ELINS_1503050_Grounds_Maintenance_Reg_5_15_AUG_2016.xlsx

XLSX spreadsheet 157 KB Posted

Attached to
Municipal Services 63rd RSC Region 5
Solicitation number
W91238-16-R-0026
Issued by

About this file

Grounds Maintenance ELINs

View the file

Other files

File Type Posted
ELINS_1800000_Environmental_Reg_5_Jan_19_2016.xlsx XLSX spreadsheet
ELINS_1503050_Grounds_Maintenance_Reg_5_15_AUG_2016.xlsx XLSX spreadsheet
Amendment_1.pdf PDF
ELINS_1503020_Pest_Control_Reg_5_Dec_23_2015.xlsx XLSX spreadsheet
ELINS_1503010_Janitorial_Reg_5_15_AUG_2016.xlsx XLSX spreadsheet
ELINS_1503020_Pest_Control_Reg_5_Dec_23_2015.xlsx XLSX spreadsheet
Proposal_Data_Sheet.pdf PDF
Region_5_PWS.pdf PDF
W91238-16-R-0026.pdf PDF
ELINS_1503010_Janitorial_Reg_5_15_AUG_2016.xlsx XLSX spreadsheet
Corporate_Relevant_Experience.pdf PDF
ELINS_1800000_Environmental_Reg_5_Jan_19_2016.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINS Summary

Grounds Maintenance Services Summary
Service Code: 404
This sheet is filled out automatically as other sheets are completed
CLINTOTAL
0009Base Period Firm Fixed-Price - High Service Level (Green)$0.00
Base Period Firm Fixed-Price - High Service Level (Green) OPTIONAL
0009APCA003$0.00
0009AQCA023$0.00
0009ARCA178$0.00
0009ASCA188$0.00
0009ATCA196$0.00
0010Base Period Firm Fixed-Price - Medium Service Level (Amber)$0.00
Base Period Firm Fixed-Price - Medium Service Level (Amber) OPTIONAL
0010APCA003$0.00
0010AQCA023$0.00
0010ARCA178$0.00
0010ASCA188$0.00
0010ATCA196$0.00
0011Base Period Indefinite Quantity$70,000.00
1009First Option Period Firm Fixed-Price - High Service Level (Green)$0.00
First Period Firm Fixed-Price - High Service Level (Green) OPTIONAL
1009APCA003$0.00
1009AQCA023$0.00
1009ARCA178$0.00
1009ASCA188$0.00
1009ATCA196$0.00
1010First Option Period Firm Fixed-Price - Medium Service Level (Amber)$0.00
First Option Period Firm Fixed-Price - Medium Service Level (Amber) OPTIONAL
1010APCA003$0.00
1010AQCA023$0.00
1010ARCA178$0.00
1010ASCA188$0.00
1010ATCA196$0.00
1011First Option Period Indefinite Quantity$70,000.00
2009Second Option Period Firm Fixed-Price - High Service Level (Green)$0.00
Second Option Period Firm Fixed-Price - High Service Level (Green) OPTIONAL
2009APCA003$0.00
2009AQCA023$0.00
2009ARCA178$0.00
2009ASCA188$0.00
2009ATCA196$0.00
2010Second Option Period Firm Fixed-Price - Medium Service Level (Amber)$0.00
Second Option Period Firm Fixed-Price - Medium Service Level (Amber) OPTIONAL
2010APCA003$0.00
2010AQCA023$0.00
2010ARCA178$0.00
2010ASCA188$0.00
2010ATCA196$0.00
2011Second Option Period Indefinite Quantity$70,000.00
$210,000.00
Note: Either CLIN 0009 or CLIN 0010 (but not both) will be awarded for fixed-price grounds maintenance services, at the discretion of the Contracting Officer.

&F

&A &P of &N

Site Summary Sheet

GROUNDS MAINTENANCE (1503050)

This sheet is filled out automatically as other sheets are completed
CLIN / SUBCLINFacility IDELINSTotal Price
0009Base Period Firm Fixed-Price - High Service Level (Green)
0009AACA002(Items A001 Through A003)$0.00
0009ABCA010(Items A004 Through A006)$0.00
0009ACCA016(Items A007 Through A008)$0.00
0009ADCA065(Items A009 Through A010)$0.00
0009AECA071(Items A011 Through A013)$0.00
0009AFCA088(Items A014 Through A016)$0.00
0009AGCA092(Items A017 Through A019)$0.00
0009AHCA093(Items A020 Through A021)$0.00
0009AJCA095(Items A022 Through A022)$0.00
0009AKCA152(Items A023 Through A024)$0.00
0009ALCA160(Items A025 Through A027)$0.00
0009AMCA165(Items A028 Through A029)$0.00
0009ANCA197(Items A030 Through A032)$0.00
$0.00
0009Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL
0009APCA003(Items A001 Through A003)$0.00
0009AQCA023(Items A004 Through A006)$0.00
0009ARCA178(Items A007 Through A008)$0.00
0009ASCA188(Items A009 Through A011)$0.00
0009ATCA196(Items A012 Through A012)$0.00
$0.00
0010Base Period Firm Fixed-Price - Medium Service Level (Amber)
0010AACA002(Items A101 Through A103)$0.00
0010ABCA010(Items A104 Through A106)$0.00
0010ACCA016(Items A107 Through A108)$0.00
0010ADCA065(Items A109 Through A110)$0.00
0010AECA071(Items A111 Through A113)$0.00
0010AFCA088(Items A114 Through A116)$0.00
0010AGCA092(Items A117 Through A119)$0.00
0010AHCA093(Items A120 Through A121)$0.00
0010AJCA095(Items A122 Through A122)$0.00
0010AKCA152(Items A123 Through A124)$0.00
0010ALCA160(Items A125 Through A127)$0.00
0010AMCA165(Items A128 Through A129)$0.00
0010ANCA197(Items A130 Through A132)$0.00
$0.00
0010Base Period Firm Fixed-Price - Medium Service Level (Amber) OPTIONAL
0010APCA003(Items A101 Through A103)$0.00
0010AQCA023(Items A104 Through A106)$0.00
0010ARCA178(Items A107 Through A108)$0.00
0010ASCA188(Items A109 Through A111)$0.00
0010ATCA196(Items A112 Through A112)$0.00
$0.00
0011Base Period Indefinite Quantity
TOTAL IQ LINE ITEMS - A701 THROUGH A745$70,000.00
1009First Option Period Firm Fixed-Price - High Service Level (Green)
1009AACA002(Items B001 Through B003)$0.00
1009ABCA010(Items B004 Through B006)$0.00
1009ACCA016(Items B007 Through B008)$0.00
1009ADCA065(Items B009 Through B010)$0.00
1009AECA071(Items B011 Through B013)$0.00
1009AFCA088(Items B014 Through B016)$0.00
1009AGCA092(Items B017 Through B019)$0.00
1009AHCA093(Items B020 Through B021)$0.00
1009AJCA095(Items B022 Through B022)$0.00
1009AKCA152(Items B023 Through B024)$0.00
1009ALCA160(Items B025 Through B027)$0.00
1009AMCA165(Items B028 Through B029)$0.00
1009ANCA197(Items B030 Through B032)$0.00
$0.00
1009First Option Period Firm Fixed-Price - High Service Level (Green) OPTIONAL
1009APCA003(Items B001 Through B003)$0.00
1009AQCA023(Items B004 Through B006)$0.00
1009ARCA178(Items B007 Through B008)$0.00
1009ASCA188(Items B009 Through B011)$0.00
1009ATCA196(Items B012 Through B012)$0.00
