SEE ADDENDUM

(No Collect Calls)

W9123719T0007 12-Dec-2018

b. TELEPHONE NUMBER

304.399.5548

8. OFFER DUE DATE/LOCAL TIME

05:00 PM 28 Dec 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912379. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

LEAH S MORGAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W81F8E83197206

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USACE, CONTRACTING DIVISION

LEAH MORGAN, 502 8TH STREET

HUNTINGTON WV 25701

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE H141000 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

HEAVY CAPACITY FLEET UNIT

2605 SHIPPINGPORT

LOUISVILLE KY 40212

TEL: FAX:

304-399-5281FAX:

TEL: 304-399-5548 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

336611

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF66

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Dry Dock Russelburg Workboat

FFP

Contractor shall provide dry dock and repair services for the LD-750/Russelburg workboat in accordance with Section 4.1.1 through 4.1.14 of the Performance Work Statement below.

FOB: Destination

MILSTRIP: W81F8E83197206

PURCHASE REQUEST NUMBER: W81F8E83197206

NET AMT

0002 1 Job OPTION Option 1 - Install Propellers

FFP

Contractor shall replace two (2) existing propellers with new propellers provided by the Government in accordance with Section 4.1.15 of the Performance Work Statement below.

FOB: Destination

0003 1 Job OPTION Option 2 - Replace Search Lights

FFP

Contractor shall replace search lights in accordance with Section 4.1.16 of the Performance Work Statement below.

0004 1 Job OPTION Option 3 - Replace Battery Charging Sys.

FFP

Contractor shall replace the battery charging system in accordance with Section

4.1.17 of the Performance Work Statement below.

0005 1 Job OPTION Option 4 - Replace Wall Heaters

FFP

Contractor shall replace wall heaters in accordance with Section 4.1.18 of the Performance Work Statement below.

0006 1 Job OPTION Option 5 - Crane Upgrades

FFP

Contractor shall perform crane upgrades in accordance with Section 4.1.19 of the Performance Work Statement below.

0007 1 Job OPTION Option 6 - Replace Radar System

FFP

Contractor shall replace the radar system in accordance with Section 4.1.20 of the Performance Work Statement below.

INSTRUCTIONS TO OFFERORS

The Government intends to award one firm-fixed price commercial service contract.

The award will be based on low-price. Prospective offerors must complete the information below.

Unique Entity Identifier (formerly DUNS): ___________________________

TAX ID: ________________________

Registration at the following website is required to be awarded this contract:

http://www.SAM.gov. Please note, as of April 2018, GSA’s System for Award Management (SAM) system is requiring new registrations and renewals of existing registrations to submit an original, signed notarized letter identifying the authorized Entity Administrator. The notarized letter is not to be submitted to the Huntington Contracting Office as it is not our requirement. Vendors are encouraged to check their entity’s status in SAM.gov and plan accordingly. If the prospective contractor is not registered in the SAM database, the Contracting Officer will follow the procedures in FAR 4.1103. Contact the supporting Federal Service Desk at http://www.fsd.gov, or by telephone at 866-606-8220 (toll free) or 334-206-7828 (internationally) Monday through Friday from 8 a.m. to 8 p.m. (EDT), for FREE assistance.

IMPORTANT NOTICE: Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

Please direct all questions to Leah Morgan at (304) 399-5548 or leah.s.morgan@usace.army.mil. THE SOLICITATION AND RESULTING CONTRACT

SHALL BE THE GOVERNING DOCUMENT IN ALL CASES.

QUOTES CAN BE FAXED OR E-MAILED TO Leah Morgan at (304) 399-5281 or leah.s.morgan@usace.army.mil.

Per FAR Provision 52.212-3 Alt 1, the Contractor is required to complete the On-line Representations and Certifications Application (SAM) OR to complete paragraphs (c) through (m) of this provision and include with quote.

CONTRACTOR FEEDBACK. Help us in BUILDING STRONG. Please provide us with your feedback, comments and recommendations for improvement by visiting our

Interactive Customer Evaluation (ICE) Website at:

http://ice.disa.mil/index.cfm?fa=card&service_provider_id=110826&site_id=856&service_categ ory_id=14

Per FAR 52.211‐6, Brand Name or Equal, if proposing an equivalent item for any of the brand names identified in the Performance Work Statement or on the drawings provided, identify the name and manufacturer of the proposed equivalent system below.

The Contractor is responsible for furnishing descriptive literature demonstrating the system identified below meets the requirements specified in the solicitation.

