Solicitation_W91238-16-Q-0036.pdf

PDF 491 KB Posted

Attached to
Waterborne and Vault Federal contract opportunity
Solicitation number
W91238-16-Q-0036
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

Solicitation W91238-16-Q-0036

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W91238-16-Q-0036 07-Jun-2016

b. TELEPHONE NUMBER

916-557-7514

8. OFFER DUE DATE/LOCAL TIME

12:00 AM 20 Jun 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912389. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

AARON L WEST

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS X

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W91238 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

NEW HOGAN LAKE

JONATHAN D. WUEBKER

2713 HOGAN DAM ROAD

VALLEY SPRINGS CA 95252-8496

TEL: 209-772-1343 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

18.0

NAICS:

561720

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF109

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W91238-16-Q-0036

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Vault Toilets and Custodial

FFP

Base Year – Waterborne Facilities, Vault Toilets and Custodial - New Hogan Lake

– This is an informational line item only for pricing see sub line items. Contractor shall furnish all labor, materials, tools, equipment, transportation and supervision necessary to clean and service waterless type restrooms located at various sites at New Hogan Lake, CA. All quantities are estimated. For more information, see the Statement of Work – Part B.

Period of Performance is 13 June 2016 – 30 November 2016.

FOB: Destination

NET AMT

0001AA 208 Each Wrinkle Cove

FFP

Wrinkle Cove – Four (4) Restrooms - (52 visits x 4 restrooms – 208 cleanings).

Clean and service four (4 vault toilets every Sunday 13 June 2016 through 30 November 2016. See Statement of Work – Part B for more information.

0001AB 104 Each Fiddleneck

FFP

Two (2) Restrooms – (52 visits x 2 restrooms – 104 cleanings). Clean and service two (2) portable chemical toilets every Sunday 13 June 2016 through 30 November 2016. See Statement of Work – Part B for more information

0001AC 104 Each Fiddleneck Rocky Point

FFP

Fiddleneck (Rocky Point) – Two (2) Restrooms - (52 visits x 2 restrooms – 104 cleanings). Clean and service two (2) vault toilets every Sunday 13 June 2016 through 30 November 2016. See Statement of Work – Part B for more information.

0001AD 198 Each Oak Knoll

FFP

Oak Knoll – Six (6) Restrooms – (33 visits x 6 restrooms – 198 cleanings). Clean and service six (6) vault toilets every Thursday and Monday during the months of 13 June 2016 through 01 September 2016. See Statement of Work – Part B for more information.

0001AE 106 Each Coyote Point

FFP

Coyote Point – Two (2) Restrooms - (53 visits x 2 restrooms =106 cleanings).

Clean and service two (2) vault toilets every Thursday and Monday during the months of 13 June 2016 through 29 September 2016. See Statement of Work – Part B for more information.

0001AF 88 Each Deer Flat

FFP

Deer Flat – Four (4) Restrooms – (22 visits x 4 restrooms = 88 cleanings). Clean and service four (4) vault toilets every Sunday 13 June 2016 through 30 September 2016. See Statement of Work – Part B for more information.

0001AG 52 Each Monte Vista

FFP

Monte Vista – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 13 June 2016 through 30 November 2016. See Statement of Work – Part B for more

0001AH 23 Each Slate Creek

FFP

Slate Creek – One (1) Restroom – (23 visits x 1 restroom = 23 cleanings). Clean and service one (1) portable chemical toilet every other Sunday, during the months of 13 June 2016 through 30 November 2016. See Statement of Work – Part B for

0001AJ 104 Each Whiskey Creek

FFP

Whiskey Creek – Two (2) Restrooms - (52 visits x 2 restrooms = 104 cleanings).

Clean and service two (2) vault toilets every Sunday during the months of 13 June 2016 through 30 November 2016. See Statement of Work – Part B for more

0001AK 52 Each Bear Creek

FFP

Bear Creek – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 13 June 2016 through 30 November 2016. See Statement of Work – Part B for more

0001AL 208 Each Fish Cleaning Station

FFP

Fish Cleaning Station – Two (2) Fish Cleaning Stations – (104 visits x 2 fish cleaning stations = 208 cleanings). Clean and service two (2) fish cleaning stations, one at Acorn Campground and one at Fiddleneck, every Sunday during the months of 13 June 2016 through 30 November 2016. See Statement of Work – Part B for more information

0001AM 52 Each Floating Restroom

FFP

Floating Restroom – Two (2) Restrooms – (26 visits x 2 restrooms = 52 cleanings).

Clean and service two (2) portable chemical toilets, located at Mineshaft Cove, every Thursday during the months of 13 June 2016 through 30 September 2016.

Note: Boat is required for this service – not accessible by land. See Statement of Work – Part B for more information.

0001AN 676 Each Trashcan

FFP

Trashcan – Playground, Cameron Trailhead, Fiddleneck; Monte Vista; Whiskey Creek; Bear Creek – Service thirteen (13) (52 visits x 13 trashcan = 676 servicing).

Trashcans shall be checked and serviced as necessary every Wednesday during the months of 13 June 2016 through 30 November 2016. See Statement of Work –

0001AP 23 Each Slate Creek

FFP

Slate Creek (1) Trashcan – (23 visits x 1 trashcan = 23 servicing). Trashcan shall be checked and serviced as necessary every other Wednesday, during the months of 13 June 2016 through 30 November 2016. See Statement of Work – Part B for

0001AQ 5 Months Acorn/Fiddleneck/Observation Point Summe

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne Cleaning/Service – Summer (See Statement of Work Part B for More Info)

0001AR 7 Months Acorn/Fiddleneck/Observation Point Winte

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne Cleaning/Service – Winter (See Statement of Work Part B for More Info)

OPTION Vault Toilets and Custodial

FFP

Option Year 1- Vault Toilets and Custodial - New Hogan Lake – This is an informational line item only for pricing see sub line items. Contractor shall furnish all labor, materials, tools, equipment, transportation and supervision necessary to clean and service waterless type restrooms located at various sites at New Hogan Lake, CA. All quantities are estimated. For more information, see the Statement of Work – Part B.

Period of Performance is 01 December 2016 – 30 November 2017.

1001AA 208 Each OPTION Wrinkle Cove

FFP

Wrinkle Cove – Four (4) Restrooms - (52 visits x 4 restrooms – 208 cleanings).

Clean and service four (4 vault toilets every Sunday 01 December 2016 through 30 November 2017. See Statement of Work – Part B for more information.

1001AB 104 Each OPTION Fiddleneck

FFP

Fiddleneck – Two (2) Restrooms – (52 visits x 2 restrooms – 104 cleanings).

Clean and service two (2) portable chemical toilets every Sunday 01 December 2016 through 30 November 2017. See Statement of Work – Part B for more

1001AC 104 Each OPTION Fiddleneck Rocky Point

FFP

Fiddleneck (Rocky Point) – Two (2) Restrooms - (52 visits x 2 restrooms – 104 cleanings). Clean and service two (2) vault toilets every Sunday 01 December 2016 through 30 November 2017. See Statement of Work – Part B for more

1001AD 204 Each OPTION Oak Knoll

FFP

Oak Knoll – Six (6) Restrooms – (34 visits x 6 restrooms – 204 cleanings). Clean and service six (6) vault toilets every Thursday and Monday during the months of 12 May 2017 through 05 September 2017. See Statement of Work – Part B for

1001AE 106 Each OPTION Coyote Point

FFP

Coyote Point – Two (2) Restrooms - (53 visits x 2 restrooms =106 cleanings).

Clean and service two (2) vault toilets every Thursday and Monday during the months of 31 March 2017 through 29 September 2017. See Statement of Work –

1001AF 88 Each OPTION Deer Flat

FFP

Deer Flat – Four (4) Restrooms – (22 visits x 4 restrooms = 88 cleanings). Clean and service four (4) vault toilets every Sunday 01 May 2017 through 30 September 2017. See Statement of Work – Part B for more information.

1001AG 52 Each OPTION Monte Vista

FFP

Monte Vista – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 01 December 2016 through 30 November 2017. See Statement of Work – Part B for more

1001AH 23 Each OPTION Slate Creek

FFP

Slate Creek – One (1) Restroom – (23 visits x 1 restroom = 23 cleanings). Clean and service one (1) portable chemical toilet every other Sunday, during the months of 01 December 2016 through 30 November 2017. See Statement of Work – Part B for more information.

1001AJ 104 Each OPTION Whiskey Creek

FFP

Whiskey Creek – Two (2) Restrooms - (52 visits x 2 restrooms = 104 cleanings).

Clean and service two (2) vault toilets every Sunday during the months of 01 December 2016 through 30 November 2017. See Statement of Work – Part B for

1001AK 52 Each OPTION Bear Creek

FFP

Bear Creek – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 01 December 2016 through 30 November 2017. See Statement of Work – Part B for more

1001AL 208 Each OPTION Fish Cleaning Station

FFP

Fish Cleaning Station – Two (2) Fish Cleaning Stations – (104 visits x 2 fish cleaning stations = 208 cleanings). Clean and service two (2) fish cleaning stations, one at Acorn Campground and one at Fiddleneck, every Sunday during the months of 01 December 2016 through 30 November 2017. See Statement of Work – Part B for more information

1001AM 52 Each OPTION Floating Restroom

FFP

Floating Restroom – Two (2) Restrooms – (26 visits x 2 restrooms = 52 cleanings).

Clean and service two (2) portable chemical toilets, located at Mineshaft Cove, every Thursday during the months of 01 April 2017 through 30 September 2017.

Note: Boat is required for this service – not accessible by land. See Statement of

1001AN 676 Each OPTION Trashcan

FFP

Trashcan – Playground, Cameron Trailhead, Fiddleneck; Monte Vista; Whiskey Creek; Bear Creek – Service thirteen (13) (52 visits x 13 trashcan = 676 servicing).

Trashcans shall be checked and serviced as necessary every Wednesday during the months of 01 December 2016 through 30 November 2017. See Statement of Work

– Part B for more information.

1001AP 23 Each OPTION Slate Creek

FFP

Slate Creek (1) Trashcan – (23 visits x 1 trashcan = 23 servicing). Trashcan shall be checked and serviced as necessary every other Wednesday, during the months of 01 December 2016 through 30 November 2017. See Statement of Work – Part

1001AQ 5 Months OPTION Acorn/Fiddleneck/Observation Point Summe

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne

1001AR 7 Months OPTION Acorn/Fiddleneck/Observation Point Winte

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne

OPTION Vault Toilets and Custodial

FFP

Option Year 2- Vault Toilets and Custodial - New Hogan Lake – This is an informational line item only for pricing see sub line items. Contractor shall furnish all labor, materials, tools, equipment, transportation and supervision necessary to clean and service waterless type restrooms located at various sites at New Hogan Lake, CA. All quantities are estimated. For more information, see the Statement of Work – Part B.

Period of Performance is 01 December 2017 – 30 November 2018.

2001AA 208 Each OPTION Wrinkle Cove

FFP

Wrinkle Cove – Four (4) Restrooms - (52 visits x 4 restrooms – 208 cleanings).

Clean and service four (4 vault toilets every Sunday 01 December 2017 through 30 November 2018. See Statement of Work – Part B for more information.

2001AB 104 Each OPTION Fiddleneck

FFP

Fiddleneck – Two (2) Restrooms – (52 visits x 2 restrooms – 104 cleanings).

Clean and service two (2) portable chemical toilets every Sunday 01 December 2017 through 30 November 2018. See Statement of Work – Part B for more

2001AC 104 Each OPTION Fiddleneck Rocky Point

FFP

Fiddleneck (Rocky Point) – Two (2) Restrooms - (52 visits x 2 restrooms – 104 cleanings). Clean and service two (2) vault toilets every Sunday 01 December 2017 through 30 November 2018. See Statement of Work – Part B for more

2001AD 204 Each OPTION Oak Knoll

FFP

Oak Knoll – Six (6) Restrooms – (34 visits x 6 restrooms – 204 cleanings). Clean and service six (6) vault toilets every Thursday and Monday during the months of 12 May 2018 through 05 September 2018. See Statement of Work – Part B for

2001AE 106 Each OPTION Coyote Point

FFP

Coyote Point – Two (2) Restrooms - (53 visits x 2 restrooms =106 cleanings).

Clean and service two (2) vault toilets every Thursday and Monday during the months of 31 March 2018 through 29 September 2018. See Statement of Work –

2001AF 88 Each OPTION Deer Flat

FFP

Deer Flat – Four (4) Restrooms – (22 visits x 4 restrooms = 88 cleanings). Clean and service four (4) vault toilets every Sunday 01 May 2018 through 30 September 2018. See Statement of Work – Part B for more information.

2001AG 52 Each OPTION Monte Vista

FFP

Monte Vista – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 01 December 2017 through 30 November 2018. See Statement of Work – Part B for more

2001AH 23 Each OPTION Slate Creek

FFP

Slate Creek – One (1) Restroom – (23 visits x 1 restroom = 23 cleanings). Clean and service one (1) portable chemical toilet every other Sunday, during the months of 01 December 2017 through 30 November 2018. See Statement of Work – Part

2001AJ 104 Each OPTION Whiskey Creek

FFP

Whiskey Creek – Two (2) Restrooms - (52 visits x 2 restrooms = 104 cleanings).

Clean and service two (2) vault toilets every Sunday during the months of 01 December 2017 through 30 November 2018. See Statement of Work – Part B for

2001AK 52 Each OPTION Bear Creek

FFP

Bear Creek – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 01 December 2017 through 30 November 2018. See Statement of Work – Part B for more

2001AL 208 Each OPTION Fish Cleaning Stations

FFP

Fish Cleaning Station – Two (2) Fish Cleaning Stations – (104 visits x 2 fish cleaning stations = 208 cleanings). Clean and service two (2) fish cleaning stations, one at Acorn Campground and one at Fiddleneck, every Sunday during the months of 01 December 2017 through 30 November 2018. See Statement of

2001AM 52 Each OPTION Floating Restroom

FFP

Floating Restroom – Two (2) Restrooms – (26 visits x 2 restrooms = 52 cleanings).

Clean and service two (2) portable chemical toilets, located at Mineshaft Cove, every Thursday during the months of 01 April 2018 through 30 September 2018.

Note: Boat is required for this service – not accessible by land. See Statement of

2001AN 676 Each OPTION Trashcan

FFP

Trashcan – Playground, Cameron Trailhead, Fiddleneck; Monte Vista; Whiskey Creek; Bear Creek – Service thirteen (13) (52 visits x 13 trashcan = 676 servicing).

Trashcans shall be checked and serviced as necessary every Wednesday during the months of 01 December 2017 through 30 November 2018. See Statement of Work

2001AP 23 Each OPTION Slate Creek

FFP

Slate Creek (1) Trashcan – (23 visits x 1 trashcan = 23 servicing). Trashcan shall be checked and serviced as necessary every other Wednesday, during the months of 01 December 2017 through 30 November 2018. See Statement of Work – Part

2001AQ 5 Months OPTION Acorn/Fiddleneck/Observation Point Summe

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne

2001AR 7 Months OPTION Acorn/Fiddleneck/Observation Point Winte

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne

OPTION Vault Toilets and Custodial

FFP

Option Year 3- Vault Toilets and Custodial - New Hogan Lake – This is an informational line item only for pricing see sub line items. Contractor shall furnish all labor, materials, tools, equipment, transportation and supervision necessary to clean and service waterless type restrooms located at various sites at New Hogan Lake, CA. All quantities are estimated. For more information, see the Statement of Work – Part B.

Period of Performance is 01 December 2018 – 30 November 2019.

3001AA 208 Each OPTION Wrinkle Cove

FFP

Wrinkle Cove – Four (4) Restrooms - (52 visits x 4 restrooms – 208 cleanings).

Clean and service four (4 vault toilets every Sunday 01 December 2018 through 30 November 2019. See Statement of Work – Part B for more information.

3001AB 104 Each OPTION Fiddleneck

FFP

Fiddleneck – Two (2) Restrooms – (52 visits x 2 restrooms – 104 cleanings).

Clean and service two (2) portable chemical toilets every Sunday 01 December 2018 through 30 November 2019. See Statement of Work – Part B for more

3001AC 104 Each OPTION Fiddleneck Rocky Point

FFP

Fiddleneck (Rocky Point) – Two (2) Restrooms - (52 visits x 2 restrooms – 104 cleanings). Clean and service two (2) vault toilets every Sunday 01 December 2018 through 30 November 2019. See Statement of Work – Part B for more

3001AD 204 Each OPTION Oak Knoll

FFP

Oak Knoll – Six (6) Restrooms – (34 visits x 6 restrooms – 204 cleanings). Clean and service six (6) vault toilets every Thursday and Monday during the months of 12 May 2019 through 05 September 2019. See Statement of Work – Part B for

3001AE 106 Each OPTION Coyote Point

FFP

Coyote Point – Two (2) Restrooms - (53 visits x 2 restrooms =106 cleanings).

Clean and service two (2) vault toilets every Thursday and Monday during the months of 31 March 2019 through 29 September 2019. See Statement of Work –

3001AF 88 Each OPTION Deer Flat

FFP

Deer Flat – Four (4) Restrooms – (22 visits x 4 restrooms = 88 cleanings). Clean and service four (4) vault toilets every Sunday 01 May 2019 through 30 September 2019. See Statement of Work – Part B for more information.

3001AG 52 Each OPTION Monte Vista

FFP

Monte Vista – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 01 December 2018 through 30 November 2019. See Statement of Work – Part B for more

3001AH 23 Each OPTION Slate Creek

FFP

Slate Creek – One (1) Restroom – (23 visits x 1 restroom = 23 cleanings). Clean and service one (1) portable chemical toilet every other Sunday, during the months of 01 December 2018 through 30 November 2019. See Statement of Work – Part

3001AJ 104 Each OPTION Whiskey Creek

FFP

Whiskey Creek – Two (2) Restrooms - (52 visits x 2 restrooms = 104 cleanings).

Clean and service two (2) vault toilets every Sunday during the months of 01 December 2018 through 30 November 2019. See Statement of Work – Part B for

3001AK 52 Each OPTION Bear Creek

FFP

Bear Creek – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 01 December 2018 through 30 November 2019. See Statement of Work – Part B for more

3001AL 208 Each OPTION Fish Cleaning Station

FFP

Fish Cleaning Station – Two (2) Fish Cleaning Stations – (104 visits x 2 fish cleaning stations = 208 cleanings). Clean and service two (2) fish cleaning stations, one at Acorn Campground and one at Fiddleneck, every Sunday during the months of 01 December 2018 through 30 November 2019. See Statement of

3001AM 52 Each OPTION Floating Restroom

FFP

Floating Restroom – Two (2) Restrooms – (26 visits x 2 restrooms = 52 cleanings).

Clean and service two (2) portable chemical toilets, located at Mineshaft Cove, every Thursday during the months of 01 April 2019 through 30 September 2019.

Note: Boat is required for this service – not accessible by land. See Statement of

3001AN 676 Each OPTION Trashcan

FFP

Trashcan – Playground, Cameron Trailhead, Fiddleneck; Monte Vista; Whiskey Creek; Bear Creek – Service thirteen (13) (52 visits x 13 trashcan = 676 servicing).

Trashcans shall be checked and serviced as necessary every Wednesday during the months of 01 December 2018 through 30 November 2019. See Statement of Work

3001AP 23 Each OPTION Slate Creek

FFP

Slate Creek (1) Trashcan – (23 visits x 1 trashcan = 23 servicing). Trashcan shall be checked and serviced as necessary every other Wednesday, during the months of 01 December 2018 through 30 November 2019. See Statement of Work – Part

3001AQ 5 Months OPTION Acorn/Fiddleneck/Observation Point Summe

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne

3001AR 7 Months OPTION Acorn/Fiddleneck/Observation Point Winte

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne

OPTION Vault Toilets and Custodial

FFP

Option Year 4- Vault Toilets and Custodial - New Hogan Lake – This is an informational line item only for pricing see sub line items. Contractor shall furnish all labor, materials, tools, equipment, transportation and supervision necessary to clean and service waterless type restrooms located at various sites at New Hogan Lake, CA. All quantities are estimated. For more information, see the Statement of Work – Part B.

Period of Performance is 01 December 2019 – 30 November 2020.

4001AA 208 Each OPTION Wrinkle Cove

FFP

Wrinkle Cove – Four (4) Restrooms - (52 visits x 4 restrooms – 208 cleanings).

Clean and service four (4 vault toilets every Sunday 01 December 2019 through 30 November 2020. See Statement of Work – Part B for more information.

4001AB 104 Each OPTION Fiddleneck

FFP

Fiddleneck – Two (2) Restrooms – (52 visits x 2 restrooms – 104 cleanings).

Clean and service two (2) portable chemical toilets every Sunday 01 December 2019 through 30 November 2020. See Statement of Work – Part B for more

4001AC 104 Each OPTION Fiddleneck Rocky Point

FFP

Fiddleneck (Rocky Point) – Two (2) Restrooms - (52 visits x 2 restrooms – 104 cleanings). Clean and service two (2) vault toilets every Sunday 01 December 2019 through 30 November 2020. See Statement of Work – Part B for more

4001AD 204 Each OPTION Oak Knoll

FFP

Oak Knoll – Six (6) Restrooms – (34 visits x 6 restrooms – 204 cleanings). Clean and service six (6) vault toilets every Thursday and Monday during the months of 12 May 2019 through 05 September 2020. See Statement of Work – Part B for

4001AE 106 Each OPTION Coyote Point

FFP

Coyote Point – Two (2) Restrooms - (53 visits x 2 restrooms =106 cleanings).

