AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This solicitation is ammended for the follow ing:

a. To incorporate Performance Work Statement dated 28 June 2018.

b. To incorporate Wage Determination WD 15-5631 (Rev.-6) dated: 01/16/2018.

c. As a result of the above, the solicitation close date has been extended to 20 August 2018 at 11:00am PT.

d. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 59

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123818Q0030

X 9B. DATED (SEE ITEM 11)

31-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2018

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123818Q0030

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

SACRAMENTO RIVER BANK PROTECTION PROJECT (SRBPP)

REVEGETATION INSTALLATION AND ESTABLISHMENT SERVICE CONTRACT

June 28, 2018

Points of Contact

Contractor Owner Company Name Company Address Line 2 address Phone Email

Contracting Officer (KO) Brittaniya J. Poirier U.S. Army Corps of Engineers, Sacramento District Attn: CESPK-CT (Brittaniya Poirier) 1325 J Street Sacramento, CA 95814-2922 Ph: (916) 557-7146 (Fax: 7854) Brittaniya.Poirier@usace.army.mil

Contracting Specialist (POC) Mr. Jennifer R. Sarraga U.S. Army Corps of Engineers, Sacramento District Attn: CESPK-CT (TBD) 1325 J Street Sacramento, CA 95814-2922 Ph: (916) 557-7299 (Fax: 7854) Email: Jennifer.Sarraga@usace.army.mil

COR (Contracting Officer’s Representative)

TBD

U.S. Army Corps of Engineers, Sacramento District Attn: CESPK-ED-DB (TBD) 1325 J Street

Sacramento CA 95814-2922 PH (916) 557- Email:

Safety Officer U.S. Army Corps of Engineers, Sacramento District Attn: CESPK-SO (Curtis Morris) 1325 J Street Sacramento, CA 95814-2922 Ph: (916)557-5358 (Fax: 7854) Email: Curtis.D.Morris@usace.army.mil

Project Manager Mr. Stephen Osgood U.S. Army Corps of Engineers, Sacramento District Attn: CESPK-PPMD (Stephen Osgood) 1325 J Street Sacramento CA 95814-2922 PH (916) 557-6695 Email: Stephen.M.Osgood@usace.army.mil

Payment Questions: Direct payment questions to the COR

For prompt payment, submit invoices to all parties and follow the guidance provided in the Invoicing and Payment paragraph. Payment is NET 30 unless the contractor specifies prompt payment discount terms in the quote/proposal.

Incomplete or inaccurate invoices shall be returned to the contractor for revision.

1. GENERAL: This is a firm fixed price non-personnel services contract to provide Revegetation Installation and Establishment Maintenance at SAC River Mile (RM) 71.3R. The Government shall not exercise any supervision or control over contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 DESCRIPTION OF SERVICES: The overall responsibility of the Contractor is to manage and perform the activities necessary to revegetate 35,750 square feet of the riparian bench and upper bank within the formerly repaired levee area. The contractor shall provide all personnel, equipment, material, tools, supervision, quality control, and other items necessary to ensure that the designated habitats are installed and maintained in order to provide suitable environment for vegetation establishment at this site. Services include, but are not limited to repairing or replacing any damage to existing Beaver Barrier Fence (BBF) or signage around the entire site, providing portable pumps to draw water directly from the adjacent river for irrigation and designing, installing, repairing and replacing the irrigation system that supplies water to the newly installed vegetation at the frequency stated within this contract. Services also include maintaining the vegetation and site infrastructure for the duration of the establishment period, trimming and herbicide spraying of the grasses, irrigating the installed vegetation, weeding around the woody plants, performing plant surveys and submitting monthly records and year end reports, performing replanting where plant survival falls below designated levels, trash removal, and removing above ground irrigation equipment and Beaver Barrier Fence (BBF) after the establishment period is completed. All work will be done during normal Federal workdays in daylight hours. The contractor shall perform to the standards in this contract.

1.2 BACKGROUND: Erosion of the levee structure was confined to the waterside berm. The eroded slope was roughly 1.5:1, including tall vertical sections. The slope consisted of trees and exposed roots, leaving large holes. Repairs completed in December 2017 include a lower bank constructed below the Summer Mean Water Surface Elevation which consists of Quarry Stone.

