A.07.23_W9123718T0086.pdf
PDF 1 MB Posted
- Attached to
- LEADERSHIP DEVELOPMENT PROGRAM Federal contract opportunity
- Solicitation number
- W91237-18-T-0086
About this file
SOLICITATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9123718T0086.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9123718T0086 11-Jul-2018
b. TELEPHONE NUMBER
304-399-5337
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 25 Jul 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912379. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CYNTHIA A OXLEY
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, CONTRACTING BRANCH
CYNTHIA OXLEY, 502 8TH STREET
HUNTINGTON WV 25701
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
304-399-5281FAX:
TEL: 304-399-5337 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$11,000,000
NAICS:
611430
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
X
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF51
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9123718T0086
Section SF 1449 - CONTINUATION SHEET
The contractor shall furnish all contractor travel expenses, contractor transportation, instruments, tools, materials, supplies, and related equipment necessary to perform the work outlined in this Performance Work Statement.
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
TASK 1: Four (4) hour planning/orientation meeting
1 JB $ ____________ $ ___________
TASK 2: Develop educational curriculum and work plan
1 JB $ ____________ $ ___________
TASK 3: Develop and participate in a two (2) day team building retreat.
1 JB $ ____________ $ ___________
TASK 4: Provide sixty (60) hours of classroom instruction and site visits.
60 HR $ ____________ $ ___________
TASK 5: Provide Assessment Tools/Methods
1 JB $ ____________ $ ___________
TASK 6: Provide formal and informal Coaching and Counseling.
1 JB $ ____________ $ ___________
TASK 7: Conduct a graduation ceremony.
1 JB $ ____________ $ ___________
TASK 8: Participate in requested meetings with the Corporate Board.
1 JB $ ____________ $____________
TOTAL
INSTRUCTIONS TO OFFERORS
This Request for Quote (RFQ) is for a Firm Fixed Price Performance Based Commerical Services Indefinite Delivery Indefinite Quantity Contract to provide all management, labor, supplies, materials and equipment necessary to perform for the Leadership Development Program (LDP) Level II Huntington District Program . All work shall be performed in strict compliance with the attached performance work statement and all other terms, clauses and conditions incorporated herein. Services for this will begin 1 October 2018 and continue through 30 September 2019.
One award will be made from this RFQ.
This procurement is 100% set-aside for Woman Owned Small Business, under NAICS code 611430 (the size standard for this NAICS code is $11.0 Million (average annual receipts for the previous three (3) years).
Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.
There is no bonding requirement for this procurement action.
Quotes will not be accepted for quantities less than the quantities specified in the price breakout schedule.
Failure to submit a unit price for all items listed will be considered as a material deviation from the requirements of the Request for Quote (RFQ) and the quote will be rejected.
Note: Subject to the provisions herein, award will be made as a whole to the lowest priced responsible and responsive offeror.
(a) The Government reserves the right, prior to making an award, to conduct a pre-award survey of the prospective Contractor in order to determine that the Contractor can meet the minimum standards for responsible, prospective Contractors as delineated in the Federal Acquisition Regulation, paragraph 9.104. The pre-award survey may include but will not be necessarily be limited to the following factors:
(1) Financial resource
(2) Ability to comply with required schedule
(3) Past record of integrity
(4) Past records of performance; and
(5) Ability to meet other qualification and eligibility requirements to receive an award of a contract.
(6) Have the necessary organization and experience
(7) Have the necessary production and resources
(b) Offerors are advised that accomplishment of this survey is a part of the evaluation process and is not to be construed as an indication that an offeror will receive or is in the best position to receive the resultant award.
Submit Offers to: U.S. Army Corps of Engineers Room 419, ATTN: Cynthia Oxley 502 8th Street Huntington, WV 25701
Quotes are due on the date and time (July 20, 2018 at 11:00 AM Eastern) as identified on page 1 (box 8) of this solicitation. Electronic submittals by email or fax will be accepted.