Clean and service two (2) vault toilets every Thursday and Monday during the months of 31 March 2019 through 29 September 2020. See Statement of Work –

4001AF 88 Each OPTION Deer Flat

FFP

Deer Flat – Four (4) Restrooms – (22 visits x 4 restrooms = 88 cleanings). Clean and service four (4) vault toilets every Sunday 01 May 2020 through 30 September 2020. See Statement of Work – Part B for more information.

4001AG 52 Each OPTION Monte Vista

FFP

Monte Vista – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 01 December 2019 through 30 November 2020. See Statement of Work – Part B for more

4001AH 23 Each OPTION Slate Creek

FFP

Slate Creek – One (1) Restroom – (23 visits x 1 restroom = 23 cleanings). Clean and service one (1) portable chemical toilet every other Sunday, during the months of 01 December 2019 through 30 November 2020. See Statement of Work – Part

4001AJ 104 Each OPTION Whiskey Creek

FFP

Whiskey Creek – Two (2) Restrooms - (52 visits x 2 restrooms = 104 cleanings).

Clean and service two (2) vault toilets every Sunday during the months of 01 December 2019 through 30 November 2020. See Statement of Work – Part B for

4001AK 52 Each OPTION Bear Creek

FFP

Bear Creek – One (1) Restroom – (52 visits x 1 restroom = 52 cleanings). Clean and service one (1) vault toilet every Sunday during the months of 01 December 2019 through 30 November 2020. See Statement of Work – Part B for more

4001AL 208 Each OPTION Fish Cleaning Station

FFP

Fish Cleaning Station – Two (2) Fish Cleaning Stations – (104 visits x 2 fish cleaning stations = 208 cleanings). Clean and service two (2) fish cleaning stations, one at Acorn Campground and one at Fiddleneck, every Sunday during the months of 01 December 2019 through 30 November 2020. See Statement of

4001AM 52 Each OPTION Floating Restroom

FFP

Floating Restroom – Two (2) Restrooms – (26 visits x 2 restrooms = 52 cleanings).

Clean and service two (2) portable chemical toilets, located at Mineshaft Cove, every Thursday during the months of 01 April 2020 through 30 September 2020.

Note: Boat is required for this service – not accessible by land. See Statement of

4001AN 676 Each OPTION Trashcan

FFP

Trashcan – Playground, Cameron Trailhead, Fiddleneck; Monte Vista; Whiskey Creek; Bear Creek – Service thirteen (13) (52 visits x 13 trashcan = 676 servicing).

Trashcans shall be checked and serviced as necessary every Wednesday during the months of 01 December 2019 through 30 November 2020. See Statement of Work

4001AP 23 Each OPTION Slate Creek

FFP

Slate Creek (1) Trashcan – (23 visits x 1 trashcan = 23 servicing). Trashcan shall be checked and serviced as necessary every other Wednesday, during the months of 01 December 2019 through 30 November 2020. See Statement of Work – Part

4001AQ 5 Months OPTION Acorn/Fiddleneck/Observation Point Summe

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne

4001AR 7 Months OPTION Acorn/Fiddleneck/Observation Point Winte

FFP

Acorn/Fiddleneck/Observation Point/ Cameron Trailhead Waterborne

STATEMENT OF WORK

Statement of Work Custodial Services

(Portable and Vault Restrooms, Floating Restroom, Fish Cleaning Stations, Trashcans & Waterborne Facilities)

New Hogan Lake2.3 Dated: 15 March 2016

A. GENERAL INFORMATION:

1. The contractor shall provide all labor, materials, equipment, supplies, transportation and supervision necessary to provide for Custodial Service, cleaning and service waterless type (portable & vault restrooms) restrooms, floating restrooms and fish cleaning stations at New Hogan Lake. A vessel shall be necessary to provide services to the floating restroom(s). New Hogan Lake is located in Calaveras County, Valley Springs, California. Prospective vendors are strongly urged to visit the work site.

2. In the event that any part, or the entire Park, is permanently or temporarily closed, the segments of this contract pertaining to those areas shall not be required and therefore not utilized. The number of facilities may vary.

Contractors shall not perform work in those closed areas or facilities that shall not be in use, and shall not be compensated for work not performed unless written permission is provided from the contracting office or their representative.

3. Period of Performance: This contract consists of a Base Year and four (4) Option Years. The Base year of this contract shall be 13 June 2016 – 30 November 2016. The Government may elect to exercise the option years.

Option Year One (1) shall be 01 December 2016 – 30 November 2017, Option Year Two (2) shall be 01 December 2017 – 30 November 2018, Option Year Three (3) shall be 01 December 2018 – 30 November 2019, and Option Year Four (4) shall be 01 December 2019 – 30 November 2020. All work completed under this contract shall be performed on days, dates, and times specified within the work schedule. No work shall be conducted on days other than those scheduled without prior approval from the Park Manager. Work completed for this contract shall be accomplished during the hours of 8:00 a.m. and 4:30 p.m.

4. Authorities/Technical Direction: The Contractor shall take no direction from any Government employee or any other person other than the Government Contracting Officer that changes the terms and conditions of this contract action, the scope, or any change that impacts the cost, price or schedule. Changes authorized by the Contracting Officer will be in the form of a written, official, signed modification to the contract action received by the Contractor before the Contractor will act upon those changes. The Contractor will comply with the Changes clause of this contract when the contractor believes direction has been given from persons other than the Government Contracting Officer that equate to a change by notifying the Contractor Officer as directed by the clause. Any direction given by any Government employee or any other person outside their authority must be reported to the Contracting Officer. Contracting Officer Representatives (CORs) are limited to the authorities stated in the COR appointment letters.

5. Estimated Quantity Line Items: All Section B, Pricing Schedule, Line Items with quantities are estimated-quantity Line Items. The quantities are estimated amounts and are not guaranteed amounts. The contractor will only be paid for work actually performed. At no time will the contractor exceed the estimated quantity on any estimated quantity Line Item. The contractor will establish a tracking system of actual quantities against the contract’s estimated quantities for each estimated quantity Line Item and will maintain the tracking system up to date throughout the life of the contract. When the actual quantity of any Line Item reaches 75% of the estimated quantity on any estimated quantity Line Item, the contractor will notify the Government’s Contract Specialist and the Technical PoC in writing, by fax, or e-mail within two calendar days. Once the Government is notified that the actual quantity has reached 75% of the estimated quantity on any Line Item and if the Government determines that the estimated quantity needs to be increased, the contractor will receive an official modification to the contract action signed by the Contracting Officer increasing the quantity and the amount obligated on the contract BEFORE the contractor will proceed to work over the existing estimated quantity. The modification will set the new estimated quantity that the contractor may not exceed without another modification. Every invoice will be accompanied by a full accounting of each Line Item being billed, the actual quantity being billed and supporting documentation to support the actual quantities.

6. Point of Contact:

Technical: Jonathan Wuebker, Sr. Park Ranger, New Hogan Lake.

Contracting: Aaron West, Contract Specialist

7. Contractor Submittals: The Contractor shall submit to the Park Manager/COR all items listed below. Unless otherwise specified these items shall be submitted at least one week prior to the Pre-Contract Meeting. If the contract is awarded less than 30 days prior to contract starting date, submittals shall be furnished on a schedule mutually agreed upon by the Park Manager/COR and the Contractor.

a. Certificates of Insurance.

b. Safety Plan.

c. Safety Hazard Analysis (Discuss with Park Manager at Pre-Contract meeting).

d. Contractors Inspection Plan

e. Name and local telephone numbers of supervisor and alternate supervisor.

f. Exposure Report (Man-hours worked) (Submit within 15 working days after the first of each month).

g. Inspection and Service Records (As required)

h. Monthly Invoice (Original and three copies sent to RMO. A copy shall be sent to the Park Office for verification)

i. Contractor Quality Control Plan (Discuss with Park Manager at Pre-contract meeting and submit prior to initiation of work.

j. S.D.S. for compounds to be used for the contract.

8. Meetings:

a. Pre-Contract Meeting: Prior to the beginning of the contract, the Contractor shall meet with the Park Manager to discuss all elements of this contract. At least one week prior to this meeting, the Contractor shall submit to the Park Manager all information required under this contract including Certificate of Insurance, Safety Plan, and name of supervisor and alternate supervisor. The Park Manager will determine the date, time, and location of this meeting. The pre-contract meeting will be repeated prior to each option period to discuss any changes.

b. Planning Meeting: The Contractor shall meet with the Park Manager or his representative to coordinate and update the work schedule and to discuss quality control, contractor performance, safety and other items pertinent to the contract. The time and location of these meetings will be determined by mutual agreement of the Park Manager and the Contractor.

9. Invoices: Invoices for payment shall be submitted within three days of the end of the month after completion of tasks as outlined in the Payment Schedule of this contract. Invoices shall be submitted to:

Original invoice only WITHOUT additional information or supporting documentation:

USAED, FINANCE CENTER

ATTN: CEFC-AO-P

5270 Integrity Drive Millington, TN 38054-5005

One copy each of invoice WITH all required information including any necessary supporting documentation:

U.S. Army Corps of Engineers ATTN: (Contract Number), Contracting Office Service & Supply Branch 1325 J Street Sacramento, CA 95814-2922

New Hogan Lake ATTN: Park Manager 2713 Hogan Dam Road Valley Springs, CA 95252

10. Payment: Payment shall be made monthly in arrears at the contract unit price for services performance in accordance with the pricing schedule and as described herein. The Government shall pay the Contractor upon submission of proper invoices for services delivered and accepted for the portion of the work actually performed under the contract.

B. WORK TO BE PERFORMED:

1. Supplies to be furnished by the Contractor: The contractor shall furnish all soap, disinfectant, deodorant cakes, cleaning compound, toilet tissue, Trashcan liners, and other supplies needed to meet scope of work requirements. All supplies shall be approved by the Park Manager or their representative.

2. Water: Water required for cleaning may be obtained from existing Government water supply system. The contractor shall furnish all equipment necessary to load, contain, and transport water for cleaning.

