Dry Dock and Repair of Storage Barge 792
Solicitation number
W91237-21-Q-0017
Issued by

About this file

This solicitation requests offers for the dry dock and repair of Storage Barge 792. The contractor shall provide all labor, materials, equipment, and services to inspect, clean, paint, and perform other repairs to the barge such as installing guardrails, replacing the crane engine and load indicator, and optional items like adding a staircase or insulating the storage building. Offers are due by 11:00 AM on January 29, 2021. The solicitation is set aside for small businesses and targets SDVOSB/HUBZone small businesses. The Department of the Army Corps of Engineers Engineering District Huntington is the contracting agency. The contractor must have the capability to perform all work within 400 river miles of the Louisville Repair Station.

View the file

Other files

File Type Posted
W9123721Q0017 P0002.pdf PDF
792 Crane Drawing.pdf PDF
792 Deckhouse.pdf PDF
792 Drawing Binder.pdf PDF
W9123721Q0017 P0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9123721Q0017 07-Jan-2021

b. TELEPHONE NUMBER

304.399.5337

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 29 Jan 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912379. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

CYNTHIA A OXLEY

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USACE, CONTRACTING DIVISION

ELLEC ROBINETTE, 502 8TH STREET

HUNTINGTON WV 25701

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

304-399-5281FAX:

TEL: 304-399-5226 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250 employees

NAICS:

336611

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF55

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9123721Q0017

Section SF 1449 - CONTINUATION SHEET

INSTRUCTIONS TO OFFERORS

The Government intends to award one firm-fixed price commercial services contract.

The award will be based on low-price. Prospective offerors must complete the information below.

Estimated Delivery Time: __________________________________

Unique Entity Identifier (formerly DUNS): ___________________________

TAX ID: ________________________

IMPORTANT NOTICE: Effective September 26, 2018 and in accordance with FAR Clause 52.204-7, “an Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.” Vendors are highly encouraged to check their registration status and plan accordingly prior to submitting an offer.

Please direct all questions to Ellec Robinette at (304) 399-5226, (410) 980-8898 or Ellec.T.Robinette@usace.army.mil.

THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING DOCUMENT IN ALL

CASES.

QUOTES MUST BE E-MAILED TO Ellec Robinette at Ellec.T.Robinette@usace.army.mil. Mailed offers will not be accepted. Faxed offers cannot be accepted at this time due to COVID-19.

CONTRACTOR FEEDBACK. Help us in BUILDING STRONG. Please provide us with your feedback, comments and recommendations for improvement by visiting our Interactive Customer Evaluation (ICE) Website at:

https://ice.disa.mil/index.cfm?fa=SiteSuggestions&site_id=856&dep=*DoD&suggestion_type=1

Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts:

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

- U.S. Department of Labor Veterans’ Employment and Training Service (VETS):

https://www.dol.gov/vets/

- Federal Veteran Employment Information: https://www.fedshirevets.gov/

- Veterans Opportunity to Work (VOW) Program: https://www.benefits.va.gov/vow/

- U.S. Army Warrior Transition Command Employment Index:

https://wct.army.mil/modules/employers/index.html

- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes

(End of special contract requirement)

PRICE BREAKOUT SCHEDULE

BASE ITEMS

Line Item:

Description QTY U/M TOTAL

0001 Dry Dock and Inspection of Storage Barge 792 1 JB $____________________ 0002 Inspect Hull 1 JB $____________________ 0003 Cleaning & Surface Preparation 1 JB $____________________ 0004 Painting 1 JB $____________________ 0005 Install Guardrails 1 JB $____________________ 0006 Crane Engine Repower 1 JB $____________________ 0007 Replace Crane Load Moment Indication (LMI) 1 JB $____________________

Total Base $____________________

OPTION ITEMS

0008 Install Staircase 1 JB $____________________ 0009 Insulate Storage Building 1 JB $____________________ 0010 Replace Crane Cab Safety Glass 1 JB $____________________ 0011 Roof Painting 1 JB $____________________ 0012 Barge Pickup – Meldahl 1 JB $____________________ 0013 Barge Pickup – Markland 1 JB $____________________ 0014 Barge Delivery – Markland 1 JB $____________________ 0015 Barge Delivery – Louisville Repair Station 1 JB $____________________

