CODE

(Hour)

PAGE(S)

until 12:00 PM local time 03 May 2011

A X B X C

D

EX

X G F 91 - 109

110 - 117 H 118

Erica.J.Taylor@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 124

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W91238 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

1325 J Street Rm 950 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ERICA J TAYLOR 916 557-7570

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 3 4 - 10

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

11 - 40 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

43 - 57

PART II - CONTRACT CLAUSES

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET-ROOM 878

SACRAMENTO CA 95814-2922

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

58 - 90

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

19 Apr 2011

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W91238-11-R-0005

Section SF 30 - BLOCK 14 CONTINUATION PAGE

SIGNATURE PAGES

(1) IF THE CONTRACTOR IS A JOINT VENTURE, EACH PARTICIPANT IN

THE JOINT VENTURE MUST COMPLETE THE FOLLOWING:

Company Name Signature & Title

NOTE: If a corporation is participating as a member of a Joint Venture, the certificate below must also be completed and signed.

CORPORATION AUTHORIZATION TO PARTICIPATE IN A JOINT VENTURE CERTIFICATE

I, _______________________, certify that I am the Secretary named as a participant in a Joint Venture on this contract;

(name) that _____________________, who signed said contract on behalf of the Corporation, was then (name)

___________________________________ of said Corporation; that the signature thereto is genuine; that said contract was (title) duly signed, sealed, and attested for and in behalf of said corporation by authority of its governing body; and that the corporation is authorized to participate in the Joint Venture on this offer.

(Name of Corporation)

(Secretary)

(2) IF THE OFFEROR IS A PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS

BELOW. SIGNATURES BY ALL PARTNERS HERE SIGNIFY THAT THE INDIVIDUAL WHO SIGNED THE

OFFER IN BLOCK 14 HAS THE AUTHORITY TO BIND THE PARTNERSHIP.

(3) IF THE OFFEROR IS A CORPORATION, THE OFFER SHALL BE SIGNED IN

THE CORPORATE NAME FOLLOWED BY THE WORD "BY" AND THE SIGNATURE OF THE PERSON

AUTHORIZED TO SIGN THE CONTRACT. PROVIDE PROOF THAT THE PERSON SIGNING FOR THE

CORPORATION HAS THE AUTHORITY TO BIND THE CORPORATION BY COMPLETING THE

FOLLOWING CERTIFICATION.

CORPORATION AUTHORIZATION CERTIFICATE

I, certify that I am the Secretary of the corporation named as

Offeror (Name) in the contract; that

(Company Name) (Name) who signed said offer on behalf of the corporation; was then

(Title) of said corporation, that the signature thereto is genuine; that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.

(Name of Corporation)

(CORPORATE SEAL)

(Secretary)

(4) IF THE CONTRACTOR IS AN INDIVIDUAL DOING BUSINESS AS A

FIRM, THE CONTRACT SHALL BE SIGNED BY THAT INDIVIDUAL IN BLOCK 14 FOLLOWED BY

THE WORDS

“AN INDIVIDUAL DOING BUSINESS AS “

(Insert Name of Firm)

(5) WHEN AN AGENT SIGNS THE OFFER, PROVIDE PROOF OF THE AGENT'S

AUTHORITY TO BIND THE PRINCIPAL.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 5,000,000 Lump Sum IDIQ Contract for Drilling Services

FFP

Firm Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Drilling Services for use primarily within the U.S. Army Corps of Engineers (USACE) Sacramento District's (CESPK) Civil and Military Works Boundaries.

Work may also be performed within the USACE South Pacific Division (CESPD) boundaries including the following districts: Sacramento District (CESPK), Albuquerque District (CESPA), Los Angeles District (CESPL), and San Francisco (CESPN). The geographical area includes California, Arizona, Nevada, Utah, New Mexico and parts of Oregon, Idaho, Wyoming, Colorado and Texas.

Contractor to provide all labor, material, equipment and supervision to perform geotechnical work and explorations in hazardous, toxic, or radioactive waste (HTRW) site conditions for drilling services in accordance with (IAW) Section C, Statement of Work. Services will be further defined and work accomplished by issuance of individual Task Orders.

The minimum guarantee is $2,500.00.

FOB: Destination

NET AMT

PRICING SCHEDULE

Section B:

Pricing Schedule

CLIN CLIN Description Unit of Issue

Unit Price

0001 MOBILIZATION AND DEMOBILIZATION FOR ALL

EQUIPMENT (each)

Mob/Demob TBN

0002 Drilling -- --

0002AA Drill Rig Drilling HOURS - Hollow Stem Auger or Mud Rotary Drilling Method to include sampling (Per Hour) for Geotechnical Projects

HSA - Geotech HR

0002AB Drill Rig Drilling HOURS - Hollow Stem Auger or Mud Rotary Drilling Method to include sampling (Per Hour) for HTRW Projects

HSA - HTRW HR

0002AC Drill Rig Drilling Standby Time HOURS - Hollow Stem Auger or Mud Rotary Drilling Method (Per Hour)

HSA - Standby HR

0002AD Drill Rig Drilling HOURS - Air Rotary/ODEX/ARCH Drilling Method to include sampling (Per Hour) for Geotechnical Projects

Air Rotary/ODEX/ARCH - Geotech

HR

0002AE Drill Rig Drilling HOURS - Air Rotary/ODEX Drilling Method to include sampling (Per Hour) for HTRW Projects

Air Rotary/ODEX/ARCH -

HTRW

HR

0002AF Drill Rig Drilling Standby Time HOURS – Air Rotary/ODEX Drilling Method (Per Hour)

Air Rotary/ODEX/ARCH - Standby

HR

0002AG Drill Rig Drilling HOURS - Sonic Drilling Method to include sampling (Per Hour) for Geotechnical Projects

Sonic - Geotech HR

0002AH Drill Rig Drilling HOURS - Sonic Drilling Method to include sampling (Per Hour) for HTRW Projects

Sonic - HTRW HR

0002AJ Drill Rig Drilling Standby Time HOURS – Sonic Drilling Method (Per Hour)

Sonic - Standby HR

0002AK Diamond Rock Core Drilling LF – for Geotechnical Projects, Drilling Method to include sampling (Per Linear Foot)

Diamond - Geotech LF

0002AL Diamond Rock Core Drilling LF – for HTRW Projects, Drilling Method to include sampling (Per Linear Foot)

Diamond - HTRW LF

0002AM Drill Rig Drilling Standby Time HOURS - Diamond Rock Coring Drilling Method (Per Hour)

Diamond - Standby HR

0002AN Small Cone Penetrometer Testing (CPT) Rig (Per Linear Foot) for Geotechnical Projects

CPT - Geotech LF

0002AP Small Cone Penetrometer Testing (CPT) Rig (Per Linear Foot) for HTRW Projects

CPT - HTRW LF

0002AQ Cone Penetrometer Test (CPT) Rig Standby Time (Per Hour)

CPT - Standby HR

0002AR Grouted Cone Penetrometer Test (CPT) (Per Linear Foot) for Geotechnical Projects

Grouted CPT - Geotech LF

0002AS Grouted Cone Penetrometer Test (CPT) (Per Linear Foot) for HTRW Projects

Grouted CPT - HTRW LF

0002AT Grouted Cone Penetrometer Test (CPT) Standby Time (Per Hour)

Grouted CPT - Standby HR

0002AU Geoprobe Rig capable of pushing holes to 50- feet or less (Per Linear Foot) for HTRW Projects

Geoprobe - HTRW <50 feet LF

0002AV Geoprobe Rig capable of pushing holes greater than 50-feet (Per Linear Foot) for HTRW Projects

Geoprobe - HTRW >50 feet LF

0002AW Geoprobe Standby Time HOURS (Per Hour) Geoprobe - Standby HR

0002AX Specialty Drilling for Geotechnical Projects (Vibracore, barge drilling, Becker Hammer, etc.) will be negotiated per task order

Specialty Drilling - Geotech (Vibracore, Barge Drilling, Becker Hammer, etc.)

TBN

0002AY Specialty Drilling for HTRW Projects (Vibracore, barge drilling, Becker Hammer, etc.) will be negotiated per task order

Speciality Drilling - HTRW TBN

0002AZ Specialty Drilling Standby Time (Vibracore, barge drilling, Becker Hammer, etc.) will be negotiated per task order

Speciality Drilling - Standby TBN

0003 Set-Ups -- --

0003AA Drill Rig Set-Up - Hollow Stem Auger or Mud Rotary Drilling Method (Lump Sum per Boring) for Geotechnical Projects

HSA - Geotech EA

0003AB Drill Rig Set-Up - Hollow Stem Auger or Mud Rotary Drilling Method (Lump Sum per Boring) for HTRW Projects

HSA - HTRW EA

0003AC Drill Rig Set-Up - Air Rotary/ODEX Drilling Method (Lump Sum per Boring) for Geotechnical Projects

Air Rotary/ODEX/ARCH - Geotech

EA

0003AD Drill Rig Set-Up - Air Rotary/ODEX Drilling Method (Lump Sum per Boring) for HTRW Projects

Air Rotary/ODEX/ARCH -

HTRW

EA

0003AE Drill Rig Set-Up - Sonic Drilling Method (Lump Sum per Boring) for Geotechnical Projects

Sonic - Geotech EA

0003AF Drill Rig Set-Up - Sonic Drilling Method (Lump Sum per Boring) for HTRW Projects

Sonic - HTRW EA

0003AG Drill Rig Set-Up - Diamond Rock Coring Drilling Method (Lump Sum per Boring) for Geotechnical Projects

Diamond - Geotech EA

0003AH Drill Rig Set-Up - Diamond Rock Coring Drilling Method (Lump Sum per Boring) for HTRW Projects

Diamond - HTRW EA

0003AJ Drill Rig Set-Up - Specialty Drilling (Vibracore, barge drilling, Becker Hammer, etc.) will be negotiated per task order

Specialty Drilling (Vibracore, Barge Drilling, Becker Hammer, etc.)

TBN

0004 Automatic Hammer Energy Testing of Automatic Hammer HOURS - to be conducted at the Beginning, Middle and End of Selected Project (Per Hour)

Energy Testing HR

0005 Grout Drill Hole per Cubic Foot of placed grout (CF) to be calculated in the field

Grouting CF

0006AA Drilling out grouted vertical intervals from tested water loss areas during Diamond Rock Core Drilling (Per Linear Foot)

- HQ to smaller

Drilling out vertical grouted sections for water loss, HQ to smaller diameter core

LF

0005AB Drilling out grouted vertical intervals from tested water loss areas during Diamond Rock Core Drilling (Per Linear Foot)

- Larger than HQ

Drilling out vertical grouted sections for water loss, larger than HQ diameter core

LF

0007 Sample Containers -- --

0007AA Shelby Tubes (Per Tube = EACH) Shelby EA 0007AB Shipping Boxes for Shelby Tubes (Two Tubes per Box =

EACH)

Shipping Box for Shelby EA

0007AC Pitcher Tubes (Per Tube = EACH) Pitcher Tube EA 0007AD Shipping Boxes for Pitcher Tubes (Two Tubes per Box =

EACH)

Shipping Box for Pitcher EA

0007AE Shipping Boxes for Rock Core Samples (Per Box = EACH) Shipping Box - Rock Core EA 0007AF Shipping Boxes for Sonic Drill Cuttings (Per Box = EACH) Shipping Box - Sonic EA

0008 PVC Well - Geotech or HTRW -- --

0008AA Drill two-inch diameter hole and install PVC screen/tube per Linear Foot (LF) for Monitoring/Observation/Piezometer Well

2" Well LF

0008AB Drill four-inch diameter hole and install PVC screen/tube per Linear Foot (LF) for Monitoring/Observation/Piezometer Well

4" Well LF

0008AC Drill six-inch diameter hole and install PVC screen/tube per Linear Foot (LF) for Monitoring/Observation/Piezometer Well

6" Well LF

0008AD Drill greater than six-inch diamter hole and install PVC screen/tube per Linear Foot (LF) for Relief Well

Other Size TBN

0008AE Drill Rig Set-up - Monitoring/Observation/Piezometer/Relief Well (EACH) will be negotiated per task order

Set-up EA, TBN

0008AF Well Surface Completion for monitoring/observation/piezometer/relief wells - Flush Mounted Well Completion (EACH)

Surface Completion EA

0008AG Well Surface Completion for monitoring/ observation/piezometer/relief wells - Above Ground Well Completion (EACH)

Above Ground Completion EA

0008AH Well Development/Rehabilitation/Cleaning for monitoring/observation/piezometer/relief wells including all equipment (per HOUR)

Well Development/Rehab/Cleani ng

HR

0009 Water Tests -- --

0009AA Water (Hydraulic) Pressure (Packer) Tests - To be used for Diamond Rock Coring (Per Hour)

Packer HR

0009AB Permeability/Pumping Test including all equipment (Per Hour)

Pumping/Permeability Test HR

0009AC Percolation Tests (Per Test = EACH) Perc Test EA 0010 Instrumentation - Piezometers, Inclinometers, and other

Instrumentations (Per Linear Foot, will be negotiated per task order)

Instrumentation LF, TBN

0011 Downhole Geophysical Test (will be negotiated per task order)

Downhole Geophysics TBN

0012 Videotape Display/Recording for down-the-hole Video Camera with audio track to view sidewalls of boreholes, drains, or relief wells (per Linear Foot)

Video Tape Display/Recording

LF

0013 Televiewer -- --

0013AA Optical and Acoustic Televiewer Logging and Data Acquisition (Per Linear Foot)

Logging and Data Acquisition

LF

0013AB Optical and Acoustic Televiewer Data Analysis and Reporting (Per Linear Foot)

Data Processing LF

0013AC Optical and Acoustic Televiewer Daily Rate (Per Day) Daily Rate DY 0014 Water Truck, including experienced operator, required operating expenses, and necessary permits (Per Day) Water Truck and Operator DY

0015 Firefighting Unit (Per Hour) Firefighting Unit HR 0016 Traffic Control/Flagger Person/Crew (Per Hour) Traffic Control HR 0017 Cold Patch Asphalt (Per Bag = EACH) Cold Patch Asphalt - Bag EA 0018 Asphalt/Concrete Pavement Cutter Operator and

Equipment Unit (Per Hour) Asphalt/Concrete Cutting -

Operator and Equip

HR

0019 DOT 55-gallon drum (Each) 55-gallon drum EA 0020 Portable metal bins for soil disposal (Each) Portable Metal Bins (rolloff) EA 0021 Stainless steel or brass sleeves (Each) Stainless Steel/Brass

Sleeves

EA

0022 Steam Cleaner for decontamination of equipment (PerDay) for the following types of equipment for HTRW Projects:

drilling equipment (drill stem, augers), sampling equipment, stainless steel or brass sleeves, backhoes, excabators (trackhoes), forklifts or other equipment

Steam Cleaner DY

0023 Fork Lift, including experienced operator, required operating expenses, and necessary permits (Per Day)

Fork Lift and Steel Hopper DY

0024AA Backhoe/Trenching Excavation, including experienced operator, required operating expenses and necessary permits, HOURS (Per Hour)

Backhoe HR

0024AB Backhoe/Trenching Excavation, including experienced operator, required operating expenses and necessary permits, Standby Time HOURS (Per Hour)

Backhoe standby HR

0025AA Excavator (Trackhoe) Excavation, including experienced operator, required operating expenses and necessary permits, HOURS (Per Hour)

Excavator HR

0025AB Excavator (Trackhoe) Excavation, including experienced operator, required operating expenses and necessary permits, Standby Time HOURS (Per Hour)

Excavator standby HR

0026 Special site access requirements or conditions, to be negotiated

Special Equipment/Field Conditions

TBN

0027 Expert specialists required for unforeseen conditions will be negotiated per task order

Technical Specialist TBN

0028 Additional Helper -- --

0028AA Additional helper for Geotech Projects: drilling; well installation; instrumentation activities; color video taping;

optical and acoustic televiewing; relief well rehabilitation;

drain cleaning; crane; boom truck; CPT; backhoe;

excavator; or Geoprobe (per DAY)

Additional Helper - Geotech

DY

0028AB Additional helper for HTRW Projects: drilling; well installation; instrumentation activities; color video taping;

optical and acoustic televiewing; relief well rehabilitation;

drain cleaning; crane; boom truck; CPT; backhoe;

excavator; or Geoprobe (per DAY)

Additional Helper - HTRW DY

0029 SUBSISTENCE FOR 1, 2, 3, AND 4-MAN CREWS drilling;

well installation; instrumentation activities; color video taping; optical and acoustic televiewing; relief well rehabilitation; drain cleaning; crane; boom truck; CPT;

backhoe; excavator; or Geoprobe (per DAY)

Subsidence - 1 person/dy DY

0030 Encroachment Permits to access property sites and Public Property (roads, etc.); Drilling Permits for drilling on any county sites; will be negotiated per task order; (Per Permit =

EACH)

Permits/Insurance EA, TBN

0031 Administrative - solely for preparing, coordinating, and obtaining Drilling Permits (per HOUR)

Admin to obtain permits HR

0032 APP-AHA (Accident Prevention Plan; Activity Hazard Analysis) for Geotechnical Projects, lump sum

APP/AHA - Geotech LS

0033 APP-SSHP (Accident Prevention Plan; Site Safety and Health Plan) for HTRW Projects, lump sum

APP/SSHP - HTRW LS

PRICING SCHEDULE NOTES

Subsistence for travel required in performance of this contract will be negotiated for each task order based on the location of work to be performed. Subsistence will be paid on a reimbursable basis upon completion of travel and billed under the appropriate CLIN, based on actual costs. An estimate of all travel costs shall be negotiated prior to the award of the task order based on the proposed costs submitted as part of the Request for Proposal. All travel claims to the Government must include an itemized travel voucher and all receipts for expenses claimed including lodging, airfare, and transportation receipts. Expenses, including lodging and per diem will be reimbursed in accordance with the Joint Travel Regulation (JTR) for the location of the temporary duty and meet the allowability, allocability and reasonableness tests of FAR Part 31. The JTR CONUS (Contiguous U.S.) can be accessed at http://www.dtic.mil/perdiem/pdrform.html.

The Contractor shall track costs and notify the Contracting Officer when 70% of the total NTE amount is reached.

Any discount fair granted in relation to this travel is strictly at the discretion of the vendor to whom the request is made, and is not a requirement based on receipt of an approved LOA. Government Contract City Pair fares shall not to be extended to contractors under this approval.

2. Prices must be submitted on all individual line items of this Pricing Schedule. Failure to do so may cause the proposal to be determined “unacceptable”. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and extension, the unit price will be considered to be the price.

3. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the application of lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not, the offeror agrees that the lump sum adjustment shall be applied on a pro-rate basis to every unit price in the Pricing Schedule.

4. All indirect (overhead) costs and profit shall be included within each pricing schedule line item. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may cause the proposal to be determined “unacceptable”.

5. Indirect (overhead) costs and other direct costs (excluding labor) include such items as, but not limited to:

contract management and administration; equipment and material costs; and office time.

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

Performance Work Statement

1. SCOPE.

This Performance Work Statement (PWS) consists of the technical services required.

Work will be performed within the South Pacific Division (SPD) boundaries. This area includes California, Arizona, Nevada, Utah, New Mexico and parts of Oregon, Idaho, Wyoming, Colorado, and Texas. It is anticipated that the majority of the work will be performed in California. The prime Contractor or subcontractor shall have all necessary Federal, State or Local Government license in the state where work will be performed.

The following technical services are required. Provide drilling, cone penetrometer testing services, backhoe, and trackhoe excavations. The principle features of the work shall include, but are not limited to: soil drilling and sampling using hollow stem flight augers, solid stem flight augers, mud-rotary, air-rotary, and percussion drilling methods (such as ODEX, Down-hole Casing Advance Systems, or other percussion drilling systems). In addition, sonic drilling and sampling, rock core drilling and sampling (up to 6-inch diameter) using wire-line or conventional, diamond-impregnated drill bits; soil sampling using standard penetrometers, and other split barrel samplers up to 3-inch-diameter (i.d.); undisturbed soil sampling using Shelby push tubes and Pitcher barrels with Pitcher tubes; test-pit excavations utilizing backhoes and trackhoes;

Cone Penetrometer testing (CPT’s) and associated tests using the Cone Penetrometer;

piezometer and inclinometer installations; hydraulic pressure testing (water pressure testing) associated with rock core drilling; observation well installation and development (includes pump tests and permeability tests); percolation tests; preparation of drill logs and trench or test-pit logs; as-built diagrams for observation well(s), piezometer(s), and inclinometer(s) installations, as well as percolation tests, and all other pertinent records. The Contractor will, on occasion, furnish the services of a registered and licensed Geologist or Geotechnical Engineer. This individual will be professionally licensed in the state that the work is being performed in. The Contractor shall provide all labor, material, equipment, and supervision to perform the work set forth in task orders provided by the Government. A U.S. Army Corps of Engineers’ (USACE) Geologist or Geotechnical Engineer will oversee all work, but on occasions, the Contractor will have to provide the services of a Geologist or Geotechnical Engineer as described above. If the Contractor is required to supply a Geologist or Geotechnical Engineer, then the USACE will supply all soil and rock logging forms and materials as well as specific directions on how to achieve precise and accurate soil or rock core logs. For projects requiring more than two (2) drill rigs at the same time, the Contractor shall provide the services of a drill foreman to coordinate all field activities.

This contract will require services for traditional geotechnical work and explorations in hazardous, toxic, or radiologic (HTRW) site conditions. For HTRW sites, before any work/project can begin, the Contractor shall provide to the government representative, names of all contract personnel who will be on site. The Contractor shall provide copies of the contract personnel’s 40 hour Training on HTRW and current 8 Hour Refresher course. The purpose of a HTRW investigation/study is to obtain data for the detailed evaluation of alternatives. The Contractor may be required to perform various investigation activities. The activities may include, but are not limited to, the following: drilling, installation of groundwater monitoring well, piezometer or observation well, development and aquifer testing; sampling of soil, sediment, and groundwater; excavation of test pits/trenches; sampling and testing of geotechnical materials. Sampling and analysis for a wide variety of parameters may be required to determine the physical, chemical, biological, and radiological properties. Contract deliverables for investigations may include, but are not limited to, permanent or temporary field installations (i.e., monitoring wells), reports, logs, maps, drawings, and sketches. Analysis and interpretation of data shall be performed as appropriate to accomplish the intent of the individual task orders.

Specific requirements will be included in individual Task Orders (TOs). Appropriate deliverables associated with each of these activities shall be prepared and submitted to the Contracting Officer for approval as required.

The Contract Line Items (CLINs)1 in this statement of work will have number designations beginning with three or two zeros followed by a number. This number designation will be consecutive from the preceding line item number. Geotechnical and HTRW work will have the same CLIN, but will also contain letters indicating Sub Contract Line Items (SUBCLINs). Associated SUBCLINs will have successive letter designations, e.g. A, B, C, etc. SUBCLINs I, O will not be used in accordance with regulatory guidance.

Subsequent Option Periods will begin with 1, 2, 3 or 4.

2. APPLICABLE PUBLICATIONS. The following standards are a part of this specification to the extent to which they are referenced in individual delivery/task orders. Other standards may be referenced as necessary and specified in individual task orders.

2.1 American Society for Testing and Materials (ASTM) Standard.

C 150-04 Standard Specification for Portland Cement

D 1452-80 Standard Practice for Soil Investigation and Sampling by Auger Borings

D 1586-99 Test Method for Penetration Test and Split –Barrel Sampling of Soils

D 1587-00 Standard Practices for Thin- Walled Tube Sampling of Soils for Geotechnical

Purposes

D 2113-99 Standard Practice for Rock Core Drilling and Sampling of Rock for Site

Investigation

D 2487-00 Standard Practice for Classification of Soils for Engineering Purposes (Unified

Soil Classification System)

D 2488-00 Standard Practice for Description and Identification of Soils (Visual-Manual

Procedure)

D 4220-95 Standard Practices for Preserving and Transporting Soil Samples

D 5079-02 Standard Practices for Preserving and Transporting Rock Core Samples

D 5778-95 Standard Test Method for Performing Electronic Friction Cone and Piezocone

Penetration Testing of Soils

2.2 U. S. Army Corps of Engineers

EM 385-1-1 Safety Manual, September 2008

EM 1110-1-1804 Geotechnical Investigations, 1 January 2001

EM 1110-1-1906 Soil Sampling, 30 September 1996

EM 1110-2-4000 Monitoring Well Design, Installation, and Documentation at Hazardous, Toxic and Radioactive Waste Site, 1 November 1998.

The most current version of each manual listed in this section shall be utilized for all work performed in accordance within this statement of work.

3. PRIMARY DUTIES. This contract contains services for geotechnical work and for hazardous, toxic, or radiological (HTRW) site conditions. Many of the services apply to both geotechnical and HTRW work; consequently, the written explanations for the duplicate services are the same. The line items for Geotechnical and HTRW work will have the same number designations. The reason for separate line items is due to the cost differences between geotechnical and HTRW work. Specific requirements for HTRW work include but are not limited to personal safety and refresher courses, specific training requirement for working with HTRW substances, personal protective equipment including respirator if necessary, sampling equipment, monitoring equipment, communication equipment, decontamination requirements for personnel and equipment. For HTRW sites, before any work/project can begin, the Contractor shall provide to the government representative names of all contract personnel who will be on site. The Contractor shall provide copies of the contract personnel’s 40 hour Training on HTRW and current 8 Hour Refresher course.

4. MOBILIZATION AND DEMOBILIZATION. Mobilization shall consist of the delivery at the site of all plant, equipment, materials, and supplies to be furnished by the Contractor, and the complete assembly of all such plant and equipment, in satisfactory working order.

Demobilization shall consist of the removal from the site of all plant and equipment after completion of the work and clean up of the site to as near the condition it was in prior to mobilization. Mobilization and demobilization includes but is not limited to delivery and removal of equipment to a work site, daily travel to a work site, and bridge or toll fees. All mobilization costs, including drill rig mobilization and demobilization, well installation, backhoe/trackhoe, etc.

will be paid using unit price per line item 0001. The line item will be negotiated per task order.

4.1 General Drill Rig Requirements. The drill rig and support equipment shall be fully maintained and in good condition. The Contractor is responsible for maintaining the drilling equipment. Any down time associated with the maintenance or repair of any piece of equipment will be solely at the Contractor’s expense. The Contractor is also solely responsible for security against theft, destruction, and/or vandalism of the Contractor's property and/or equipment. The drill rig shall be operated by competent and qualified personnel. The driller and at least one helper shall have the appropriate, current license(s) to operate the equipment required for this type of work. The rental of any type of drill rig shall include all operating expenses, such as fuel, oil, gas, accessory and support equipment that conform to the manufacturer’s specifications for the type and size of drill rig required.

5. DRILL RIG DRILLING HOURS AND SAMPLING PROCEDURES

Drilling hours for hollow stem-auger or mud rotary, ARCH, air/rotary/ODEX, diamond rock core, and sonic rigs will be paid using unit price per line items 0002A through 0002M. The line items specify Geotechnical or HTRW projects and standby time. A general description for each type of drilling, sampling, and special requirements is described in the following sections.

5.1 Drilling Procedures for hollow stem-auger or mud rotary, ARCH, air/rotary/ODEX.

The Contractor shall provide equipment capable of soil drilling and sampling to a depth of 150 feet with 6-inch to 8-inch-O.D. (outside diameter) hollow stem augers and/or mud rotary methods, and 300 feet with 6-inch nominal diameter or greater ODEX, down hole casing advance, or other percussion drilling systems. For any task order, the Contractor shall have on hand equipment and material to allow him to drill 30 feet greater than the maximum depth required by the task order, or 30 percent in excess of the maximum depth when the depth is 100 feet or greater. Augers shall be nominal 6-inch or 8-inch hollow stem flight auger with a minimum I.D. (inside diameter) of 3-1/4 inches. Larger size diameter hollow stem augers may be required for monitoring well, piezometer, or inclinometer installation work.

Soil drilling and sampling by hollow stem auger or mud rotary drilling will be paid at the unit price per line items 0002A through 0002C. Drilling by air rotary, ODEX, or Air Rotary Casing Hammer (ARCH) drilling will be paid at the unit price per line items 0002D through 0002F as described in the pricing schedule.

5.1.1 Standard Penetration Tests and Disturbed Samples. Standard penetration tests (SPTs) shall be performed in accordance with ASTM D 1586-84 at the depth intervals prescribed in each individual task order. No standard penetration test shall bottom within 0.5 feet of a potential undisturbed sample zone. If no sample is retrieved at the specified interval, another sample will be taken immediately below. If refusal is encountered during drilling or sampling, an attempt shall be made to identify the type and occurrence (bedrock, boulder, etc.)

of the material. A disturbed sample shall be taken from each split-barrel sample and double bagged in plastic zip-lock type bags and properly labeled. Labels shall be clearly legible and be printed in indelible ink on the bag label, the sack, and the shipment boxes. Labels shall include, but are not limited to the installation designation (i.e. base or project), project name, hole number, sample depth, date collected, type of sample, and sampler’s initials. If a change of material is encountered in any split-barrel sampler, it will be noted on the drill logs and bagged separately.

5.1.2 Three-Inch Split-Barrel Sampling. Three-inch split barrel samples, where ordered, shall be driven up to 24 inches, in a fashion identical to that used for standard penetration tests.

A 300-pound hammer may be used if approved by the Government prior to use. Blow counts shall be recorded for the entire drive with the type of hammer and the drive intervals noted on the drill log. Samples shall be retained from each split-barrel as directed by each individual task order. The split-barrel samplers used for standard penetration tests shall be 2.0-inch O.D., 1.375-inch I.D.; 24-inches split section length and shall conform to ASTM D 1586-99. Automatic trip type hammers are required. The hammer shall deliver the equivalent energy of a 140 lb.

weight experiencing a 30-inch free fall. Drill rods used for standard penetration tests shall be AWJ size or larger. Nominal 3-inch diameter split-spoon samplers (California Modified Sampler) should also be available for additional sampling.

5.1.3 Standard Penetration Tests and Undisturbed Samples. Every effort shall be made to assure a clean hole for standard penetration tests and undisturbed sampling. Casing, if used, shall not be driven deeper than 1-foot above the depth of the next standard penetration test. If using drilling fluid, the fluid shall be circulated long enough to assure a clean hole. Between penetration tests, bit pressure and rate of penetration shall be noted and recorded on the log. If refusal is encountered during drilling or sampling, an attempt shall be made to identify the material-causing refusal as to its type and occurrence (bedrock, limestone, boulder, granite, etc.). This information shall be recorded on the drill log. At all times during rotary drilling, drill fluid shall be maintained at the top of the hole. If heaving of the hole bottom occurs and the addition of water does not improve hole stability sufficiently, a weighted drill fluid shall be used, with density not to exceed 12 lbs/gallon. Other drilling procedures may be specified on an individual task order.

5.1.4 Mud Tanks. For mud rotary drilling, the Contractor shall have available, or have ready access to, drilling fluids, such as bentonite; natural organic polymers, and a drill mud weighted with barite in case artesian conditions, or flowing or heaving sands are encountered while drilling. These supplies shall be considered incidental to the drilling costs. The Contractor shall have a portable mud tank of a least 175-gallon capacity. Mud pits shall not be excavated into the ground without approval by the Government prior to use.