For contractual/technical questions, please contact Cynthia Oxley at 304-399-5337, fax 304-399- 5281 or by e-mail at cynthia.a.oxley @usace.army.mil.
NOTE: Clause 52.223-2 “Affirmative Procurement of Bio-based Products Under Service and Construction Contracts” is incorporated in this solicitation. Reporting by the contractor is required no later than October 31 of each year during contract performance and at the end of contract performance.”
Contract Award
D.1 The contract award will be made as a whole to the contractor offering the lowest price, after a determination of responsibility is made by the Contracting Officer and prices are determined to be fair and reasonable (see paragraph D.3). This means that low price will be the determining factor considered for award of this contract. “Offeror Quotes” as referred to in this solicitation shall include a completed Price Breakout Schedule as included in this solicitation.
D.2 Content. Offeror quotes and any supporting information shall be specific and complete in every detail and shall contain the information necessary to properly assess the Contractor's capability to perform the specified contract services.
D.3 Quoted Prices. The completed Price Breakout Schedule will be reviewed for completeness and compatibility with the estimated price to perform the contract services. Quoted prices will be evaluated for price reasonableness.
The Offeror’s price quote will also be evaluated for proportionality and balance. An Offerors’ price quote may be considered to have unbalanced pricing when it contains line item prices that are significantly over or understated when compared to the estimated cost or competitive pricing. An offerers’ quote may be rejected if the Contracting Officer determines that the lack of balanced pricing poses an unacceptable risk to the Government.
D.4 Overall Price Evaluations. The Government will evaluate quoted prices for award purposes by adding the Offerors’ total price (See FAR 52.217-5). All unit prices shall be inclusive of all costs associated with this contract.
For example, there will be no additional payment for supervision, administration, equipment, supplies, profit or other items/services not included on the price breakout schedule.
D.5 Discounts. Prompt payment discounts will not be considered in the evaluation of quotes.
D.6 The Government intends to evaluate price quotes and award a contract without discussions with offerors.
Therefore, the offeror's initial quote should contain the offeror's best terms.
D.7 A Government Representative may verify any information provided in the quote to better evaluate the Offerors’ ability to perform.
D.8 Simplified Acquisition procedures are being used per FAR Part 13.
PERFORMANCE WORK STATEMENT
LEADERSHIP DEVELOPMENT PROGRAM (LDP)
(LEVEL II, DISTRICT PROGRAM)
C.1-1. GENERAL. The Huntington District, U.S. Army Corps of Engineers (USACE) is dedicated to providing opportunity to those within the organization interested in management and leadership training to build a solid foundation of leadership competencies that can be used in the workplace and help each student build personal leadership skills.
The Huntington District Leadership Development Program (LDP) is an eleven (11) month, multi-faceted leadership and management development program. This program will be provided to employees who have demonstrated leadership potential with the overall program objective being the development of these employees to become effective team leaders and managers. Disciplines represented among those chosen for the LDP include a wide variety of scientific and engineering, administrative, maintenance, trade and craft positions. The overall objective of LDP is to provide knowledge regarding leadership and management skills and abilities encompassing both the theoretical and practical, while promoting the growth and development of these employees to become effective leaders within the Huntington District Corps of Engineers. The anticipated goals of the program include developing awareness and understanding of the visions and values of current Corps of Engineer leaders and managers; assist participants in identifying, clarifying and establishing their own goals and values; provide a forum for future leaders and managers to exchange ideas; foster group dynamics to improve communication skills; and provide instruction to enhance a focused approach to effective management methods and standards of competence.
The academic training, as well as the overall administration and coordination of this program, shall primarily be the responsibility of the contractor. All classes shall be conducted in a government facility with the Huntington District.
C.1-2. PROGRAM DESCRIPTION. The contractor shall provide non-personal services to develop, implement, and administer the program. The program requires the contractor to provide an initial kickoff event, classroom training, individual counseling sessions for personal growth, participation in scheduled meetings or presentations, and a graduation ceremony. The contractor will provide a dynamic program design that effectively promotes the overall objectives:
1) Heightened awareness of one’s strengths and weaknesses as they pertain to leadership, supervisory skills and management.
2) Development and refinement of skills necessary to be an effective leader, including interpersonal communication, conflict management, time management, situational leadership, stress management, team building, coaching, management of change and other related topics.
3) Enhanced knowledge of how to be an effective team player and an effective team leader.
4) Greater insight into the visions, values, missions and culture of the Huntington District and the Corps of Engineers.
C.1-3. PROGRAM DESIGN ELEMENTS. The contractor shall undertake the following tasks in addition to other approaches deemed necessary for increasing the potential of successfully developing the participant’s knowledge, skills and abilities relative to leadership.
a. TASK 1: Attend and participate in a four hour planning/orientation meeting to be held within two weeks after award of the contract. This meeting shall be held at the USACE, Huntington District site at a mutually agreeable time. This meeting shall be held as an opportunity to discuss respective roles, responsibilities, clarify expectations and develop initial norms and structures, preliminary activity schedule and assist in the identification of goals and objectives of the program.
A partnership shall be developed of responsibilities between the Contractor, U.S. Army Corps of Engineers, participant’s mentors and supervisors and the Huntington District Corporate Board illustrated through sharing the responsibilities for speakers, activities, time, resources and emotional and technical support. Once the contract is awarded, the contractor shall provide one program administrator (PA) to serve as the single point of contact between the contractor and Contracting Officer’s Representative (COR). The PA shall administer the program, provide at least 50% of classroom instruction, and attend all meetings, training, events, etc. which are part of this program. The PA’s purpose is to provide continuity throughout the program by assisting the participants in making connections in materials and experiences. Exceptions for attendance will be coordinated through the COR and approved by the Huntington District Corporate Board. The PA shall arrange and provide oversight for formal training and work with the designated Corps of Engineers COR for development of Corps related portions of the training, field trips and class project. The PA shall also insure invoicing is completed and sent to the COR and all reporting requirements are met.
b. TASK 2: The Contractor shall develop and submit for review an educational curriculum and work plan detailing training format, objectives, goals, sessions and all other pertinent specifics necessary to provide a successful program for USACE review and approval. Classes shall be taught in a government facility in the local Huntington, WV area. The contractor will propose the site location and submit as part of the curriculum and schedule deliverable.
c. TASK 3: Develop and participate in a two day team building retreat. The retreat shall be devoted primarily to lecture, small group discussion sessions, personal introspection, self analysis on leadership effectiveness, individual goal setting and group bonding. The retreat shall be facilitated by the Contractor, and at least 50% (8 hours) of instruction will be provided by the PA.
The Contractor shall assist with setting goals and objectives. Suggested topics and activities can include, but are not limited to the following:
Dynamic teambuilding activities Giving Effective Presentations Initial Interviews / Input / Expectations Hermann Brain Dominance Instrument/Myers-Briggs Type Indicator or similar instrument Time Management Life Balance Leading Discussions
d. TASK 4: Provide thirty six (36) hours of classroom instruction with the PA responsible for at least 50% (18 hours) of the instruction and twenty-four (24) hours (including transportation to and from) allotted to external leadership instruction provided by other organizations/businesses.
Travel time to site visit should be limited to no more than one hour. Nine, 4-hour classroom sessions shall be held one per month to allow sufficient time for the participants to gather and synthesize information and experiences and for practice in using new behaviors and/or techniques and six, 4-hour tours/visits in the local metropolitan area will be conducted for external leadership instruction. There will be up to 12 participants/students. The Contractor shall teach leadership skills by setting personal leadership goals, incorporate collaboration with a Leadership Coach, and participating in various leadership experiences. The Contractor shall provide college-level class sessions, which provide a variety of contemporary leadership and management concepts presented by leading professionals in their fields. The Contractor will provide a verbal and written evaluation to all participants to collect feedback following each event. Verbal discussion should address the general pros and cons of the event such as the learning environment, instructors, topics addressed, logistical concerns and other items. A written evaluation should measure new learning, if and how skills can be applied on the job, and areas that need to be further addressed.
Instruction shall be presented in an interactive manner that addresses a variety of learning styles.
Self-assessment tools are used to supplement the instruction as appropriate. These sessions of instruction shall be followed by discussions of the practical applications of the concepts in the U.S. Army Corps of Engineers and the Huntington District environments. Suggested session topics include, but are not limited to the following:
Life Balance Coaching Conflict Management Teambuilding Meeting Management Generational Differences Behavioral Interviewing Job Stress Decision Making Delegation Effective Presentations Change Management Performance Counseling Situational Leadership Time Management
e. TASK 5: Provide Assessment Tools/Methods and readings from classic and contemporary literature on leadership and effective management linked to the topics addressed in the classroom sessions. Readings should vary in length and style to accommodate participants’ diverse learning styles. Assessment Tools should also relate to the topics addressed in the classroom sessions to deepen understanding of individual and group leadership skills and self-awareness. The contractor shall provide a list of the proposed the readings and assessments to be approved by the U.S. Army Corps of Engineers Corporate Board. Examples of suggested literature and assessments include, but are not limited to the following:
7 Habits of Highly Effective People Covey Gung Ho! Blanchard The One Minute Manager Meets the Monkey Blanchard, et al Leading with the Heart Krzyzewski & Phillips Getting to Yes Fisher, et al The 360 Degree Leader Maxwell Good to Great in the Social Sectors Collins The Five Dysfunctions of a Team Lencioni Hermann Brain Dominance Instrument (HBDI)/ Myers-Briggs Type Indicator DiSC Stress Map Thomas Kilmann Instrument (Conflict Management) Profiles XT / PPI or similar instrument
f. TASK 6: Provide formal and informal coaching and counseling to each program participate individually. The PA will provide clear, candid, constructive feedback in confidential counseling sessions given within the last 2-3 months of the program. The objective is to help the participants set goals and gain insights into their progress regarding individual leadership strengths and weaknesses, build on their strengths and overcome weaknesses and blind spots which, if not corrected, might adversely influence their effectiveness as leaders.
g. TASK 7: A graduation ceremony is held during the last month of the program.. The purpose is to recognize the achievements of the participants and to celebrate the success of the year’s activities.
Participants, their significant others, Corporate Board members, mentors and supervisors may be invited. The ceremony shall include time for speeches by the Commander and participants, and presentation of graduation certificates by the District Commander and/or the PA. The ceremony is traditionally conducted as a luncheon. However, under no circumstances may government funds be used to pay for food; each attendee must pay for their meal individually out of their own pocket. The PA is responsible for acquiring a venue and caterer, preparing the agenda, obtaining necessary technical equipment, and acting as master of ceremonies. The PA will work with the COR to ensure that all aspects of the graduation adhere to legal requirements.
h. TASK 8: The PA shall furnish the District’s Corporate Board with oral evaluations of the effectiveness of the program components and activities and provide recommendations for changes and improvements.
C.1-4. FACTORS CONSIDERED KEY TO THE SUCCESS OF THE LEADERSHIP DEVELOPMENT
PROGRAM.
a. Flexibility to capitalize on opportunities and additional learning experiences or information which occurs throughout the year, although not anticipated in the original design of the year’s developmental activities. Additionally, flexibility is needed to adapt the program to address the specific needs of the selected participants.
b. Continuity from one learning activity to another that is provided by the PA who personally participates in all the key program activities and brings together learning from separate activities into a cohesive whole. Lessons learned from one program year to the next help the program designs to remain dynamic, build on program strengths and minimize areas of weakness.
c. Integrated Program Development serves to integrate all aspects of the program so they achieve maximum benefit internally to the individual participants, interpersonally between the participants, their co-workers; and organizationally throughout the Huntington District and within our Great Lakes and Ohio River Division.
C.1-5. DESIGNATED CONTRACTING OFFICER’S REPRESENTATIVE (COR). No government personnel, other than the Contracting Officer, shall have the authority to do other than clarify technical points or supply relevant information. Specifically, no requirement in this Performance Work Statement may be altered as a sole result of such verbal clarification.
C.1-6. CONTRACTOR RESPONSIBILITIES. The contractor shall furnish all contractor travel expenses, contractor transportation, instruments, tools, materials, supplies, and related equipment necessary to perform the work outlined in this Performance Work Statement.
The Contractor shall schedule all tasks under this Performance Work Statement through coordination with the COR.
The contractor shall comply with the approved Work Plan throughout the project. The government will not be obligated for payment of any additional materials or services that are not covered in this Performance Work Statement. Any additional work or modifications are required to be coordinated and approved through the Contracting Officer. Any and all changes must be coordinated in writing through the contracting officer.
C.1-7. COSTS TO BE BORNE DIRECTLY BY THE U.S. ARMY CORPS OF ENGINEERS.
a. Travel and per diem will be provided for Corps of Engineers employees for approved program activities for the initial kickoff event. All other costs for the kickoff shall be included in the contractor’s price.
b. Transportation of Corps of Engineers employees within the Huntington commuting area for approved program activities.
c. Use of the U.S. Army Corps of Engineers inter-office mail system, with advance approval of the
COR.
d. Use of Corps of Engineers facilities, such as meeting rooms and audio-visual equipment, for special meetings. A schedule will need to be coordinated with the Corps of Engineers COR for use.
e.
C.1-8. MISCELLANEOUS CONDITIONS AND ISSUES.
a. At the conclusion of the program, the PA shall provide each participant with framed certificates of completion, sigd by both the PA and Huntington District Commander.
b. The PA may be requested to meet with the Huntington District Corporate Board or the COR before the initial kickoff event, quarterly for program review, after the conclusion of the program and/or to participate in special events and meetings, which are not specified in the Performance Work Statement.
c. The COR will work in conjunction with the PA to ensure all program components comply with Army Directive 2011-20, which include, but are not limited to the following:
1) All events will be held in a government facility in the local Huntington area.
2) It is not allowable for government funds to be spent on food, either directly or indirectly, except when an employee is on official government travel and receiving per diem allowance.
C.1-9. PERIOD OF PERFORMANCE. The period of peroformance for this award is October 1, 2018 thru September 30, 2019. The class schedule shall be conducted, at a designated time, during the follow weeks:
November 5-9, 2018 December 10-14, 2018 January 7-11, 2019 February 11-15, 2019 March 11-15, 2019 April 8-12, 2019 May 13-17, 2019 June 10-14, 2019 July 8-12, 2019 August 12-16, 2019 September 9-13, 2019
C.1-10. REPORTS/DELIVERABLES. During the course of this contract, the Contractor shall submit the following reports/deliverables to the COR for review and/or approval. All materials submitted electronically shall be produced in PC-compatible software that meets Department of Defense (DoD) standards and is readily available (i.e., MS Word, MS Excel)
a. One (1) electronic copy of a Work Plan that identifies the curriculum and schedule of yearly events shall be due no later than 4 weeks prior to the start date of the retreat as identified in TASK 3 above.
b. One (1) electronic copy of all survey tabulations and data as gathered during the closing retreat shall be due within two (2) weeks after the retreat. The Contractor shall furnish the LDP POC/COR with the written reports evaluating the effectiveness of LDP components and activities, and include recommendations for changes and improvements. (Submitted for the base and each option period exercised).
C.1-11. SECURITY REQUIREMENTS
All Contractors and subcontractor employee(s) working on this contract who require access in and/or around any Huntington District facilities shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Huntington District Security Management Office shall submit contractor(s) personal information in order to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on
Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results provided by the Huntington District Security Management Office of the background investigation. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.
FOR CONTRACTS LESS THAN 1 YEAR DURATION:
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or on District facilities. The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number and (4) Task Order Number when applicable, (5) Security Information sheet on each employee working on site must be submitted directly to the Huntington District Security Office. The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State), Driver’s license # if available. If is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.
FOR CONTRACTS IN EXCESS OF 1YEAR DURATION THE DOCUMENTS LISTED BELOW ARE
REQUIRED:
The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Huntington District Security Management office).
Contractor shall report any changes in personnel or at anytime conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, Security Management Office will make recommendations to the PCO or their Designated Representative. The Security Management Office cannot give approval due to unfavorable report(s). The Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise Contractor of the decision.
FOREIGN NATIONALS
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time (less than 45 days) in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters Staff to accomplish. All Foreign Nationals must comply with the following paragraph: In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following a U.S.
passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc. In order to assure forms are properly completed, and to minimize time delays, Contractor is encouraged to work closely with the Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Security Management Office by phone, letter, or email at the following numbers/addresses:
CELRH-SM
502 Eighth Street Huntington, WV 25701
Stephen R. Curry, phone (304) 399-5695; email stephen.r.curry@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil
AT/OPSEC REQUIREMENTS
AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes
For contractors who do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
For Contracts that Require OPSEC Training. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:
https://www.iad.gov/ ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
JUN 2016
52.204-22 Alternative Line Item Proposal JAN 2017 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.242-15 Stop-Work Order AUG 1989 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)
(a) Definition. As used in this provision--
Commercial and Government Entity (CAGE) code means—
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;
or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
(b) The Offeror shall enter its CAGE code in its offer with its name and address or otherwise include it prominently in its proposal. The CAGE code entered must be for that name and address. Enter ``CAGE'' before the number. The CAGE code is required prior to award.
(c) CAGE codes may be obtained via--
(1) Registration in the System for Award Management (SAM) at www.sam.gov. If the Offeror is located in the United States or its outlying areas and does not already have a CAGE code assigned, the DLA Commercial and Government Entity (CAGE) Branch will assign a CAGE code as a part of the SAM registration process. SAM registrants located outside the United States and its outlying areas shall obtain a NCAGE code prior to registration in SAM (see paragraph (c)(3) of this provision).
(2) The DLA Commercial and Government Entity (CAGE) Branch. If registration in SAM is not required for the subject procurement, and the offeror does not otherwise register in SAM, an offeror located in the United States or its outlying areas may request that a CAGE code be assigned by submitting a request at https://cage.dla.mil.
(3) The appropriate country codification bureau. Entities located outside the United States and its outlying areas may obtain an NCAGE code by contacting the Codification Bureau in the foreign entity's country if that country is a member of NATO or a sponsored nation. NCAGE codes may be obtained from the NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx if the foreign entity's country is not a member of NATO or a sponsored nation. Points of contact for codification bureaus, as well as additional information on obtaining NCAGE codes, are available at http://www.nato.int/structur/AC/135/main/links/contacts.htm.
(d) Additional guidance for establishing and maintaining CAGE codes is available at https://cage.dla.mil.
(e) When a CAGE Code is required for the immediate owner and/or the highest-level owner by 52.204-17 or 52.212-3(p), the Offeror shall obtain the respective CAGE Code from that entity to supply the CAGE Code to the Government.
(f) Do not delay submission of the offer pending receipt of a CAGE code.
(End of Provision)
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation.
Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.
Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC
20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.
Additional copies will be issued for a fee.
(2) Most unclassified Defense…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.