from the government source that posted it. Updated .