3. Cleaning of Portable and Vault Toilets - A cleaning service shall consist of the following:

a. Clean and disinfect all portable and vault toilets, including doors, interior and exterior walls, roof projections, window screens, partitions, floors, toilet seats, urinals, and holding tank exterior surfaces. Mop floors dry to prevent standing water. Replace toilet tissue with an amount sufficient to last until the next cleaning. Deodorant cakes shall be maintained in all urinals. During the period of the contract requiring twice a day service, the first service shall start no earlier than 6:00 AM and shall be completed by 10:00 AM. The second daily service shall start no earlier than 2:00 PM and be completed by 6:00 PM. Once a day service shall start no earlier than 6:00 AM and shall be completed by 12:00 noon.

b. Pick up all garbage, trash, broken glass and other refuse within 25 feet of the restrooms.

c. Empty the trash receptacle and replace the liner in vault restrooms. Empty the free standing trashcans adjacent the restrooms and replace the lines when trashcans become ¾ full or contents produces bad or offensive odors.

4. Cleaning of Floating Restroom - A cleaning service shall consist of the following:

a. Clean and disinfect toilets including doors, interior and exterior walls, roof projections, window screens, partitions, floors, toilet seats, urinals and holding tank exterior surfaces. Mop floors dry to prevent standing water.

Replace toilet tissue with an amount sufficient to last until the next cleaning. Deodorant cakes shall be maintained in all urinals. During the period of the contract requiring twice a day service, the first service shall start no earlier than 6:00 AM and shall be completed by 10:00 AM. The second daily service shall start no earlier than 2:00 PM and be completed by 6:00 PM. Once a day service shall start no earlier than 6:00 AM and shall be completed by 12:00 noon.

b. Pick up all garbage, trash, broken glass and other refuse found in and around restrooms or on deck of the floating restroom.

5. Cleaning of Fish Cleaning Stations - A cleaning service shall consist of the following:

a. Wash, scrub, and rinse cleaning table, trough, and concrete pad of all scales and other fish parts.

b. Pick up all garbage, trash, broken glass and other fish carcass debris and refuse within 25 feet of the fish cleaning stations.

6. Servicing of Trashcans – These trashcans are the freestanding type, approximately 33 gallons +-, and are not associated with the restrooms. Trashcans shall be checked on days to be serviced. It is not necessary to empty the trashcan unless the contents is approximately ¾ full or the contents produces a bad or offensive odor. When emptied, the trashcan shall have a fresh new plastic line installed. The contents removed from the trashcans may be placed in dumpsters throughout the park system. Trashcans are located at the following locations:

Observation Point (Playground) - 2 trashcans located at each end of playground.

Cameron Trail Head – 1 trashcan located at the

Fiddleneck – 7 trashcans located along the lower picnic road.

Monte Vista – 1 trashcan located adjacent the parking lot.

Whiskey Creek – 1 trashcan located adjacent the parking lot.

Bear Creek – 1 trashcan located adjacent the parking lot.

Slate Cove – 1 trashcan located adjacent the equestrian group campsite.

Siberia Ridge – 1 trashcan located adjacent the portable restroom.

7. Waterborne Restroom Facilities

a) Description of Restrooms: The following descriptions are typical of the restrooms in each area.

However, there are variations in the restrooms within each area. Restrooms in Acorn Campground are approximately 340 sq ft. concrete brick buildings with concrete floors containing a women’s side, a men’s side and a service access room between the two sides. Some walls are painted some are tiled. The men’s side typically has one stall with toilet, two flushing urinals, two sinks and an approximately 45 sq. ft. coin operated shower and changing area with tile floor and walls. The women’s side typically has two stalls, two sinks, and an approximately 45 sq. ft. coin operated shower and changing area with tile walls and floor. Restrooms are located in a campground, which is heavily used in the summer and lightly used in the winter. Two restrooms in Fiddleneck Day Use Area are approximately 310 sq. ft. and resemble the Acorn Campground restrooms except they do not have showers. The other two restrooms in Fiddleneck are approximately 85 sq. ft. concrete brick buildings with two stalls on the women’s side and one stall with toilet and urinal on the men’s side. Both sides have one sink located in a breezeway. Restrooms at Observation Point Day Use Area have three stalls and one sink on the women’s side and two stalls a urinal and one sink on the men’s side. These restrooms have liquid soap dispensers, sanitary napkin containers, tile walls, and coated concrete floors. Each side is approximately160 sq. ft. Restrooms at Cameron Trailhead Day Use Area have one commode and one sink on the each side. These restrooms have liquid soap dispensers, air hand dryers, sanitary napkin containers, and coated concrete walls and floors. Each side is approximately 64 sq. ft. The contractor shall supply toilet paper. Restrooms do not have paper towel dispensers.

b) Specifications:

a. Cleaning: A cleaning shall consist of the following: clean and disinfect all waterborne toilet, shower and restroom structures including doors, interior walls, exterior walls and roof projections, windows, screens and windowsills, pipe chases, ceilings, partitions, floors, fixtures, and service rooms. Eliminate all mold, mildew, cobwebs, and insect and bird nests. Clean toilet bowls, seats, urinals, showers, and sinks with disinfectant. Clean shower floors and walls to remove mold and prevent stain, and scale build-up. Sweep, mop and rinse floors to remove dirt and debris. Remove all standing water and cleaning solutions from the floor. Sweep and mop pipe chases and service rooms and remove dust dirt and cobwebs from the fixtures. Remove graffiti not permanently etched into the interior and exterior building surfaces. Sweep and clean the sidewalks adjacent to waterborne restrooms. The contractor shall fill all toilet paper dispensers at the time of cleaning with a commercial grade toilet paper. The contractor shall ensure that there is a sufficient amount of toilet paper to prevent depletion prior to the next cleaning/service. Remove all garbage, trash, glass, and other debris (1/2 inch size or larger) from the refuse containers. Rake the grounds surrounding the waterborne restrooms for a distance of 25 ft. Empty and disinfect trash containers and replace trashcan liners. Replace sanitary napkin liners when used. Refill liquid soap containers as needed. Maintain a log of daily activities giving date, time started, and time completed, cleanup, and other information necessary for each restroom. Store a copy or the original of this log in the pipe chase. Start all cleanings after 6:00 A.M. and complete cleanings before 10:00 A.M.

b. Service: Service all restrooms twice daily April through September, and once daily during October through March (see contract details for exact dates). Daily and/or morning services will start after 6:00 A.M. and complete the servicing before 10:00 A.M. Start the second/afternoon service after 2:00 P.M. and complete the second/afternoon service before 6:00 P.M. Check and service the exterior and interior of all waterborne restrooms and shower facilities to ensure proper cleanliness and to maintain sanitary conditions. Check the paper supplies and restock as needed. Sweep the floors and remove debris from floors, and clean porcelain fixtures, showers, toilets, and urinals with disinfectant. Dump trash containers and replace liners as needed. The contractor shall fill all toilet paper dispensers at the time of servicing with a commercial grade toilet paper. The contractor shall ensure that there is a sufficient amount of toilet paper to prevent depletion prior to the next cleaning/service. Refill liquid soap containers as needed. Replace sanitary napkin liners when used.

c) Water: Water required for cleaning shall be obtained from existing Government water supply system.

The contractor shall furnish all equipment necessary to load, contain and transport water for cleaning.

PART C - GOVERNMENT RESPONSIBILITIES

1. Financial Accountability: The Government shall be held financially accountable only for those scheduled services performed by the Contractor. Circumstances beyond the control of the government may occur which shall reduce the number of services required. Possible causes for non-performance may include but not limited to the following:

a. Contractor negligence.

b. Lack of sufficient or competent personnel.

c. Equipment malfunction.

d. Unfavorable weather conditions (rain, wind, etc.).

e. Damaged or missing facilities.

f. Recreation area closures.

g. High lake level (flooded recreation areas).

h. Low lake level preventing up lake access.

i. Improper use and/or lack of safety gear worn and/or used by contractor personnel.

j. Other acts of God preventing contract compliance.

2. Forms: The park office shall supply the Contractor with all forms required by the Government to meet the administrative requirements of this contract. The required forms for this contract shall be supplied per the Appendices below.

3. Contract Inspection: The Government shall monitor the Contractor's performance in each functional area under this contract and shall reserve the right to use whatever additional surveillance procedures are deemed appropriate.

Contractor services shall be monitored using the random sampling method, the planned sampling method and/or 100% inspection method. The Government reserves the right to change or alter the type of inspection plan at it's discretion at any time.

4. Deficiencies: Unacceptable performance shall not be approved for payment by the government. If any of the services do not conform to the contract requirements, the Government shall require the Contractor to perform the services again in conformity with contract specifications, at no increase in cost. When the defects in service cannot be corrected, the Government may reduce the contract price to reflect the reduced value of the services performed.

If the Contractor fails to perform the service again or take necessary action to conform to contract requirements, the government may/will:

a. Perform the service and charge the Contractor any cost incurred by the Government that is directly related to the performance of such service.

b. Issue a Contract Discrepancy Report. The purpose of this procedure is to correct the unacceptable performance at the park level with the shortest disruption of services. The Contractor shall prepare a response, in writing within 5 working days, as to the cause and corrective actions to prevent recurrence.

c. In the event the procedure for the Contract Discrepancy Report fails to solve the problems, a Notice of Contract Deficiency shall be issued and forwarded to the District Office. The Contractor shall explain, in writing within 5 working days, any disagreement with the deficiency notice and/or shall describe the corrective action(s) to prevent future recurrence of the problem.

d. In the event the procedures for the Contract Discrepancy Report and the Notice of Contract Deficiency fail to resolve the problem, the Contractors performance shall be considered unsatisfactory. The Contracting Officer shall issue a Cure Notice or Cancellation of the contract. During the processing of the failure to perform procedures, all other provisions of this contract shall apply.

5. Government Provided Equipment: All Government provided keys, tools, and equipment associated with this contract shall be returned on the last working day of this contract. Failure to comply with this requirement shall delay final payment for services provided under this contract.

6. Office/Storage Facilities: The Government shall not provide office space of operational facilities to the Contractor. The Contractor shall be responsible, at his/her own expense, to secure and maintain the necessary office space and other facilities if required for performance of this contract.

PART D - CONTRACTOR RESPONSIBILITIES:

1. Employees: The Contractor shall furnish competent personnel. If employees prove to be incompetent or unsatisfactory, the Contractor shall remove the employee(s) immediately and replace the employee(s). For safety and security purposes, the Contractor shall submit IN WRITING the name, address and phone number of all personnel performing services under this contract prior to the commencement of work. The Contractor shall submit IN WRITING the name of all employee(s) discharged during this contract. The Contractor shall provide an adequate number of fully qualified personnel to perform the work specified herein. If the Contractor chooses to accomplish the work by subcontract, he/she shall still be able to provide the required service within the established time limits. It shall be the Contractors responsibility to ensure that personnel fulfill the requirements of the contract. All personnel employed under this contract shall be legal residents of the United States. All personnel shall be qualified to perform the tasks assigned in accordance with Government Regulations.

a. Conduct: The Contractor shall conform and require Contractor employees to conform to similar standards of conduct as Government personnel. Personal conditions such as being under the influence of intoxicating beverages, drugs, etc.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .