A.03.09_Exhibits.pdf

PDF 390 KB Posted

Attached to
Concrete Apron Extension Fishtrap Lake, Shelbiana, KY
Solicitation number
W91237-19-Q-0006
Issued by

View the file

Other files

File Type Posted
W9123719Q0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ex is ti n g p ad

A p ro n

C o n cr et e

Pa d

Ex te n si o n C o n crete fill LV L w

/existin g p ad

110’

Exhibit 1: Improvements to Existing Debris Removal Ramp

20’

30’

75’

30’

Weep holes 2” pipe every 8’

12” above footer

Exhibit 2: Apron Extension Requirements

Existing Bank/Shoreline

Back Fill with 4”- 15” stone

E x t e n s i o n

Apron Extension

3’

12’

45”

Footer

2’ Weep Hole

Exhibit 3: Slope of Concrete Pad Extension (Side View)

Existing Concrete Pad

Existing Apron

24”

File details come from the government source that posted it.