The gradation of the Quarry Stone is that of a “launch rock” material. The upper bank is constructed above the Summer Mean Water Surface Elevation and consists of soil-filled quarry stone. The upper bank protection is designed with a minimum thickness of 3 ft of soil-filled quarry stone within the erosion areas and 1.5 ft of soil filled quarry stone within areas that are not actively eroding. The riparian bench is composed of quarry stone that provides a surface that can support vegetation, providing overhead cover and near-shore aquatic habitats during the low flow season. The riparian bench quarry stone was covered with a 3”-6” top layer of class II aggregate base material at end of the repair procedure. Soil was not mixed into the underlying quarry stone due to upstream reservoir releases and high water flows.

1.3 OBJECTIVES:

a. To use an innovative and creative technical approach to maintaining newly installed vegetation to develop self-sustaining riparian water edge habitats.

b. Develop a Performance Work Plan (PP) that contains solutions to accomplish the objectives described herein focusing on criteria such as vigorous healthy grasses, trees, and shrubs and an overall natural habitat. Include in the PP a typical work schedule, list of typical materials and equipment the contractor plans to use, labor resources and a quality control plan to monitor the contractor’s performance in meeting the goals. Use whatever method necessary to meet the objectives, as long as the end result satisfies the minimum acceptable levels (MAL) of performance as defined in the Performance Requirements Summary contained in Attachment A and complies with the terms of the contract.

c. The work will be evaluated based on the Quality Assurance Surveillance Plan (QASP), see Attachment B. The QASP includes indicators of success for each of the performance objectives.

d. Provide mitigation vegetation establishment installation and maintenance including, but not limited to install vegetation, install a temporary irrigation system, irrigate, weed, maintain existing beaver barrier fence (BBF) and mitigation signage.

e. To propose a practical solution using innovative and efficient techniques resulting in a satisfactory product.

f. Specifically establish a performance plan focusing on criteria such as complying with environmental requirements, controlling weed growth, removing contractor generated trash and debris. The plan will include a performance work schedule, list of materials, labor, and a quality control plan to monitor the contractor’s performance in meeting the goals.

1.4 SCOPE: Provide all personnel, equipment, material, tools, supervision, quality control, and other items necessary to ensure that the designated habitats are installed and maintained in order to provide suitable environment for vegetation establishment at this site. Services include, but are not limited to repairing or replacing any damage to existing BBF or signage around the entire site, providing portable pumps to draw water directly from the adjacent river for irrigation and designing, installing, repairing and replacing the irrigation system that supplies water to the newly installed vegetation at the frequency stated within this contract. Services also include maintaining the vegetation and site infrastructure for the duration of the establishment period, trimming and herbicide spraying of the grasses, irrigating the installed vegetation, weeding around the woody plants, performing plant surveys and submitting monthly records and year end reports, performing replanting where plant survival falls below designated levels, trash removal, and removing above ground irrigation equipment and BBF after the establishment period is completed. All work will be done during normal Federal workdays in daylight hours.

1.5 PERIOD OF PERFORMANCE: The contract period consists of vegetation installation (+/- 4 weeks) plus one year vegetation establishment. This contract has two Option Items; Option 1 is for the 2nd year of vegetation establishment and Option 2 is for the 3rd year of vegetation establishment. At the completion of each year a yearly report is required which presents all establishment activities as defined within this scope. At the end of the final year a final report which presents a compilation of all establishment years is required.

1.6 PROJECT SCHEDULE: Develop a detailed project schedule showing the timing and duration of all contract line items and any other necessary detail and submit to the KO/CO for approval. The schedule shall be submitted at the pre-work meeting or 30 calendar days from award of contract, whichever occurs first. Provide Schedule in Excel spreadsheet format.

Project schedule shall be kept up to date and an updated schedule shall be submitted every month with the Contractor’s invoice. Project schedule submitted with invoices shall show status of items as completed, in progress or not started. Items in progress shall indicate percentage completion of that item.

1.7 QUALITY CONTROL (QCP): The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The QCP shall list the project’s key design team members along with their functional discipline and state the risks inherent to the project. The QCP shall include an inspection plan covering all services required by this contact; on-site records of all inspections; and methods for identifying and preventing deficiencies in the quality of service performed. See Sections 18 and 19, herein, for more specific requirements.

1.8 RECOGNIZED HOLIDAYS:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day

Independence Day Christmas Day

1.9 HOURS OF OPERATION: The contractor is responsible for conducting business, between the hours of 7:00 am and 5:00 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons.

The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.10 PLACE OF PERFORMANCE: The erosion site at SAC RM 71.3R is located on the right bank of the Sacramento River, approximately seven miles east of Woodland adjacent to County Road 117. This erosion site spans approximately 521 feet and is on the outside of a slight bend.

The rock revetment and soil cover were placed under a different contract which completed repairs in December 2017. This site is accessible from the levee road adjacent to the river. The overall area to be maintained is approximately .82 acre. See Exhibit A ‘Drawings’ for location of the project area.

1.11 TYPE OF CONTRACT: A Firm Fixed Priced contract will be awarded.

1.12 POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS: Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.13 CONTRACTING OFFICER REPRESENTATIVE (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies;

coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.14 IDENTIFICATION OF CONTRACTOR EMPLOYEES: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

The contractor’s personnel will be required to obtain and wear badges in the performance of this service while on the military base and job site.

1.15 TRAVEL: Contractor Travel is non-reimbursable. Travel is Not Separately Priced.

2. DEFINITIONS:

CONTRACTING OFFICER (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and finding on behalf of the Government. Note: The only individual who can legally bind the Government.

CONTRACTING OFFICER’S REPRESENTATIVE (COR): An employee of the U. S.

Government appointed by the Contracting Officer to administer the contract. Such appointment will be in writing and state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding or schedule implications. This individual does NOT have authority to change the terms and conditions of the contract.

CONTRACTOR: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

MAINTENANCE ACCEPTANCE (MA): When all weed control maintenance requirements have been met, the final inspection has been completed and accepted, all reports have been received and accepted by the Government, and an acceptance in writing has been issued by the Government. This MA completes the establishment period.

MAINTENANCE PERIOD (MP): Is the amount of time indicated to perform the required weed control. The MP begins when an ORA is issued and continues until the MP is accepted.

GOVERNMENT: Referenced within this Performance Work Statement is the U.S. Army Corps of Engineers, Sacramento District.

KEY PERSONNEL (KP): Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the key personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

MAINTENANCE: Maintenance tasks include; mowing, herbicide spraying, erosion control repair, reseeding, Tasks that are generally performed during the MP.

PERMISSIBLE EXPOSURE LIMIT (PEL): The maximum amount or concentration of a chemical that a worker may be exposed to under OSHA regulations.

PHYSICAL SECURITY: Actions that prevent the loss or damage of Government property.

POINT OF CONTACT (POC): The person designated by the Contractor as the point of contact for specific matters.

QUALITY ASSURANCE (QA): The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance. Refer to Attachment B.

QUALITY CONTROL (QC): All necessary measures taken by the Contractor to assure that the quality of an end product or service meets contract requirements.

SUBCONTRACTOR: One that enters into a contract with a prime Contractor.

THRESHOLD LIMIT VALUE (TLV): The Threshold Limit Value of a chemical substance is the level to which it is believed a worker can be exposed day after day for a working lifetime without adverse health effects

WORK DAY: The number of hours per day the Contractor provides services in accordance with the contract.

WORK WEEK: Monday through Friday, unless specified otherwise.

3. ACRONYMS:

AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis APP Accident Prevention Plan BMP Best Management Practice (used in context of erosion control for compliance with stormwater pollution requirements) COR Contracting Officer Representative DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation GDA Government Designated Authority KO Contracting Officer OCI Organizational Conflict of Interest ODC Other Direct Costs PEL Permissible Exposure Limit POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan

QC Quality Control QCP Quality Control Program TE Technical Exhibit TLV Threshold Limit Value

4. TASKS:

4.1 Task 1: Provide all submittals to the Contracting Officer. Provide submittals to any other Government Designated Authority as noted for each submittal. Provide submittals in electronic format. Submittal by e-mail is acceptable, where attachments exceed the size limits for email, provide the submittal via FTP site, or by mailing CD’s, DVD’s or Blue Ray discs. Submittals provided on discs must be placed on media of appropriate capacity to avoid single files spanning multiple discs. Thumb drives, flash drives and other such removable media cannot be used on USACE computer systems and will not be accepted for submittals. Refer to the submittal requirements for software and file type. Submit the following plans and schedules:

Project Schedule: Provide a detailed project schedule showing the timing and duration of all contract line items and any other necessary detail. Project schedule shall be kept up to date and an updated schedule shall be submitted every month with the Contractor’s invoice. Project schedule submitted with invoices shall show status of items as completed, in progress or not started. Items in progress shall indicate percentage completion of that item.

o Develop a schedule and submit to the KO and Contracting Officer’s Representative (COR) for approval. The schedule shall be submitted at the pre-work meeting or 30 calendar days from award of contract, whichever occurs first. Provide Schedule in Excel spreadsheet format.

Performance Work Plan: Provide a work plan addressing the approach. Describe all tasks as listed in the Performance Objectives and how each will be performed.

Identify who will undertake the tasks, where the work will be done, what will be done, and task duration. Provide evidence of any required certification, training, or approvals for personnel. Update the work plan as needed on a monthly basis. Submit work plan updates to the COR in electronic format with monthly invoices.

Quality Control Plan (QCP): The QCP shall list the project’s key design team members along with their functional discipline and state the risks inherent to the project. The QCP shall include an inspection plan covering all services required by this contact; on-site records of all inspections; and methods for identifying and preventing deficiencies in the quality of service performed.

o Develop and maintain a complete QCP to assure the requirements of this contract are provided as specified. The KO will review the QCP and list any needed clarifications, and return to Contractor for response, if necessary. The Contractor’s QCP shall include the following or have incorporated into during performance of contract, at a minimum:

o An inspection plan covering all services required by this contact. The inspection plan shall specify the areas to be inspected on either a scheduled or unscheduled basis, how often inspections will be accomplished and documented, and specify the title of the individual(s) who will perform the inspections.

o Provide on-site records of all inspections conducted noting necessary corrective action taken. The Government reserves the right to request copies of any and/or each inspection.

o Incorporation of either active or established internal policy and procedures for updating equipment and procedures that may affect performance of contract.

o On-site records identifying the character, physical capabilities, certifications and ongoing training of each employee performing services under this contract.

o On-site records of any complaints or problems, with procedures taken to allow for corrections and/or elimination before effects caused interruption of performance of contract

Accident Prevention Plan (APP): The Contractor shall prepare the written site-specific Accident Prevention Plan (APP) in accordance with the format and requirements of USACE EM 385-1-1 (2014). Cover all paragraph and subparagraph elements in Appendix A of USACE EM 385-1-1 "Minimum Basic Outline for Preparation of Accident Prevention Plan." Activity Hazard Analyses (AHAs) shall be appended to the APP. The APP shall be used for the project because it will present site specific hazards and provide site specific controls. Where a paragraph or subparagraph element is not applicable to the work to be performed indicate "Not Applicable" next to the heading. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program (SHP). Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all worksite safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed in accordance with the requirements of EM 385-1-1, Appendix A.

Activity Hazard Analysis (AHA) Appendix to the APP. The Contractor shall develop an Activity Hazard Analysis (AHA) for every operation involving site activities presenting hazards. The AHA(s) format shall be in accordance with Figure 1-2 of EM 385-1-1. Subsequent AHAs shall be submitted as amendments to the APP.

The analysis shall identify and evaluate hazards and outline the proposed methods and techniques for the safe completion of each phase of work. At a minimum, the AHA shall define activity being performed, sequence of work, specific safety and health hazards anticipated, control measures (to include personal protective equipment) to eliminate or reduce each hazard to acceptable levels, equipment to be used, inspection requirements, training requirements for all involved, and the competent person in charge of that phase of work.

o For operations using chemicals containing 2,4-D, Sulfometuron, or any other chemicals which have TLVs, PEL standards, or other regulated standards based on known health hazards, a Health Hazard Control Program must be submitted to the COR and the Government Safety Officer. The Health Hazard Control Program shall address the requirements in EM 385-1-1 Section 06.A and be completed by a qualified Industrial Hygienist, or equivalent competent person in Industrial Hygiene operations.

o References. The Contractor’s APP Appendix and subsequent activities shall comply with the following referenced documents (most current version, to include changes, if different than the date referenced), at a minimum:

o EM 385-1-1, USACE Safety & Health Requirements Manual, 30 November 14 Edition.

o http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals /EM_385-1-1.pdf Title 29 Code of Federal Regulations (CFR) 1910, Occupational Safety and Health Standards.

o NIOSH/OSHA/USCG/EPA, Occupational Safety and Health Guidance Manual for Hazardous Waste Activities (October 1985).

o American Conference of Governmental Industrial Hygienists (ACGIH®), TLVs® and BELs®, Threshold Limit Values for Chemical Substances and Physical Agents & Biological Exposure Indices (2016).

o Title 8 California Code of Regulations (CCR) Chapter 4 Subchapter 4, Construction Safety Orders.

o 8 CCR Chapter 4 Subchapter 7, General Industry Safety Orders.

o 8 CCR Sections 3203 & 1509, Injury and Illness Prevention Program. OSHA ancillary safety and health regulations governing certain aspects for this contract include:

o Respiratory Protection (29 CFR 1910.134/8 CCR Section 5144) o Occupational Noise Exposure (29 CFR 1910.95/8 CCR Sections 5095-5100) o Hazard Communication (29 CFR 1910.1200/29 CFR 1926.59/8 CCR Section

5194) o The Control of Hazardous Energy (Lockout/Tagout) (29 CFR 1910.147) o Proposition 65 (22 CCR Section 12000) Chemicals Know to the State to Cause

Cancer or Reproductive Toxicity o Title 3 California Code of Regulations (CCR), Division 6, Pesticides and Pest

Control Operations Injury and Illness Prevention Program (IIPP) The Contractor shall submit their corporate Injury and Illness Prevention Program (IIPP) for projects within the State of California The IIPP shall address all elements of Title 8 California Code of Regulations (CCR) Section 3203 and Section 1509. The IIPP shall be developed under the direct supervision of a qualified SHM.

Environmental Protection Plan (EPP):

o Temporary Work Facility Plan: showing locations of temporary excavation for roads, ingress/egress, material storage, structures, sanitary facilities, fence locations, signs, etc. Show proposed activity in each portion of the site and measures for marking the limits of use areas and areas to be preserved. List measures to be conducted to minimize the amount of mud transported onto paved public roads.

o Spill Control Plan: including procedures, instructions, and reports to be used in the event of an unforeseen spill.

o Herbicide Treatment Plan: including target, dates, times, locations, pesticide trade names, EPA registration numbers, application rates, equipment used, management record keeping and reporting requirements. Update the pesticide treatment plan on a yearly basis and submit by January 15th of each calendar year during the life of the contract to the Government for review. The updated treatment plan shall take into account current climate conditions and current weed growth conditions at the project site. Submit the Pesticide Treatment Plan updates in electronic format. All herbicide application equipment shall be optimized to control drift and overspray, utilizing the best available technology to limit overspray.

o Traffic Control Plan: including advanced notification, warning signs, and physical monitoring and flagging controlling access to work areas. The Traffic Control Plan must also satisfy all relevant requirements for Traffic Control Plans required by EM 385-1-1. This plan also must be appended to the Accident Prevention Plan (APP) as required under EM 385-1-1 (2014).

o General Requirements:

i. Contractor shall verify all existing underground conditions and dimensions prior to excavation.

ii. The job site shall be left in a clean and orderly condition during installation, and all installation debris and excess material shall be removed upon completion of the job. Contractor shall not use Government trash cans, dumpsters, or other waste receptacles.

iii. All work shall comply with the specifications of the contract.

iv. Installation shall be in compliance with all applicable local, state and federal standards.

v. Contractor is subject to all Defense Distribution Depot San Joaquin health and safety regulations and DLA security requirements.

vi. Read and adhere to Air District Rule 8021 such as limiting fugitive dust, speed limitations and submitting Dust Control Plan (DCP) if exceeding 2,500 cubic yards/day of moved, deposited, or relocated bulk materials on at least three days of the project.

vii. Written notification to Air District at least 48 hours to commencing any earthmoving activities and 10 days prior if submitting a DCP.

viii. Submit the DCP to the environmental office.

ix. Any soil-disturbing equipment shall be thoroughly washed prior to bringing on the depot. This is to reduce and possibly prevent invasive/noxious weed growth.

4.2 Task 2: Install 290 cubic yards of topsoil at the riparian bench. Distribute evenly and incorporate top soil existing fines and class II aggregate and compact to 85% compaction.

4.3 Task 3: Design and install an irrigation system to successfully supply water from the source (Sacramento River) to the newly installed vegetation at the rate and frequency that will enhance plant growth and vigor for the duration of the contract. The pump system will conform to the following specifications: See Fish Screening Criteria for Anadromous Salmonids National Marine Fisheries Service Southwest Region, January 1997 for more information):

o Perforated plate: screen openings shall not exceed 3/32 inches (2.38 mm), measured in diameter.

o Profile bar: screen openings shall not exceed 0.0689 inches (1.75 mm) in width.

o Woven wire: screen openings shall not exceed 3/32 inches (2.38 mm), measured diagonally.(e.g.: 6-14 mesh) o Screen material shall provide a minimum of 27% open area.

4.4 Task 4: Harvest and install fascine bundles at Summer Mean Surface Water Elevation on the riparian bench per the details included in the attachments. Install fascines in virgin class II aggregate base material per detail B, Sheet LP-04 of the landscape drawings. Recycled class II aggregate base is not acceptable.

4.5 Task 5: Acquire initial vegetation (plants and plugs) in the size, quantities and species as stated in this contract and the plans.

4.6 Task 6: Install initial vegetation (plants and plugs) in the size, quantities and species as stated in this contract.

4.7 Task 7: Hydro-seed areas shown on plans with the specified seed mix identified in plans.

Refer to Attachment C for incorporated hydro-seed amendments.

4.8 Task 8: 1st Year Beaver Fence Maintenance. Repair or replacing existing BBF around site boundary. Repair or replace areas of the fencing which have been damaged or that would provide an access point for beaver activity on the site.

4.9 Task 9: 1st Year Irrigation. Perform weekly irrigation between April 01st and November 15th. The irrigation frequency (number of watering events per week) is a minimum of two events per week. Additional events may be required in order to enhance/maintain vigorous growth; supplemental events (rate, frequency & dates) are at the Contractor’s discretion in order to meet the minimum standard of establishing a healthy and vigorous mitigation habitat.

4.10 Task 10: 1st Year Trimming/Weeding/Spraying. The project site will be 90% weed free during the establishment year. Weed within 6” radius of each woody plant so that weeds do not grow higher than 3” during the establishment year. Weeds must not compete for soil moisture around the plant and irrigation can properly reach the installed vegetation. Perform mechanical or hand trimming of grasses, weeds, and all herbaceous growth, so that the site is kept in a neat appearance and does not obstruct the woody plants from receiving proper sun and water. Keep the herbaceous growth to a minimum during the new seedlings growth period. Provide a fire suppressor system near trimming activities. Perform herbicide spraying for eradication and control of undesirable and invasive weed species as follows:

Ensure no more than 2% coverage of undesirable and invasive weed species exists in Zones 1 and 2.

Ensure no coverage of undesirable and invasive weed species exists at Zone 3.

4.11 Task 11: 1st Year Clearing site of trash, Remove/Restore impacts from human and animals.

The Contractor has monthly cleared the site within the boundaries of the site of trash and restore impacts from human and animal impacts (e.g. dismantle fire pits, fill burrowing holes)

4.12 Task 12: Provide monthly site records and yearly final survival study report.

Monthly reports must contain a write-up stating the visual appearance of the newly installed vegetation and daily maintenance performed overall impression of site conditions, photos taken at monthly inspections (minimum six photos per month) and any unusual conditions that may be effecting the plant growth. (A standard form will be provided to the Contractor by the USACE COR).

Provide a final plant survival study report. Include construction history, species planted, yearly survival results, and all monthly reports.

Monthly reports must contain a write-up stating the visual appearance of the newly installed vegetation and daily maintenance performed overall impression of site conditions, photos taken at monthly inspections (minimum six photos per month) and any unusual conditions that may be effecting the plant growth. (A standard form will be provided to the Contractor by the USACE COR). Provide one report at the end of each 12 month period for the first years.

Include in the year-end reports all monthly reports, a write up stating the successes and failures related to the mitigation area, and table which presents “initial plant count”, year-end plant count, and percentage of survival for each individual species for each individual year. After the first and second year recount the site identifying the quantity of individual species, and the survival quantity for each species expressed in actual quantities and percentage of survival.

Provide a table with columns and rows which identifies the following:

o Individual plant species installed o Individual plant species survival for each year.

4.13 Option Task 1001: 2nd Year Acquire & Install New Plantings. Replace plant material quantities at the END of the first year of establishment (if awarded) for totals which fall below 90% of the originally installed quantity within each species. Replace in-kind plant material to bring each species up to 90% of the originally installed quantity. (The Government will pay up to 20% of replacement and installation of the third year-end of the non-surviving plants, quantities greater than 20% will be at the Contractor’s expense unless documented extenuating circumstances are declared and negotiated.)

4.14 Option Task 1002: 2nd Year Beaver Fence Maintenance. Repair or replacing existing BBF around site boundary. Repair or replace areas of the fencing which have been damaged or that would provide an access point for beaver activity on the site.

4.15 Option Task 1003: 2nd Year irrigation. Maintain irrigation system to provide weekly irrigation between April 01st and November 15th. The irrigation frequency (number of watering events per week) is a minimum of two events per week. Additional events may be required in order to enhance/maintain vigorous growth; supplemental events (rate, frequency & dates) are at the Contractor’s discretion in order to meet the minimum standard of establishing a healthy and vigorous mitigation habitat.

4.16 Option Task 1004: 2nd Year Trimming/Weeding/Spraying. The project site will be 90% weed free during the establishment year. Weed within 6” radius of each woody plant so that weeds do not grow higher than 3” during maintenance years 2. Weeds must not compete for soil moisture around the plant and irrigation can properly reach the installed vegetation. Perform mechanical or hand trimming of grasses, weeds, and all herbaceous growth, so that the site is kept in a neat appearance and does not obstruct the woody plants from receiving proper sun and water. Keep the herbaceous growth to a minimum during the new seedlings growth period.

Provide a fire suppressor system near trimming activities.

Perform herbicide spraying for eradication and control of undesirable and invasive weed species as follows:

Ensure no more than 2% coverage of undesirable and invasive weed species exists in Zones 1 and 2.

Ensure no coverage of undesirable and invasive weed species exists at Zone 3.

4.17 Option Task 1005: 2nd Year Clearing site of trash, Remove/Restore impacts from human and animals. The Contractor has monthly cleared the site within the boundaries of the site of trash and restore impacts from human and animal impacts (e.g. dismantle fire pits, fill burrowing holes)

4.18 Option Task 1006: Perform plant surveys and providing monthly records and yearly reports.

Monthly reports must contain a write-up stating the visual appearance of the newly installed vegetation and daily maintenance performed overall impression of site conditions, photos taken at monthly inspections (minimum six photos per month) and any unusual conditions that may be effecting the plant growth. (A standard form will be provided to the Contractor by the USACE COR). Provide one report at the end of the 12 month period for the 2nd year.

impression of site conditions, photos taken at monthly inspections (minimum six photos per month) and any unusual conditions that may be effecting the plant growth. (A standard form will be provided to the month period for the first two years.

presents “initial plant count”, year-end plant count, and percentage of survival for each individual species for each individual year. After the first and second year recount the site identifying the quantity of individual o Individual plant species survival for each year.

o Survivorship comparing originally installed with end of year survival for each individual species. Submit one report summary at the end of the first year and one at the end of the second year (if awarded), with a comparison of the two consecutive years for each individual species.

Comparison numbers must be presented in actual quantity and percentages. The year-end report for the second year shall indicate each individual year and the compilation of the two/ years of establishment (as awarded).

4.19 Option Task 2001: 3rd Year Acquire & Install New Plantings. Replace plant material quantities at the END of the second year of establishment (if awarded) for totals which fall below 80% of the originally installed quantity within each species. Replace in-kind plant material to bring each species up to 90% of the originally installed quantity. (The Government will pay up to 10% of replacement and installation of the third year-end of the non-surviving plants, quantities greater than 10% will be at the Contractor’s expense unless documented extenuating circumstances are declared and negotiated.)

4.20 Option Task 2002: 3rdYear Beaver Fence Maintenance. Repair or replacing existing BBF around site boundary. Repair or replace areas of the fencing which have been damaged or that would provide an access point for beaver activity on the site.

4.21 Option Task 2003: 3nd Year irrigation. Maintain irrigation system to provide weekly irrigation between April 01st and November 15th. The irrigation frequency (number of watering events per week) is a minimum of two events per week. Additional events may be required in order to enhance/maintain vigorous growth; supplemental events (rate, frequency & dates) are at the Contractor’s discretion in order to meet the minimum standard of establishing a healthy and vigorous mitigation habitat.

4.22 Option Task 2004: 3rdYear Trimming/Weeding/Spraying. The project site will be 90% weed free during the establishment year. Weed within 6” radius of each woody plant so that weeds do not grow higher than 3” during maintenance years 2. Weeds must not compete for soil moisture around the plant and irrigation can properly reach the installed vegetation. Perform mechanical or hand trimming of grasses, weeds, and all herbaceous growth, so that the site is kept in a neat appearance and does not obstruct the woody plants from receiving proper sun and water. Keep the herbaceous growth to a minimum during the new seedlings growth period.

Provide a fire suppressor system near trimming activities.

Perform herbicide spraying for eradication and control of undesirable and invasive weed species as follows:

Ensure no more than 2% coverage of undesirable and invasive weed species exists in Zones 1 and 2.

Ensure no coverage of undesirable and invasive weed species exists at Zone 3.

4.22 Option Task 2005: 3rd Year Clearing site of trash, Remove/Restore impacts from human and animals. The Contractor has monthly cleared the site within the boundaries of the site of trash and restore impacts from human and animal impacts (e.g. dismantle fire pits, fill burrowing holes)

4.23 Option Task 2006: Perform final site clean up and irrigation system removal. Remove all temporary irrigation equipment and the related accessories from the site. Perform one final clean up of human debris impeding plant growth.

4.24 Option Task 2007: Perform plant surveys and providing monthly records and yearly reports.

Monthly reports must contain a write-up stating the visual appearance of the newly installed vegetation and daily maintenance performed overall impression of site conditions, photos taken at monthly inspections (minimum six photos per month) and any unusual conditions that may be effecting the plant growth. (A standard form will be provided to the Contractor by the USACE COR). Provide one report which includes each of the 12 month periods for all 3 years.

impression of site conditions, photos taken at monthly inspections (minimum six photos per month) and any unusual conditions that may be effecting the plant growth. (A standard form will be provided to the month period for the first two years.

Provide a final report, the final report will cover the total of all years awarded (year 1-base, year 2-option 1, year 3 option 2).

presents “initial plant count”, year-end plant count, and percentage of survival for each individual species for each individual year. After the first and second year recount the site identifying the quantity of individual o Individual plant species survival for each year (end of year 1, 2 & 3), o Survivorship comparing originally installed with end of year survival for each individual species. Submit one report summary at the end of the first year and one at the end of the second year (if awarded), with a comparison of the two consecutive years for each individual species. Comparison numbers must be presented in actual quantity and percentages. The year-end report for the second & three year shall indicate each individual year and the compilation of the two/three years of establishment (as awarded).

6. STANDARDS OF EMPLOYEE CONDUCT: Personnel shall be required to adhere to the following standards of dress and conduct while performing work at the project sites. These regulations are enforceable as per the US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, 2014.

a. Be properly equipped at all times with personal protective and safety equipment. Hard hats and steel-toed shoes will be required in accordance with OSHA requirements.

Contractor employees will maintain personal hygiene.

b. Shall not engage in loud or boisterous behavior or use profane or abusive language.

c. Shall not use intoxicating beverages and/or drugs at the work site.

d. Possession of weapons is prohibited.

7. PARKING: Contractor employees may park privately owned vehicles in the area designated for parking by the COR. Ensure employees park in the appropriate designated parking areas.

Parking at this site is extremely limited. The Government will not invalidate or make reimbursement for parking violations of the Contractor’s employees under any conditions.

8. USE OF SITE FACILITIES:

a. The Government will not be responsible for any loss, damage, or theft. Use responsible acceptable standards of housekeeping and custodial maintenance.

b. The Government will not furnish a storage building at the site. The Contractor may establish facilities to include, but not limited to covered storage, etc. on or in the designated area after such facilities are accepted by the COR. The Government will not be responsible for any damage to or loss of equipment and supplies stored on the Government’s premises. Maintain fire extinguishers and other safety equipment responsibly.

c. Safely store any chemicals, pesticides, herbicides, cleaning solutions, etc. in accordance with manufacturer’s recommendations.