Total Option $____________________

Base and Option TOTAL $____________________

PERFORMANCE WORK STATEMENT

SPECIFICATION

DRY-DOCK REPAIR OF STORAGE BARGE 792

1. GENERAL

A. The work consists of furnishing all labor, materials, fittings, equipment, tools, power, heat, water, etc., and performing all work on the Storage Barge 792. The Storage Barge 792 is a barge that is 140’ long and 54’ wide.

B. The contractor shall furnish the necessary facilities for this contract and shall bear the expense of any movement of the storage barge while it is at their facility and in their possession. Possession will start at the time when the government provides the Storage Barge 792 to the contractor. Possession ends when the storage barge is returned to the government’s possession.

C. The removal or shifting of any parts on the boat that will facilitate the contractor’s work shall be completed by the government’s staff that will be present during the work required by this contract.

D. These specifications prescribe the requirements for the necessary repairs and work to be completed on the Storage Barge 792. The contractor’s work shall comply with (US Coast Guard “Rules and Regulations for Subchapter I, Vessels”) as found in the Code of Federal Regulations (Title 46, CFR) and American Bureau of Shipping “Rules for Building and Classing Steel Vessels”.

E. The term “Plant” that is used in these specifications is referring to the Storage Barge 792, together with its normal appurtenances, equipment and supplies.

F. All contract work shall be completed within 400 river miles of Louisville Repair Station at Ohio River mile marker 606. Any bids to perform the work outside of 400 river miles will be considered nonresponsive.

G. The barge will be located at and available for inspection at one of the following locations prior to the dry dock:

Louisville Repair Station 2605 Shippingport Drive Louisville, KY 40212

Greenup Locks and Dam 600 Corps Street Greenup, KY 41144

Captain Anthony Meldahl Locks and Dam

2443 US 52

Felicity, OH 45120

Contact Gary Murphy at 304-399-6216 or Drake Riley at 502-619-6002 to schedule inspection.

2. SCHEDULE

The Storage Barge 792 will be available for dry dock from June 21, 2021 to October 22, 2021. The Storage Barge 792 is not required to be on the contractor’s jobsite during the entire time period. Storage Barge must be available pickup by October 22, 2021. If option line items 0014 or 0015 are exercised, the delivery must be made to the specified location by October 22, 2021.

3. PRICE BREAKOUT SCHEDULE

Contractor shall quote on the following items and options:

Under Separate Cover

4. Specificaitons

Line Item 0001:

Dry Dock and Inspection of Storage Barge 792

Unless otherwise stated, all work may be completed during dry-dock or as dockside service at the contractor’s choice. Anything below the waterline shall be completed during dry-dock to facilitate government inspection.

Government Personnel – Access to the Storage Barge 792 shall be maintained at all times. Government personnel will be making regular visits to the vessel to monitor progress and to perform standard maintenance that is not related to and does not interfere with the work specified in this contract.

Line Item 0002:

Inspect Hull

1. Visual Inspection

a. Contractor shall inspect all hull compartments and document interior condition.

b. Photographs are to be taken of any paint failure, existing corrosion, or structural damage.

c. A condition report shall be submitted within 10 calendar days of the barge arriving on the contractor’s facility that lists the area on the hull of the damage as well as the corresponding photographs.

d. The report shall include a proposal for any repairs necessary to restore the structural integrity of the boat.

e. The Government shall determine if any additional contract modification will be pursued based on the condition report, a physical inspection, the reasonableness of the proposal, and the availability of funding.

2. Audio-Gauge Inspection

a. Contractor shall provide the service of a marine surveyor to audio-gauge the hull of the barge in accordance with 7-3-4/3.1 ABS Steel Vessel Rules. The Contractor is responsible for all coordination to ensure that the marine surveyor and the equipment used are acceptable to ABS and USCG prior to the start of any audio-gauging work.

b. The minimum requirements for the hull thickness measurement is as follows:

i. Bottom Plating – Ten (10) equally spaced transverse sections beginning at the forward collision bulkhead and extending aft, four (4) readings per section.

ii. Rake End Plating – Three (3) transverse sections at both the bow and stern rake sheets; one at the rake tangent, one at the light waterline, and one at the load waterline, four transverse readings per section.

iii. Bilge Knuckle (Port and Starboard) – Ten (10) equally spaced transverse sections beginning at the forward collision bulkhead and extending aft, two (2) readings per section located at 30-degrees and 60-degrees on the knuckle radius.

iv. Rake Knuckles (Bow and Stern, Port and Starboard) – Three (3) transverse sections at both the bow and stern rake sheets; one at the rake tangent, one at the light waterline, and one at the load waterline, two (2) readings per section located at the 30-degrees and 60-degrees on the knuckle radius.

v. Side Shell Plating (Port and Starboard) – Twelve (12) equally spaced transverse sections beginning 5-ft. aft of the headlog and extending to the stern log, three (3) readings per section (above the bilge knuckle and at the 2-ft and 4-ft draft marks.

vi. Areas of particular concern and as considered necessary by the attending Surveyor or government representative. Any additional recommended work shall be incorporated into the contract by written modification.

Line Item 0003:

Cleaning & Surface Preparations

1. All steel surfaces listed shall be cleaned and prepared for painting in accordance with applicable

“Surface Preparation Specifications” published by the Steel Structures Painting Council, 4400 Fifth Avenue, Pittsburgh, PA 15213 and others, as listed below:

Solvent Cleaning: SSPC-SP1, 1 Nov 82 Hand Tool Cleaning: SSPC-SP2, 1 Nov 82 Power Tool Cleaning: SSPC-SP3, 1 Nov 82 Commercial Blast Cleaning: SSPC-SP6 / NACE 3, 1 Jan 07 Near White Metal Blast: SSPC-SP10-85 Power Tool Cleaning To Bare Metal: SSPC-SP11, 19 Jul 12 High-Pressure Water Cleaning: SSPC-SP12

2. All surfaces to be painted shall be clean and dry. Solvents used for cleaning shall be of the type that will leave a surface that is free from oil, grease, soap, detergent, and alkali after cleaning.

3. All edges of cleaned areas adjoining existing paint must be “feathered” (i.e. sand or grind to form a gradual slope from bare metal up to the height of the existing paint). Feathering must also be performed when grinding or chipping.

4. All areas cleaned under these specifications shall be kept clean for the duration of the contract.

Line Item 0004:

Painting

Contractor shall paint the Storage Barge 792’s hull and main deck. All surface preparation and coating applications shall be in accordance with the requirements listed below for that respective area:

1. Hull Exterior (all surfaces below the top edge of the main deck radius)

Contractor shall remove all paint to re-establish the surface profile by either hydro-blasting or abrasive blasting.

Immediately upon completion of surface preparation, all steel shall be coated with the coating system described below:

All hull surfaces shall be coated with a base coat of marine grade epoxy primer at 8 mils DFT.

All hull surfaces higher than 6 feet above the base line shall be coated with a fade resistant urethane top coat at 4 mils DFT minimum.

Minimum time allowed between coats shall be in accordance with the manufacturer’s recommendations.

Note that complete coverage of the hull exterior shall require shifting the Storage Barge 792 while on the dry dock blocks to provide access to areas under the blocks in the initial docking position. The contractor shall shift the Storage Barge 792 as required to provide complete coatings coverage of the hull but will do so in a manner that does not cause damage or deformation of the hull or damage or deformation of any structure of the barge.

2. Main Deck

For the main deck, any surface areas of the deck requiring painting, the contractor shall either abrasive blast these surfaces to SSPC-SP6 or power tool clean in accordance with Steel Structure Painting Council Standards SSPC-SP11 to achieve a minimum DFT of 1.0 mils. All edges shall be feathered back to match the original surrounding coatings.

Immediately upon completion of surface, all steel shall be coated with the coating system described below:

All main deck (non-hull exterior surfaces) shall be coated with a base coat of marine grade epoxy primer at 8 mils DFT minimum.

All main deck (non-hull exterior) surfaces shall be overcoated with top coat of marine grade, steel structure paint at 12 DFT minimum.

o All deck areas shall include a non-skid abrasive mixture in the final coat, as described in section 6.D.

Minimum time allowed between coats shall be in accordance with the manufacturer’s recommendations.

All painting of the Storage Barge 792 shall meet requirements as described under Section 6 – Painting.

Line Item 0005:

Install Guardrails

1. Contractor shall install a guardrail system around the exterior of the roof of the storage barge’s warehouse.

2. Guardrails shall have a minimum height of 42 in +/- 2 in as measured vertically from the top of the roofs walking surface.

3. Guardrails shall include midrails, installed halfway between the toprails and the roof.

4. Contractor shall leave four entry points, two feet wide, for access to the roof. Two entry points shall be on the starboard side with the other two located on the port side.

5. Guardrails must meet all safety regulations listed under EM 385-1-1 19.C and 21.F.01. for service on US Army Corps of Engineers owned floating plant.

Line Item 0006:

Crane Engine Repower

1. Contractor shall repower the 792’s existing crane engine.

2. The existing crane uses a John Deere 4045HF285 engine. The serial number for the engine is

PE4045L005772.

3. New engine and power unit must be capable of supplying hydraulic and electrical components with adequate power for the crane and its components.

4. New engine and power unit must come equipped with quick-connect fittings to allow for easy and quick disconnection of the engine’s fluid lines.

Line Item 0007:

Replace Crane LMI

1. Contractor shall replace existing Load Moment Indication (LMI) system with a 24 VDC hard wired system.

2. LMI shall be compatible with the Storage Barge 792’s Alaska North Pacific MCT-3090-08-1853 8 ton crane.

3. LMI shall measure and display the following variables:

Load on the Hook Rated Capacity Crane Radius Boom Angle Wind Speed

4. LMI shall include the following capabilities:

Anti-2-Block System Screen capable of being read in direct sunlight Audible and Visual Alarms

OPTION ITEMS

OPTION 1 - Line Item 0008:

Install Staircase

1. Contractor shall install staircase to provide access to the roof of the Storage Barge 792.

2. Staircase will be located on the starboard or port side of the barge, located by the storage barge’s warehouse.

3. Staircase shall start at deck level and end in at the roof of the warehouse. The end of the stair case in a location separate from the entry points described in Line Item 0005.4. A fifth entry point shall be installed to allow for access to roof from the staircase.

4. Staircase must have a personnel rated capacity.

5. Staircase must be installed within accordance of EM 385-1-1 19.B.03 and ASTM F1166.

OPTION 2 - Line Item 0009:

Insulate Storage Building

1. Contractor shall place 1” of non-combustible closed cell spray foam insulation onto the interior walls and interior ceiling of the LD 792’s warehouse.

2. To be considered acceptable, the spray foam must have a minimum R-value of 6/inch.

3. Insulation must also meet all safety requirements listed in the EM 385-1-1.

OPTION 3 - Line Item 0010:

Replace Crane Cab Safety Glass

1. Contractor shall remove the four (4) existing crane cab window panels from the Barge 792’s crane cab.

2. Contractor shall install four (4) new ¼” thick acrylic safety glass window panels onto the crane cab.

OPTION 4 - Line Item 0011:

Roof Painting

The Storage Barge 792’s warehouse roof shall be painted in accordance below requirements. The roof includes any area located on top of the warehouse structure that is currently painted black.

The contractor shall abrasive blast the roof SSPC-SP6 or power tool clean in accordance with Steel Structure Painting Council Standards SSPC-SP11 to achieve a minimum DFT of 1.0 mils. All edges shall be feathered back to match the original surrounding coatings.

Immediately upon completion of surface, all steel shall be coated with the coating system described below:

The roof shall be coated with a base coat of marine grade epoxy primer at 8 mils DFT minimum.

The roof shall be overcoated with top coat of marine grade, steel structure paint at 12 DFT minimum.

o All deck areas shall include a non-skid abrasive mixture in the final coat, as described in section 6.D.

Minimum time allowed between coats shall be in accordance with the manufacturer’s recommendations.

All painting of the Storage Barge 792 shall meet requirements as described under Section 6 – Painting.

OPTION 5 - Line Item 0012:

Barge Pickup: Captain Anthony Meldahl Locks and Dam

1. Contractor shall bid on the option line items for the pickup of the Barge 792 from the Heavy Capacity

Fleet at Captain Anthony Meldahl Locks and Dam.

2. If this option for pickup is exercised, the contractor will be responsible for providing pickup of the barge from Captain Anthony Meldahl Locks and Dam (Ohio River Mile 436) to the contractor’s site.

3. Pickup shall be made during the time period allocated for completion of the dry dock.

4. The contractor shall be responsible for any or all damages that occur while the barge in their possession.

5. This item will not be exercised if line item 013 is exercised.

OPTION 6 - Line Item 0013:

Barge Pickup: Markland Locks and Dam

1. Contractor shall bid on the option line items for the pickup of the Barge 792 from the Heavy Capacity

Fleet at Markland Locks and Dam.

2. If this option for pickup is exercised, the contractor will be responsible for providing pickup of the barge from Markland Locks and Dam (Ohio River Mile 531) to the contractor’s site.

3. Pickup shall be made during the time period allocated for completion of the dry dock.

4. The contractor shall be responsible for any or all damages that occur while the barge in their possession.

5. This item will not be exercised if line item 012 is exercised.

OPTION 7 - Line Item 0014:

Barge Delivery: Markland Locks and Dam

1. Contractor shall bid on the option line items for the delivery of the Barge 792 to the Heavy Capacity

Fleet.

2. If the option for delivery is exercised, the contractor will be responsible for providing delivery of the barge from the contractor’s site to Markland Locks and Dam (Ohio River Mile 531).

3. Delivery shall be completed within 7 Calendar days after completion of the dry dock.

4. This item will not be exercised if line item 0015 is exercised.

OPTION 8 - Line Item 0015:

Barge Delivery: Louisville Repair Station

1. Contractor shall bid on the option line items for the delivery of the Barge 792 to the Heavy Capacity

Fleet.

2. If the option for delivery is exercised, the contractor will be responsible for providing delivery of the barge from the contractor’s site to Louisville Repair Station (Ohio River Mile 606).

3. Delivery shall be completed within 7 Calendar days after completion of the dry dock.

4. This item will not be exercised if line item 0014 is exercised.

5. MATERIALS AND WORKMANSHIP STANDARDS

A. Applicable Publications - The following publications of the issues listed below, but referred to thereafter by basic designation only, form a part of these specifications to be the extent indicated by the references thereto:

American Welding Society, Inc. (AWS) D 1.1 (2006) Structural Welding Code-Steel

B. Workmanship - Workmanship shall be of the highest grade and in accordance with the best modern practices to conform to the specifications for the item of work being furnished.

C. Quality Control - The Contractor shall establish and maintain a quality control system to assure compliance with contract requirements and shall maintain records of all quality control operations covered by these specifications. The Contractor shall provide continuous inspection of all operations for quality control and record the results for submitting to the Contracting Officer to show compliance with contract requirements.

D. Welding

1. General - Welding shall be by an electric arc-welding process and shall conform to the applicable provisions of AWS D1.1, Sections 1 thru 7, 9 and 10 unless otherwise specified or authorized. Welding operators, welders and tack welders shall be qualified and requalified if necessary for the particular type of work to be done. Qualification shall be in accordance with AWS D1.1, Section 5, (Coast Guard qualification acceptable). The Contractor shall certify by name the welders and welding procedures under which qualified. Prior qualification will be accepted if welders have performed satisfactory work under the code for which qualified within the preceding three months. The Contractor shall require welders and welding operators to repeat the qualifying tests when in the opinion of the Contracting Officer their work indicates a reasonable doubt as to proficiency. Those passing the re-qualification tests shall be recertified. Those not passing shall be disqualified until passing. All expenses in connection with qualification and re-qualification shall be borne by the Contractor.

2. Inspection - The Contractor shall maintain an approved inspection system and perform required inspections to assure compliance with contract requirements. Welding shall be subject to inspection by the Contracting Officer or his authorized representative to determine conformance with the requirements of AWS D1.1, the approved welding procedures and provisions stated in other sections of these specifications. The Contractor shall clean the welds of scale, slag, weld spatter, etc., in preparation for inspection. The Contractor shall ascertain that all welding conforms with the requirements and/or these specifications as to size, length, location, and positioning of members prior to welding, particularly members that are to be positioned into close contact for welding. The Contractor shall carefully examine each weld for surface defects, undercutting, lack of fusion, insufficient penetration, porosity, craters, cracks, gas pockets, etc., in the weld or base metal.

3. Non-Destructive Examination - The Contracting Officer may require non-destructive testing of Contractor welds. If Contractor welds are to be non-destructively tested as required by the Contracting Officer, the Contractor shall make the necessary arrangements for the non-destructive testing by a recognized testing agency. If the welds are found to be satisfactory, the Government will pay the costs of the non-destructive testing. If the welds are found to be defective, the Contractor will be required to bear both the costs of the non-destructive testing and of the required rewelding. All sections of welds found defective shall be chipped, cut, or gouged out to base metal and properly re-welded.

4. Procedure - The Contractor may be required to prepare and submit for approval a complete schedule of welding procedures consisting of detailed procedure specifications to be used for each welded connection. The schedule shall conform to the provisions of AWS D1.1, Sections 2, 3, 4, 7, and 9 and applicable provisions of Section 10. Procedures shall be such as to minimize residual stresses, distortion and shrinkage. Approval of any procedure will not relieve the Contractor of the responsibility for producing a finished structure meeting all requirements of these specifications.

5. Temporary welds - Temporary welds required for fabrication and erection shall be under the same controlled conditions described herein for permanent work. All temporary welds shall be made by welders qualified for permanent work as previously specified. Temporary welds shall be removed after having served their purposes, and shall be ground flush with adjacent surfaces. All depressions shall be filled overfull with weld metal and the excess weld metal shall then be ground flush.

6. Preheat - Preheating shall be performed as required by AWS D1.1, Sections 4.2 and 4.3 except that the temperature of the base metal shall be at least 70 degrees F. The weldments to be preheated shall be slowly and uniformly heated by approved means to the prescribed temperature, held at that temperature until the welding is completed, and then permitted to cool slowly in still air. Preheating temperatures shall be monitored by the use of suitable temperature-indicating sticks, liquids, or pellets, as manufactured by Tempil Corporation, Markal Company, Curtiss-Wright Corporation, and others.

7. Filler Metal - The electrode, electrode-flux combination and grade of weld metal shall conform to the appropriate AWS specification for the base metal and welding process being used. The AWS designation of the electrodes to be used shall be included in the schedule of welding procedures. A controlled temperature storage oven shall be used at the job site as prescribed by AWS D1.1, Section

4.45 to maintain low moisture of low hydrogen electrodes.

8. All butt splices to any members should be made full penetration

E. Flame Cutting - Structural steel may be cut by machine-guided or hand guided torches instead of by shears or saws. Flame cutting of material other than structural steel shall be subject to approval by the Contracting officer. Where a torch is mechanically guided, no chipping or grinding will be required except as necessary to remove slag and sharp edges. Where a torch is hand guided, all cuts where the material is to be welded and the cuts will be exposed or visible shall be chipped, ground, or machined to sound metal. Where metal is not to be welded and where cuts will be exposed, burrs and rough edges only shall be removed. Where the torch is mechanically guided, flame gouging will be permitted in preparation for welding.

F. The contractor is responsible for compliance with U.S. Coast Guard regulations for handling of inflammable and combustible liquids. Whenever hot work is to be performed on fuel tanks, bilge areas or any enclosed compartment or structure subject to gas accumulation or excessive gas pressures building up as a result of heat, a marine chemist's gas-free certificate shall be furnished to the Government representative at the contractor's expense prior to commencing work.

G. No welding is permitted on any structural member of the crane. Contractor shall get approval before commencing any work on any portion of the crane.

6. PAINTING

A. Surface Preparation - Surface preparation of bare metal as well as tightly adhering coating will conform to manufacture’s recommendations unless specified differently in this document. Areas that might require blast cleaning in preparation for application of the paint system, for example but not limited to damaged coating, corroded metal, and bare metal, shall be performed in accordance with Steel Structures Painting Council Specification SSPC-SP-6, for “Commercial Blast Cleaning.” Surfaces shall be dry at the time of blasting. Within eight (8) hours after cleaning, but in any event prior to the deposition or formation of any detectable moisture or corrosion, all blast cleaned surfaces shall be cleaned of dust and abrasive particles by brushing, vacuum cleaning, and/or blow-down with clean, dry compressed air, and given the first coat of paint. Cleaning and painting shall be so programmed that dust or other contaminants from the cleaning process do not fall on wet, newly painted surfaces, and surfaces not intended to be painted shall be suitably protected from the effects of cleaning and painting operations. Prior to painting, abrasive particles, dust, water, and all other matter on the deck which might, in the opinion of the Contracting Officer, adversely affect the painting application, shall be removed to the satisfaction of the Contracting Officer.

B. Paint Requirements - Paint shall be delivered in sealed containers with labels to indicate manufacturer, contents, and any special instructions. Paints and painting materials shall be stored under cover and protected from extreme temperatures. Paints shall not be used if they have exceeded the closed shelf life or pot life recommended by the manufacturer. Additionally, paints shall not be applied in weather or humidity conditions not recommended by the manufacturer.

C. Application of Coatings - Surface preparation and paint application shall be in strict compliance with the coating manufacturer’s recommendations. The Contractor shall take particular care to insure that coating system requirements are met in all areas, especially those difficult to coat, such as flange undersides. All painting on both the interior and exterior surfaces below the main deck shall be accomplished prior to launching of the vessel. All requirements outlined in this specification are additional to the manufacturer’s recommendations and does not relieve the Contractor from meeting both the manufacturer’s recommendations along with the additional requirements outlined in this specification.

D. Painting system – All paints shall be applied in strict conformance with the recommendation of manufacturer. Where dry film thickness requirements are specified, they shall have precedence over the number of coats specified. Thickness requirements of each coat specified shall be maintained by a method approved by the manufacturer.

The barge colors shall be as listed below.

AREA COLOR/FS 595 NUMBER

Hull exterior and Crane Structure (except deck) Black/17038 Barge Deck (see note) Deck Red/10076 Deck Fittings and Warnings Yellow/13655 Hull Markings White/27880

NOTE: Add non-skid material to the last coat on all deck areas. The non-skid abrasive shall be fine pumice mixed into the paint and not broadcast on top.

E. The contractor will be held responsible for delivering the vessel with all painted surfaces in sound condition. Prior to delivery of the vessel all interior and exterior painting shall be thoroughly inspected, and any defects in the integrity of the paint system. Notice shall be given 2 days prior to launching so that paint can be inspected. The vessels shall not be launched until the painting has been approved. Any additional painting required as a result of this final inspection process shall be done to the satisfaction of the Authorized Representative of the Contracting Officer at no additional cost to the Government.

7. PICKUP & DELIVERY

If both line items 012 and 013 are not exercised, the government will be responsible for delivering the Storage Barge 792 to the contractor’s facility. If both line items 014 and 015 are not exercised, the government will be responsible for picking up the Storage Barge 792 from the contractor’s facility. Delivery and pickup will be coordinated at least 1 week prior. Contractor is responsible for any damage to the barge that occurs once the barge has been delivered.

8. ANTI-TERRORISM/OPERATIONAL SECURITY - Contractor shall comply with the following required training and/or security procedures. Any proof of training required shall be submitted to the COR or government representative.

SECURITY REQUIREMENTS

All Contractors and subcontractor employee(s) working on any contract who require access in and/or around any Huntington District facilities, projects, owned or leased facility/space shall receive authorization to be on site at these areas based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12).

The Huntington District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on any contract based upon the results of the background investigation provided by the Huntington District Security Management Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.

FOR ALL CONTRACTS 1-YEAR AND SUBSEQUENT OPTION YEARS:

Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or on District facilities.

The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working,

(2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) Security Information Sheet on each employee working on site must be submitted directly to the Huntington District Security Management Office.

The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

Contractors shall have background checks completed for their employees annually in the case of Contracts with option periods. For instance, if the employee was cleared in May of 2018, they shall be cleared again in May of 2019. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite.

The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Huntington District USACE Security Management Office for background purposes.

FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC)

The documents listed below are required:

SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Huntington District Security Management Office).

Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.

Following submission of paperwork, the Huntington District Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Huntington District Security Management Office will make recommendations to the PCO or their Designated Representative. The Huntington District Security Management Office cannot give approval due to unfavorable report(s). The Huntington District Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the

PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.

PRE-BID MEETINGS

Any Contractor or sub contractor who plans to attend a pre-bid site visit to any Huntington District facilities, projects, owned or leased facility/spaces must be vetted by having a background investigation conducted by the Security Management Office prior to the site visit. Information for the background investigation must contain the following: a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State). It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

FOREIGN NATIONALS

The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must be cleared 30 to 45 days in advance of any site visit, tour or work on USACE owned/leased property. All Foreign Nationals must comply with the following paragraph:

In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.

In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Huntington District Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work. A scanned copy of a valid passport must be sent to the Security Management Office in order to formally request a visit to any Huntington District facilities, projects, owned or leased facility/spaces.

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, Engineering or Army regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Huntington District Security Management Office by phone, letter, or email at the following numbers/addresses:

CELRH-SM

502 Eighth Street Huntington, WV 25701

Scott E. Grandon, phone (304) 399-5661; email scott.e.grandon@usace.army.mil Stephen R. Curry, phone (304) 399-5695; email stephen.r.curry@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil

AT/OPSEC REQUIREMENTS. Contractor shall comply with the following required training and/or security procedures. Any proof of training required shall be submitted to the COR or government representative.

Access and General Protection/Security Policy and Procedures – All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

8. INVOICING

Louisville Repair Station 2605 Shippingport Drive Louisville, KY 40212 or email to Drake Riley at drake.c.riley@usace.army.mil

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2020

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.217-5 Evaluation Of Options JUL 1990 52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION

2020-O0008).

MAR 2020

52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2020-O0008) MAR 2020 52.223-6 Drug-Free Workplace MAY 2001 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

DEC 2013

52.237-1 Site Visit APR 1984 52.242-13 Bankruptcy JUL 1995 52.245-1 Government Property JAN 2017 52.245-9 Use And Charges APR 2012 52.246-16 Responsibility For Supplies APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

DEC 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

DEC 2019

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors.

JAN 2018

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten.

OCT 2020

252.225-7972 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems (DEVIATION 2020-O0015)

MAY 2020

252.225-7973 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems - Representation (DEVIATION 2020- O0015)

MAY 2020

252.225-7974 (Dev) Representation Regarding Business Operations with the Maduro Regime (DEVIATION 2020-O0005)

FEB 2020

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.232-7017 Accelerating Payments to Small Business Subcontractors--

Prohibition on Fees and Consideration

APR 2020

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items OCT 2020 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished

Property

APR 2012

252.245-7002 (Dev) Reporting Loss of Government Property (DEVIATION 2020- O0004)

FEB 2020

252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal DEC 2017 252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)

(a) Definitions. As used in this clause--

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access…

This is the start of the file's text. The full file is on GovTribe.