5.1.5 Drill Bits. The Contractor shall have side or upwards discharge bits (when mud-rotary drilling is utilized) for use in zones of testing and sampling. The Contractor shall also have tri-cone roller-rock bits available for possible use if cobbles or boulders are encountered. The drill bits will be considered incidental to the drilling costs.

5.1.6 Procedures for Rotary Drilling on Embankments. Procedures for drilling through embankments will be specified in the individual task orders. Unless otherwise specified, the use of drilling fluids (water or air) is not permitted when drilling through embankments, including dams and levees.

5.1.7 Standby Time for Rotary Drilling. Standby time shall be any time that rotary drilling activities are delayed for the convenience of the Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. The standby time for the rotary drill rig at geotechnical or HTRW sites will be paid at the unit price per line item 0002F as described in the pricing schedule.

5.2 Procedures for Sonic Drilling. Sonic drilling and sampling consists of drilling boreholes using sonic technology to an approximate depth specified for each borehole and collecting continuous samples for geologic and engineering characterization. The samples shall be vibrated out of the core barrel into a plastic sleeve. The sleeve sample shall be cut into shorter lengths and placed in core boxes for inspection and logging by Corps personnel, then moved to storage. The Contractor shall perform sonic drilling and have sufficient support equipment to perform the required work. The sonic rig shall be capable of advancing cased boreholes to a specified depth using up to 8-inch outer diameter (OD) casing. The Contractor shall be prepared and will have enough casing, sample containers, and core boxes to obtain a continuous sample to the estimated maximum depth as specified at each drilling location.

Continuous samples shall be vibrated from the casing into plastic sleeves, knotted, and placed in core boxes for field logging by the Government Field Representative. Special care must be given to the position of the top and bottom of each run. After logging is completed, the core box, containing the sample, will be transported by the Contractor to a specified storage area on the site.

Sonic drilling for Geotechnical work will be paid at the unit price per line item 0002G as described in the pricing schedule. Sonic drilling for HTRW work will be paid at the unit price per line item 0002H.

5.2.1 Standby Time for Sonic Drilling. Standby time shall be any time that sonic drilling activities are delayed for the convenience of the Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. The standby time for the sonic drill rig at geotechnical or HTRW sites will be paid at the unit price per line item 0002J as described in the pricing schedule.

5.3 Procedures for Diamond Core, Rock Drilling. The Contractor shall provide equipment capable of rock core drilling to 500 feet by rotary methods and the capability to core up to and including HQ diameter cores. Core sizes will be determined by the Government per individual job. All effort shall be made to obtain as complete a recovery as possible. The Contractor shall exercise care in recording water losses, rod jerks, and other unusual experiences while coring that, supplementing the core record, will enhance evaluation of the core. Fractures (mechanical or natural) in the rock shall be marked in the core boxes and on the logs. Voids and core losses will be marked in the core boxes by appropriately marked wooden/styrofoam blocks, as well as being marked on the logs. All rock core recovered shall be photographed with 35mm color film or with a digital camera. The original and duplicate set of pictures shall be submitted as part of the completed boring logs. Rock cores shall be carefully handled and preserved in core boxes of wood/metal approved by the Government. Unless stated otherwise in an individual task order, the Government Representative shall arrange core in correct sequence and separate them by wooden/styrofoam blocks marked to indicate the top and bottom of each core run and the depth from which the core was obtained. No box shall contain core from more than one (1) hole unless authorized by the Government. Covers shall be fastened securely to the core boxes; lids and both ends of core boxes will be labeled with the following information: (1) Project and site name or number, (2) date of recovery, (3) test hole number, (4) depth and elevation of top and bottom of the rock cores, (5) run numbers(s), (6) length of recovery, and sampler’s initials. The Contractor shall store the rock core until the project is completed. The cost associated with construction of suitable core boxes shall be paid for using a separate bid item.

Diamond core, rock drilling for Geotechnical work will be paid at the unit price per line item 0002K as described in the pricing schedule. Diamond core, rock drilling for HTRW work will be paid at the unit price per line item 0002L.

5.3.1 Standby Time for Diamond Core, Rock Drilling. Standby time shall be any time that diamond core, rock drilling activities are delayed for the convenience of the Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. The standby time for the diamond core, rock drill rig at geotechnical or HTRW sites will be paid at the unit price per line item 0002M as described in the pricing schedule.

5.4 CPT Drilling. The Contractor shall provide a CPT rig to perform cone penetrometer testing of soils and data analysis as specified in individual task orders and per ASTM D 5778-

95. The Contractor-supplied rig will be fully maintained, in good condition, complete with competent and qualified operating personnel with all the necessary accessories and supplemental equipment capable of conducting CPT’s to at least 200 feet deep. Costs are to include backfilling any and all holes developed by the Contractor including CPT holes. The Contractor is responsible for maintaining the CPT rig and associated equipment. Any down time associated with the maintenance or repair of any piece of equipment will be solely at the

Contractor’s expense. The Contractor is also solely responsible for security against theft, destruction and/or vandalism of the Contractor’s property and/or equipment. The Contractor will provide all data printouts, plots, and geotechnical interpretations to the Government. The data printouts will include, but not be limited to, depth, tip resistance, local friction, friction ratio, pore pressure, differential pore pressure, inclination, and temperature. The Contractor will provide copies of all available data collected immediately after CPTs are completed in the field.

The interpretation and data are to be provided to the Government Representative in electronic format and hard copy at the completion of fieldwork. All electronic data shall be Microsoft Excel compatible, in comma delimited files. The CPT rig shall be equipped with all approved safety items, per EM 385-1-1, Safety Manual. The CPT rig operator shall have the appropriate, current license(s) to operate the equipment required for this type of work. The rental of any type of CPT rig shall include all operating expenses, such as fuel, oil, gas, accessory and support equipment that conform to the manufacturer’s specifications for the type and size of CPT rig required.

CPT drilling for Geotechnical work will be paid at the unit price per line item 0002N as described in the pricing schedule. CPT drilling for HTRW work will be paid at the unit price per line item 0002P.

5.4.1 Grouting CPT Drilling. Upon completion of Cone Penetration Testing, each hole shall be grouted with a bentonite-cement grout to the ground surface per paragraph 8.1. Grouting Specifications. Costs for grouting will be included in the cost of performing the CPT’s on a linear foot basis. Holes left open will be covered with a minimum ½ - inch thick plywood board and safety cones until grouted.

Grouting of CPT holes for Geotechnical work will be paid at the unit price per line item 0002R as described in the pricing schedule. Grouting of CPT holes for HTRW work will be paid at the unit price per line item 0002S.

5.4.2 Standby Time for CPT Rig. Standby time shall be any time that CPT activities are delayed for the convenience of the Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. Standby time for the small CPT rig at geotechnical or HTRW sites will be paid at the unit price per line item 0002Q as described in the pricing schedule. Standby time during grouting of CPT holes will be paid at the unit price per line item 0002T.

5.5 Geoprobe. The Geoprobe rig (large and small) and support equipment shall be fully maintained and in good condition. The Contractor is responsible for maintaining the geoprobe rig and associated equipment. Any down time associated with the maintenance or repair of any piece of equipment will be solely at the Contractor’s expense. The Contractor is also solely responsible for security against theft, destruction and/or vandalism of the Contractor’s property and/or equipment. The CPT rig shall be equipped with all approved safety items, per EM 385-1- 1, Safety Manual. The geoprobe rig operator shall have the appropriate, current license(s) to operate the equipment required for this type of work. The rental of a geoprobe rig shall include all operating expenses, such as fuel, oil, gas, accessory and support equipment that conform to the manufacturer’s specifications for the type and size of geoprobe rig required.

5.5.1 Small Geoprobe Rig. A small geoprobe rig capable of pushing and completing holes to 50 feet or less. The small geoprobe rig will be paid at the unit price per line item 0002U as described in the pricing schedule.

5.5.2 Large Geoprobe Rig. A large geoprobe rig capable of pushing and completing holes greater than 51 feet. The large geoprobe rig will be paid at the unit price per line item 0002V as described in the pricing schedule.

5.5.3 Geoprobe Standby Time. Standby time shall be any time that the Geoprobe Rig activities are delayed for the convenience of the Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. Geoprobe Rig standby time will be paid at the unit price per line item 0002W as described in the pricing schedule.

5.6 Specialty Drilling. Specialty drilling may include Vibracore, barge drilling, Becker Hammer, or other more exotic drilling methods. This drilling will be paid at the unit price per line items 0002X through 0002Z as described in the pricing schedule and shall be negotiated per each task order.

5.7 Supplementary Holes. Holes that are abandoned before reaching the specified or required depth, and which are rejected by the Government Representative because of mechanical failure of the drilling equipment, or negligence on the part of the Contractor, shall be supplemented by another hole adjacent to the first and at no additional cost to the Government.

The drilling method shall be the same as the rejected hole unless otherwise approved by the Government. Upon reaching the previous depth, specified procedures for drilling, sampling, and clean out shall resume. Abandoned or rejected holes shall be grouted as specified under section 8.1, Grouting Specifications.

6. DRILL RIG SET-UP

Drill Site set-ups include all labor, material and equipment to move the drill rig and all supporting equipment from one drill site to another. The line item will be employed when movement from one site to another is difficult and requires more than one (1) hour to move all materials and equipment from one site to another. Drill rig set-ups for hollow stem-auger or mud rotary, ARCH, air/rotary/ODEX, diamond rock core, sonic, and barge drilling will be paid using unit price per line items 0003A through 0003J. The line items specify Geotechnical or HTRW projects.

7. AUTOMATIC HAMMER ENERGY TESTING

The Contractor shall provide all supplies necessary to perform automatic hammer energy testing of an automatic hammer. The testing shall be conducted at the beginning, middle, and end of selected projects. The automatic hammer energy testing will be paid at the unit price per line item 0004 as described in the pricing schedule.

8. DRILL RIG GROUTING

Drill rig grouting for hollow stem-auger or mud rotary, ARCH, air/rotary/ODEX, diamond rock core, sonic, and barge drilling will be paid using unit price per line item 0005. The line items specify Geotechnical or HTRW projects.

8.1 Grouting Specifications. All borings not utilized for instrumentation, groundwater monitoring well, observation well or piezometer installation shall be grouted from the bottom of the hole to the top using a tremie or grout pipe unless otherwise directed by the delivery/task order. For geotechnical drilling, holes that do not exceed 20 feet in depth and do not encounter water may be grouted by free-falling the grout. Grouting should be accomplished by using a tremie or grout pipe. In most cases, upon completion of drilling, each hole shall be grouted to the ground surface. The Contractor will be paid only for the amount of grout introduced into the drill holes based on a linear foot measurement. Costs are to include all materials and labor needed to complete the grouting process, plus disposal of all drill cuttings and cleanup if needed.