Atch 1 Summary of Work

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91238-17-R-0012 Attachment 1 23 January

Summary 649 MUNS Munitions STAMP/Maintenance & Inspection Facility

Hill AFB, UT

1. Scope of Work

The work for this project is to design and construct a 40,000 square foot (SF) combined Standard Air Munitions Package (STAMP) Maintenance and Inspection Facility at Hill Air Force Base (HAFB), Utah. The Contractor shall provide all labor, equipment, transportation, material and supervision to perform the design and construction of the complete operational facilities. Design and construction shall include all civil, paving, architectural, geotechnical, structural, utilities, landscaping, security, mechanical, electrical, demolition, and communications work to support the necessary construction. Estimated Period of Performance is 580 calendar days.

Note: This intent of this Summary is to provide general project information to interested Offerors of the subject procurement. Conceptual drawings are provided for reference. The complete project requirements, including but not limited to the Specific Technical Engineering and Design Criteria, Functional Design Criteria Room by Room Requirements, including all attachments, Base Facility Design Standard, Architectural Compatibility Guide, will be issued in the Phase 2 solicitation.

2. Description

2.1 The Contractor shall furnish and install all labor, materials, tools, equipment, and supervision necessary to provide a complete and usable project per the Specific Technical Engineering and Design Criteria, Functional Design Criteria Room by Room Requirements, including all attachments, Base Facility Design Standard, Architectural Compatibility Guide and requirements specified herein. Contractor shall include in the design the following features:

• Provide four 30' x 50' drive through munitions Maintenance and Inspection (M&I) bays with 16' x 10' high overhead doors each end of drive-through bays;

• Provide one 150' x 200' drive through Standard Air Munitions Package (STAMP) assembly bay with eight 20' x 12' high overhead doors;

• Facility to include an administrative support core for offices and personnel. Facility will be designed as a permanent construction in accordance with UFC 1-200-01. M&I bays to be furnished with 400 Hz/3 phase power and high pressure air.

• Provide insulated exterior walls, insulated standing seam roof, explosion proof lighting, lightning protection system, fire protection, and supporting facilities including utilities, site improvements, and exterior apron pavement to accommodate munitions and Munitions Material Handling Equipment (MMHE).

• Provide adequate number of parking spaces to support the mission of the facility. This project will comply with DOD Antiterrorism Protection requirements per UFC 4-010-01.

Sustainable principles will be integrated into the design, development, and construction of this project in accordance with UFC 1-200-02.

This is a design-build contract therefore the Contractor is required to perform design work prior to construction. The design of architectural, interior design, structural, mechanical, electrical, civil, landscape and other engineering features of the work shall be accomplished, reviewed, approved and sealed by engineers, architects and interior designers who are licensed professionals with a minimum of six (6) years’ experience to practice in their respective professional field in a state or possession of the United States.

2.2 Special Design Requirements: The structural interior design (SID) shall be designed/supervised by a registered or certified (as appropriate for the state) interior designer who is National Council for Interior Design Qualification (NCIDQ) certified. The Contractor’s team shall include a Leadership in Energy and Environmental Design (LEED) Accredited Professional (LEED AP). The LEED AP shall have the responsibility to coordinate the design and construction efforts in achieving a U.S. Green Building Council (USGBC) LEED Silver rating, using LEED for New Construction version 2009. The hydraulic design, drawings and layout of the sprinkler system shall be prepared by a registered Fire Protection Engineer or National Institute for Certification in Engineering Technologies (NICET) Level 4 technician with 4 years current experience in design of fire protection systems. The geotechnical design shall be performed by a Geotechnical firm with at least five (5) years experience of geotechnical design work within the Ogden/Salt Lake City region. Communications Systems Engineering and Design shall be performed by a Building Industry Consulting Service International (BICSI) Registered Communications Distribution Designer (RCDD). The shop drawings shall be Stamped and Signed by the RCDD certifying compliance with the applicable Electronic Industry Association/Telecommunication Industry Association (EIA/TIA) standards as required. Design of fire alarm system shall be done by a registered (NICET) Level 4 Designer, with at least three

(3) years of current and applicable experience in similar designs. The design drawings must bear the Designer's NICET Level 4 Certification and signature. Contractor shall have experience in Building Envelope with continuous Air Barrier Systems, and Lightning Protection Systems. The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.

The Government’s conceptual facility and site design provided in the RFP documents illustrates intent and functional relationships and does not indicate all necessary construction requirements or components. The Specific Technical Engineering and Design Criteria and Functional Design Criteria Room by Room Requirements describes associated technical, performance and systems requirements The Contractor is responsible for the complete project design, shall retain all responsibilities, and be recognized as the Designer of Record.

3. General Project Requirements:

Contractor shall follow all security requirements for base access. All Contractor and subcontractor personnel will need to obtain badges for all access on base from the security office.

AT Level I Training: All Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at http://jko.jtens.mil

The Contractor shall be responsible for the coordination of work performed by their employees and all subcontractors. The Contractor should inspect all work areas prior to submitting a proposal in accordance with FAR 52.236-3, Site Investigation and Conditions Affecting the Work. It shall be the Contractor’s responsibility to verify all current record drawings prior to the start of any and all design and /or construction work. The Contractor shall be responsible for the coordination and proper relationship of this work to the building premises and thoroughly familiarize themselves with all details of the work and working conditions, to verify all dimensions in the field, and advise the Administrative Contracting Officer (ACO) of any discrepancies before performing any work.

The Contractor is responsible for maintaining the site and all other Contractor controlled areas in such a manner as to minimize the risk of injury or accident to site personnel or others who may be in the area. The Contractor is also responsible for furnishing an identification badge/card to each individual working on the site.

Attachments 2– Site Layout (Draft) 3 – Conceptual Floor Plan (Draft) 4 – Specification section 01 45 00 http://jko.jtens.mil/

Summary
2. Description