Brand Name or Equal-Quoting on: Beebe Bros. 351R-RC deck winches

Manufactured by: ________________________________________

Brand Name or Equal-Quoting on: Wintech DC30-E5 Electric Deck Winch

Manufactured by: ________________________________________

Brand Name or Equal-Quoting on: Simplan bearings with return home feature

Manufactured by: ________________________________________

Brand Name or Equal-Quoting on: Twin Disc MG514C gear boxes

Manufactured by: ________________________________________

Brand Name or Equal-Quoting on: Zenon 500 Watt search lights

Manufactured by: ________________________________________

Brand Name or Equal-Quoting on: QMark SED1512 wall heaters

Manufactured by: ________________________________________

Brand Name or Equal-Quoting on: Devoe Bar Rust 235 epoxy coating (interior)

Manufactured by: ________________________________________

Brand Name or Equal-Quoting on: Devoe Bar Rust 235 epoxy coating (exterior)

Manufactured by: ________________________________________

PERFORMANCE WORK STATEMENT

1. GENERAL

A. Description of Work. These specifications cover the requirements for dry dock and repair of the Government owned and operated Motor Vessel RUSSELBURG. The work to be performed under this contract consists of furnishing all plant, labor, materials, equipment and transportation thereof, and performing all operations required to make repairs to the vessel as specified herein. All work shall be in accordance with USCG (U.S. Coast Guard), ABS (American Bureau of Shipping) Regulations and Standards whereas applicable. Should the removal or shifting of any parts of the vessel be necessary for carrying out the repairs specified, the same shall be completed by Government personnel who will be present during the performance of work required by this contract. Should the Contractor complete any such removal or shifting itself, any damage or loss resulting there from shall be restored by the Contractor at its own expense. While the vessel is in the Contractor’s possession, the Contractor shall be responsible for any loss or damages. The Contractor shall construct temporary cover and take the necessary precautions to prevent delays resulting from weather.

B. Changes to Contract. All additional recommended work identified after contract award throughout the performance of the contract, including condition reports, shall be submitted in writing to the COR (Contracting Officer Representative). The report(s) shall only include the recommended work and shall not include any costs at the time of submission in order to facilitate an independent estimate by the Government. The Government shall determine if a contract modification shall be pursued based on condition reports, physical inspections, and availability of funding.

If it is determined that a modification will be issued to cover the recommended work, the Government will then request a quote for the cost thereof.

C. The services to be performed include the following:

1. Dry docking of the workboat

2. Cleaning, inspecting, repairing, sandblasting, and painting the hull.

3. Pulling the main engines and transmissions for major overhauls

4. Pulling the 2 inboard flanking rudders, 2 outboard flanking rudders and the 2 steering rudders so that the bushings and seals can be removed and replaced.

5. Removing and installing new bumpers and new doors in the pilot house and galley.

6. Remove existing deck winches and installing new ones.

7. Remove old shaft locking bearings and installing maintenance free Simplan

Bearings with return home feature, or equivalent.

8. Remove, inspect, and pressure test keel coolers and provide list of any recommended repairs to the COR, repair stanchioning systems port, starboard and aft.

9. Install a charging system capable of charging two (2) 24-volt battery sets and two (2) 12-volt battery sets as well as a solar trickle down charging system for when the boat is on shore power or not able to be connected to shore power.

10. Remove and install new wall heaters in the engine room.

11. Pump out and store fuel, clean and inspect both fuel tanks, and provide a written report with photos on any recommended repairs.

12. The contract will also include options, which are to be included in quotations.

After contract award, the Government will determine whether to exercise these options.

For a complete description of the work please refer to specifications below for full scope of work.

D. Job Site. The Government will transport the vessel to and from the job site. The contractor shall furnish the necessary facilities for this contract and shall bear the expense of any movement of the workboat while it is at their facility and in their possession. Contractor possession will start at the time when delivery is made by the Government to the contractor’s site. Contractor possession ends when the Government retrieves the workboat from the Contractor’s site. It is expected that the contractor will remove, treat/stabilize, and store up to 1,000 gallons of diesel fuel from the workboat. The tanks shall be purged before any work begins on the boat and remain purged until all work is completed. The fuel shall be pumped back onto the boat after all work is completed.

E. Job Site Location. All contract work shall be completed within 300 river miles of the

Louisville Repair Station, which is located at Ohio River mile marker 606. Any offers to perform the work outside of 300 river miles will not be accepted.

F. Location. The boat is currently located and available for inspection at Louisville

Repair Station, 2605 Shippingport Drive, Louisville, KY 40212. Contact Jerry Farias at 304-399-6210 or Drake Riley at 502-619-6002 to schedule an inspection.

G. The M/V RUSSELBURG was built by Marine Design, INC. The vessel is used in the maintenance and repair of hydraulic structures for the Lakes and Rivers Division of the U.S. Army Corps of Engineers. Principal dimensions of the vessel are as follows:

Length over All (Molded): 52’-0” Beam (Molded): 22’-0” Depth: 7’-6” Draft: 5’-0” Height of Eye above Water Level: 15’-8” Maximum Height above Water Level: 24’-4”

2. SCHEDULE – The contract duration will be 60 calendar days. This will include 30 calendar days to order and have on hand all the necessary parts to complete the rebuilds as required by this contract. An additional 30 calendar days will be allowed to complete the workboat dry- docking, complete all removals, rebuilds, and installations along with performance tests. Therefore, the vessel will only be in the Contractor’s possession for 30 calendar days. The Contractor shall immediately notify the COR if a time extension is needed. If the Government chooses to exercise options, the contract duration may be extended by up to 15 calendar days total. The Government will determine whether to exercise options via contract modification as needed based on timely condition reports submitted by the Contractor.

3. PRICE BREAKOUT SCHEDULE - Contractor shall provide a quote on the following items and options:

3.1 BASE ITEMS

Line Item: Description: Cost 001 Dry Dock and Inspection of LD-750

002 Inspect Hull

003 Sandblast and Paint Hull

004 Overhaul Main Engines

005 Rudder and Drive Shaft Seals and

Bushings

006 Replace Bumpers

007 Replace New Doors

008 Replace Deck Winches

009 Replace Simplan Bearings

010 Inspect Keel Coolers

011 Repair Stanchion

012 Replace Gear Boxes

013 Overhaul Generators

014 Inspect Fuel Tank

3.2 OPTION ITEMS

Line Item Description: Cost 015 OPTION 1 – Install Propellers

016 OPTION 2 – Replace Search Lights

017 OPTION 3 – Replace Battery Charging

018 OPTION 4 – Replace Wall Heaters

019 OPTION 5 – Crane Upgrades

020 OPTION 6 – Replace Radar System

4. Specifications

1.1 Line Item 001:

Dry Dock and Inspection of LD-750

Unless otherwise stated, all work may be completed during dry-dock or as dockside service at the Contractor’s discretion. Any work below the waterline shall be completed during dry-dock to facilitate Government inspection. The vessel shall be dry-docked at the site where repairs are to be made prior to commencement of the repair work specified in this Contract.

The Contractor shall be responsible for properly positioning the supporting blocks so that the vessel will not be damaged. The blocks shall be set to bear on frames or bulkheads of the hull and the vessel shall be supported with the bottom of the hull high enough above the floor to allow all work to be accomplished. The dry-dock and/or other places where work under this work order is being performed shall be kept clean and free of expended blasting abrasives, scrap metal, water, scrap lumber, and other debris. All air hoses, water hoses, and electrical extension cables on or about the vessel shall be kept arranged in a neat, orderly, and workman like fashion. Safe access by Government personnel to the LD-750 shall be maintained at all times. Government personnel will conduct periodic site visits to the vessel on location to monitor progress and to perform standard maintenance that is not related to and does not interfere with the work specified in this contract. The contractor shall notify the government in advance when tests are being performed to determine if repairs meet standards required by the contract.

1.2 Line Item 002:

Inspect Hull

Inspect all hull compartments and documentation of interior condition. Provide photographs of any paint failure and/or existing corrosion. The Contractor shall inspect all interior compartments of the boat and document the condition. The Contractor shall submit a detailed report including location with measurements and photographs of each notable breach in the interior paint coating, structural damage and excessive corrosion point. The Contractor shall submit the condition report within 10 calendar days after the boat has been delivered to the contractor’s facility and shall include a proposal for any repairs necessary to protect the structural integrity of the boat. The Government shall determine if an additional modification shall be pursued based on the condition report, physical inspection and reasonableness of the proposal and availability of funding.

1.3 Line Item 003:

Sandblast and Paint Hull

1. Exterior surfaces – Contractor shall sandblast the sides and bottom of the hull below the main deck and the rudders. Contractor shall sandblast all other exterior surfaces affected by any welding or repairs to the hull. These surfaces shall be prepared to “Commercial Blast Cleaning” SSPC-SP6.

2. Interior surfaces – Contractor shall sandblast all interior areas affected by any welding or grinding, and any repairs to the hull. These surfaces shall be prepared to “Commercial Blast Cleaning” SSPC-SP6.

3. The boat, before painting, shall be free of all visible oil, grease, dirt, dust, mill scale, rust paint, oxides, corrosion products, and other foreign matter, except for staining.

Staining shall be limited to no more than 33 percent of each square inch of surface area and may consist of light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mil scale, or stains of previously applied paint. Before blast cleaning, visible deposits of oil or grease shall be removed by any of the methods specified in SSPC-SP1 or other agreed upon methods. For complete instructions, refer to Joint Surface Preparation Standard SSPC-SP6/NACE No. 3.

4. Paint all surfaces that were sandblasted to the specifications listed below in Section 6, Painting. This, at minimum, includes the exterior of the hull below the main deck and any interior areas where welding or grinding was performed.

5. Coating application shall be inspected by the on-site COR or the designated representative before launching vessel.

6. Existing paint is as follows:

AREA COLOR/FS 595 NUMBER

Hull exterior and Crane Structure (except deck) Black/17038 Vessel Deck Deck/Red/10076 Deck House Margin Facings (Trim) Red/11136 Deck Fittings and Warnings Yellow/13655 Hull Markings White/27880

1.4 Line Item 004:

Overhaul Main Engines

1. The Contractor shall pull/remove the 350 hp main engines from the boat and have them overhauled/rebuilt by certified Cummins mechanics. The engines are model number NTA855M with serial number 60511208 and 60509926. This is to be a major overhaul of the engines so that the overhauled engine meets or exceeds the OEM (original equipment manufacturers’) operating and functional standards as originally designed and built.

2. The engines shall be operated prior to them being reinstalled in the workboat. All defects such as, oil or fuel leaks, insufficient cylinder compression, cooling water flows, oil pressures, or other possible defects in the engines shall be repaired prior to the engine being re-installed in the workboat by the Contractor.

3. To meet the requirements of this section, offerors may alternatively propose to replace the existing engines with rebuilt units. The rebuilt units must come with as-new warranties. The units to be replaced would then become the property of the Contractor.

1.5 Line Item 005:

Rudder and Drive Shaft Seals and Bushings

1. The steering (2), inboard flanking (2) and the outboard flanking (2) rudders shall be removed from the workboat and inspected. This inspection shall be conducted in the presence of a Government representative. The Contractor shall replace all the hardened steel sleeves of the rudder shafts.

2. The upper and lower bearing material and the packing seals shall be removed from the workboat. All surfaces shall be cleaned. New bearing materials shall be installed in the workboat that are equivalent to the materials noted on drawing D-180-26. The rudder support shafts shall be pressure tested to 5 psi for 1 hour to insure that the packing seals are properly seated to the shaft. Then the rudders shall be operated prior to the boat being set in the water by the contractor.

3. Reference drawing D-180-30, to remove the propeller shafts (2) from the workboat after the packing seals have been removed. Then remove the inner and outer bearing material from the shaft sleeve. Also, remove the inner and out shaft hardened steel sleeves from the propeller shafts. All the removed parts shall be replaced in kind to tolerances given on the drawings and materials equal to or better than those shown. The government will provide 2 new propellers to be installed on the workboat by the Contractor.

1.6 Line Item 006:

Install New Bumpers

1. The vessel has sectional bumpers around the entire perimeter of the boat. Contractor shall remove and discard the existing bumpers as well as the bumpers in the tow-knee area.

2. Contractor shall supply and install like rubber bumpers to port, starboard, tow-knee and stern of the vessel. This includes rounded sections on the stern and bow corners. New bumpers shall be similar in style to existing bumpers.

3. The bumpers shall be installed in standard lengths with space between each section to allow for maintenance.

1.7 Line Item 007:

Replace Doors

1. Remove and discard four (4) existing doors at the entrances of the pilot house and the galley.

2. Install four (4) standard stainless steel doors in the pilot house and at the entrance of the galley.

a. Two (2) pilot house doors – 30” x 80”

b. Two (2) galley doors – 28” x 80”

1.8 Line Item 008:

Replace Deck Winches

1. Remove and discard existing two (2) Beebe Bros. 351R-RC deck winches with 8000 lb.

of line pull at 15 fpm.

2. Install two new Wintech DC30-E5 Electric Deck Winch, or equivalent model, with 30 ton holding capacity, 8000lbs of line pull at 18 fpm.

1.9 Line Item 009:

Replace Simplan Bearings

1. Remove and discard two (2) existing Johnson Shaft Locks.

2. Replace with two (2) each Simplan bearings, or equivalent, with return home feature.

1.10 Line Item 010:

Inspect Keel Coolers

1. Remove two (2) keel coolers from the vessel. Clean, pressure test, and inspect keel coolers.

2. Contractor shall submit a report with the general condition of the keel coolers and any recommended repairs to the COR within 7 calendar days after inspection.

3. Proper operation of keel coolers shall be demonstrated to the on-site Government representative before acceptance.

4. Contractor shall replace all the O-rings in the keel coolers.

5. Conduct a pressure test the keel coolers and all connecting piping and hoses after the engines have been re-installed. The test shall be conducted for a period of 4 hours and at the normal operating pressure of the system. Test shall be conducted before the boat is re- floated.

6. The report shall include a list of recommended repairs to protect the structural integrity of the boat.

1.11 Line Item 011:

Repair Stanchion

1. Contractor shall inspect and repair the workboat’s stanchion that runs along the perimeter of the boat’s port, starboard, and aft.

2. If contractor’s inspection determine that part of stanchion is beyond, they shall replace after seeking government approval.

3. The repaired stanchion must meet the requirements put forth by the 2014 edition EM

385-1-1 19.E.04.

1.12 Line Item 012:

Replace Gear Boxes

1. Remove and discard of two (2) existing MG514C gear boxes.

2. Install two (2) Twin Disc MG514C gear boxes or equivalent type and size.

1.13 Line Item 013:

Overhaul 40KW Generator Set

1. The contractor shall pull/remove two (2) 66 hp Cummins engines and generators and have them overhauled/rebuilt by the original manufacturers’ certified mechanics.

2. The generator sets are model 4B 76-2500 with serial numbers 7091330410 and

7091420410.

3. This is to be a major overhaul of the generator sets so that the overhauled engine and generator meets or exceeds the OEM operating and functional standards as originally built. This major overhaul shall be equal to a new long block and the replacement of all fuel and cooling hoses.

4. The generators shall be operated prior to them being reinstalled in the workboat. The contractor shall conduct a 100% load test on the generator sets using a load bank properly sized for the generators.

5. All defects such as oil or fuel leaks, insufficient cylinder compression, cooling water flows, oil pressure, and generator output, overheating on any component and/or any other possible defects in the engines or generators shall be repaired prior to the engine being reinstalled in the workboat in the Contractor.

6. To meet the requirements of this section, offerors may alternatively propose to replace the existing generators with rebuilt units. The rebuilt units must come with as-new warranties. The units to be replaced would then become the property of the Contractor.

1.14 Line Item 014:

Inspect Fuel Tank

1. The vessel has two (2) steel diesel fuel tanks, each with a capacity of 2,000 gallons.

Tanks are located in the hull of the boat – one on the port and one on the starboard side.

2. Before commencing any work on, or any hot work near, the fuel tanks, the Contractor shall drain the tanks and provide a marine chemist’s gas-free certificate to the on-site Government representative. All requirements of section 2.F of this specification must be adhered to when working on fuel tanks. Fuel tanks are considered confined spaces and all confined space entry procedures shall be followed in accordance with EM 385- 1-1, Section 34.B and applicable OSHA Standards.

3. The contractor shall store all fuel removed from the tanks in fuel tanks designed for diesel fuel storage. An equal amount of fuel that is drained from the tanks shall be returned upon completion of the work. It is expected that there will be around 1,000 gallons of fuel or less on board. The on-site Government representative will supply the Contractor with an exact amount before the Contractor takes possession of the vessel.

4. The Contractor shall inspect the interior of all fuel tanks and document the condition.

The Contractor shall submit a detailed report including location and photographs of structural damage and excessive corrosion point.

5. The Contractor shall submit the condition report within 10 calendar days after the boat has been delivered to the Contractor’s facility and shall include a list of recommended repairs necessary to protect the structural integrity of the boat.

1.15 OPTION 1 - Line Item 015:

Install New Propellers

1. The contractor will replace two (2) propellers and replace with propellers to be provided by the Government. The propellers are currently located at Louisville Repair Station, 2605 Shippingport Drive, Louisville, KY 40212. Government will be responsible for delivering the propellers to the contractor’s site.

2. The contractor will return the two (2) removed propellers to the Government upon completion of the project. Government will be responsible for pickup of the propellers.

1.16 OPTION 2 - Line Item 016:

Replace Search Lights

1. Contractor shall remove and discard existing search lights.

2. Contractor shall install new Zenon 500 Watt search lights or of an equivalent model.

1.17 OPTION 3 - Line Item 017:

Replace Battery Charging System

1. Replace battery charging system for the main engine and generators. The system should be capable of charging two (2) 24-volt and two (2) 12-volt systems while on shore power.

2. Include solar trickle down charging system capable of charging two (2) 24-volt systems and two (2) 12-volt systems when vessel is not able to be on shore power.

1.18 OPTION 4 - Line Item 018:

Replace Wall Heaters

1. Remove and discard four (4) existing wall heaters located in the engine room and galley.

2. Install four (4) QMark SED1512 shallow wall, painted steel, front wall heater fan forced (1500 W at 120 V) or of equivalent type and size. They will be placed in the location of the removed wall heaters.

1.19 OPTION 5 - Line Item 019:

Crane Upgrades

1. Replace existing wireless Load Moment Indicator system with 24 VDC hard wired system.

2. Replace high speed valve system for cabling and boom extension.

3. Install external remote power switch for crane.

4. Install new Plexiglas windows for the cab of the crane.

1.20 OPTION 6 - Line Item 020:

Replace Radar System

1. Contractor shall remove existing radar system and screen. These items shall be returned to the Government.

2. Contractor shall install a comparable full radar system with the following capabilities.

a. Display AIS

b. Display Swing Meter

c. Display Depth

d. Display Wind speed and direction

e. Broadcast to a remote screen no further than 1,200 feet away. The remote screen can be hard-wired or wireless so long as it meets other requirements in this section.

2. MATERIALS AND WORKMANSHIP STANDARDS

A. Applicable Publications – The following publications of the issues listed below, but referred to thereafter by basic designation only, form a part of these specifications to be the extent indicated by references thereto:

American Welding Society, Inc. (AWS) D 1.1 (2006) Structural Welding Code-Steel

B. Workmanship – Workmanship shall be of the highest grade and in accordance with the best modern practices to conform to the specifications for the item of work being furnished.

C. Quality Control – The Contractor shall establish and maintain a quality control system to assure compliance with contract requirements and shall maintain records of all quality control operations covered by the specifications. The Contractor shall provide continuous inspection of all operations for quality control and record the results for submitting to the COR to show compliance with contract requirements.

D. Welding

1. General – Welding shall be by an electric arc-welding process and shall conform to the applicable provisions of AWS D1.1, Sections 1 thru 7, 9 and 10 unless otherwise specified or authorized. Welding operators, welders and tack welders shall be qualified and requalified if necessary for the particular type of work to be done. Qualification shall be in accordance with AWS D1.1, Section 5, and meet all requirements to be accepted by USCG. The Contractor shall certify by name the welders and welding procedures for which they are qualified. Prior qualification will be accepted if welders have performed satisfactory work under the code for which they were qualified within the preceding three months. The Contractor shall require welders and welding operators to repeat the qualifying tests when, in the opinion of the COR, their work indicates a reasonable doubt as to proficiency. Those passing the re-qualification tests shall be re-certified.

Those not passing shall be disqualified until passing. All expenses in connection with qualification and re-qualification shall be borne by the Contractor.

2. Inspection - The Contractor shall maintain an approved inspection system and perform required inspections to assure compliance with contract requirements.

Welding shall be subject to inspection by the COR or his/her authorized representative to determine conformance with the requirements of AWS D1.1, the approved welding procedures and provisions stated in other sections of these specifications. The Contractor shall clean the welds of scale, slag, weld spatter, and any foreign materials/wasted, in preparation for inspection. The Contractor shall ascertain that all welding conforms with the requirements and/or these specifications as to size, length, location, and positioning of members prior to welding, particularly members that are to be positioned into close contact for welding. The Contractor shall carefully examine each weld for surface defects, undercutting, and lack of fusion, insufficient penetration, porosity, craters, cracks, and gas pockets in the weld or base metal.

3. Non-Destructive Examination – By formal modification to the contract, the

Contracting Officer may require non-destructive testing of Contractor welds. If Contractor welds are to be non-destructively tested as required by the Contracting Officer, the Contractor shall make the necessary arrangements for the non-destructive testing by a recognized testing agency. If the welds are found to be satisfactory, the Government will pay the costs of the non-destructive testing. If the welds are found to be defective, the Contractor will be required to bear both the costs of the non-destructive testing and of the required re-welding.

All sections of welds found defective shall be chipped, cut, air arced, or gouged out to be base metal and properly re-welded.

4. Procedure - The Contractor may be required to prepare and submit for approval a complete schedule of welding procedures consisting of detailed procedure specifications to be used for each welded connection. The schedule shall conform to the provisions of AWS D1.1, Sections 2, 3, 4, 7, and 9 and applicable provisions of Section 10. Procedures shall be such as to minimize residual stresses, distortion and shrinkage. Approval of any procedure will not relieve the Contractor of the responsibility for producing a finished structure meeting all requirements of these specifications.

5. Temporary welds - Temporary welds required for fabrication and erection shall be under the same controlled conditions described herein for permanent work.

All temporary welds shall be made by welders qualified for permanent work as previously specified. Temporary welds shall be removed after having served their purposes, and shall be ground flush with adjacent surfaces. All depressions shall be filled overfull with weld metal and the excess weld metal shall then be ground flush.

6. Preheat - Preheating shall be performed as required by AWS D1.1, Sections 4.2 and 4.3 except that the temperature of the base metal shall be at least 70 degrees

F. The weldments to be preheated shall be slowly and uniformly heated by approved means to the prescribed temperature, held at that temperature until the welding is completed, and then permitted to cool slowly in still air. Preheating temperatures shall be monitored by the use of suitable temperature-indicating sticks, liquids, or pellets, as manufactured by Tempil Corporation, Markal Company, Curtiss-Wright Corporation, or others.

7. Filler Metal - The electrode, electrode-flux combination and grade of weld metal shall conform to the appropriate AWS specification for the base metal and welding process being used. The AWS designation of the electrodes to be used shall be included in the schedule of welding procedures. A controlled temperature storage oven shall be used at the job site as prescribed by AWS D1.1, Section 4.45 to maintain low moisture of low hydrogen electrodes.

8. All butt splices to any members should be made full penetration weld.

E. Flame Cutting – Structural steel may be cut by machine-guided or hand guided torches instead of by shears or saws. Flame cutting of material other than structural steel shall be subject to approval by the Contracting Officer. Where a torch is mechanically guided, no chipping or grinding will be required except as necessary to remove slag and sharp edges. Where a torch is hand guided, all cuts where the material is to be welded and the cuts will be exposed or visible shall be chipped, ground, or machined to sound metal. Where metal is not to be welded and where cuts will be exposed, burrs and rough edges only shall be removed. Where the torch is mechanically guided, flame gouging will be permitted in preparation for welding.

F. The contractor is responsible for compliance with U.S. Coast Guard regulations for handling of inflammable and combustible liquids. Whenever hot work is to be performed on fuel tanks, bilge areas or any enclosed compartment or structure subject to gas accumulation or excessive gas pressures building up as a result of heat, a marine chemist's gas-free certificate shall be furnished to the Government representative at the contractor's expense prior to commencing the work.

G. No welding is permitted on any structural member of the crane. Contractor shall obtain approval from the on-site Government representative before commencing any work on any portion of the crane.

3. MATERIALS AND WORKMANSHIP STANDARDS

A. Surface Preparation - Surface preparation of bare metal as well as tightly adhering coating will conform to manufacture’s recommendations unless specified differently in this document. Areas that might require blast cleaning in preparation for application of the paint system, including but not limited to damaged coating, corroded metal, and bare metal, shall be performed in accordance with Steel Structures Painting Council Specification SSPC-SP-6, for “Commercial Blast Cleaning”. Surfaces shall be dry at the time of blasting. Within eight (8) hours after cleaning, but in any event prior to the deposition or formation of any detectable moisture or corrosion, all blast cleaned surfaces shall be cleaned of dust and abrasive particles by brushing, vacuum cleaning, and/or blow-down with clean, dry compressed air, and given the first coat of paint. Cleaning and painting shall be programmed to ensure that dust, or other contaminants from the cleaning process do not fall on wet, newly painted surfaces, and surfaces not intended to be painted shall be suitably protected from the effects of cleaning and painting operations. Prior to painting, abrasive particles, dust, water, and all other matter on the deck which might, in the opinion of the COR, adversely affect the painting application, shall be removed to the satisfaction of the COR.

B. Paint Requirements - Paint shall be delivered in sealed containers with labels to indicate manufacturer, contents, and any special instructions. Paints and painting materials shall be stored under cover and protected from extreme temperatures. Paints shall not be used if it has exceeded the closed shelf life or pot life recommended by the manufacturer. Additionally, paints shall not be applied in weather or humidity conditions not recommended by the manufacturer.

C. Application of Coatings – Surface preparation and paint application shall be in strict compliance with the coating manufacturer’s recommendations. The Contractor shall take particular care to insure that coating system requirements are met in all areas, especially those difficult to coat, such as flange undersides. All painting on both the interior and exterior surfaces below the main deck shall be accomplished prior to launching of the vessel. All requirements outlined in this specification are additional to the manufacturer’s recommendations and not relive the Contractor from meeting both the manufacturer’s recommendations along with the additional requirements outlined in this specification.

D. Painting system – All paints shall be applied in strict conformance with the recommendation of manufacturer. Where dry film thickness requirements are specified, they shall have precedence over the number of coats specified. Thickness requirements of each coat specified shall be maintained by a method approved by the manufacturer. The repaired boat interior shall be coated with one coat of Devoe Bar Rust 235 epoxy coating, or equivalent, at a total of 6 mils DFT minimum. Hull interior color shall be white or off white. The barge hull exterior shall be coated with Devoe Bar Rust 235 epoxy coating, or equivalent, at a total 12 mils DFT minimum.

The final coat on the complete barge exterior will be a polyurethane topcoat at a total of 2-4 mils DFT.

The barge colors shall be as listed below.

AREA COLOR/FS 595 NUMBER

Hull exterior and Crane Structure (except deck) Black/17038 Barge Deck (see note) Deck/Red/10076 Deck House Margin Facings (Trim) Red/11136 Deck Fittings and Warnings Yellow/13655

Hull Markings White/27880

NOTE: Add non-skid material to the last coat on all deck areas. The non-skid abrasive shall be fine pumice mixed into the paint and not broadcast on top.

E. The Contractor will be held responsible for ensuring all painted surfaces are in sound condition upon pickup by the Government. Prior to the Government picking up the vessel, all interior and exterior painting shall be thoroughly inspected, and any defects in the integrity of the paint system. Notice shall be given 2 working days prior to launching so that paint can be inspected. The vessel shall not be launched until the painting has been approved. Any additional painting required as a result of this final inspection process shall be done to the satisfaction of the Authorized Representative of the COR at no additional cost to the Government.

4. MATERIALS AND WORKMANSHIP STANDARDS

The Government will deliver and pick up the LD-750 Russelburg to/from a repair facility within 300 river miles of Ohio River mile marker 606 (Louisville, Kentucky). The Government will coordinate with the Contractor one week prior to delivery/retrieval of the vessel to/from the Contractor’s facility. Contractor is responsible for any damage to the towboat, barge, and spare parts while it has possession of the vessel.

5. SECURITY REQUIREMENTS

All Contractors and subcontractor employee(s) working on this contract who require access in and/or around any Huntington District facilities shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Huntington District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Huntington District Security Management Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.

Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or on District facilities.

The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) Security Information sheet on each employee working on site must be submitted directly to the Huntington District Security Office.

The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

Contractors shall have background checks completed for their employees annually in the case of Contracts with option periods. For instance, if the employee was cleared in May of 2018, they shall be cleared again in May of 2019. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite.

The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Huntington District USACE Security Management Office for background purposes.

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Huntington District Security Management Office by phone, letter, or email at the following numbers/addresses:

CELRH-SM

502 Eighth Street Huntington, WV 25701

Stephen R. Curry, phone (304) 399-5695; email stephen.r.curry@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil

6. ANTI-TERRORISM/OPERATIONAL SECURITY

Contractor shall comply with the following required training and/or security procedures.

Access and General Protection/Security Policy and Procedures – All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility, access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforces must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy.

In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

7. VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY COROPS OF

ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

U.S. Department of Labor Veterans employment: https://www.veterans.gov/ Federal veteran employment information: www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS): http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program: http://benefits.va.gov/vow/ U.S. Army Warrior Transition Command Employment Index:

http://www.wct.army.mil/modules/employers/index.html Hiring Our Heroes initiative: www.uschamberfoundation.org/hiring-our-heroes Guide to Hiring Veterans:

https://obamawhitehouse.archives.gov/sites/default/files/docs/white_house_business_counci l_-_guide_to_hiring_veterans_0.pdf

QUALITY ASSURANCE SURVEILLANCE

1. Purpose

This plan establishes the specific quality assurance (QA) activities for the subject contract.

This plan shall be reviewed and updated as necessary by the Chief, Regional Rivers Repair Fleet.

Period Covered: Duration of Contract (60 calendar days from date of award)

2. Staffing

QA oversight staffing will include team members from the Regional Rivers Repair Fleet and supplemented with Huntington District office.

3. Overview

This performance-based Quality Assurance Surveillance Plan (QASP) sets forth the procedures and guidance the U.S. Army Corps of Engineers (USACE), Huntington District, will use in evaluating the technical performance of the Contractor in accordance with the terms and conditions of the Performance Work Statement (PWS).