Amendment_5.pdf

PDF 29 KB Posted

Attached to
Satellite Communications Earth Terminal Station Facility, Camp Roberts, California
Solicitation number
W91238-13-R-0036
Issued by

View the file

Other files

File Type Posted
Amendment_6.pdf PDF
Amendment_4.pdf PDF
Amendment_3.pdf PDF
Site_Visit_Minutes.pdf PDF
Site_Visit_Sign-In_Sheet.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Solicitation_W91238-13-R-0036.pdf PDF
AMRDEC_Access.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Satellite Communications Earth Terminal Station Facility, Camp Roberts, California

The purpose of this amendment is to:

1. Extend the proposal due date to 23 October 2013.

2. Revise Specif ication 01 32 01, and 22 14 43.

3. Revise Draw ings Sheet G-002, and C-002.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Oct-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-13-R-0036

X 9B. DATED (SEE ITEM 11)

03-Sep-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Oct-2013

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-13-R-0036

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment Drawings 37 03-SEP-2013 Attachment 2 Drawings Volume 1 of 5 120 03-SEP-2013 Attachment 3 Drawings Volume 2 of 5 129 03-SEP-2013 Attachment 4 Drawings Volume 3 of 5 120 03-SEP-2013 Attachment 5 Drawings Volume 4 of 5 125 03-SEP-2013 Attachment 6 Drawings Volume 5 of 5 81 03-SEP-2013 Attachment 7 Specs Volume 1 1459 03-SEP-2013 Attachment 8 Specs Volume 2 1369 03-SEP-2013 Attachment 9 Amendment 1 Drawings 9 16-SEP-2013 Attachment 10 Amendment 1 Power

Upgrade Project As-Builts

5 16-SEP-2013

Attachment 11 Amendment 2 Drawings 9 23-SEP-2013 Attachment 12 Amendment 3 Drawings 4 27-SEP-2013 Attachment 13 Amendment 3

Specifications

1 27-SEP-2013

Attachment 14 Amendment 4 Drawings 15 09-OCT-2013 Attachment 15 Amendment 4

Specifications

10 09-OCT-2013

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment Drawings 37 03-SEP-2013 Attachment 2 Drawings Volume 1 of 5 120 03-SEP-2013 Attachment 3 Drawings Volume 2 of 5 129 03-SEP-2013 Attachment 4 Drawings Volume 3 of 5 120 03-SEP-2013 Attachment 5 Drawings Volume 4 of 5 125 03-SEP-2013 Attachment 6 Drawings Volume 5 of 5 81 03-SEP-2013 Attachment 7 Specs Volume 1 1459 03-SEP-2013 Attachment 8 Specs Volume 2 1369 03-SEP-2013 Attachment 9 Amendment 1 Drawings 9 16-SEP-2013 Attachment 10 Amendment 1 Power

Upgrade Project As-Builts

5 16-SEP-2013

Attachment 11 Amendment 2 Drawings 9 23-SEP-2013 Attachment 12 Amendment 3 Drawings 4 27-SEP-2013 Attachment 13 Amendment 3

Specifications

1 27-SEP-2013

Attachment 14 Amendment 4 Drawings 15 09-OCT-2013 Attachment 15 Amendment 4 10 09-OCT-2013

W91238-13-R-0036

Attachment 16 Amendment 5 Drawings 2 15-OCT-2013 Attachment 17 Amendment 5

2 15-OCT-2013

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 17-Oct-2013 01:00 PM to 23-Oct-2013 01:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .