SEE ADDENDUM

(No Collect Calls)

W91238-15-Q-0073 11-Sep-2015

b. TELEPHONE NUMBER

916-557-7929

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 22 Sep 2015

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912389. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TILDEN L BROOKS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

15,000,000.00

NAICS:

541360

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF50

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W91238-15-Q-0073

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Sucess Dam Wells

FFP

Contractor to provide all labor, material, equipment, transportation, supplies, supervision and subsistance required to complete the monitoring well rehabilitation at Success Dam, as described in the Performance Work Statement and appendices dated 11 August 2015, attached.

FOB: Destination PROJECT: Success/Farm Wells

NET AMT

0001AA 1 Job Mob & De-Mob

FFP

Contractor to deliver and setup all equipment, materials and suppliesto perform the stated work at Success Dam for the duration of the task including transportation and subsistance costs, in accordance with the Performance Work Statement dated 11 August 2015, attached.

0001AB 24 Each Well Development

FFP

Well Development/Rehabilitation/Cleaning for Monitoring/Observation, 24 Relief Wells, Success Dam site. Per requirements of the Performance Work Statement dated 11 August 2015, attached.

0001AC 24 Each Permeability/Pump Tests

FFP

Contractor to perform permeability/pumping tests on wells at the Success Dam site, as required by the Performance Work Statement dated 11 August 2015, attached.

0001AD 1 Job Test Equipment

FFP

Contractor to provide speciality pumping test equipment necessary for Success Dam well testing, as required by the Performance Work Statement, dated 11 August 2015, attached.

0001AE 4 Each Piezometer Rehab

FFP

Development/Rehabilitation/Cleaning for Four (4) piezometers subject to rehabilitation in accordance with procedures discussed in Section 1. Success Dam well construction information is attached in Appendix 1.

Farmington Dam, Phase 1

FFP

Contractor to provide all labor, material, equipment, transportation, supplies, supervision and subsistance required to complete the monitoring well rehabilitation for Farmingyon Dam, Phase 1, as described in the Performance Work Statement and appendices dated 11 August 2015, attached.

0002AA 1 Job Mob & Demob

FFP

Contractor to deliver and setup all equipment, materials and suppliesto perform the stat4ed work at Farmington Dam for the duration of the task including transportation and subsistance costs, in accordance with the Performance Work Statement section 2.2 dated 11 August 2015, attached.

0002AB 20 Each Well Development

FFP

Well Development/Rehabilitation/Cleaning for Monitoring/Observation, 20 Relief Wells, Farmington Dam site. Per requirements of the Performance Work Statement section 2.2 dated 11 August 2015, attached.

0002AC 20 Each Permeability/Pump tests

FFP

Contractor to perform permeability/pumping tests on wells at Farmington Dam, as required by the Performance Work Statement section 2.2 dated 11 August 2015, attached.

0002AD 1 Job Test Equipment

FFP

Contractor to provide speciality pumping test equipment necessary for Success Dam well testing, as required by the Performance Work Statement, dated 11 August 2015, attached.

OPTION Optional Wells

FFP

Contractor to provide all labor, material, equipment, transportation, supplies, supervision and subsistance required to complete the monitoring well rehabilitation for Farmington Dam, Phase 2, as described in the Performance Work Statement section and appendices dated 11 August 2015, attached.

0003AA 1 Job Mob & Demob

FFP

Contractor to deliver and setup all equipment, materials and suppliesto perform the stat4ed work at Farmington Dam for the duration of the task including transportation and subsistance costs, in accordance with the Performance Work Statement section 2.3 dated 11 August 2015, attached.

0003AB 17 Each Well Development

FFP

Rehabilitation of seventeen (17) Piezometer/Relief Wells, RRW-21 through RRW- 37 at Farmington Dam, Per requirements of the Performance Work Statement sections 1 and 2.3 dated 11 August 2015, attached.

0003AC 17 Each Permeability/Pump Tests

FFP

Contractor to perform permeability/pumping tests on Seventeen (17) wells at Farmington Dam, Phase 2, wells RRW-21 through RRW-37 as required by the Performance Work Statement section 2.3 dated 11 August 2015, attached.

0003AD 1 Job Test Equipment

FFP

Contractor to provide speciality pumping test equipment necessary for Success Dam well testing, as required by the Performance Work Statement, dated 11 August 2015, attached.

0004 1 Each Accident Prvention Plan

FFP

The contractor shall provide a written, site-specific Accident Prevention Plan using the reequirements and format of USACE EM 385-1-1. Plan must cover the Minimum Basic Ouatline for Preparation of Accident Prevention Plan and conform to requirements in Section 3, Deliverables, of the Performance Work Statement, , dated 11 August 2015, attached.

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

11 August 2015

Relief Well Rehabilitation and Pumping Tests at Success and Farmington Dams

PROJECT: The work to be accomplished consists of rehabilitation and pumping tests at relief wells at Success and Farmington Dams.

CONTRACTORS: TBD

Government COR: John Kemp

U.S. Army Corps of Engineers Attention: CESPK-ED-GG (J. Kemp) 1325 “J” Street, Sacramento, CA 95814 Ph: 916-557-6642, Cell: 916-267-8628 Email: john.e.kemp@usace.army.mil

Technical POC: John Kemp

Attention: CESPK-ED-GG (J. Kemp) 1325 “J” Street, Sacramento, CA 95814 Ph: 916-557-6642, Cell: 916-267-8628

Contract Specialist: Mr. Tilden Brooks Jr.

ATTN: CESPK-CT-B (Brooks) 1325 J Street, Sacramento, CA 95814-2922 Ph: 916-557-7929, Fax: 916-557-7854/7524 Email: tilden.l.brooks@usace.army.mil

LOCATION: Success Dam is located 5 miles east of the town of Porterville, CA. A total of twenty-four (24) relief wells and four (4) piezometers are the focus of the project. Farmington Dam is located 19 miles east of Stockton, CA. A total of thirty-seven (37) relief wells are the focus of Farmington Dam task. All wells are accessible via gravel or paved roads.

1 General Requirements

The objective of this project is to conduct reoccurring maintenance of relief wells (wells). The maintenance is typically conducted on a 5-year basis. The following section provides an overview of typical procedures required to successfully execute the work in a manner consistent with previous efforts.

The contractor for this job shall provide all labor, material, equipment necessary to rehabilitate wells and conduct pumping tests at the wells. Equipment typically includes but is not limited to:

suitable compressor; all piping necessary to provide an eductor pipe; air pipe, clamps, fittings, and necessary equipment to redevelop wells and clean sediments from the bottom by airlift pumping or use of a suction or vacuum; suitable submersible pump with power supply, couplings, valves, pipes and hoses; electrical meter for measuring the depth of water; a minimum of three transducers and data logger, Rossum sand sampler; flow meter for accurately measuring the discharge of water; turbidity meter; pumps, hoses, and any other pertinent equipment such as Jet Truck or any other vehicle that the Contractor deems necessary for the performance of this contract.

Well rehabilitation shall be conducted in a similar fashion as previous maintenance events.

Rehabilitation of wells shall include, but not be limited to: surging/swabbing, bailing, pumping, cleaning, and air-lifting by use of an eductor system as needed to accomplish this rehabilitation project. Well rehabilitation efforts typically have a duration of up to 2 hours per well. Any sediment or debris that may have settled to the bottom of the relief wells shall be removed and disposed using some of the above listed methods, or, if feasible, a vacuum or suction hose may be used. The thickness of sediment at each well shall be measured at the start of each well rehabilitation. The wells shall be surged through short intervals throughout the screened interval until little or no additional material from the foundation or filter pack can be pulled through the screen. No violent surging shall be allowed. If surging pulls much material into the well, the material shall be removed by bailing. Air-lifting shall be accomplished by installing an eductor pipe and an air line into the screened section of the bottom of the well. The hose from the compressor shall be as large as, or larger than, the air-line and should have sufficient slack to allow for moving the air-lift assembly up and down. With the air pipe held up inside the eductor pipe, enough volume of air is used to pump the well slowly by air-lift. The air pipe is then dropped quickly so that its lower end is below the bottom of the eductor pipe. This reverses the flow through the screen openings by backwashing and a buildup of air pressure inside the screen.

From time to time the air-lift shall be lowered to a position near the bottom of the well and operated as a pump to clean out any fines or sand that may have accumulated inside the screen.

The air-lift shall proceed until essentially sand free water is produced. Discharge water produced during project shall be conveyed away from the work area at a distance of up to 100 feet. The volume of water discharged shall be quantified. After the rehabilitation of each well is completed, sounding of the well shall be repeated to measure the amount of sediment removed.

Pumping tests shall be conducted in a similar fashion as previous maintenance events. Pumping tests are conducted following rehabilitation, and after enough time has elapsed for the water levels to return to steady state conditions. Each well shall be used for pumping tests if there is enough water in the relief wells to warrant such tests. Each pumping test shall include the following measurements: (1) original static water level and depth to bottom; (2) pumping rate of discharge; (3) drawdown during the minimum 2-hour pumping period; (4) water turbidity using a turbidity meter equivalent to or similar to an Equipco DRT-15CE Turbidimeter; (5) measurement of sediment using equipment similar to or equivalent to a Rossum Sand Sampler;

and (6) continuous measurement of water level rebound following termination of pumping. The original static water level of the adjacent relief wells and the changing water levels of the adjacent relief wells during the pumping and rebound periods shall be tabulated. Water level measurements in the pumping test well shall be measured and recorded by the Contractor every minute for the first ten (10) minutes and every ten (10) minutes thereafter for the duration of both the pumping test and the static water level rebound test. Each pumping test shall also include water levels measurements in the pumping well and in the two closest adjacent relief wells using transducers. All information shall be recorded using a data logger similar or equivalent to an In- Situ Mini-Troll or equal with associated transducers, software, cables, handheld reader, and laptop that can provide electronic data files of all pumping tests. The digital format of water level obtained from transducers is transferred in field from data reader to a CD in a file format compatible with Microsoft Excel. Accuracy of the transducers in both the test well and the companion observation well shall be to the nearest one hundredth of a foot (0.01 ft) for pumping tests. Each relief well shall be pumped continuously for up to two (2) hours. The pumping shall be at a constant rate sufficient to produce a discharge of 10 to 100 gallons of water or more per minute (gpm), to be followed by a static water level rebound test. The Contractor shall provide means for accurately measuring the discharge rate and volume from the wells during the pumping tests. If possible, each well shall be tested at several different rates. These rates shall be determined by the Government field representative based on the information obtained during the rehabilitation phase. Any test that is interrupted prior to the completion of the prescribed time shall be rerun to the point of interruption at no cost to the Government. The pumping tests shall be conducted under the observation of the Government field representative. Sand or any other material collected in the well as a result of the pumping tests shall be removed from the well by the Contractor. Any damages to the well caused by the installation or operation of the test equipment shall be repaired by the Contractor at no additional cost to the Government. The Contractor shall be required to monitor and log the rate of sand infiltration into the well during the pumping test using a Rossum Sand Sampler. If the sand infiltration rate nears or exceeds 5 mg/L, the Contractor shall bring it to the immediate attention of the Government field representative. At the discretion of the Government field representative, the Contractor shall be directed to terminate the pumping test at that time. Upon completion of the rehabilitation and pumping tests, the contractor shall remove all equipment and shall restore the area, as nearly as possible, to its original condition.

The Government will award a task order resulting from this request by using the ‘Lowest Price Technically Acceptable’ evaluation procedure. Technical criteria and past performance considered.

Technical Criteria: (1) proposed start date and completion date; (2) proposed equipment and materials as well as completeness of described equipment; (3) proposed subcontractors and subcontractor tasks.

Past Performance: The Government will evaluate past performance information to assess the offeror's likelihood of success in performing the requirements stated in the solicitation. Currency and relevance of the information (as determined by the Government), the source of the information, content of the data and general trends in the contractor's performance may be considered.

2 TASKS

2.1 SUCCESS DAM

0001AA – MOBILIZATION AND DEMOBILIZATION FOR ALL EQUIPMENT:

Mobilization shall consist of the delivery and setup of all equipment, materials, and supplies necessary to perform the stated work at Success Dam for the duration of this task. This category will also include any and all transportation and subsistence costs. The equipment shall be in good working order and capable of performing the investigation as defined in Section 1, general requirements. Demobilization shall consist of the removal from the site of all investigation equipment and restoration of the work site(s) as nearly as possible to the original condition.

Costs shall contain all incidental costs associated with this statement of work. The contractor is also solely responsible for security against theft, destruction, and/or vandalism of the contractor's property and/or equipment.

0001AB – Well Development/Rehabilitation/Cleaning for Monitoring/Observation/

Relief Wells including all Equipment (Per Well): A total of twenty-four (24) relief wells shall be subject to rehabilitation in accordance with procedures discussed in Section 1. Success Dam well construction information is attached in Appendix 1.

0001AC – PERMEABILITY/PUMPING TESTS ALL EQUIPMENT (PER Well): A total of twenty-four (24) relief wells shall be subject to pumping tests in accordance with procedures discussed in Section 1. Success Dam well construction information is attached in Appendix 1.

0001AD – SPECIALITY PUMPING TEST EQUIPMENT (LUMP SUM): This line item covers specialty equipment required for pumping tests described in Section 1, including Rossum sand sampler, pressure transducers and digital water level collection devices.

0001AE - Piezometer Wells including all Equipment (Per Well): Four (4) piezometers shall be subject to rehabilitation in accordance with procedures discussed in Section 1. Success Dam well construction information is attached in Appendix 1.

2.2 FARMINGTON DAM, PHASE I

Field work at Farmington Dam shall be conducted in two phases. Phase I will cover work at twenty (20) relief wells. Work at the remaining 17 wells shall be conducted as Option 1.

0002AA – MOBILIZATION AND DEMOBILIZATION FOR ALL EQUIPMENT:

Mobilization shall consist of the delivery and setup of all equipment, materials, and supplies necessary to perform the stated work at Farmington Dam for the duration of this task. This category will also include any and all transportation and subsistence costs. The equipment shall be in good working order and capable of performing the investigation as defined in Section 1, general requirements. Demobilization shall consist of the removal from the site of all investigation equipment and restoration of the work site(s) as nearly as possible to the original condition. Costs shall contain all incidental costs associated with this statement of work. The contractor is also solely responsible for security against theft, destruction, and/or vandalism of the contractor's property and/or equipment.

0002AB - Well Development/Rehabilitation/Cleaning for Monitoring/Observation/

Piezometer/Relief Wells including all Equipment (Per Hour): A total of twenty (20) relief wells at Farmington Dam shall be subject to rehabilitation in accordance with procedures discussed in Section 1. Phase I will include wells RRW-1 through RRW-20. Farmington Dam well construction information is attached in Appendix 2.

0002AC – PERMEABILITY/PUMPING TESTS ALL EQUIPMENT (PER HOUR): A total of twenty (20) relief wells at Farmington Dam shall be subject to pumping tests in accordance with procedures discussed in Section 1. Phase I will include wells RRW-1 through RRW-20.

Farmington Dam well construction information is attached in Appendix 2.

0002AD – SPECIALITY PUMPING TEST EQUIPMENT (LUMP SUM): This line item sand sampler, pressure transducers and data loggers.

2.3 OPTION 1, FARMINGTON DAM, PHASE II

Option 1 may be executed only if approved by the COR.

Field work at Farmington Dam shall be conducted in two phases. Phase II will cover work at seventeen (17) relief wells that were not included during Phase I. Work at the remaining 17 wells shall be conducted as Option 1.

0003AA – MOBILIZATION AND DEMOBILIZATION FOR ALL EQUIPMENT:

Mobilization shall consist of the delivery and setup of all equipment, materials, and supplies necessary to perform the stated work at Farmington Dam for the duration of this task. This category will also include any and all transportation and subsistence costs. The equipment shall be in good working order and capable of performing the investigation as defined in Section 1, general requirements. Demobilization shall consist of the removal from the site of all investigation equipment and restoration of the work site(s) as nearly as possible to the original condition. Costs shall contain all incidental costs associated with this statement of work. The contractor is also solely responsible for security against theft, destruction, and/or vandalism of the contractor's property and/or equipment.

0003AB - Well Development/Rehabilitation/Cleaning for Monitoring/Observation/

Piezometer/Relief Wells including all Equipment (Per Hour): A total of seventeen (17) relief wells at Farmington Dam shall be subject to rehabilitation in accordance with procedures discussed in Section 1. Phase II will include wells RRW-21 through RRW-37. Farmington Dam well construction information is attached in Appendix 2.

0003AC – PERMEABILITY/PUMPING TESTS ALL EQUIPMENT (PER HOUR): A total of seventeen (17) relief wells at Farmington Dam shall be subject to pumping tests in accordance with procedures discussed in Section 1. Phase II will include wells RRW-21 through RRW-37.

Farmington Dam well construction information is attached in Appendix 2.

0003AD – SPECIALITY PUMPING TEST EQUIPMENT (LUMP SUM): This line item sand sampler, pressure transducers and data loggers.

3 DELIVERABLES

0004 – APP – AHA ACCIDENT PREVENTION PLAN / ACTIVITY HAZARD

ANALYSIS (AHA) APPENDIX TO THE APP: The Contractor shall use a qualified Safety and Health Manager (SHM) to prepare the written site-specific APP in accordance with the format and requirements of USACE EM 385-1-1, and cover all paragraph and subparagraph elements in Appendix A of USACE EM 385-1-1 "Minimum Basic Outline for Preparation of Accident Prevention Plan". The APP shall include an Activity Hazard Analyses (AHAs) appendix. Where a paragraph or subparagraph element is not applicable to the work to be performed, indicate "Not Applicable" next to the heading.

A single deliverable shall be prepared that covers work at Success and Farmington Dams.

The APP shall be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program (SHP). Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific.

The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The Contractor, SHM, on-site Project Supervisor, and Site Safety and Health Officer (SSHO) shall sign the APP.

The contractor shall develop an AHA for every operation involving site activities presenting hazards not experienced in previous project operations or where a new work crew or subcontractor shall perform work. The AHA(s) format shall be in accordance with Figure 1-2 of EM 385-1-1. Subsequent AHAs shall be submitted as amendments to the APP. The analysis shall identify and evaluate hazards and outline the proposed methods and techniques for the safe completion of each phase of work. At a minimum, the document shall define the activity being performed, sequence of work, specific safety and health hazards anticipated, control measures (to include personal protective equipment) to eliminate or reduce each hazard to acceptable levels, equipment to be used, inspection requirements, training requirements for all involved, and the competent person in charge of that phase of work. The APP – AHA will be reviewed by the USACE and the Contractor may be required to address one round of review comments. The USACE shall provide comments to the Contractor within 5 business days after receipt of the draft APP – AHA. The fieldwork shall not start until the APP – AHA is approved by the

USACE.

The Contractor’s APP, SSHP Appendix and subsequent activities must comply with the following referenced documents (most current version, if different than the date referenced), at a minimum:

Title 29 Code of Federal Regulations (CFR) 1910, Occupational Safety and Health Standards.

29 CFR 1926, Safety and Health Regulations for Construction.

8 CCR Chapter 4 Subchapter 7, General Industry Safety Orders.

EM 385-1-1 U.S. Army Corps of Engineers (USACE), Safety and Health Requirements Manual, (15 September 2008).

EM 1110-1-1804 Geotechnical Investigations, 1 January 2001

EM 1110-1-1802 Geophysical Exploration For Engineering And Environmental Investigations, 31 August 95

NIOSH/OSHA/USCG/EPA, Occupational Safety and Health Guidance Manual for Hazardous Waste Activities (October 1985).

American Conference of Governmental Industrial Hygienists (ACGIH®), TLVs® and BELs®, Threshold Limit Values for Chemical Substances and Physical Agents & Biological Exposure Indices (2005).

In addition to the Hazardous Waste Operations and Emergency Response regulation, there are other OSHA ancillary safety and health regulations governing certain aspects for this contract. State and local safety and occupational health regulations.

4 MEASUREMENT AND PAYMENT: The contract unit price for each item shall constitute full compensation for furnishing all plant, labor, equipment, materials, and supplies and performing all operations required for the completion of all work included under the item as specified herein, shown on the drawings, or directed by the Contracting Officer.

5 SCHEDULE: The project Geologist (USACE government representative) in coordination with the Contractor shall arrange the exact time and place of equipment delivery at least 5 days prior to the start date. Once determined, it shall be necessary that the Contractor be prepared to begin work at the site on that day. Normal work hours will be between 0700 and 1730 hours. If the Contractor elects to work other hours, days, or overtime hours at the

Contractor’s convenience and expense, the Contractor will notify the project Geologist, so as to adjust the daily work schedule. Overtime is not allowable without the written approval of the Contracting Officer prior to work in accordance with FAR 22.103.

The following shall be delivered to the Project Geologist by the specified dates:

a.) The draft Accident Prevention Plan with the Activity Hazard Analysis appendix for review and comment. The Contractor will not mobilize to the site until the APP / AHA has been reviewed and approved by the USACE. Delivered within 14 business days of contract award.

b.) Field work shall commence within 60 days of task order award.

c.) If CLIN 3, Optional Wells is authorized, field work at Farmington Dam Phase II shall commence within 30 days of option authorization. If the Optional Wells Clin is exercised at time of award, field work for Phase 2 wells shall be scheduled with Phase 1 work.

d.) Transducer Data: The Contractor shall provide the water level data in electronic format during the course of the field work.

6 PERIOD OF PERFORMANCE:

All fieldwork and deliverables shall be completed by 27 May 2016.

7 AUTHORITIES/TECHNICAL DIRECTION:

The Contractor shall take no direction from any Government employee or any other person other than the Government Contracting Officer that changes the terms and conditions of this contract action, the scope, or any change that impacts the cost, price or schedule. Changes authorized by the Contracting Officer shall be in the form of a written, official, signed modification to the contract action received by the Contractor before the Contractor shall act upon those changes.

The Contractor shall comply with the Changes clause of this contract when the Contractor believes direction has been given from persons other than the Government Contracting Officer that equate to a change by notifying the Contractor Officer as directed by the clause. Any direction given by any Government employee or any other person outside their authority shall be reported to the Contracting Officer. Contracting Officer Representatives (CORs) are limited to the authorities stated in the COR appointment letters. If a COR is appointed under this contract, they shall be appointed by written letter from the Contracting Officer to the Contractor and COR specific to this contract only. COR appointment letters from previous contracts at this installation are not valid for this contract.

8 PAYMENT AND INVOICES:

a. Invoices: Invoices for payment shall be submitted upon completion of tasks as outlined in the Payment Schedule of this Task Order. Invoices shall be submitted to:

Original invoice only WITHOUT additional information or supporting documentation:

USAED, FINANCE CENTER

ATTN: CEFC-AO-P

5270 Integrity Drive Millington, TN 38054-5005

One copy each of the invoice WITH all required information including any necessary supporting documentation:

U.S. Army Corps of Engineers, Sacramento District ATTN: CESPK-CT-B (T. Brooks) 1325 J Street Sacramento, CA 95814-2928

U.S. Army Corps of Engineers, Sacramento District Attention: CESPK-ED-GG (J. Kemp) 1325 J Street Sacramento, CA 95814

b. Contract Payments: The Government shall pay the Contractor upon submission of proper invoices for services delivered and accepted for the portion of the work actually performed under the contract.

NOTE: All invoices shall reflect contract and Task Order number and the final invoice must be marked “FINAL”.

SUCCESS WELL LOCATIONS

FARMINGTON WELL LOCATIONS

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0001AC Destination Government Destination Government 0001AD Destination Government Destination Government 0001AE Destination Government Destination Government 0002 Destination Government Destination Government 0002AA Destination Government Destination Government 0002AB Destination Government Destination Government 0002AC Destination Government Destination Government 0002AD Destination Government Destination Government 0003 Destination Government Destination Government 0003AA Destination Government Destination Government 0003AB Destination Government Destination Government 0003AC Destination Government Destination Government 0003AD Destination Government Destination Government 0004 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 30-SEP-2015 TO

27-MAY-2016

N/A N/A

0001AA POP 30-SEP-2015 TO

27-MAY-2016

N/A GEOLOGY SECTION

JOHN KEMP

1325 J STREET ATTN: CESPK-ED

SACRAMENTO CA 95814

916-557-6642

W91238

0001AB POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AC POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AD POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AE POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0002 POP 30-SEP-2015 TO

0002AA POP 30-SEP-2015 TO

N/A GEOLOGY SECTION

JOHN KEMP

1325 J STREET ATTN: CESPK-ED

SACRAMENTO CA 95814

916-557-6642

0002AB POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0002AC POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0002AD POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 30-SEP-2015 TO

0003AA POP 30-SEP-2015 TO

N/A GEOLOGY SECTION

JOHN KEMP

1325 J STREET ATTN: CESPK-ED

SACRAMENTO CA 95814

916-557-6642

0003AB POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0003AC POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0003AD POP 30-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 21-OCT-2015 1 (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management JUL 2013 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

JUL 2013

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

AUG 2013

52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-9 Small Business Subcontracting Plan OCT 2014 52.246-4 Inspection Of Services--Fixed Price AUG 1996 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

CLAUSES INCORPORATED BY FULL TEXT

52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (APR 2014)

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.

(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of offers;

(3) The name, address, and telephone number of the offeror;

(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) "Remit to" address, if different than mailing address;

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);

(9) Acknowledgment of Solicitation Amendments;

(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and

(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.

(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.

(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.

(f) Late submissions, modifications, revisions, and withdrawals of offers:

(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.

(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or

(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(C) If this solicitation is a request for proposals, it was the only proposal received.

(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.

Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.

(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.

(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.

(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.

(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.

Additional copies will be issued for a fee.

(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(i) ASSIST (https://assist.dla.mil/online/start/).

(ii) Quick Search (http://quicksearch.dla.mil/).

(iii) ASSISTdocs.com (http://assistdocs.com).

(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--

(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);

(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.

(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.

(j) Data Universal Numbering System (DUNS) Number. (Applies to all offers exceeding $3,000, and offers of $3,000 or less if the solicitation requires the Contractor to be registered in the System for Award Management (SAM) database. The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS +4” followed by the DUNS or DUNS +4 number that identifies the offeror's name and address. The DUNS +4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR Subpart 32.11) for the same concern. If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one. An offeror within the United States may contact Dun and Bradstreet by calling 1-866-705-5711 or via the internet at http://fedgov.dnb.com/webform. An offeror located outside the United States must contact the local Dun and Bradstreet office for a DUNS number. The offeror should indicate that it is an offeror for a Government contract when contacting the local Dun and Bradstreet office.

(k) System for Award Management. Unless exempted by an addendum to this solicitation, by submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://www.acquisition.gov.

(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(1) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(4) A summary of the rationale for award;

(5) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(6) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of provision)

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsive and responsible small business using the lowest price technically acceptable evaluation procedure. Technical criteria and past performance considered.

The following factors shall be used to evaluate offers:

Technical Criteria: (1) proposed start and completion date: (2) proposed equipment and materials as well as completeness of described equipment: (3) proposed subcontractors and subcontractor tasks.

Past Performance: The Government will evaluate past performance information to assess the offeror's likelihood of success in performing the requirements stated in the solicitation. Currency and relevance of the information (as determined by the Government), the source of the information, content of the data and general trends in the contractor's performance may be considered. Offerors to provideperformance information on not more than three completed jobs, similar in scope to the work required by this solicitation. Offoror to provide point of contact information to verify performance.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (MAR 2015)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (p) of this provision.

(a) Definitions. As used in this provision --

“Economically disadvantaged women-owned small business (EDWOSB) Concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

"Forced or indentured child labor" means all work or service-

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .