This document is a Solicitation Amendment for federal contract opportunity W9123724Q0071. The amendment extends the due date for quotes from May 16, 2024 to May 17, 2024 and provides clarification on several questions regarding the Statement of Work. The original solicitation is for a Contractor to supply a Modular Office Trailer for the Marietta Repair Station in Marietta, OH. The Contractor shall provide all associated labor, materials, supplies, tools, and transportation/travel for delivery and installation of the new, unused trailer. Key details include:
The trailer shall be a standard commercial design, not a prototype or demo. The Contractor is responsible for following all applicable safety standards. The trailer is for permanent usage and shall have specific requirements such as 2 ADA/IBC compliant restrooms, fluorescent lighting, HVAC, 8 private offices, data closet space, etc. There are details provided on data drops, flooring, exterior finish, and site conditions. The modular building will be placed on a concrete and gravel site with available 200A electrical service. The Contractor is not responsible for any additional site work. The government will dispose of any existing unit.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81F8E40684855
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this Solicitation Amendment is to answ er Questions regarding the Statement of Work and to extend the date that quotes are due from 16 May 2024 to 17 May 2024.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-May-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123724Q0071
X 9B. DATED (SEE ITEM 11)
02-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-May-2024
CODE
USACE, CONTRACTING DIVISION
ELLEC ROBINETTE, 502 8TH STREET
HUNTINGTON WV 25701
W91237 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123724Q0071
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 16-May-2024 12:00 AM to 17-May-2024 04:00 PM.
The following have been added by full text:
FURTHER CLARIFICATIONS
Questions and Answers
• Is this going to be a purchase or a lease? If Lease, Project Terms/Duration?
This will be a Purchase
• Expected Mobilization/Delivery Date?
See Solicitation Document, Page 5, Paragraph 5, Sub Paragraph a.
• Do you have an available Floor Plan in mind, if not we can help you develop one= two ADA and IBC compliant restrooms, fluorescent lighting, central HVAC with programmable thermostats, eight private office rooms, data closet space and J-boxes, and commercial interior doors with steel jams.
Please refer to the technical Specification beginning on Page 4 of the Solicitation Document.
• Are Data Drops Network J-Boxes required in the building. If so, quantities and locations. Also, do you need for MM to provide with the CAT-6 wiring onsite?
Please refer to the technical Specification under Interior, beginning on Page 5 of the Solicitation Document.
• Is the modular building meant for temporary or permanent usage?
Permanent
• If purchasing. Exterior finish/Color=
Smart panel wood exterior siding (no color preference). See technical Specifications on Page 4 of the Solicitation Document.
• Flooring (Carpeted or VCT Tile):
Commercial grade tile with base cove molding. See technical Specifications on Page 4 of the Solicitation Document.
• Have you already selected the site locations. If so, do you happen to have a google map picture with the location that you can provide over to me?
See shipping address at the top of Page 6 of the Solicitation Document
• How’s the Site (any slopes)?
No Slopes
• How’s the soil conditions (cement, gravel, asphalt, grass, dirt, etc?
Concrete and Gravel
• Is there enough footprint space available for the modular building (s)?
Yes
W9123724Q0071
• Holding Tanks required or have existing sewer lines?
City Sewer that MRS will connect
• Fresh Water Tanks required or have fresh water lines?
City water that MRS will connect.
• Temp Power Requirements or already have power?
200 service is available with external disconnect
• Any Furniture Requirements (Desk, chairs, cubicles, kitchen items, etc.?
No
• What direction will the building face?
Both man doors will facing South West (Sown Stream)
• Any Additional turnkey site work for MM onsite:
No
• Is there a Current Unit(s) Disposal (If any)?
There is a unite in place GSA will have dispose