W91238-09-B-0008AM001pkg.pdf
PDF 349 KB Posted
- Attached to
- Bid Results Federal contract opportunity
- Solicitation number
- W91238-09-B-0008
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RD150_Plans.pdf | ||
| Specifications.pdf | ||
| W91238-09-B-0008 Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
The purpose of this amendment to:
Make corrections to the Pricing Schedule.
Correct Draw ing C-7: The reference to Note 8 should be a reference to Note 7.
Correct Draw ing C-6: Details A, B, &C should be referring to Note 6.
Fill material w ill not be used on this site and is deleted from the Specifications Section 01 50 00.
See Changes to Specification Section 35 31 19, about barge displacement charts. The submittal register has also changed due to this addition.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Sep-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-09-B-0008
X 9B. DATED (SEE ITEM 11)
04-Sep-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Sep-2009
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET-ROOM 878
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91238-09-B-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization below has been added:
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET-ROOM 878
SACRAMENTO CA 95814-2922
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Wage Determination 39 04-SEP-2009 Attachment 2 Specifications 176 04-SEP-2009 Attachment 3 Plans 9 04-SEP-2009 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 4 AM0001 20 25-SEP-2009
The following have been modified:
PRICING SCHEDULE
Revised PRICING SCHEDULE
LINE
ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE PRICE
0001 Period of Performance from Date of Award through 30 October 2009
0001AA Mobilization - Sites 1 LS LUMP SUM $__________ 10,13,14,15,18, and
0001AB Clearing and Grubbing 1.49* AC $_______ $__________
0001AC Stripping 1.49* AC $_______ $__________ 1.39*
0001AD Excavation and 3,760* CY $_______ $__________ Disposal
0001AE Rip Rap 9,104* TN $_______ $__________
0001AF 18” Minus - Quarry 6,313* TN $_______ $__________ Rock
0001AG 4” Minus - Infill 1,644* TN $_______ $__________ Rock
0001AH Hydoseed .04* AC $_______ $__________ .4*
0001AJ Demobilization - 1 LS LUMP SUM $__________ Sites 10,13,14,15,18, And 19
TOTAL ESTIMATED PRICE CONTRACT (CLIN 0001AA-0001AJ) $__________
0002 Period of Performance from 1 August 2010 through 30 September 2010
0002AA Mobilization - Sites 1 LS LUMP SUM $__________ 02,03,04,05,06,07,08, 11,12,16,and 17
0002AB Clearing and Grubbing 2.31* AC $_______ $__________
0002AC Stripping 2.31* AC $_______ $__________ 2.21*
0002AD Excavation and 6,220* CY $_______ $__________
Disposal
0002AE Rip Rap 13,686* TN $_______ $__________
0002AF 18” Minus - Quarry 25,087* TN $_______ $__________ Rock
0002AG 4” Minus - Infill 1,666* TN $_______ $__________ Rock
0002AH Hydoseed 0.6* AC $_______ $__________
0002AJ Demobilization - Sites 1 LS LUMP SUM $__________ 02,03,04,05,06,07,08, 11,12,16,and 17
TOTAL ESTIMATED PRICE CONTRACT (CLIN 0002AA-0002AJ) $__________
TOTAL ESTIMATED PRICE CONTRACT (CLIN 0001AA-0002AJ) $_______________
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION
IN ESTIMATED QUANTITY CONTRACT CLAUSE.
1. Prices must be submitted on all individual items of this Pricing Schedule. Failure to do so may be cause for rejection of bids.
2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.
3. The bidder/offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for award.
4. The lump sum, "LS", line items above are not "estimated quantity" line items and therefore are not subject to the Variation in Quantity contract clause.
(End of Summary of Changes)
S U
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
P L
-9
Le ve e
R eh ab ili ta tio n R ep ai rs fo r R D
.2
2.
1.
se ed m ix S
D -0
C er tif ic at es In vo ic es
S
D -0
P ro du ct D at a
G R ip ra p S
D -0
Te st R ep or ts 2.
4.
G G ra da tio n
Te st
2.
5.
G
G ra da tio n Te st G
E va lu at io n
Te st in g of S to ne
S D
-0
C er tif ic at es
S to ne W ei gh
S ca le C er tif ic at io n
C er tif ie d W ei gh t S ca le T ic ke ts 1.
3.
1.
G ag in g Ta bl e
D at a
S
D -0
P re co ns tru ct io n S ub m itt al s G
P la n of
O pe ra tio ns S
D -0
Te st R ep or ts 3.
.1
Q ua lit y
C on tro l T es t R es ul ts Te st D at a
S um m ar ie s;
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
A m e n d m e n t
PL 84-99 Levee Rehabilitation Repairs for RD150 RD150
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 50 00
TEMPORARY CONSTRUCTION FACILITIES
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.2.1 BULLETIN BOARD AND PROJECT SAFETY SIGNS
1.2.1.1 Bulletin Board
1.2.1.2 Safety Signs
1.3 CLEANUP
1.4 MEASUREMENT AND PAYMENT
1.5 PROOF OF LIABILITY INSURANCE
1.6 SUBMITTALS
PART 2 PRODUCTS
2.1 CONSTRUCTION TRAFFIC
PART 3 EXECUTION
3.1 EMPLOYEE PARKING
3.2 AVAILABILITY AND USE OF UTILITY SERVICES
3.2.1 Temporary Utilities
3.2.2 Sanitation
3.2.3 Telephone
3.2.4 Fire Protection
3.3 TRAFFIC PROVISIONS
3.3.1 Maintenance of Traffic
3.3.2 Protection of Traffic
3.3.3 Dust Control
3.4 CLEANUP
3.5 RESTORATION OF STAGING AREA
-- End of Section Table of Contents --
01 50 00 - 1 Amendment 0001
SECTION 01 50 00
TEMPORARY CONSTRUCTION FACILITIES
PART 1 GENERAL1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 310-1-6a (2006) Sign Standards Manual, VOL 1
EP 310-1-6b (2006) Sign Standards Manual, VOL 2
U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)
MUTCD-3 PART 6 (2003; R2 2007) Manual of Uniform Traffic Control Devices, Part 6, Temporary Traffic Control
1.2 GENERAL REQUIREMENTS
1.2.1 BULLETIN BOARD AND PROJECT SAFETY SIGNS
Provide safety, bulletin board, and hard hat signs at locations designated by the Contracting Officer. The sign requirements are shown in Section 16 of EP 310-1-6a and specified in EP 310-1-6b Appendix B. Erect signs within 15 days after receipt of the notice to proceed.
TEMPORARY SIGNAGE
Sign Sign Type
Number of
Signs
Panel Size
Post Size
Specification Code
Mounting Height
Color Bkg/Lgd
Safety Sign
CID-02 1 4’x4’ 4"x4" HDO-3 48 inches WH-RD/BK
Hard Hat Signs
SDA-13 1
each site
2'x2' 4"x4" HDO-5 48 inches SR-SW/SK
Bulletin Board
CID-02 1 3'x4' 4"x4" HDO-3 48 inches WH-RD/BK
1.2.1.1 Bulletin Board
Immediately upon beginning of work, provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches in size for displaying the
01 50 00 - 2
Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.
1.2.1.2 Safety Signs
The requirements for the signs, their content, and location are as shown on the drawings. Provide hard hat signs at each site while construction is in progress. Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.
1.3 CLEANUP
Construction debris, waste materials, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away promptly. Materials resulting from demolition activities which are salvageable shall be stored within the fenced area described above or at the supplemental storage area. Stored material not in trailers, whether new or salvaged, shall be neatly stacked when stored.
1.4 MEASUREMENT AND PAYMENT
Separate payment will not be made for providing Temporary Construction Facilities, and all costs associated therewith shall be included in the bid item, "MOBILIZATION AND DEMOBILIZATION".
1.8 GOVERNMENT FURNISHED BORROW SOURCE
The Government has identified a commercial borrow source for use during the repair of the damaged levee sites identified in this contract. This borrow source has been selected for levee fill material. The Contractor may need to identify commercial sources for other types of material. The Contractor shall contact a representative of the borrow source during development of their cost proposal for construction as well as within 48 hours of receiving contract award in order to schedule borrow operations. The development of a new borrow source or the execution of an independent agreement to use an alternate borrow source by the Contractor is prohibited.
1.6 SOURCE AND COMMUNICATION
The following commercial borrow source and point of contact has been established for use during this contract:
SOURCE – Teichert - Sacramento
REPRESENTATIVE – Mr. Mike Cunningham
TELEPHONE NO – (916) 386-6873
1.5 PROOF OF LIABILITY INSURANCE
The Contractor and any associated subcontractors, including but not limited to trucking contractors, shall be prepared to submit proof of general liability insurance coverage and worker’s compensation insurance to the commercial borrow source owner or the Contracting Officer upon request.
01 50 00 - 3
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submitted the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Traffic control plan; G
PART 2 PRODUCTS
2.1 CONSTRUCTION TRAFFIC
All levee repairs completed under this contract are expected to be conducted by waterborne or landside equipment. Waterbourne repairs shall be the primary method, while landside repairs will be conducted as needed if excess vegetation at the waterside levee toe inhibits repairs from the water. While repairs are being completed by waterborne equipment, the contractor shall use the existing public and patrol roads for light duty access only.
Light duty access may include necessary erosion control seeding and pole planting operations.
PART 3 EXECUTION
3.1 EMPLOYEE PARKING
Contractor employees will park privately owned vehicles in an area designated by the Contracting Officer. This area will be within reasonable walking distance of the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.
3.2 AVAILABILITY AND USE OF UTILITY SERVICES
3.2.1 Temporary Utilities
Provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.
3.2.2 Sanitation
Provide and maintain within the construction area minimum field-type sanitary facilities approved by the Contracting Officer and periodically empty wastes into a municipal, district, or station sanitary sewage system, or remove waste to a commercial facility. Obtain approval from the system owner prior to discharge into any municipal, district, or commercial sanitary sewer system. Any penalties and / or fines associated with improper discharge will be the responsibility of the Contractor. Coordinate with the Contracting Officer and follow station regulations and procedures when discharging into the station sanitary sewer system. Maintain these conveniences at all times without nuisance. Include provisions for pest control and elimination of odors. Government toilet facilities will not be available to Contractor's personnel.
01 50 00 - 4
3.2.3 Telephone
Make arrangements and pay all costs for telephone facilities desired.
3.2.4 Fire Protection
Provide temporary fire protection equipment for the protection of personnel and property during construction. Remove debris and flammable materials daily to minimize potential hazards.
3.3 TRAFFIC PROVISIONS
3.3.1 Maintenance of Traffic
a. Conduct operations in a manner that will not close any thoroughfare or interfere in any way with traffic on railways or highways except with written permission of the Contracting Officer at least 15 calendar days prior to the proposed modification date, and provide a Traffic Control Plan detailing the proposed controls to traffic movement for approval.
The plan must be in accordance with State and local regulations and the MUTCD-3 PART 6. Make all notifications and obtain any permits required for modification to traffic movements. Contractor may move oversized and slow-moving vehicles to the worksite provided requirements of the highway authority have been met.
b. Conduct work so as to minimize obstruction of traffic, and maintain traffic on at least half of the roadway width at all times. Obtain approval from the Contracting Officer prior to starting any activity that will obstruct traffic.
c. Provide, erect, and maintain, at contractors expense, lights, barriers, signals, passageways, detours, and other items, that may be required by the Life Safety Signage, overhead protection authority having jurisdiction.
3.3.2 Protection of Traffic
Maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment the work, and the erection and maintenance of adequate warning, danger, and direction signs, will be as required by the State and local authorities having jurisdiction. Protect the traveling public from damage to person and property. Minimize the interference with public traffic on roads selected for hauling material to and from the site. Investigate the adequacy of existing roads and their allowable load limit. Contractor is responsible for the repair of any damage to roads caused by construction operations.
3.3.3 Dust Control
Dust control methods and procedures must be approved by the Contracting Officer. Treat dust abatement on access roads with applications of calcium chloride, water sprinklers, or similar methods or treatment.
01 50 00 - 5
3.4 CLEANUP
Construction debris, waste materials, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away promptly.
3.5 RESTORATION OF STAGING AREA
If a staging area is designated on the drawings for use by the contractor during construction, these areas shall be restored to the original or better condition. Gravel used to traverse grassed areas shall be removed and the area restored to its original condition, including top soil and seeding as necessary. Erosion control seeding shall be completed in accordance with Section 32 92 19.26, EROSION CONTROL SEEDING.
-- End of Section --
01 50 00 - 6
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 31 19
STONE PROTECTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 UNIT PRICES
1.3.1 Riprap
1.3.1.1 Payment
1.3.1.2 Measurement
1.3.1.3 Unit of Measure
1.3.2 Minus 18-Inch Quarry Rock
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.3 Unit of Measure
1.3.3 Minus 4-Inch Clean Infill Rock
1.3.3.1 Payment
1.3.3.2 Measurement
1.3.3.3 Unit of Measure
1.3.4 Weighbills and Delivery Tickets
1.4 CONSTRUCTION TOLERANCES
PART 2 PRODUCTS
2.1 SOURCE AND MATERIAL APPROVAL
2.2 QUALITY COMPLIANCE
2.2.1 General
2.3 TESTS FOR STONE PROTECTION
2.4 RIPRAP
2.4.1 Gradation Test
2.5 MINUS 18-INCH QUARRY ROCK
2.5.1 Gradation Test
2.6 MINUS 4-INCH CLEAN INFILL ROCK
2.6.1 General
2.6.2 Material
PART 3 EXECUTION
3.1 PLACEMENT
-- End of Section Table of Contents --
35 31 19 - 1
SECTION 35 31 19
STONE PROTECTION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 88 (2005) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate
ASTM C 127 (2007) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate
ASTM C 136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C 33/C 33M (2008) Standard Specification for Concrete Aggregates
ASTM C 535 (2003e1) Standard Test Method for Resistance to Degradation of Large-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
ASTM D 1141 (1998; R 2008) Standard Practice for the Preparation of Substitute Ocean Water
ASTM D 3370 (2008) Sampling Water from Closed Conduits
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST HB 44 (2007) NIST Handbook 44: Specifications, Tolerances, and other Technical Requirements for Weighing and Measuring Devices
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Riprap; G
35 31 19 - 2
Submit the source for materials used in riprap.
SD-06 Test Reports
Gradation Test; G
Submit the gradation tests using the GRADATION TEST DATA SHEET enclosed at end of this section for riprap or stone.
Evaluation Testing of Stone; G
Quality test on the stone in accordance with PART 2 paragraph EVALUATION TESTING OF STONE shall be the responsibility of the Contractor. Prior to delivery of such material to the worksite, submit a copy of the laboratory inspection report along with actions taken to correct deficiencies. Submit a copy of the test reports.
SD-07 Certificates
Stone
Submit certificates of compliance attesting that the materials meet specification requirements.
Weigh Scale Certification
Submit a copy of the certification from the regulation agency attesting to the scale's accuracy.
Certified Weight Scale Tickets
Submit a copy of each certified weight scale ticket 10 working day(s) after weighing.
Gaging Table Data
1.3 UNIT PRICES
1.3.1 Riprap
1.3.1.1 Payment
Payment for riprap satisfactorily placed will be made at the applicable contract unit price for Riprap. Price(s) and payment(s) shall constitute full compensation for furnishing, hauling, handling, placing, and maintaining the riprap until final acceptance by the Government. No separate payment will be made for the stockpiling of riprap, and all cost in connection with stockpiling shall be included in the contract unit price for riprap and stone.
1.3.1.2 Measurement
Riprap will be measured for payment by the ton as determined by weighbills from a certified scale. Scales for measurement may be either scales operated by the commercial vendor of the material at the quarry or public truck scales. Scales shall be tested, approved, and sealed by an inspector of the state in which the scale is located. Vehicles used for hauling
35 31 19 - 3 materials shall be weighed empty daily at such time as desired, and each shall bear a plainly legible identification mark.Riprap will be measured for payment by the ton as determined by barge displacement, where direct placement into structure(s) is practicable, or by weighing by the truckload on approved scales meeting the requirements of paragraph TRUCKLOAD.
a. Truckload. Each truck load will be weighed to the nearest 0.1 ton and the final quantity rounded to the nearest whole ton. Riprap will be measured for payment by weighing on approved scales before being placed in the work. Scales shall be of sufficient length to permit simultaneous weighing of all axle loads and shall have an accuracy within 0.2 percent throughout the range of the scales. The scale's accuracy shall conform to the applicable requirements of NIST HB 44 and shall be certified by an inspector of the State Inspection Bureau charged with scales inspection within the state in which the project is located prior to weighing any riprap. The scales shall be capable of printing a weight ticket including time, date, truck number, and weight.. Scales will be checked and certified before hauling riprap.
b. Barge Load
(1) If delivered by barge, riprap will be measured for payment by the Contracting Officer by weight determined by barge displacement.
Furnish the Contracting Officer a barge displacement table not less than 10 work days prior to unloading the riprap from any barge. Each table submitted shall show the name and/or number of the barge owner, the name of the fabricator, and the certification and date of certification of the person or firm preparing the table. Furnish with the barge displacement tables a drawing or sketch of each barge, dimensioned in sufficient detail to permit checking of the tables. The drawings shall show, as a minimum, the length, width, depth of the barge, and dimensions of the rake or rakes. Each such table shall have its accuracy certified by a person or firm, other than the Contractor, customarily performing this service. Each table submitted shall contain, in parallel columns, the freeboard of the barge in feet and tenths from zero to the full depth of the barge and the corresponding gross displacement to the nearest ton. Each barge shall be suitably marked with three displacement gaging locations on each side near each end of the barge and two amidships on opposite sides. Each gaging location shall be marked by a line perpendicular to the edge of the barge, 4 inches wide and 1 foot long, on both the deck and side of the bargeand two amid ship on opposite sides.
Barges with rakes shall have the displacement gaging lines placed at each corner of the box section between the rakes. If a barge has a box end or ends, the gaging locations shall be placed approximately 4 feet from the box end(s). The freeboard will be measured at the six gaging locations and the displacement determined by the use of "STANDARD BARGE TABLES" from the average of these measurements. The displacement will be determined before and after being unloaded and the difference between these values shall be the quantity delivered. Submit the Gaging Table Data as specified in the Submittals paragraph. Barges shall be loaded so that the readings taken at the gaging locations do not vary more than 1.5 feet port to starboard fore and aft and do not vary more
35 31 19 - 4 than 0.5 feet port to starboard. If such is not the case, trim the carrier by shifting the stone until this limit is reached, before the measurement will be accepted.
(2) If barge tables are furnished for fresh water and if it is believed that barge displacement measurements made within the contract limits of the work are being taken in water that has salinity, the Contractor has the option of obtaining water samples and determining densities or unit weights of these samples. These water samples shall be taken in accordance with ASTM D 3370 (Practice A - Grab Samples) at depths of 4 and 8 feet in the area where measurements are made. Water sampling shall be performed when the barges are measured for quantities, both when fully loaded and when empty. Take water samples, as witnessed by the Contracting Officer, with the use of "Polypro" 2000 ml water sampler, or equal. Densities shall be determined as specified in ASTM D 1429 (Method D-Hydrometer Method). Testing shall be done for the Contractor by a certified testing laboratory, and test results certified by the laboratory. After review and approval of the test results by the Contracting Officer, the average of the densities obtained at 4 and 8 feet will be used as the suitable salt water conversion factor. In all calculations, the unit weight of 62.4 pounds per cubic foot will be used for fresh water.
1.3.1.3 Unit of Measure
Unit of measure: Ton.
1.3.2 Minus 18-Inch Quarry Rock
1.3.2.1 Payment
Payment for minus 18-inch quarry rock satisfactorily placed will be made at the applicable contract unit price for minus 18-inch quarry rock. Price(s) and payment(s) shall constitute full compensation for furnishing, hauling, handling, placing, and maintaining the minus 18-inch quarry rock until final acceptance by the Government. No separate payment will be made for the stockpiling of minus 18-inch quarry rock, and all cost in connection with stockpiling shall be included in the contract unit price for minus 18-inch quarry rock and stone.
1.3.2.2 Measurement
Minus 18-inch quarry rock will be measured for payment by the ton as determined by weighbills from a certified scale. Scales for measurement may be either scales operated by the commercial vendor of the material at the quarry or public truck scales. Scales shall be tested, approved, and sealed by an inspector of the state in which the scale is located.
Vehicles used for hauling materials shall be weighed empty daily at such time as desired, and each shall bear a plainly legible identification mark.
1.3.2.3 Unit of Measure
Unit of measure: Ton.
35 31 19 - 5
1.3.3 Minus 4-Inch Clean Infill Rock
1.3.3.1 Payment
Payment for gravel, crushed stone, and sand placed for infill rock will be made at the applicable contract unit prices for Infill Rock. Price(s) and payment(s) shall include all costs of furnishing, hauling, placing and maintaining the infill rock material until project is completed and accepted. Preparation of the base will not be paid for separately and all costs incidental thereto shall be included in contract prices for other items for which payment will be made. No payment will be made for excess thickness of infill rock material.
1.3.3.2 Measurement
Gravel, crushed stone, and sand placed for infill rock will be measured for payment by the ton. Quantities will be determined by weighbills from a certified scale. Scales for measurement may be either scales operated by the commercial vendor of the material at the quarry or public truck scales.
Scales shall be tested, approved, and sealed by an inspector of the state in which the scale is located. Vehicles used for hauling materials shall be weighed empty daily at such time as desired, and each shall bear a plainly legible identification mark.
1.3.3.3 Unit of Measure
Unit of measure: Ton.
1.3.4 Weighbills and Delivery Tickets
Copies of weighbills or delivery tickets shall be submitted to the Contracting Officer or his designated representative, during the progress of the work. The Contractor shall furnish the Contracting Officer or his designated representative scale tickets for each load of material weighed;
these tickets shall include tare weight, identification mark of each vehicle weighed, date, time, and location of loading. Tickets shall be furnished at the point and time individual loads arrive at the work site.
A master log of all vehicles loading shall be furnished for each day of loading operation. The Contractor shall file with the Contracting Officer or his designated representative, the master log of loading, certified tickets within 24 hours of material delivery. Prior to finial payment, the Contractor shall furnish written certification that the material recorded on the submitted weighbills and/or certified tickets was actually used in the construction covered by the contract
1.4 CONSTRUCTION TOLERANCES
The finished levee side slopes shall be armored with stone protection to the thickness specified on the drawings. For finial acceptance, the thickness shall have a tolerance of 0 to +4 inches greater than the thickness specified.
PART 2 PRODUCTS
2.1 SOURCE AND MATERIAL APPROVAL
The Contractor shall make all arrangements, pay all royalties, and secure all permits for the procurement, furnishing and transporting of material.
The sources from which the Contractor proposes to obtain the material shall
35 31 19 - 6 be selected and a sample submitted a minimum of 5 calendar days in advance of the time when the material will be required in the work. Stone from a proposed source where exploratory investigations and compliance test reports or satisfactory service records are not available, will be tested by the Government for quality compliance. The Government will test one sample of quarry rock at its expense. If the material fails the tests or if the Contractor desires to utilize more than one source, additional testing will be accomplished by the Government for the prevailing rate for each sample tested. The costs of such tests will be deducted from payment due the Contractor. All test samples (225 kg (500 Lbs.) minimum) shall be representative of the rock source and shall be obtained by the Contractor under the supervision of the Contracting Officer and delivered at the Contractor's expense to the Quality Assurance laboratory designated by the Contracting Officer. A list of sources from which acceptable quarry rock has been obtained, is included in Paragraph 2.4 of this section and is for information only. Quarry rock sources listed may no longer be available due to depletion or may not be acceptable because of changes in the material. The Contractor shall vary the quarrying, processing, loading, and placing operations to secure the type and quality of stone protection specified. If the stone being furnished by the Contractor does not fully meet all the requirements of these specifications, the Contractor shall furnish at no additional cost to the Government, other stone meeting the requirements of these specifications. Approval of stone from a source shall not be construed as a waiver of the right of the Government to require the Contractor to furnish stone which complies with these specifications. Materials produced from localized areas, zones, or strata will be rejected when such materials do not comply with the specifications
2.2 QUALITY COMPLIANCE
2.2.1 General
Test results and service records may be used to determine the acceptability of the Riprap and Stone Fill materials. In the event acceptable compliance test reports and/or service records for recent testing within 4 years of the award date of this contract are not available, the material shall be subjected to the tests outlined in these specifications to determine its acceptability for use in the work. Before a proposed new source of stone will be considered for sampling and testing, one of the following criteria must be met:
a. A sufficiently developed quarry operation to demonstrate that an adequate quantity of stone is available to fulfill the contract requirements; or,
b. An exposed face plus sufficient explorations (results of which are made available to the Government) to demonstrate that an adequate quantity of stone is available to fulfill the contract requirements.
2.3 TESTS FOR STONE PROTECTION
Quarry rock for Stone Protection materials shall meet the following test requirements:
Test Test Method Requirement
Specific Gravity (Bulk SSD) ASTM C 127 2.65 minimum Riprap
35 31 19 - 7
Test Test Method Requirement
Absorption ASTM C 127 2.0% maximum
Wetting and Drying SPD Test Procedure No fracturing1 3
Magnesium Sulfate ASTM C 88 15% maximum loss, 24 cycles2 4
Abrasion Loss ASTM C 535 50% maximum loss
1. Test procedure wetting-and-drying tests: The initial step of the test is the careful examination of the entire sample and the selection of representative test specimens. The piece should be large enough to produce two cut slabs, 25 mm (1 inch) thick (± 6 mm (0.25 inch)) with a maximum surface area of 190 square cm (30 square inches) on one side.
Two chunks approximately 75 mm by 100 mm (3 inches by 4 inches) are also chosen. The slabs and chunks are carefully examined under a low-power microscope and all visible surface features are noted and recorded. The specimens are then oven dried at 60°C (140°F), for eight hours, cooled and weighed to the nearest tenth of a gram. The test specimens are photographed to show all surface features before the test. The chunks and slabs are then subjected to fifteen cycles of wetting and drying. One slab and one chunk are soaked in fresh tap water, and the other slab and chunk are soaked in salt water prepared in accordance with ASTM D 1141. Each cycle consists of soaking for sixteen hours at room temperature and then drying in an oven for eight hours at 60°C (140°F). After each cycle the specimens are examined with the low-power microscope to check for opening or movement of fractures, flaking along edges, swelling of clays, softening of rock surface, heaving of micaceous minerals, breakdown of matrix material, and any other evidence of weakness developing in the rock. The cycle in which any of these actions occurs is recorded. After fifteen cycles, the slabs and chunks are again carefully examined and all changes in the rocks are noted and recorded. The test specimens together with all flakes or particles which come off during the test are oven dried, weighed, and photographed.
2. The test shall be made of 50 particles each weighing 100 grams, (± 20 grams), in lieu of the gradation given in ASTM C 88.
3. Weakening and loss of individual surface particles is permissible unless bond of the surface grains softens and causes general disintegration of the surface material.
4. Sandstones which have a loss greater than the specified limit will be accepted if the Contractor demonstrates that the rock has a satisfactory service record.
In addition to the above tests, the stone shall be subjected to a petrographic and X-ray diffraction analysis. The stone shall not contain any swelling type clay (illite or montmorillonite).
35 31 19 - 8
2.4 RIPRAP
2.4.1 Gradation Test
Gradation tests shall be performed by the commercial vendor or the contractor. One gradation test is required at the beginning of production prior to delivery of stone to the project and a minimum of one additional test for each 10,000 tons of material placed. Gradation test results supplied by the commercial vendor shall include an affidavit stating that the test was conducted on material being used for this job. The individual grading curves shall not exhibit abrupt change in slope denoting skip grading or scalping of certain sizes. Specified grading of all material shall be met both at the source and as delivered to the project. In addition, material not meeting the required grading due to segregation or degradation during placement shall be rejected. If test results show that the stone does not meet the required grading, the hauling operation will be stopped immediately and will not resume until rock processing procedures are adjusted and a gradation test is completed showing gradation requirements are met. Riprap shall be quarry stone, as specified below.
Quarry stone shall be angular in shape. Riprap placed at the sites shall meet the following gradation. Only quarried stone shall be used. Stone shall be well graded and shall conform to the table(s) below:
WEIGHT PER
STONE (Lbs.)
PERCENT SMALLER
BY WEIGHT, LB.
200 100
100 60-90
50 35-65
20 10-30
5 0-5
2.5 MINUS 18-INCH QUARRY ROCK
2.5.1 Gradation Test
Gradation tests shall be performed by the commercial vendor or the contractor. One gradation test is required at the beginning of production prior to delivery of stone to the project and a minimum of one additional test for each 10,000 tons of material placed. Gradation test results supplied by the commercial vendor shall include an affidavit stating that the test was conducted on material being used for this job. The individual grading curves shall not exhibit abrupt change in slope denoting skip grading or scalping of certain sizes. Specified grading of all material shall be met both at the source and as delivered to the project. In addition, material not meeting the required grading due to segregation or degradation during placement shall be rejected. If test results show that the stone does not meet the required grading, the hauling operation will be stopped immediately and will not resume until rock processing procedures are adjusted and a gradation test is completed showing gradation requirements are met. Minus 18-inch quarry rock shall be quarry stone, as specified below. Quarry stone shall be angular in shape. Quarry stone placed at the sites shall meet the following gradation. Only quarried stone
35 31 19 - 9 shall be used. Stone shall be well graded and shall conform to the table(s) below:
Size Percent Passing
18 inch 100
16 inch 60-95
10 inch 15-40
3 inch 0
2.6 MINUS 4-INCH CLEAN INFILL ROCK
2.6.1 General
Infill rock material shall consist of a washed gravel or crushed stone.
2.6.2 Material
Infill rock material shall be composed of tough, durable particles, adequately free from thin, flat and elongated pieces, and shall contain no organic matter nor soft, friable particles in quantities considered objectionable by the Contracting Officer. The aggregates shall meet the quality requirements of ASTM C 33/C 33M. Gradation shall conform to the following requirements:
U.S. STANDARD SIEVE PERMISSIBLE LIMITS
PERCENT BY WEIGHT,
PASSING
SURFACE ROCK
4 inch 100
3 inch 80-100
1 inch 40-75
#4 15-45
#8 8-35
The infill rock material shall be well-graded between the limits shown. At least one test shall be performed on each 1,000 tons to be delivered to the project site for each specified gradation in accordance with ASTM C 136.
35 31 19 - 10
PART 3 EXECUTION
3.1 PLACEMENT
Riprap shall be placed to the slope lines and grades indicated on the drawings. Riprap shall be placed on the prepared base in such a manner as to produce a well-graded mass with a minimum practicable percentage of voids. For Riprap placed below water, a tolerance of zero to plus (6 inches) from the thickness shown on the drawings is acceptable. For Riprap placed above water, a tolerance of zero to plus (3 inches) from the thickness shown on the drawings is acceptable. Riprap with a measured thicknesses less than the thickness shown on the drawings is unacceptable.
Where the measured thickness of the Riprap exceed the thickness indicated on the drawings plus the specified tolerance, it shall be considered as conforming with the required thickness plus the specified tolerance. This additional riprap can remain in place provided that the final surface is smooth and uniform. If, however, the extra thickness causes eddies or additional hydraulic roughness, the additional riprap shall be removed.
Riprap shall be placed in such a manner as to avoid displacing underlying material. The entire mass of stones in final position shall conform to the gradation specified in Paragraph 2.3 of this section. The finished Riprap shall be free from pockets of small stones and clusters of larger stones.
Placing Riprap by methods likely to cause segregation of the various sizes is not acceptable. The desired distribution of the various sizes of stones throughout the mass shall be obtained by selective loading of the material at the quarry or other source, by controlled dumping of successive loads during final placing, or by other methods of placement which will produce the specified results. Rearranging of individual stones by mechanical equipment or by hand will be required to the extent necessary to obtain a reasonably well graded distribution of stone sizes as specified above and to provide a finished surface free of protruding stones. Dozers or other equipment which would cause degradation or displacement of stone shall not be used on the slopes. The Contractor shall maintain the Riprap until accepted and any material displaced by any cause shall be replaced at no additional cost to the Government.
-- End of Section --
35 31 19 - 11
| RD150AM1.pdf |
| SUBMITTAL REGISTER PAGE 3 OF 3 PAGES |
| 01 50 00 - TEMPORARY CONSTRUCTION FACILITIES |
| 01 50 00 - TEMPORARY CONSTRUCTION FACILITIES |
| PART 1 GENERAL1.1 REFERENCES |
| 1.2 GENERAL REQUIREMENTS |
| 1.2.1 BULLETIN BOARD AND PROJECT SAFETY SIGNS |
| 1.2.1.1 Bulletin Board |
| 1.2.1.2 Safety Signs |
| 1.3 CLEANUP |
| 1.4 MEASUREMENT AND PAYMENT |
| 1.8 GOVERNMENT FURNISHED BORROW SOURCE |
| 1.6 SOURCE AND COMMUNICATION |
| 1.5 PROOF OF LIABILITY INSURANCE |
| 1.6 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 CONSTRUCTION TRAFFIC |
| PART 3 EXECUTION |
| 3.1 EMPLOYEE PARKING |
| 3.2 AVAILABILITY AND USE OF UTILITY SERVICES |
| 3.2.1 Temporary Utilities |
| 3.2.2 Sanitation |
| 3.2.3 Telephone |
| 3.2.4 Fire Protection |
| 3.3 TRAFFIC PROVISIONS |
| 3.3.1 Maintenance of Traffic |
| 3.3.2 Protection of Traffic |
| 3.3.3 Dust Control |
| 3.4 CLEANUP |
| 3.5 RESTORATION OF STAGING AREA |
| 35 31 19 - STONE PROTECTION |
| 35 31 19 - STONE PROTECTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 UNIT PRICES |
| 1.3.1 Riprap |
| 1.3.1.1 Payment |
| 1.3.1.2 Measurement |
| 1.3.1.3 Unit of Measure |
| 1.3.2 Minus 18-Inch Quarry Rock |
| 1.3.2.1 Payment |
| 1.3.2.2 Measurement |
| 1.3.2.3 Unit of Measure |
| 1.3.3 Minus 4-Inch Clean Infill Rock |
| 1.3.3.1 Payment |
| 1.3.3.2 Measurement |
| 1.3.3.3 Unit of Measure |
1.3.4 Weighbills and Delivery Tickets
1.4 CONSTRUCTION TOLERANCES
| PART 2 PRODUCTS |
| 2.1 SOURCE AND MATERIAL APPROVAL |
| 2.2 QUALITY COMPLIANCE |
| 2.2.1 General |
| 2.3 TESTS FOR STONE PROTECTION |
| 2.4 RIPRAP |
| 2.4.1 Gradation Test |
| 2.5 MINUS 18-INCH QUARRY ROCK |
| 2.5.1 Gradation Test |
| 2.6 MINUS 4-INCH CLEAN INFILL ROCK |
| 2.6.1 General |
| 2.6.2 Material |
| PART 3 EXECUTION |
| 3.1 PLACEMENT |
| C-6 |
| C-7 |