Yuba River Basin, CA 1756

MARYSVILLE RING LEVEE PHASE 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00.00

SUBMITTAL PROCEDURES

03/04

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTAL IDENTIFICATION (SD)

1.3 SUBMITTAL CLASSIFICATION

1.3.1 Government Approved

1.3.2 Information Only

1.4 APPROVED SUBMITTALS

1.5 DISAPPROVED SUBMITTALS

1.6 WITHHOLDING OF PAYMENT

1.7 GENERAL

1.8 SUBMITTAL REGISTER

1.9 SCHEDULING

1.10 TRANSMITTAL FORM (ENG FORM 4025)

1.11 SUBMITTAL PROCEDURES

1.11.1 Procedures

1.11.1.1 Resubmittals

1.11.1.2 Submittal Register Copy

1.11.2 Deviations

1.12 AS-BUILTS

1.13 GEOTECHNICAL AND CONCRETE MATERIALS REPORT

1.14 CONTROL OF SUBMITTALS

1.15 GOVERNMENT APPROVED SUBMITTALS

1.16 INFORMATION ONLY SUBMITTALS

1.17 STAMPS

-- End of Section Table of Contents --

SECTION 01 33 00.00 Page 1 Amendment 02

SECTION 01 33 00.00

SUBMITTAL PROCEDURES

03/04

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

ER 1110-1-1901 (1999) Project Geotechnical and Concrete Materials Completion Report for Major USACE Projects

U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT (CESPK)

CESPK INSP05L0 (2004) Preparing As-Built Drawings

1.2 SUBMITTAL IDENTIFICATION (SD)

Submittals required are identified by SD numbers and titles as follows:

SD-01 Preconstruction Submittals

SD-02 Shop Drawings

SD-03 Product Data

SD-04 Samples

SD-05 Design Data

SD-06 Test Reports

SD-07 Certificates

SD-08 Manufacturer's Instructions

SD-09 Manufacturer's Field Reports

SD-10 Operation and Maintenance Data

SD-11 Closeout Submittals

1.3 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.3.1 Government Approved

Government approval is required for extensions of design, critical

SECTION 01 33 00.00 Page 2 materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.

Within the terms of the Contract Clause entitled "Specifications and Drawings for Construction," they are considered to be "shop drawings."

1.3.2 Information Only

All submittals not requiring Government approval will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.

1.4 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory.

Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.5 DISAPPROVED SUBMITTALS

The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" shall be given promptly to the Contracting Officer.

1.6 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained.

1.7 GENERAL

The Contractor shall make submittals as required by the specifications.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items shall be checked and approved by the Contractor's Quality Control (CQC) System Manager and each item shall be stamped, signed, and dated by the CQC System Manager indicating action taken.

Proposed deviations from the contract requirements shall be clearly identified. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves;

test reports; test cylinders; samples; O&M manuals (including parts list);

certifications; warranties; and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby. Samples

SECTION 01 33 00.00 Page 3 remaining upon completion of the work shall be picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.8 SUBMITTAL REGISTER

At the end of this section is a submittal register showing items of equipment and materials for which submittals are required by the specifications; this list may not be all inclusive and additional submittals may be required. The Contractor shall maintain a submittal register for the project in accordance with Section 01 45 00.00 40

CONTRACTOR QUALITY CONTROL.

1.9 SCHEDULING

Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time (a minimum of 35 calendar days exclusive of mailing time) shall be allowed and shown on the register for review and approval. No delay damages or time extensions will be allowed for time lost in late submittals. An additional 10 calendar days shall be allowed and shown on the register for review and approval of submittals for food service equipment and refrigeration and HVAC control systems.

1.10 TRANSMITTAL FORM (ENG FORM 4025)

The sample transmittal form (ENG Form 4025) attached to this section shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor are included in the Quality Control System (QCS) software that the Contractor is required to use for this contract. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted.

Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.

1.11 SUBMITTAL PROCEDURES

Submittals shall be made as follows:

1.11.1 Procedures

Submittals required by the CONTRACT CLAUSES and other non-technical parts of the contract are not included in this section. The Contractor shall submit to the Contracting Officer: seven (7) copies for approval, and five

(5) copies for information only, of all shop drawings, certificates of compliance, materials, fixtures and equipment lists called for under the various headings of these specifications. These drawings, certificates and lists shall be complete and detailed and, prior to submission, must be reviewed and certified correct by the Contractor as required by the Quality Control System paragraph of the Construction Quality Control Section. If approved by the Contracting Officer, five (5) sets of all submittals will be retained by the Contracting Officer and two (2) sets will be returned to the Contractor. Submittals for information only usually will not be returned. The Contractor is encouraged to submit paper documents that are printed/copied double-sided on recycled paper that has at least 20% postconsumer material.

SECTION 01 33 00.00 Page 4

1.11.1.1 Resubmittals

If a submittal is returned for correction or is not satisfactory and is disapproved by the Contracting Officer, the Contractor shall resubmit the corrected material in the same quantity, including reproducibles as specified for the original submittal for approval within 14 days after receipt by him of the disapproved material.

1.11.1.2 Submittal Register Copy

One copy of noted items on the Submittal Register shall be sent directly to the address provided by the Contracting Officer.

1.11.2 Deviations

For submittals which include proposed deviations requested by the Contractor, the column "variation" of ENG Form 4025 shall be checked. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

1.12 AS-BUILTS

The Contractor will prepare As-Built Drawings in accordance with CESPK INSP05L0. See Internet address:

http://iso9000.spk.usace.army.mil/docs/INSP05L0.pdf.

1.13 GEOTECHNICAL AND CONCRETE MATERIALS REPORT

Contractor shall prepare an as constructed geotechnical and concrete materials report for project. For additional information see ER 1110-1-1901 (Internet Address:

http://www.usace.army.mil/inet/usace-docs/eng-regs/er1110-1-1901/toc.htm).

1.14 CONTROL OF SUBMITTALS

The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

1.15 GOVERNMENT APPROVED SUBMITTALS

Upon completion of review of submittals requiring Government approval, the submittals will be identified as having received approval by being so stamped and dated. 5 copies of the submittal will be retained by the Contracting Officer and 2 copies of the submittal will be returned to the Contractor.

1.16 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.

The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;

SECTION 01 33 00.00 Page 5 and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.17 STAMPS

Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:

| CONTRACTOR |

| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s). |

| SIGNATURE: __________________________________________________________ |

| TITLE: ______________________________________________________________ |

| DATE: _______________________________________________________________ |

-- End of Section --

SECTION 01 33 00.00 Page 6

S U

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

Y ub a R iv er

B as in , C

A

S D

-0

P re co ns tru ct io n

S ub m itt al s

1.

3.

G

P er m its a nd

A pp ro va ls 1.

3.

G C on st ru ct io n em is si on

/d us t co nt ro l p la n 1.

3.

G P er m it, w ai ve r o r o th er do cu m en ta tio n w ith th e m ap pe d ha ul ro ut es fr om lo ca l j ur is di ct io ns to re pa ir or c om pe ns at e fo r da m ag e

1.

3.

G

S lu rr y

S pi ll P re ve nt io n C on tin ge nc y P la n

1.

3.

G

Fl oo d C on tin ge nc y P la n

1.

3.

G

U til ity P ro vi de r R es po ns e

P la n 1.

3.

G S to rm

W at er P ol lu tio n

P re ve nt io n

P la n 1.

3.

G G ra di ng P er m it

.0

S

D -0

P re co ns tru ct io n S ub m itt al s G

W rit te n gu ar an te es fo r a ll th e eq ui pm en t a nd

/o r a pp lia nc es

1.

G U til iti es 1.

6.

G Jo b H az ar d A na ly si s

1.

G H au l R ou te

P la n 1.

G

A W

A R

D C

D w ith d ra w in gs a nd sp ec ifi ca tio ns

1.

G H ar d

C op y D ra w in gs

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

Y ub a R iv er

B as in , C

A

.0

1.

G P re -C on st ru ct io n

V id eo a nd P ho to gr ap h S ur ve y G

V id eo T ap e an d

P ho to gr ap hs o f pr oj ec t s ite

1.

G D is po sa l P la n

1.

G D is po sa l P la n

1.

G D oc um en ta tio n of h au l r oa d re pa irs 1.

.1

G P re co ns tru ct io n Q ua lit y S ur ve ys 1.

8.

G P re co ns tru ct io n A cc es s R oa d

S ur ve y

1.

.2 G

P re co ns tru ct io n

Q ua nt ity

S ur ve y

P la n 1.

8.

G Tr af fic

C on tro l P la n

S D

-1

C lo se ou t S ub m itt al s

1.

6.

A cc id en t R ep or tin g

V id eo T ap e an d

P ho to gr ap hs o f

P ro je ct

S ite

1.

P os t-C on st ru ct io n V id eo a nd

P ho to gr ap h

S ur ve y

1.

D oc um en ta tio n of

H au l R oa d R ep ai rs

.0

S

D -0

M an uf ac tu re r’s

F ie ld R ep or ts M ob ili za tio n/ D em ob ili za tio n

W or k P la n

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

Y ub a R iv er

B as in , C

A

.0

E m er ge nc y

Le ve e R ec on st ru ct io n P la n

S D

-0

P re co ns tru ct io n

S ub m itt al s

3.

G P ro je ct S ch ed ul e

3.

G P ro je ct S ch ed ul e

3.

G ba r c ha rt sc he du le 3.

4.

G In iti al

N A

S P ro je ct S ch ed ul e

3.

4.

G

P re lim in ar y

N A

S P ro je ct S ch ed ul e

S D

-0

P ro du ct

D at a 3.

5.

D at a C

D s

3.

1.

S ch ed ul e

S ta tu s

R ep or ts

3.

4.

P er io di c

S ch ed ul e U pd at es 3.

5.

N ar ra tiv e R ep or t 3.

7.

Ju st ifi ca tio n of D el ay

3.

P ro po se d S ch ed ul e

R ev is io ns 3.

3.

2.

M an da to ry

T as ks 3.

4.

D es ig n

P ac ka ge

S ch ed ul e S ub m is si on 3.

5.

4.

E ar ni ng s

R ep or t b y C

LI

N

3.

6.

U pd at e S ub m is si on F ol lo w in g P ro gr es s

M ee tin g

3.

7.

Ju st ifi ca tio n fo r e ac h re qu es t f or a ch an ge

S D

-0

P re co ns tru ct io n

S ub m itt al s

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

Y ub a R iv er

B as in , C

A

1.

G C on tra ct or

S af et y

S el f-E va lu at io n

C he ck lis t 1.

G

A cc id en t P re ve nt io n

P la n (A

P P

1.

G

A ct iv ity

H az ar d

A na ly si s (A

H A

1.

G

R eg ul at or y

R eq ui re m en ts S

D -0

Te st R ep or ts 1.

R ep or ts 1.

.1

A cc id en t R ep or ts

S D

-0

C er tif ic at es

3.

5.

Li ce ns e C er tif ic at es 1.

C on tra ct or

S af et y

S el f-E va lu at io n

C he ck lis t M ac hi ne ry

M ec ha ni ze d E qu ip m en t C er tif ic at io n Fo rm

S

D -0

P re co ns tru ct io n S ub m itt al s 3.

C on tra ct or

Q ua lit y

C on tro l (

C Q

C

P la n S

D -0

Te st R ep or ts 3.

D oc um en ta tio n

S D

-0

P re co ns tru ct io n

S ub m itt al s

1.

3.

G

S ite

P la n 1.

4.

G P ro je ct a nd S af et y S ig ns

S D

-0

P ro du ct

D at a G eo te xt ile

F ab ric M an uf ac tu re r's lit er at ur e S

D -0

C er tif ic at es

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

Y ub a R iv er

B as in , C

A

C er tif ic at io n of re cy cl ed c on te nt

S ta te m en t o f r ec yc le d co nt en t C er tif ic at io n of o rig in

In st al le r's Q ua lif ic at io n

S D

-0

P re co ns tru ct io n

S ub m itt al s

G

FR

A Q

M D

P la n 3.

6.

G Fu gi tiv e D us t C on tro l P la n 3.

.7

G N oi se

C on tro l P la n

3.

.3 .5

G H az ar do us

M at er ia ls C on tin ge nc y P la n

G H az ar do us

M at er ia ls C on tro l P la n 1.

G

E nv iro nm en ta l P ro te ct io n

P la n 3.

.3

.5 G

W or ke r H ea lth a nd

S af et y

P la n 3.

.3

.5 G

A ct iv ity

H az ar d

A na ly si s 3.

.1

G C on fin ed S pa ce

D oc um en ta tio n 1.

G

P ro te ct io n

Fe at ur es

3.

.1 G

Fi re

P ro te ct io n

P la n S

D -0

Te st R ep or ts 3.

.1

G ro un d

V ib ra tio n R es ul ts 3.

4.

4.

R ec or de d

S ou nd R es ul ts

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

G

C er tif ie d S to rm

W at er P ol lu tio n

P re ve nt io n

P la n (S

W P

P P

1.

G

C er tif ie d S to rm

W at er P ol lu tio n

P re ve nt io n

P la n (S

W P

P P

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

Y ub a R iv er

B as in , C

A

1.

6.

5.

G C on cr et e an d

Fu el

S pi ll M an ag em en t P la n 1.

G

S to rm W at er

S am pl in g A nd A na ly si s

P ro gr am

S D

-1

C lo se ou t S ub m itt al s

1.

3.

R ec or d D ra w in gs

1.

3.

Fi na l A pp ro ve d

S ho p D ra w in gs

S D

-0

P re co ns tru ct io n

S ub m itt al s

1.

G D em ol iti on

P la n

S

D -0

S ho p

D ra w in gs S ho p

D ra w in gs 2.

M is ce lla ne ou s

M et al s

S ta nd ar d

M et al A rti cl es S

D -0

Te st R ep or ts Te st R ep or ts

.2

S

D -0

M an uf ac tu re r’s

In st ru ct io ns

1.

4.

Jo in t S ea la nt In st ru ct io ns 1.

4.

C oa tin g

S ys te m

In st ru ct io ns

1.

Jo b

S ite

R ef er en ce s

S am pl es

1.

P ro du ct

D at a

S

D -0

S ho p

D ra w in gs A pp ro ve d de ta il sh op d ra w in gs

S D

-0

P ro du ct

D at a 2.

M od ul ar E xt er io r S ig na ge S ys te m 3.

In st al la tio n

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

Y ub a R iv er

B as in , C

A

E xt er io r s ig na ge s ch ed ul e 3.

1.

P ro te ct io n an d

C le an in g

S

D -0

P re co ns tru ct io n S ub m itt al s 3.

2.

G S he et in g an d

S ho rin g

P la n S

D -0

P ro du ct D at a

P la n of

O pe ra tio ns 2.

2.

E m ba nk m en t a nd

B ac kf ill

M at er ia ls Fl oo d

S ta ge C on tin ge nc y P la n

S D

-0

Te st

R ep or ts

2.

3.

B or ro w S ite C he m ic al

S ui ta bi lit y

C er tif ic at io n R ep or t 2.

3.

B or ro w

S ite

C he m ic al S ui ta bi lit y C er tif ic at io n

R ep or t

S D

-0

C er tif ic at es

2.

3.

Te st in g S

D -0

M an uf ac tu re r’s

F ie ld R ep or ts 3.

6.

1.

Q ua lit y C on tro l T es tin g

3.

6.

1.

In sp ec tio n R ec or ds A nd A ll M at er ia l T es tin g R es ul ts

S

D -0

P re co ns tru ct io n S ub m itt al s G

W or k P la n

S D

-0

S am pl es

2.

Tr ee w ou nd p ai nt

2.

H er bi ci de

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

Y ub a R iv er

B as in , C

A

3.

7.

N on sa le ab le M at er ia ls

.0

S D

-0

S am pl es

1.

S ee di ng

S am pl es

S D

-0

P re co ns tru ct io n

S ub m itt al s

G C ut of f W al l C on st ru ct io n B en to ni te

S lu rr y

M ix in g, S to ra ge an d

D el iv er y M et ho ds a nd E qu ip m en t G

C em en t S lu rr y M ix in g O pe ra tio n

G B en to ni te

/C em en t S lu rr y M ix in g O pe ra tio n

G C ut of f W al l S ur ch ar ge L oa di ng C ut of f W al l S ur ch ar ge L oa di ng P la n

Q ua lif ic at io n S ub m itt al

G P re -C on st ru ct io n

Q ua lit y

C on tro l

R ep or ts

G S ch ed ul e an d

S eq ue nc e of

O pe ra tio ns G

S eq ue nc e of

O pe ra tio ns A t U til ity Li ne C ro ss in gs

S eq ue nc e of

O pe ra tio ns A t U til ity Li ne C ro ss in gs

P la n G

E qu ip m en t a nd P ro ce du re s G

V er tic al a nd

H or iz on ta l

To le ra nc es Q ua lit y C on tro l P la n

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

Y ub a R iv er

B as in , C

A

C on tra ct or Q ua lif ic at io ns

S D

-0

S am pl es

G E qu ip m en t a nd

P ro ce du re s to O bt ai n W et B ul k an d

C or e S am pl es o f M ix ed S oi l

3.

8.

W et B ul k

S am pl in g 3.

2.

S oi l B or in gs

3.

6.

G

La bo ra to ry T ria l M ix es

C ha in o f C us to dy

F or m fo r Q ua lit y C on tro l / A cc ep ta nc e

Q ua lit y

A ss ur an ce S am pl es S

D -0

Te st R ep or ts G

Q ua lit y

C on tro l T es tin g an d E qu ip m en t P ro ce du re s

G Q ua lit y C on tro l a nd

A cc ep ta nc e

Te st

R es ul ts fo r t he T es t S ec tio n 3.

6.

G C ut of f W al l S C

B M at er ia l M ix D es ig n an d Te st R ep or t 3.

4.

C al ib ra tio n

R es ul ts

2.

1.

3.

W at er Q ua lit y Te st R es ul ts G

A s-

B ui lt P ro fil e of

C ut of f W al l a nd E nd o f C on st ru ct io n S um m ar y

R ep or t

G S ub su rfa ce

E xp lo ra tio n

R ep or t

G C on st ru ct io n

R ec or ds

C on st ru ct io n D oc um en ta tio n

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O

F

P A

G E

S

Y ub a R iv er

B as in , C

A

G C on st ru ct io n

Q ua lit y

C on tro l a nd Q ua lit y A cc ep ta nc e Te st R es ul ts C on st ru ct io n

Lo g

3.

9.

1.

D ai ly Q ua lit y C on tro l R ep or ts

R ig

-S hi ft Q ua lit y C on tro l R ep or ts

3.

9.

R ig -S hi ft

Q ua lit y

C on tro l R ep or t S

D -0

C er tif ic at es 2.

1.

C em en t C er tif ic at io n

B en to ni te C er tif ic at io n

A dm ix tu re s

S D

-0

P ro du ct

D at a 1.

3.

M ix

D el iv er y R ec or d D at a

1.

3.

R eg ul at or y R eq ui re m en ts

S D

-0

Te st

R ep or ts

1.

3.

Tr ia l b at ch

1.

3.

M ix d es ig n 2.

A sp ha lt co nc re te Te st in g C or es

3.

4.

1.

D en si ty

3.

4.

1.

Th ic kn es s 3.

4.

1.

Th ic kn es s eq ua tio n

3.

4.

1.

S tra ig ht ed ge te st

3.

4.

1.

un co m pa ct ed m ix

S D

-0

C er tif ic at es

A sp ha lt m ix d el iv er y re co rd

A sp ha lt co nc re te a nd m at er ia l

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O

F

P A

G E

S

Y ub a R iv er

B as in , C

A

2.

A sp ha lt co nc re te

3.

2.

A sp ha lt D ik e

S D

-0

P ro du ct

D at a 1.

P la nt

, E qu ip m en t, an d

To ol s W ay bi lls a nd D el iv er y

Ti ck et s

S D

-0

Te st

R ep or ts

1.

5.

G

S ou rc e of M at er ia l C om pl ia nc e Te st D at a

1.

5.

3.

La bo ra to ry M oi st ur e-

D en si ty

R el at io ns hi p M oi st ur e-

D en si t D et er m in at io ns 1.

5.

2.

Fi el d

D en si ty

T es ts 1.

S am pl in g

A nd

T es tin g

.0

S

D -0

P ro du ct D at a

1.

E qu ip m en t

2.

1.

C om po si tio n R eq ui re m en ts

1.

4.

Q ua lif ic at io ns

S D

-0

Te st

R ep or ts

2.

S am pl in g an d Te st in g S

D -0

C er tif ic at es 2.

1.

V ol at ile

O rg an ic

C om po un d (V

O C

S

D -0

S ho p

D ra w in gs 1.

In st al la tio n D ra w in gs

Lo ca tio n of g at e an d bo lla rd 1.

G at e

A ss em bl y

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O

F

P A

G E

S

Y ub a R iv er

B as in , C

A

1.

G at e H ar dw ar e an d

A cc es so rie s

S D

-0

P ro du ct

D at a 1.

D el iv er y, S to ra ge

, A nd

H an dl in g 1.

M an uf ac tu re r's

D at a an d In st ru ct io ns 1.

G at e

A ss em bl y 1.

G at e

H ar dw ar e an d A cc es so rie s 2.

P ai nt

M an uf ac tu re r's c at al og d at a an d ap pl ic at io n in st ru ct io ns

2.

B ol la rd

M an uf ac tu re r's c at al og

S

D -0

S ho p

D ra w in gs 3.

7.

In st al la tio n

D ia gr am s 3.

7.

S ur ve y

M ap s an d N ot es

S D

-0

P ro du ct

D at a 3.

7.

B or eh ol e Lo gs 3.

7.

In st al la tio n

D ia gr am s 3.

7.

W el l D ev el op m en t R ec or ds

3.

7.

W el l

D ec om m is si on in g/ A ba nd on m en t

R ec or ds

M on ito rin g W el l

1.

5.

Q ua lif ic at io ns

1.

P er m its

1.

3.

In st al la tio n P la n

3.

D oc um en ta tio n an d Q ua lit y C on tro l R ep or ts

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O

F

P A

G E

S

Y ub a R iv er

B as in , C

A

2.

D is po sa l O f D ev el op m en t W at er

A nd D ril l C ut tin gs S

D -0

Te st R ep or ts 3.

2.

2.

S oi l T es ts

2.

Fi lte r P ac k 3.

2.

D ril lin g

Fl ui d A dd iti ve /m et ho d S

D -0

C er tif ic at es 1.

3.

Y ub a C ou nt y E nv iro nm en ta l

H ea lth D ep ar tm en t P er m it fo r

P ie zo m et er

In st al la tio n

.1

S D

-0

S ho p D ra w in gs

3.

In st al la tio n

2.

E qu ip m en t/M et al

B ea m G ua rd

R ai lin g

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

A m e n d m e n t

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 45 00

QUALITY CONTROL

02/10

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 PAYMENT

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.2 QUALITY CONTROL PLAN

3.2.1 Content of the CQC Plan

3.2.2 Acceptance of Plan

3.2.3 Notification of Changes

3.3 COORDINATION MEETING

3.4 QUALITY CONTROL ORGANIZATION

3.4.1 Personnel Requirements

3.4.2 CQC System Manager

3.4.3 CQC Personnel

3.4.4 Additional Requirement

3.4.5 Organizational Changes

3.5 SUBMITTALS AND DELIVERABLES

3.6 CONTROL

3.6.1 Preparatory Phase

3.6.2 Initial Phase

3.6.3 Follow-up Phase

3.6.4 Additional Preparatory and Initial Phases

3.7 TESTS

3.7.1 Testing Procedure

3.7.2 Testing Laboratories

3.7.2.1 Capability Check

3.7.2.2 Quality Assurance Check

3.7.2.3 Capability Recheck

3.7.3 Onsite Laboratory

3.7.4 Furnishing or Transportation of Samples for Testing

3.8 COMPLETION INSPECTION

3.8.1 Punch-Out Inspection

3.8.2 Pre-Final Inspection

3.8.3 Final Acceptance Inspection

3.9 DOCUMENTATION

3.10 IMPLEMENTATION OF GOVERNMENT RESIDENT MANAGEMENT SYSTEM

3.11 SAMPLE FORMS

3.12 NOTIFICATION OF NONCOMPLIANCE

3.13 CONSTRUCTION CONTROL MANUAL

SECTION 01 45 00 Page 1 Amendment 0002

-- End of Section Table of Contents --

SECTION 01 45 00 Page 2

SECTION 01 45 00

QUALITY CONTROL

02/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C 1077 (2009b) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation

ASTM D 3666 (2009a) Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials

ASTM D 3740 (2008) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction

ASTM E 329 (2009) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction

U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT (CESPK)

CESPK FORM 437 (1988) Materials Test Summary

CESPK PAM 415-1-2 (1989) Construction Control Manual

1.2 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Contractor Quality Control (CQC) Plan

SD-06 Test Reports

Documentation

SECTION 01 45 00 Page 3

1.3 PAYMENT

Separate payment will not be made for providing and maintaining an effective Quality Control program, and all associated costs will be included in the applicable Bid Schedule unit or lump-sum prices.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Contractor shall establish and maintain an effective quality control (QC) system in compliance with the FAR 52.246-12 Contract Clause titled " Inspection of ConstructionINSPECTION OF CONSTRUCTION." QC consist of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. Cover all construction operations, both onsite and offsite, and be keyed to the proposed construction sequence. The project superintendent will be held responsible for the quality of work and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract. In this context the highest level manager responsible for the overall construction activities at the site, including quality and production is the project superintendent. The project superintendent must maintain a physical presence at the site at all times and is responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.

3.2 QUALITY CONTROL PLAN

Submit no later than 30 days after receipt of notice to proceed and a minimum of 14 days prior to the coordination meeting, the Contractor Quality Control (CQC) Plan proposed to implement the requirements of the Contract Clause titled "Inspection of Construction." The Government will consider an interim plan for the first 60 days of operation. Construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional work.

3.2.1 Content of the CQC Plan

Include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:

a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff will implement the three phase control system for all aspects of the work specified. Include a CQC System Manager who reports to the project superintendent.

b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.

SECTION 01 45 00 Page 4

c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities will be issued by the CQC System Manager. Copies of these letters must be furnished to the Government.

d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures must be in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities approved by the Contracting Officer must be used.)

f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.

h. Reporting procedures, including proposed reporting formats.

i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. This list will be agreed upon during the coordination meeting.

3.2.2 Acceptance of Plan

Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in his CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.

3.2.3 Notification of Changes

After acceptance of the CQC Plan, notify the Contracting Officer in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.

SECTION 01 45 00 Page 5

3.3 COORDINATION MEETING

Before start of construction, and prior to acceptance by the Government of the CQC Plan, meet with the Contracting Officer or Authorized Representative and discuss the Contractor's quality control system. Submit the CQC Plan a minimum of 14 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details must be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting will be prepared by the Government, signed by both the Contractor and the Contracting Officer and will become a part of the contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.

3.4 QUALITY CONTROL ORGANIZATION

3.4.1 Personnel Requirements

The requirements for the CQC organization are a CQC System Manager, and sufficient number of additional qualified personnel to ensure safety and contract compliance. The Safety and Health Manager must receive direction and authority from the CQC System Manager and serve as a member of the CQC staff. Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization. The Contractor's CQC staff must maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance. The CQC staff will be subject to acceptance by the Contracting Officer. Provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC organization. Promptly complete and furnish all letters, material submittals, shop drawing submittals, schedules and all other project documentation to the CQC organization. The CQC organization shall be responsible to maintain these documents and records at the site at all times, except as otherwise acceptable to the Contracting Officer.

3.4.2 CQC System Manager

Identify as CQC System Manager an individual within the onsite work organization who is responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC System Manager must be a graduate engineer, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this contract. This CQC System Manager must be on the site at all times during construction and be employed by the prime Contractor. The CQC System Manager must be assigned no other duties.

Identify in the plan an alternate to serve in the event of the CQC System Manager's absence. The requirements for the alternate are the same as the CQC System Manager.

3.4.3 CQC Personnel

In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: civil, environmental, materials

SECTION 01 45 00 Page 6 technician, submittals clerk. These individuals must be directly employed by the prime Contractor and may not be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager;

have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals must have no other duties other than quality control. A single person may cover more than one area provided that they are qualified to perform QC activities in each designated and that workload allows.

Experience Matrix

Area Qualifications

a. Civil Graduate Civil Engineer or Construction Manager with 2 years experience in the type of work being performed on this project or technician with 5 yrs related experience

b. Environmental Graduate Environmental Engineer with 3 yrs experience

c. Submittals Submittal Clerk with 1 yr experience

d. Concrete, Pavements and Soils Materials Technician with 2 yrs experience for the appropriate area

e. Testing, Adjusting and Balancing Specialist must be a member (TAB) Personnel of AABC or an experienced technician of the firm certified by the NEBB.

3.4.4 Additional Requirement

In addition to the above experience and education requirements the CQC System Manager must have completed the course entitled "Construction Quality Management For Contractors".

3.4.5 Organizational Changes

Maintain the CQC staff at full strength at all times. When it is necessary to make changes to the CQC staff, revise the CQC Plan to reflect the changes and submit the changes to the Contracting Officer for acceptance.

3.5 SUBMITTALS AND DELIVERABLES

Submittals, if needed, must comply with the requirements in Section 01 33 00 SUBMITTAL PROCEDURES. The CQC organization is responsible for certifying that all submittals and deliverables are in compliance with the contract requirements.

SECTION 01 45 00 Page 7

3.6 CONTROL

Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control must be conducted by the CQC System Manager for each definable feature of the construction work as follows:

3.6.1 Preparatory Phase

This phase is performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:

a. A review of each paragraph of applicable specifications, reference codes, and standards. Make available during the preparatory inspection a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field. Maintain and make available in the field for use by Government personnel until final acceptance of the work.

b. Review of the contract drawings.

c. Check to assure that all materials and/or equipment have been tested, submitted, and approved.

d. Review of provisions that have been made to provide required control inspection and testing.

e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.

f. Examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.

g. Review of the appropriate activity hazard analysis to assure safety requirements are met.

h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.

i. Check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.

j. Discussion of the initial control phase.

k. The Government must be notified at least 48 hours in advance of beginning the preparatory control phase. Include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. Document the results of the preparatory phase actions by separate minutes prepared by the CQC System Manager and attach to the daily CQC report. Instruct applicable workers as to the acceptable level of

SECTION 01 45 00 Page 8 workmanship required in order to meet contract specifications.

3.6.2 Initial Phase

This phase is accomplished at the beginning of a definable feature of work. Accomplish the following:

a. Check work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.

b. Verify adequacy of controls to ensure full contract compliance.

Verify required control inspection and testing.

c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.

d. Resolve all differences.

e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.

f. The Government must be notified at least 48 hours in advance of beginning the initial phase. Prepare separate minutes of this phase by the CQC System Manager and attach to the daily CQC report. Indicate the exact location of initial phase for future reference and comparison with follow-up phases.

g. The initial phase should be repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.

3.6.3 Follow-up Phase

Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. Record the checks in the CQC documentation. Conduct final follow-up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work.

3.6.4 Additional Preparatory and Initial Phases

Conduct additional preparatory and initial phases on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.

3.7 TESTS

3.7.1 Testing Procedure

Perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements.

Upon request, furnish to the Government duplicate samples of test specimens for possible testing by the Government. Testing includes operation and/or

SECTION 01 45 00 Page 9 acceptance tests when specified. Procure the services of a Corps of Engineers approved testing laboratory or establish an approved testing laboratory at the project site. Perform the following activities and record and provide the following data:

a. Verify that testing procedures comply with contract requirements.

b. Verify that facilities and testing equipment are available and comply with testing standards.

c. Check test instrument calibration data against certified standards.

d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.

e. Record results of all tests taken, both passing and failing on the CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test. If approved by the Contracting Officer, actual test reports may be submitted later with a reference to the test number and date taken. Provide an information copy of tests performed by an offsite or commercial test facility directly to the Contracting Officer. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for this contract.

3.7.2 Testing Laboratories

3.7.2.1 Capability Check

The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques. Laboratories utilized for testing soils, concrete, asphalt, and steel must meet criteria detailed in ASTM D 3740, ASTM C 1077, ASTM D 3666 and ASTM E 329.

The Contractor shall use an independent commercial laboratory that has been validated by abbreviated…