$0.00
1010First Option Period Firm Fixed-Price - Medium Service Level (Amber)
1010AACA002(Items B101 Through B103)$0.00
1010ABCA010(Items B104 Through B106)$0.00
1010ACCA016(Items B107 Through B108)$0.00
1010ADCA065(Items B109 Through B110)$0.00
1010AECA071(Items B111 Through B113)$0.00
1010AFCA088(Items B114 Through B116)$0.00
1010AGCA092(Items B117 Through B119)$0.00
1010AHCA093(Items B120 Through B121)$0.00
1010AJCA095(Items B122 Through B122)$0.00
1010AKCA152(Items B123 Through B124)$0.00
1010ALCA160(Items B125 Through B127)$0.00
1010AMCA165(Items B128 Through B129)$0.00
1010ANCA197(Items B130 Through B132)$0.00
$0.00
1010First Option Period Firm Fixed-Price - Medium Service Level (Amber) OPTIONAL
1010APCA003(Items B101 Through B103)$0.00
1010AQCA023(Items B104 Through B106)$0.00
1010ARCA178(Items B107 Through B108)$0.00
1010ASCA188(Items B109 Through B111)$0.00
1010ATCA196(Items B112 Through B112)$0.00
$0.00
1011First Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - B701 THROUGH B745$70,000.00
2009Second Option Period Firm Fixed-Price - High Service Level (Green)
2009AACA002(Items C001 Through C003)$0.00
2009ABCA010(Items C004 Through C006)$0.00
2009ACCA016(Items C007 Through C008)$0.00
2009ADCA065(Items C009 Through C010)$0.00
2009AECA071(Items C011 Through C013)$0.00
2009AFCA088(Items C014 Through C016)$0.00
2009AGCA092(Items C017 Through C019)$0.00
2009AHCA093(Items C020 Through C021)$0.00
2009AJCA095(Items C022 Through C022)$0.00
2009AKCA152(Items C023 Through C024)$0.00
2009ALCA160(Items C025 Through C027)$0.00
2009AMCA165(Items C028 Through C029)$0.00
2009ANCA197(Items C030 Through C032)$0.00
$0.00
2009Second Option Period Firm Fixed-Price - High Service Level (Green) OPTIONAL
2009APCA003(Items C001 Through C003)$0.00
2009AQCA023(Items C004 Through C006)$0.00
2009ARCA178(Items C007 Through C008)$0.00
2009ASCA188(Items C009 Through C011)$0.00
2009ATCA196(Items C012 Through C012)$0.00
$0.00
2010Second Option Period Firm Fixed-Price - Medium Service Level (Amber)
2010AACA002(Items C101 Through C103)$0.00
2010ABCA010(Items C104 Through C106)$0.00
2010ACCA016(Items C107 Through C108)$0.00
2010ADCA065(Items C109 Through C110)$0.00
2010AECA071(Items C111 Through C113)$0.00
2010AFCA088(Items C114 Through C116)$0.00
2010AGCA092(Items C117 Through C119)$0.00
2010AHCA093(Items C120 Through C121)$0.00
2010AJCA095(Items C122 Through C122)$0.00
2010AKCA152(Items C123 Through C124)$0.00
2010ALCA160(Items C125 Through C127)$0.00
2010AMCA165(Items C128 Through C129)$0.00
2010ANCA197(Items C130 Through C132)$0.00
$0.00
2010Second Option Period Firm Fixed-Price - Medium Service Level (Amber) OPTIONAL
2010APCA003(Items C101 Through C103)$0.00
2010AQCA023(Items C104 Through C106)$0.00
2010ARCA178(Items C107 Through C108)$0.00
2010ASCA188(Items C109 Through C111)$0.00
2010ATCA196(Items C112 Through C112)$0.00
$0.00
2011Second Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - C701 THROUGH C745$70,000.00

&F

&P of &N

ELINS BASE PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A132
CLIN 0009 - Base Period - Firm Fixed-Price Work - High Service Level (Green)
FACIDSITE NAMESITE CODEStart of Performance:
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
CA002Patton Hall USARC0606A
Firm Fixed-Price Work
A001Improved Grounds (Spec Item 3.1)6.0Month$ - 0$ - 0
A002Semi-Improved Grounds (Spec Item 3.2)6.0Month$ - 0$ - 0
A003Storm Drainage Systems (Spec Item 3.3)6.0Month$ - 0$ - 0
Total CLIN 0009AA (Items A001 Through A003)$0.00
CA010El Monte USARC0626A
Firm Fixed-Price Work
A004Improved Grounds (Spec Item 3.1)7.0Month$ - 0$ - 0
A005Semi-Improved Grounds (Spec Item 3.2)7.0Month$ - 0$ - 0
A006Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0009AB (Items A004 Through A006)$0.00
CA016Garden Grove USARC0620B
Firm Fixed-Price Work
A007Improved Grounds (Spec Item 3.1)6.0Month$ - 0$ - 0
A008Storm Drainage Systems (Spec Item 3.3)6.0Month$ - 0$ - 0
Total CLIN 0009AC (Items A007 Through A008)$0.00
CA065Van Deman Hall USARC0677F
Firm Fixed-Price Work
A009Improved Grounds (Spec Item 3.1)6.0Month$ - 0$ - 0
A010Storm Drainage Systems (Spec Item 3.3)6.0Month$ - 0$ - 0
Total CLIN 0009AD (Items A009 Through A010)$0.00
CA071Tustin USARC0678B
Firm Fixed-Price Work
A011Improved Grounds (Spec Item 3.1)4.0Month$ - 0$ - 0
A012Semi-Improved Grounds (Spec Item 3.2)4.0Month$ - 0$ - 0
A013Storm Drainage Systems (Spec Item 3.3)4.0Month$ - 0$ - 0
Total CLIN 0009AE (Items A011 Through A013)$0.00
CA088Thrall Hall USARC0691A
Firm Fixed-Price Work
A014Improved Grounds (Spec Item 3.1)7.0Month$ - 0$ - 0
A015Semi-Improved Grounds (Spec Item 3.2)7.0Month$ - 0$ - 0
A016Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0009AF (Items A014 Through A016)$0.00
CA092Daniels Hall USARC0692B
Firm Fixed-Price Work
A017Improved Grounds (Spec Item 3.1)6.5Month$ - 0$ - 0
A018Semi-Improved Grounds (Spec Item 3.2)6.5Month$ - 0$ - 0
A019Storm Drainage Systems (Spec Item 3.3)6.5Month$ - 0$ - 0
Total CLIN 0009AG (Items A017 Through A019)$0.00
CA093AMSA #32 (G)0692C
Firm Fixed-Price Work
A020Improved Grounds (Spec Item 3.1)6.5Month$ - 0$ - 0
A021Storm Drainage Systems (Spec Item 3.3)6.5Month$ - 0$ - 0
Total CLIN 0009AH (Items A020 Through A021)$0.00
CA095Holderman Hall USARC0650C
Firm Fixed-Price Work
A022Storm Drainage Systems (Spec Item 3.3)4.0Months$ - 0$ - 0
Total CLIN 0009AJ (Item A022)$0.00
CA152March USARC/ AMSA 19(G)06523
Firm Fixed-Price Work
A023Improved Grounds (Spec Item 3.1)11.0Months$ - 0$ - 0
A024Storm Drainage Systems (Spec Item 3.3)11.0Months$ - 0$ - 0
Total CLIN 0009AK (Items A023 Through A024)$0.00
CA160Costa Mesa USARC0619E
Firm Fixed-Price Work
A025Improved Grounds (Spec Item 3.1)4.0Months$ - 0$ - 0
A026Semi-Improved Grounds (Spec Item 3.2)4.0Months$ - 0$ - 0
A027Storm Drainage Systems (Spec Item 3.3)4.0Months$ - 0$ - 0
Total CLIN 0009AL (Items A025 Through A027)$0.00
CA165March AFRC06529
Firm Fixed-Price Work
A028Improved Grounds (Spec Item 3.1)4.0Months$ - 0$ - 0
A029Storm Drainage Systems (Spec Item 3.3)4.0Months$ - 0$ - 0
Total CLIN 0009AM (Items A028 Through A029)$0.00
CA197Bell AFRC06994
Firm Fixed-Price Work
A030Improved Grounds (Spec Item 3.1)4.0Months$ - 0$ - 0
A031Semi-Improved Grounds (Spec Item 3.2)4.0Months$ - 0$ - 0
A032Storm Drainage Systems (Spec Item 3.3)4.0Months$ - 0$ - 0
Total CLIN 0009AN (Items A030 Through A032)$0.00

Total CLIN 0009 - Base Period - Firm Fixed-Price Work - High Service Level (Green) $0.00

CLIN 0010 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber)

CA002Patton Hall USARC0606A
Firm Fixed-Price Work
A101Improved Grounds (Spec Item 3.1)6.0Month$ - 0$ - 0
A102Semi-Improved Grounds (Spec Item 3.2)6.0Month$ - 0$ - 0
A103Storm Drainage Systems (Spec Item 3.3)6.0Month$ - 0$ - 0
Total CLIN 0010AA (Items A101 Through A103)$0.00
CA010El Monte USARC0626A
Firm Fixed-Price Work
A104Improved Grounds (Spec Item 3.1)7.0Month$ - 0$ - 0
A105Semi-Improved Grounds (Spec Item 3.2)7.0Month$ - 0$ - 0
A106Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0010AB (Items A104 Through A106)$0.00
CA016Garden Grove USARC0620B
Firm Fixed-Price Work
A107Improved Grounds (Spec Item 3.1)6.0Month$ - 0$ - 0
A108Storm Drainage Systems (Spec Item 3.3)6.0Month$ - 0$ - 0
Total CLIN 0010AC (Items A107 Through A108)$0.00
CA065Van Deman Hall USARC0677F
Firm Fixed-Price Work
A109Improved Grounds (Spec Item 3.1)6.0Month$ - 0$ - 0
A110Storm Drainage Systems (Spec Item 3.3)6.0Month$ - 0$ - 0
Total CLIN 0010AD (Items A109 Through A110)$0.00
CA071Tustin USARC0678B
Firm Fixed-Price Work
A111Improved Grounds (Spec Item 3.1)4.0Month$ - 0$ - 0
A112Semi-Improved Grounds (Spec Item 3.2)4.0Month$ - 0$ - 0
A113Storm Drainage Systems (Spec Item 3.3)4.0Month$ - 0$ - 0
Total CLIN 0010AE (Items A111 Through A113)$0.00
CA088Thrall Hall USARC0691A
Firm Fixed-Price Work
A114Improved Grounds (Spec Item 3.1)7.0Month$ - 0$ - 0
A115Semi-Improved Grounds (Spec Item 3.2)7.0Month$ - 0$ - 0
A116Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0010AF (Items A114 Through A116)$0.00
CA092Daniels Hall USARC0692B
Firm Fixed-Price Work
A117Improved Grounds (Spec Item 3.1)6.5Month$ - 0$ - 0
A118Semi-Improved Grounds (Spec Item 3.2)6.5Month$ - 0$ - 0
A119Storm Drainage Systems (Spec Item 3.3)6.5Month$ - 0$ - 0
Total CLIN 0010AG (Items A117 Through A119)$0.00
CA093AMSA #32 (G)0692C
Firm Fixed-Price Work
A120Improved Grounds (Spec Item 3.1)6.5Month$ - 0$ - 0
A121Storm Drainage Systems (Spec Item 3.3)6.5Month$ - 0$ - 0
Total CLIN 0010AH (Items A120 Through A121)$0.00
CA095Holderman Hall USARC0650C
Firm Fixed-Price Work
A122Storm Drainage Systems (Spec Item 3.3)4.0Months$ - 0$ - 0
Total CLIN 0010AJ (Item A122)$0.00
CA152March USARC/ AMSA 19(G)06523
Firm Fixed-Price Work
A123Improved Grounds (Spec Item 3.1)11.0Months$ - 0$ - 0
A124Storm Drainage Systems (Spec Item 3.3)11.0Months$ - 0$ - 0
Total CLIN 0010AK (Items A123 Through A124)$0.00
CA160Costa Mesa USARC0619E
Firm Fixed-Price Work
A125Improved Grounds (Spec Item 3.1)4.0Months$ - 0$ - 0
A126Semi-Improved Grounds (Spec Item 3.2)4.0Months$ - 0$ - 0
A127Storm Drainage Systems (Spec Item 3.3)4.0Months$ - 0$ - 0
Total CLIN 0010AL (Items A125 Through A127)$0.00
CA165March AFRC06529
Firm Fixed-Price Work
A128Improved Grounds (Spec Item 3.1)4.0Months$ - 0$ - 0
A129Storm Drainage Systems (Spec Item 3.3)4.0Months$ - 0$ - 0
Total CLIN 0010AM (Items A128 Through A129)$0.00
CA197Bell AFRC06994
Firm Fixed-Price Work
A130Improved Grounds (Spec Item 3.1)4.0Months$ - 0$ - 0
A131Semi-Improved Grounds (Spec Item 3.2)4.0Months$ - 0$ - 0
A132Storm Drainage Systems (Spec Item 3.3)4.0Months$ - 0$ - 0
Total CLIN 0010AN (Items A130 Through A132)$0.00

Total CLIN 0010 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber) $0.00

&F

&P of &N

ELINS BASE PERIOD FFP (OPTNL)

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH Spec Item C, SPEC ITEM 3 ELINS A001 - A112
CLIN 0009- Base Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
CA003Roark Hall USARC/ AMSA 29(G)0667F
Firm Fixed-Price Work
A001Improved Grounds (Spec Item 3.1)11.0Month$ - 0$ - 0
A002Semi-Improved Grounds (Spec Item 3.2)11.0Month$ - 0$ - 0
A003Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0
Total CLIN 0009AP (Items A001 Through A003)$0.00
CA023Los Alamitos JFTB/ECS16/ASF28
Firm Fixed-Price Work
A004Improved Grounds (Spec Item 3.1)11.0Month$ - 0$ - 0
A005Semi-Improved Grounds (Spec Item 3.2)11.0Month$ - 0$ - 0
A006Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0009AQ (Items A004 Through A006)$0.00
CA178San Diego USARC #2
Firm Fixed-Price Work
A007Improved Grounds (Spec Item C, 3.1)11.0Month$ - 0$ - 0
A008Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0009AR (Items A007 Through A008)$0.00
CA188San Diego USARC #3
Firm Fixed-Price Work
A009Improved Grounds (Spec Item 3.1)11.0Month$ - 0$ - 0
A010Semi-Improved Grounds (Spec Item 3.2)11.0Month$ - 0$ - 0
A011Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0
Total CLIN 0009AS (Items A009 Through A011)$0.00
CA196MCLB Barstow ECS171 C Street (Yermo Annes)
A012Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0009AT (Items A012 Through A012)$0.00

TOTAL FFP LINE ITEMS - A001 THROUGH A012 $0.00

CLIN 0010 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL

CA003Roark Hall USARC/ AMSA 29(G)0667F
Firm Fixed-Price Work
A101Improved Grounds (Spec Item 3.1)11.0Month$ - 0$ - 0
A102Semi-Improved Grounds (Spec Item 3.2)11.0Month$ - 0$ - 0
A103Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0
Total CLIN 0010AP (Items A101 Through A103)$0.00
CA023Los Alamitos JFTB/ECS16/ASF28
Firm Fixed-Price Work
A104Improved Grounds (Spec Item 3.1)11.0Month$ - 0$ - 0
A105Semi-Improved Grounds (Spec Item 3.2)11.0Month$ - 0$ - 0
A106Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0010AQ (Items A104 Through A106)$0.00
CA178San Diego USARC #2
Firm Fixed-Price Work
A107Improved Grounds (Spec Item C, 3.1)11.0Month$ - 0$ - 0
A108Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0010AR (Items A107 Through A108)$0.00
CA188San Diego USARC #3
Firm Fixed-Price Work
A109Improved Grounds (Spec Item 3.1)11.0Month$ - 0$ - 0
A110Semi-Improved Grounds (Spec Item 3.2)11.0Month$ - 0$ - 0
A111Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0
Total CLIN 0010AS (Items A109 Through A111)$0.00
CA196MCLB Barstow ECS171 C Street (Yermo Annes)
Firm Fixed-Price Work
A112Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0010AT(Items A112 Through A112)$0.00

Total CLIN 0010AQ-0010AT (Items A101 Through A112) $0.00

TOTAL FFP LINE ITEMS - A101 THROUGH A112 $0.00

ELINS BASE PERIOD IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A745
CLIN 0011 - Base Period - Indefinite Quantity Work
UNITUNIT OFMIN. ORDER
ELINSHORT DESCRIPTIONFULL DESCRIPTIONPRICEISSUEQTY
A701Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.$ - 0Each1
A702Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.$ - 0Each1
A703Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A704Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A705Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A706Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.$ - 0Each1
A707Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.$ - 0Each1
A708Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.$ - 0Each1
A709Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.$ - 0Each1
A710GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.$ - 0SF50
A711Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A712Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A713Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A714Bedding/Ornamental Plants (4" pot size)All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each10
A715SoddingSod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A716SpriggingSprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A717FertilizeVegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days.$ - 0SF100
A718Dethatch & AerateServices shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance.
Work shall be completed within 14 calendar days.$ - 0SF100
A719AerateGrass shall be aerated to promote health and growth.
Work shall be completed within 10 calendar days.$ - 0SF100
A720Shrub Pruning (Stand-alone plants)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0Each5
A721Hedge Pruning (Continuous Hedging)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0L.F.100
A722Erosion ControlSoil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days.$ - 0SF50
A723UnderbrushingAll brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days.$ - 0SF100
A724Field MowingVegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days.$ - 0SF5,000
A725Control Undesired VegetationRemove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work shall be completed within 10 calendar days.$ - 0LF100
A726Debris RemovalRemove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris.
Work shall be completed within 10 calendar days.$ - 0SF50
Special Event Grass Cutting at the following sites:Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site.
A727CA002$ - 0Each1
A728CA003$ - 0Each1
A729CA010$ - 0Each1
A730CA016$ - 0Each1
A731CA023$ - 0Each1
A732CA065$ - 0Each1
A733CA071$ - 0Each1
A734CA088$ - 0Each1
A735CA092$ - 0Each1
A736CA093$ - 0Each1
A737CA095Xeriscape maintenance instead of mowing at this location to include pruning, weeding, trimming, debris removal, and replacement of mulch/ground cover. Work to be completed in 3 calendar days.$ - 0Each1
A738CA152$ - 0Each1
A739CA160$ - 0Each1
A740CA165$ - 0Each1
A741CA178$ - 0Each1
A742CA188$ - 0Each1
A743CA196$ - 0Each1
A744CA197$ - 0Each1
A745Plant Native VegetationAll native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape.

Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. $ - 0 Each 10

TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A745 $70,000.00

&F

&P of &N

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ELINS FIRST OPTION PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 - B132
CLIN 1009 - First Option Period - Firm Fixed-Price Work - High Service Level (Green)
FACIDSITE NAMESITE CODEStart of Performance:
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
CA002Patton Hall USARC0606A
Firm Fixed-Price Work
B001Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B002Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B003Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AA (Items B001 Through B002)$0.00
CA010El Monte USARC0626A
Firm Fixed-Price Work
B004Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B005Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B006Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AB (Items B004 Through B006)$0.00
CA016Garden Grove USARC0620B
Firm Fixed-Price Work
B007Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B008Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AC (Items B007 Through B008)$0.00
CA065Van Deman Hall USARC0677F
Firm Fixed-Price Work
B009Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B010Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AD (Items B009 Through B010)$0.00
CA071Tustin USARC0678B
Firm Fixed-Price Work
B011Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B012Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B013Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AE (Items B011 Through B013)$0.00
CA088Thrall Hall USARC0691A
Firm Fixed-Price Work
B014Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B015Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B016Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AF (Items B014 Through B016)$0.00
CA092Daniels Hall USARC0692B
Firm Fixed-Price Work
B017Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B018Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B019Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AG (Items B017 Through B019)$0.00
CA093AMSA #32 (G)0692C
Firm Fixed-Price Work
B020Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B021Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AH (Items B020 Through B021)$0.00
CA095Holderman Hall USARC0650C
Firm Fixed-Price Work
B022Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1009AJ (Item B022)$0.00
CA152March USARC/ AMSA 19(G)06523
Firm Fixed-Price Work
B023Improved Grounds (Spec Item 3.1)12.0Months$ - 0$ - 0
B024Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1009AK (Items B023 Through B024)$0.00
CA160Costa Mesa USARC0619E
Firm Fixed-Price Work
B025Improved Grounds (Spec Item 3.1)12.0Months$ - 0$ - 0
B026Semi-Improved Grounds (Spec Item 3.2)12.0Months$ - 0$ - 0
B027Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1009AL (Items B025 Through B027)$0.00
CA165March AFRC06529
Firm Fixed-Price Work
B028Improved Grounds (Spec Item 3.1)12.0Months$ - 0$ - 0
B029Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1009AM (Items B028 Through B029)$0.00
CA197Bell AFRC06994
Firm Fixed-Price Work
B030Improved Grounds (Spec Item 3.1)12.0Months$ - 0$ - 0
B031Semi-Improved Grounds (Spec Item 3.2)12.0Months$ - 0$ - 0
B032Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1009AN (Items B030 Through B032)$0.00

Total CLIN 1009 - First Option Period - Firm Fixed-Price Work - High Service Level (Green) $0.00

CLIN 1010 - First Option Period - Firm Fixed-Price Work - Medium Service Level (Amber)

CA002Patton Hall USARC0606A
Firm Fixed-Price Work
B101Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B102Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B103Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1010AA (Items B101 Through B103)$0.00
CA010El Monte USARC0626A
Firm Fixed-Price Work
B104Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B105Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B106Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1010AB (Items B104 Through B106)$0.00
CA016Garden Grove USARC0620B
Firm Fixed-Price Work
B107Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B108Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1010AC (Items B107 Through B108)$0.00
CA065Van Deman Hall USARC0677F
Firm Fixed-Price Work
B109Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B110Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1010AD (Items B109 Through B110)$0.00
CA071Tustin USARC0678B
Firm Fixed-Price Work
B111Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B112Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B113Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1010AE (Items B111 Through B113)$0.00
CA088Thrall Hall USARC0691A
Firm Fixed-Price Work
B114Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B115Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B116Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1010AF (Items B114 Through B116)$0.00
CA092Daniels Hall USARC0692B
Firm Fixed-Price Work
B117Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B118Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B119Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1010AG (Items B117 Through B119)$0.00
CA093AMSA #32 (G)0692C
Firm Fixed-Price Work
B120Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B121Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1010AH (Items B120 Through B121)$0.00
CA095Holderman Hall USARC0650C
Firm Fixed-Price Work
B122Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1010AJ (Items B122)$0.00
CA152March USARC/ AMSA 19(G)06523
Firm Fixed-Price Work
B123Improved Grounds (Spec Item 3.1)12.0Months$ - 0$ - 0
B124Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1010AK (Items B123 Through B124)$0.00
CA160Costa Mesa USARC0619E
Firm Fixed-Price Work
B125Improved Grounds (Spec Item 3.1)12.0Months$ - 0$ - 0
B126Semi-Improved Grounds (Spec Item 3.2)12.0Months$ - 0$ - 0
B127Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1010AL (Items B125 Through B127)$0.00
CA165March AFRC06529
Firm Fixed-Price Work
B128Improved Grounds (Spec Item 3.1)12.0Months$ - 0$ - 0
B129Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1010AM (Items B128 Through B129)$0.00
CA197Bell AFRC06994
Firm Fixed-Price Work
B130Improved Grounds (Spec Item 3.1)12.0Months$ - 0$ - 0
B131Semi-Improved Grounds (Spec Item 3.2)12.0Months$ - 0$ - 0
B132Storm Drainage Systems (Spec Item 3.3)12.0Months$ - 0$ - 0
Total CLIN 1010AN (Items B130 Through B132)$0.00

Total CLIN 1010 - First Option Period - Firm Fixed-Price Work - Medium Service Level (Amber) $0.00

&F

&P of &N

ELINS FIRST OPTION FFP (OPTNL)

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH Spec Item C, SPEC ITEM 3 ELINS B001 - B112
CLIN 1009 - First Option Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
CA003Roark Hall USARC/ AMSA 29(G)0667F
Firm Fixed-Price Work
B001Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B002Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B003Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AP (Items B001 Through B003)$0.00
CA023Los Alamitos JFTB/ECS16/ASF28
Firm Fixed-Price Work
B004Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0
B005Semi-Improved Grounds (Spec Item 3.2)12.0Month$ - 0$ - 0
B006Storm Drainage Systems (Spec Item C, 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AQ (Items B004 Through B006)$0.00
CA178San Diego USARC #2
Firm Fixed-Price Work
B007Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B008Storm Drainage Systems (Spec Item C, 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AR (Items B007 Through B008)$0.00
CA188San Diego USARC #3
Firm Fixed-Price Work
B009Improved Grounds (Spec Item 3.1)12.0Month$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .