SEE ADDENDUM
(No Collect Calls)
W91237-17-T-0008 23-Dec-2016
b. TELEPHONE NUMBER
304-399-5182
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 09 Jan 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912379. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KAREN L SIMMONS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W81F8E63229583
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, CONTRACTING BRANCH
KAREN SIMMONS, 502 8TH STREET
HUNTINGTON WV 25701
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 9655AY 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
REGIONAL RIVERS REPAIR FLEET
BRADY BECKMAN
502 8TH STREET
HUNTINGTON WV 25701-2070
TEL: FAX:
304-399-5281FAX:
TEL: 304-399-5182 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
1250 employees
NAICS:
336611
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF68
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
FFP
CONTRACTOR TO FURNISH ALL EQUIPMENT, LABOR, LAYOUTS OF
WORK FEATURES, AND SUPERVISION NECESSARY TO DRYDOCK AND
REPAIR THE M/V KENNETH EDDY, REGIONAL RIVERS REPAIR FLEET,
IN ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK
STATEMENT. CONTRACTOR MUST FILL OUT AND SUBMIT ATTACHED
PRICE BREAKOUT SCHEDULE.
FOB: Destination
PURCHASE REQUEST NUMBER: W81F8E63229583
NET AMT
INSTRUCTION TO OFFERORS
This Request for Quote (RFQ) is for a firm fixed price performance based commercial service contract for the Dry-docking and Repairs to the M/V Kenneth Eddy, part of the Regional Rivers Repair Fleet (R3F). All work shall be performed in strict compliance with the attached performance work statement and all other terms, clauses and conditions incorporated herein. Services will begin at date of award and continue through completion, approximately 43 calendar days.
One award will be made from this RFQ.
This procurement is 100% set-aside for Small Business, under NAICS code 336611 (1250 employees).
Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.
There is no bonding requirement for this procurement action.
Quotes will not be accepted for quantities less than the quantities specified in the price breakout schedule.
Failure to submit a unit price for all items listed will be considered as a material deviation from the requirements of the Request for Quote (RFQ) and the quote will be rejected.
Note: Subject to the provisions herein, award will be made as a whole to the lowest priced responsible and responsive offeror.
(a) The Government reserves the right, prior to making an award, to conduct a pre-award survey of the prospective Contractor in order to determine that the Contractor can meet the minimum standards for responsible, prospective Contractors as delineated in the Federal Acquisition Regulation, paragraph 9.104. The pre-award survey may include but will not be necessarily be limited to the following factors:
(1) Financial resource
(2) Ability to comply with required schedule
(3) Past record of integrity
(4) Past records of performance; and
(5) Ability to meet other qualification and eligibility requirements to receive an award of a contract.
(6) Have the necessary organization and experience
(7) Have the necessary production and resources
(b) Offerors are advised that accomplishment of this survey is a part of the evaluation process and is not to be construed as an indication that an offeror will receive or is in the best position to receive the resultant award.
Quotes are due on the date and time identified on page 1 (box 8) of this solicitation. Electronic submittals may be accepted.
Submit Offers to: U.S. Army Corps of Engineers
Room 419, ATTN: Karen Simmons 502 8th Street Huntington, WV 25701
PLEASE DIRECT ALL QUESTIONS TO KAREN SIMMONS AT (304) 399-5182 OR
Karen.l.simmons@usace.army.mil. THE SOLICITATION AND RESULTING CONTRACT SHALL BE
THE GOVERNING DOCUMENT IN ALL CASES.
QUOTES CAN BE FAXED OR E-MAILED TO KAREN L. SIMMONS AT (304)399-5281 or Karen.l.simmons@usace.army.mil.
Contractors must be registered in the System for Awards Management at www.SAM.gov (formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).
Provide DUNS number: ___________________________ (telephone 800-333-0505 for DUNS)
Provide TAX ID: __________________________
Per FAR Clause 52.212-3 Alt I, the Contractor is required to complete the On-line Representations and Certifications Application (www.SAM.gov) and paragraph (b) if applicable, OR to complete paragraphs (c) thru
(m) of this clause and return with quote.
Contract Award
1. The contract award will be made as a whole to the contractor offering the lowest price, after a determination of responsibility is made by the Contracting Officer and prices are determined to be fair and reasonable. This means that low price will be the determining factor considered for award of this contract. “Offeror Quotes” as referred to in this solicitation shall include a completed Price Breakout Schedule as included in this solicitation.
2. Content. Offeror quotes and any supporting information shall be specific and complete in every detail and shall contain the information necessary to properly assess the Contractor's capability to perform the specified contract services,
3. Quoted Prices. The completed Price Breakout Schedule will be reviewed for completeness and compatibility with the estimated price to perform the contract services. Quoted prices will be evaluated for price reasonableness.
The Offeror’s price quote will also be evaluated for proportionality and balance. An Offerors’ price quote may be considered to have unbalanced pricing when it contains line item prices that are significantly over or understated when compared to the estimated cost or competitive pricing. An offerers’ quote may be rejected if the Contracting Officer determines that the lack of balanced pricing poses an unacceptable risk to the Government.
4. Overall Price Evaluations. The Government will evaluate quoted prices for award purposes by adding the Offerors’ total price, including option pricing.
5. Discounts. Prompt payment discounts will not be considered in the evaluation of quotes.
6. The Government intends to evaluate price quotes and award a contract without discussions with offerors.
Therefore, the offeror's initial quote should contain the offeror's best terms.
7. A Government Representative may verify any information provided in the quote to better evaluate the Offerors’ ability to perform.
8. Simplified Acquisition procedures are being used per FAR Part 13 and Subpart 13.5.
PRICE BREAKOUT SCHEDULE
DESCRIPTION AMOUNT
Dry‐docking of M/V Kenneth Eddy $____________________
Pressure‐wash marine growth present on underwater body and keel coolers
Inspection and report of underwater body, paint, welded structural members, keel coolers/ boxes, all rudders, propulsion system and sea chest
Remove, repair, straighten, balance and reinstall 2 each propellers to OEM design specification
Remove, repair, straighten, balance and reinstall 2 each propeller shaft to OEM design specification
Check and replace worn steering rudder bushings and seals $____________________
Check and replace worn flanking rudder bushings and seals $____________________
Replace 4 each Cutlass Bearings with Johnson Duramax “Hoist” model at the strut barrels and stern tubes
Remove and replace 2 existing Eagle EVKIIRV‐190 stuffing boxes with government furnished Johnson Duramax Heavy Duty Model #1786 with Ultra‐X Compression Packing
Check and adjust water flow and pressure to new stuffing box as recommended by manufacturer
Pressure test Keel coolers for leaks and repair if needed $____________________
Check and replace leaking rear main seal to starboard main engine $____________________
Inspect and document any other fluid leaks to main propulsion system that may need attention and repair
Drain all engine coolant from both main engines and generators and replace with ELC (Extended Life Coolant) 50/50 mix CAT engine coolant
Supply and pump 770 gallons of Mobil Delvac Super 1300 SAE 15W‐40 motor oil into vessel’s clean oil storage tanks
Pump off 400 gallons used waste motor oil $____________________
Repair leaks in both generator cooling systems and add 1 each cut off valve on inboard side of each generator so cooling system can be isolated from engine
Check and replace any missing or partially consumed hull anodes $____________________
Check and replace deck drains damaged by winter freeze $____________________
Check and replace air condition condensation drains damaged by winter freeze
TOTAL $ ___________________
OPTIONS
A. Check and replace worn bushing material with excessive clearance to steering and flanking rudder tiller arm, tie bar and linkages
B. Check and repair deteriorated welds to Kort Nozzle liners and 200 linear feet to structural members
OPTION TOTAL $ ____________________
GRAND TOTAL $ ____________________
STATEMENT OF WORK
SPECIFICATIONS FOR 2017 DRYDOCKING & REPAIRS OF THE M/V KENNETH
EDDY
PERFORMANCE WORK STATEMENT
SW-1 Description of Work
a. The work consists of furnishing all labor, materials, fittings, equipment, tools, power, heat, water, etc., and performing all work on Motor Vessel Kenneth Eddy specified herein. The principal dimensions and physical data for the vessel are shown below:
GENERAL DESCRIPTION
Length Overall....................................... 125’-1” Beam, Maximum……………………… 35’-2” Depth..................................................... 8’-1.250” Material...................................................All Welded Steel
b. The performance work statement is as follows:
Dry-docking of M/V Kenneth Eddy.
Pressure-wash marine growth present on underwater body and keel coolers.
Inspection and report of underwater body, paint, welded structural members, keel coolers/ boxes, all rudders, propulsion system and sea chest.
Remove, repair, straighten, balance and reinstall 2 each propellers to OEM design specification.
Remove, repair, straighten, balance and reinstall 2 each propeller shaft to OEM design specification.
Check and replace worn steering rudder bushings and seals Check and replace worn flanking rudder bushings and seals Replace 4 each Cutlass Bearings with Johnson Duramax “Hoist” model at the strut barrels and stern tubes.
Remove and replace 2 existing Eagle EVKIIRV-190 stuffing boxes with government furnished Johnson Duramax Heavy Duty Model #1786 with Ultra-X Compression Packing. The cost of the two items are $16,780.00.
Check and adjust water flow and pressure to new stuffing box as recommended by manufacturer.
Pressure test Keel coolers for leaks and repair if needed.
Check and replace leaking rear main seal to starboard main engine.
Inspect and document any other fluid leaks to main propulsion system that may need attention and repair.
Drain all engine coolant from both main engines and generators and replace with ELC
(Extended Life Coolant) 50/50 mix CAT engine coolant (or equal).
Supply and pump 770 gallons of Mobil Delvac Super 1300 SAE 15W-40 motor oil (or equal) into vessel’s clean oil storage tanks.
Pump off 400 gallons used waste motor oil.
Repair leaks in both generator cooling systems and add 1 each cut off valve on inboard side of each generator so cooling system can be isolated from engine.
Check and replace any missing or partially consumed hull anodes Check and replace deck drains damaged by winter freeze.
Check and replace air condition condensation drains damaged by winter freeze.
Optional Items (Option Items will not extend the 43 Calendar Days Completion time frame) A. Check and replace worn bushing material with excessive clearance to steering and flanking rudder tiller arm, tie bar and linkages.
B. Check and repair deteriorated welds to Kort Nozzle liners and 200 linear feet to structural members.
Check structural integrity and replace keel cooler guards if needed.
An Inspection and Report shall be submitted to the Government Representative (GR) within 5 calendar days of the inspection taking place. The Contractor shall be notified by the Contracting Officer in writing if any of the Option Items are to be exercised by form of a Modification to the Contract. Optional Items are to be priced and shall be submitted along with the QUOTE. The Government may exercise the Options based on the Inspection Results that are submitted in the Report.
c. Wherever the term "Plant" is used in these specifications, it is understood to refer to the items of floating plant named in this paragraph, together with their normal appurtenances, equipment, and supplies.
d. General vessel arrangements and details are included in the attached file named “Drawing No. 556-D205-01 – Outboard Profile, 556-D170-01- Docking Plan, 556-D606-01 Kort Nozzle Details, 556-D610-01 Shafting Arrangement, 556-D612-01 and 02 Steering Rudder Details .pdf.” The accuracy of these drawings has not been verified and drawings shall be used as “Information Only” drawings. Therefore, the Contractor shall template all work from the actual vessel. Potential offerors are encouraged to inspect the vessel prior to submitting a quote. See paragraph SW-4 to request a site visit..
e. The Contractor shall furnish the necessary facilities for and shall bear the expense of any movement of the plant while it is in their possession.
f. Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. Similarly, all interference and access removals shall be reinstalled by the Contractor at their expense. Any damage from removal or relocation of parts, equipment, etc. shall be repaired or replaced at the Contractor’s expense.
g. The Contractor's work shall comply with ABS "Rules for Building and Classing Steel Vessels" and USCG "Rules and Regulations for Subchapter I, Vessels" as found in the Code of Federal Regulations (Title 46, CFR).
SW-2 Contract Duration The Contract duration is (43) calendar days after delivery of the vessel to Contractor’s yard. The Contractor is responsible for completing all work items within the (43) calendar day Contract duration. See Paragraph SC-1 for additional details.
SW-3 Distance Restriction from Barkley Lock All Contract work shall be performed at a location no further than twelve (12) hours underway from Barkley Lock, 758 Barkley Dam Road, Grand Rivers, KY 42045 @ an average vessel sailing speed of 10 knots.
SW-4 Offeror Inspection All potential Offerors may request an inspection of the vessel prior to submitting a quote. All requests shall be coordinated with US Army Corps of Engineers, Huntington District Plant Office John Nunley- (615) 218-9267 cell or Gary Fleeman- (615)240-4000 office, (615) 766- 2913 cell. All requests for inspection shall be no later than 10 Calendar days after the original posted date of the solicitation.
SPECIAL CONDITIONS
SC-1 Delivery, Commencement, Completion of Work and Return of Plant
a. The Government will deliver the plant to the nearest slip at the Contractor's facility upon award of the contract. Schedule will be coordinated with contractor prior to delivery.
b. When all described work has been completed as per SW-1-b, the contractor shall schedule with the GR and representatives of the Government to conduct sea trials for the purpose of acceptance of repairs done by the contractor.
c. The Government will accept return of the plant at Contractor's yard or any other berthing facility used in connection with Contract work upon completion of the Contract.
d. The Contractor shall commence the work under the Contract within one (1) working business day after delivery of the vessel to the Contractor’s facility, and shall execute the work within the time stated in the Contract. The Contract duration shall be computed from and including the first calendar day after delivery of the vessel to the Contractor.
d. The time for completion shall be computed to the hour at which the plant is accepted by the
GR moored at pier side of the Contractor's yard. The date of completion shall be considered as half a day if the plant is accepted by the GR before 12:00 o'clock Noon and as a whole if accepted after 12:00 o'clock Noon. If all work is not satisfactorily completed when the plant is returned to the GR, the Contractor shall complete the work remaining to be done and any working time lost by the plant thereafter, because of any activities of the Contractor in completing said work, shall be included in the computation of time.
SC-2 Contractor’s Custody of Plant
a. On entering and leaving dry dock, or marine railway, the Contractor shall have charge of, and be responsible for a vessel not operating under its own power. If tug or pilot service is required during delivery or return of the plant or at any time during Contractor's custody for maneuvering the plant between open water and dry dock, slip or berth at the Contractor's yard or other facility, or for moving the plant for any reason during the course of Contract work, such service shall be promptly furnished by the Contractor at his/her expense. This shall not exclude the right of the Government to move its plant around the Contractor's premises using the Government's personnel and facilities if the Government representative considers such movement of the plant to be in the interests of safety of the plant, or otherwise in the Government's interests.
b. The Government shall have the right to access the vessel while in the Contractor's custody with Government owned or hired floating plant or personnel for the purpose of delivering equipment, materials or personnel to the plant in the Contractor's custody.
c. The Contractor shall not permit the plant to go aground or bear upon the bottom of any waterway or go aground or bear upon any submerged object while in their possession. The Contractor shall not perform any Contract work on the plant if it should accidentally go aground or bear upon any submerged object, but shall notify Government representative and immediately take the necessary steps to refloat the plant. The sole exception to this shall be that the plant shall be allowed to rest or bear upon a drydock which is properly prepared, in accordance with the plant's drydocking plan.
d. If the Contractor anchors the plant offshore for the purpose of performing Contract work on the plant, the Contractor shall convey Government inspectors, crew and hired personnel to and from the plant at the convenience of the Government at the Contractor's expense. While at such anchorage, the plant shall be considered in the custody of the Contractor and subject to any pertaining provision of these conditions.
SC-3 Performance of Work by the Government The Government reserves the right to quarter and subsist the crew on the vessel and to perform certain work while the plant is in the Contractor’s possession. Government personnel, as well as materials, equipment, and tools, shall be permitted to access the vessel while in the Contractor’s possession.
SC-4 Workmanship
a. General
1. All labor shall be especially skilled for each kind of work, thorough and first class in every respect, and under competent direction.
2. Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be cause of Contractor's replacement at no additional cost to the Government.
3. Lightening holes may be punched or burned and all edges shall have burrs removed.
4. All hull castings shall be machined or ground to bear solidly against the connecting structure and all holes drilled. Holes in members having sharp curvature shall be avoided whenever practicable.
5. All new and disturbed iron and/or steel work shall have its finish restored in kind, or as otherwise indicated by specification.
b. Cutting
1. All edges and corners of plates and shapes shall be smooth and free of burrs. The use of a cutting torch is permissible for cutting plates and shapes to size, but burning of bolt or rivet holes will not be permitted.
c. Welders and Welding
1. All welding performed under this Contract shall be accomplished only by welders who have successfully passed the qualification tests of ABS, the American Welding Society and/or the ASME for the type of welding to be performed by each welder. Copies of the certifications of each welder the Contractor wishes to use for Contract work shall be provided to the Government representative by the Contractor prior to awarding the Contract..
2. The Contractor shall bear the expense of conducting these tests and shall certify by name to the GR, welders who have successfully passed the prescribed test. The Contractor shall require any welder to repeat these tests when, in the opinion of the Government Representative, the work of the welder indicated a reasonable doubt of his/her efficiency.
In such cases, the welder shall be re-certified as above if he/she successfully passes the re-test.
3. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld. Electrodes shall be received on the job in unbroken packages bearing the manufacturer's label or be otherwise marked. Certified statements shall accompany each shipment of electrodes to the effect that sample pieces, representatives of each kind and size in each shipment, have satisfactorily passed the tests required by ABS.
4. All welding procedures shall conform to American Bureau of Shipping standards where applicable.
5. Welding procedures, as to direction, length, number and sequence of beads, shall be carefully planned so as to minimize locked up stresses, shrinkage and distortion.
d. Standard Parts
1. All articles, fittings, equipment, machinery and supplies used in the work covered by these specifications shall, as far as possible, be the manufacturer's standard articles, of reliable make, the manufacturer's current product, for which spare parts are readily available.
2. All materials, equipment, and machinery installed in or delivered with the vessel shall be new and of the quality specified herein.
SC-5 Coating Systems and Painting
a. All paint specified to be applied under this Contract shall be furnished by the Contractor unless stated otherwise.
b. Surface preparation, painting, staining, and varnishing of new and old construction, shall be in compliance with "Painting: New Construction and Maintenance", EM 1110-2-3400, 30 April 1995. All paint in use shall be thoroughly mixed at frequent intervals. Any materials not specified shall be the best of their kind suitable for marine work and subject to the approval of the GR.
c. Paint shall not be applied when atmospheric conditions will affect its application or durability.
d. Each coat of paint should adhere firmly and uniformly to the surface to which it is applied.
Sufficient drying time shall be allowed between coats.
e. In general, if paint is sprayed, each coat of paint shall consist of a double spray coat in which the surface or section of a surface to be coated is sprayed in a series of half-lapped passes over the surface or section of the surface, and then sprayed again at right angles to the first spraying direction in half-lapped passes.
SC-6 Standard Hull Materials All structural hull material shall be in accordance with the current rules of ABS, or with the following specifications:
Standard Specifications for Structural Steel: ASTM A131/A131M Rev A;
Standard Specifications for Carbon and Alloy Steel Forgings for Thin-Walled
Pressure Vessels: ASTM A372/A372M;
Standard Specifications for Steel Castings, Carbon, for General Application: ASTM
A27/A27M;
Standard Specifications for Steel Castings, High Strength, for Structural Purposes:
ASTM A148/A148M
Standard Specifications for Gray Iron Castings: ASTM A48/A48M.
SC-7 Electric Power, Steam, Water, and Heating Oil The contractor shall furnish at their expense, all necessary steam and electric power for lighting and heating, and for the operations of necessary deck and auxiliary machinery of the plant while it is in their possession. The Contractor shall provide water for use on the vessel. The water is intended to be used for sinks and toilets and therefore does not need to be potable.
SC-8 Wharfage, Dockage, Garbage Disposal, Etc.
While the plant is in their possession, the Contractor shall be responsible for any, and pay all expenses of wharfage, dunnage, dockage, mooring lines, garbage disposal, security, etc. The Contractor, after making repairs shall move the boat to a convenient berth for the purpose of testing machinery and taking on supplies. Fresh water for the use of the plant shall be provided by the Contractor, at their expense, while the plant is in their possession, and all fresh water tanks shall be properly filled on completion of the work and return of the plant to the Government.
SC-9 Tests and Trials All machinery or other equipment installed, repaired or worked on by the Contractor shall be tested upon completion of all work to demonstrate proper installation and operation to the
Government Representative. This shall include all removals for access and/or interference (See SW-1-g. for details).
Rework on any such equipment to demonstrate proper installation and operation shall be performed at the expense of the Contractor.
SC-10 Contractor Cooperation with the U.S. Coast Guard, the American Bureau of Shipping and the Contracting Officer’s Representative The Contractor shall cooperate with the GR in the recertification and/or inspection of the vessel by the U.S. Coast Guard (USCG), ABS and the GR. All costs associated with the Contractor's cooperation shall be the responsibility of the Contractor. The Contractor's cooperation during or in connection with such investigations may include, but not be limited to, the following:
a. Dye penetrant, water hose, air lance, and/or vacuum box testing of any welds performed under this Contract;
b. Flooding of areas of decks, small voids, small tanks and small spaces for testing of watertight integrity whether worked on under this Contract or not;
c. Pressure testing of piping that has been worked upon by the Contractor;
d. Manual movement of any unattached objects or any objects which can be easily dismounted or opened and moved anywhere on the vessel;
e. Minor amounts of audio gaging, chipping and paint and rust removal using hand held tools for investigative purposes, not to exceed twenty-four (24) man-hours of such work with single tools and/or instruments.
f. Minor interruptions of work for purposes of inspection not to exceed eight (8) man-hours of such interruptions.
g. Scheduling of work to accommodate inspections of sea valves, sea chests, tanks, hull sections and spaces, machinery and electrical items.
For the purpose of monitoring the quantity of man-hours used for items e. and f. above, the Contractor shall maintain a log sheet to document the number of man-hours worked throughout the Contract completion. The Contractor shall request approval and signature of the Government Representative on site for each entry on the log sheet to verify the information.
SC-11 Watch Service Requirements The Contractor shall provide a 24 hour watch service to respond to any emergencies/alarms on the vessel while in the Contractor’s possession. The watchman will be given a key to the Kenneth Eddy for use at night, on weekends and on holidays. The Contractor shall provide the name and qualifications of the watchman in writing to the GR. This information shall be submitted no later than 10 calendar days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.
SC-12 Vessel Security The Contractor is responsible for security while the vessel is in the Contractor’s possession.
Physical means of preventing unauthorized access (i.e. gated access) to the vessel shall be provided in accordance with Federal Acquisition Regulation (FAR) Clause 252.217-7016 - Plant Protection.
SC-13 Security Requirements
All Contractors and subcontractor employee(s) working on this contract who require access in and/or around any Huntington District facilities (i.e. flood control dams, locks and dams, etc.)
shall receive authorization to be on our facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Huntington District Security Management Office shall submit contractor(s) information in order to complete the background investigation and make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results provided by the Huntington District Security Management Office of the background investigation. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed a review of such items and determined they can be released. Contractor’s failure to adhere can result in penalties, fines, or sanctions up to and including contract termination and/or forfeiture of future contract consideration.
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or around all District facilities. The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number and (4) Task Order Number when applicable.
The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Huntington District Security Management office).
Contractor shall report any changes in personnel or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, Security Management Office will make recommendations to the PCO or their Designated Representative.
The Security Management Office cannot give approval due to unfavorable report(s). The Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise Contractor of the decision.
FOREIGN NATIONALS
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters Staff to accomplish. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States at least 10 business days (excluding Federal holidays) prior to the requested work start date. Such documentation shall include at least one of the following a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.
All foreign government Requests for Visit Authorizations to the Department of Army organizations must be submitted at least ten business days (excluding Federal holidays) prior to the requested start date of the visit due to attempting to support, accommodate and approve the high number of short-fused Requests for Visit Authorizations (RVAs) received into the Foreign Disclosure Office on a daily basis.
In order to assure forms are properly completed, and to minimize time delays, Contractor is encouraged to work closely with the Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.
Holiday Moratorium - The Department of Defense traditionally imposes a moratorium on Requests for Visit Authorization (RVA's) during the December and January timeframes each calendar year. Where it is possible, the Contractor should avoid scheduling visits unless they are mission essential during this timeframe. The DOD Foreign Visits System will be operational;
however, Army foreign disclosure will only process RVA's designated as mission essential by the Contracting Officer. The only two exceptions to the 10 working day suspense requirement are (1) visits to the Army Secretariat and Army Staff, and (2) visits deemed mission essential or time sensitive by the U. S. Army. A waiver to the Office of the Deputy Chief of Staff, G-2 must be submitted to authorize the request.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Security Management Office by phone, letter, or email at the following numbers/addresses:
CELRH-SM
502 Eighth Street Huntington, WV 25701
Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil
SECURITY INFORMATION SHEET
Full Name __________________________________________ Date of Birth________________________________________ City and State of Birth__________________________________
SSN __ __ __ __ __ __ __ __ __
Country of Birth_______________________________________ US Citizen (circle one) Yes or No Email Address_________________________________________ Phone Numbers Primary __ __ __ __ __ __ __ __ __ __ Secondary __ __ __ __ __ __ __ __ __ __
Supervisor Full Name_____________________________________ Supervisor Email Address__________________________________ Supervisor Phone Number_________________________________
Operational Security and Anti-Terrorism. The following shall be accomplished by the contractor before work may begin:
1. Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
2. Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the Procuring Contracting Officer or Government Representative no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
Technical Provisions Hull Repairs - Definite Items
TP 1.01 Drydocking
a. The vessel shall be drydocked for such time as may be necessary to complete the work required by this Contract. In particular, but not limited to the following, the vessel shall be drydocked for any exterior hull cleaning and painting below the waterline and for any interior or exterior hull plating, cutting, welding, plate replacement or structural repair or replacement within or upon the hull including hull anodes, rudders, shafts and propellers.
The Contractor shall assure that there is a drydock available for the plant for the entire duration of possession of the plant by the Contractor in the event that an emergency drydocking of the plant should be necessary for any reason.
b. The GR shall allow exceptions at their discretion to the necessity for drydocking for various items of work on a case-by-case basis only when informed by the Contractor and allowed to render a decision prior to any work being performed on the requested exception.
c. Drydocking blocks and other drydocking supports shall not obstruct access to remove, work upon, or replace: docking plugs, discharge openings, seachests, anodes, shafts, struts, stern tubes, propellers, rudders, keel coolers or any other hull fittings. The Contractor shall remove and relocate drydocking blocks and/or supports, or refloat and redrydock the plant, as needed at no additional cost to the Government in order to assure complete coverage in cleaning and painting or for any other work as specified herein. Prior to doing so, the Contractor shall notify the GR of their plan to relocate the blocks to adequately support the vessel.
d. The drawings listed below are included with the Contract package for the Contractor’s use with dry docking the vessel. The Contractor is responsible for determining the actual drydock blocking arrangement. The Contractor shall use the drawings listed below to determine the drydock block size and arrangement.
Drawing No. 556-D170-01 - Docking Plan Drawing No. 556-D205-01 - Outboard Profile Drawing No. 556-D606-01 - Kort Nozzle
Detail Drawing No. 556-D610-01 Shafting
Arrangements Drawing No. 556-D612-01 & 02 - Steering &
Rudder Details
TP 1.02 Exterior Cleaning and Painting
a. General
1. The Contractor shall pressure wash, sandblast heavy corrosion spots, visible hull abrasion and expose metal, clean and paint the underwater body of the vessel using only paints that are compliant with the requirements specified herein in addition to all Federal, State and Local environmental laws.
2. Paint systems shall, in general, consist of three-part marine epoxy paint systems: primer, anti-corrosive and finish. A system by any given producer once chosen by the Contractor shall be used consistently throughout the vessel and shall be applied according to the manufacturer’s directions.
b. Procedure
NOTE - The Contractor shall coordinate an inspection with the Government Representative on site prior to the start of any sandblasting or pressure washing to ensure that all areas, equipment, and fittings are adequately protected.
The contractor shall perform the following work in sequence:
1. Pressure wash below waterline of foreign material and marine organisms attached to vessels hull, steering rudders, propulsion system, seachest and keel coolers.
Recommended wash pressure of 3500 psi.
2. Remove all missing and consumed hull anodes in accordance with TP 1.04 “Zinc
Anodes”.
3. Surfaces to be sandblasted shall be degreased prior to cleaning. Sandblast the following in accordance with Steel Structures Painting Council “Commercial Blast” Specification
SSPC-SP-6:
a) Below waterline, corrosion spots, paint abrasions and bare metal. To include struts and rudders
b) Protect keel coolers from blasting media if needed
6. Apply a three-part marine epoxy paint system to all cleaned and prepped surfaces.
7. Install all new hull anodes in accordance with TP 1.04 “Zinc Anodes” below.
c. Paints
Paints listed below are acceptable under these specifications. The paints and brands on this list are not to be construed as favored over or excluding others. The Contractor shall submit a list of paints to be used to the GR for approval prior to the start of painting. Color references below (such as “red” and “black”) in these specifications refer to the color definitions in (III) above.
The abbreviation “DFT” below means “dry film thickness”.
1. First Coat: Anti-Corrosive, all areas:
International Paint: Intertuf 262 red epoxy anti-corrosive or equivalent, (1) coat @ 5 mils
DFT
2. Second Coat: Finish, below water line:
International Paint: Intertuf 350 black Underwater Anticorrosive or equivalent, (2) coats,@ 6mils DFT
TP 1.03 Sea Chest The Contractor shall remove the sea chest strainer from the hull and clean the strainer and chest for foreign material and marine organisms. The Contractor shall paint the sea chest with approved marine epoxy paint system and reinstall the strainer, renewing damaged or missing screws and partially consume zinc anodes. All replacement parts above are to be furnished by the contractor.
TP 1.04 Hull Anodes The Contractor shall replace zinc hull anodes as follows:
a. Prior to exterior cleaning and painting in TP 1.02 “Exterior Cleaning and Painting” above, the Contractor shall remove all fully and partially consumed anodes leaving stubs of old anode straps still attached to the hull, minimizing the contact of burning gas jets used to remove anodes with the hull.
b. After hull cleaning and painting, the Contractor shall furnish and install missing or partially consumed anodes.
c. Following installation of all zinc anodes, the Contractor shall restore any damage to the hull coatings.
Quality Assurance Surveillance Plan
(QASP)
MV Kenneth Eddy Drydock
U. S. Army Corps of Engineers Huntington District Regional Rivers Repair Fleet (R3F) CELRH-RRRF
Solicitation: W91237-17-T-0008
1. Purpose and Scope This plan establishes the specific quality assurance (QA) activities for the subject contract. This plan shall be reviewed and updated as necessary by the Chief, Regional Rivers Repair Fleet.
Period Covered: Duration of the Contract.
2. Staffing QA oversight staffing will include team members from the Regional Rivers Repair Fleet and supplemented with Huntington District office.
3. Overview This performance-based Quality Assurance Surveillance Plan (QASP) sets forth the procedures and guidance the U.S. Army Corps of Engineers (USACE), Huntington District, will use in evaluating the technical performance of the Contractor in accordance with the terms and conditions of the Performance Work Statement (PWS). The QASP objective is to define Government procedures to be used to verify that appropriate performance and quality assurance methods are used in the management of this performance-based contract. The purpose of the QASP is to assure that performance of specific activities and/or completion of milestones are accomplished in accordance with all requirements set forth in the PWS.
This QASP is a Government developed document used to ensure the Government receives quality services, and pays only for services actually provided. The QASP provides a systematic method to evaluate the services the Contractor is required to furnish.
This QASP describes the mechanism for documenting noteworthy accomplishments or discrepancies for work performed by the Contractor. Information generated from the USACE quality assurance activities will directly feed into the evaluation of incentives/disincentives as well as in performance discussions with the Contractor. The intent is to ensure that the Contractor performs in accordance with the requirements set forth in the performance work statement, that USACE receives the quality of services called for in the contract and that the USACE only pays for the acceptable level of services received.
The QASP details how and when the USACE will monitor, evaluate and document Contractor performance on the PWS. The QASP is intended to accomplish the following:
Define USACE roles and responsibilities.
Define the key milestones/deliverables that will be assessed.
Define acceptable, superior and unacceptable performance standards for key milestones/deliverables, as well as incentives/disincentives.
Describe the surveillance methodology that will be employed by the USACE in assessing the Contractor’s performance.
Describe the surveillance documentation process and provide copies of the form the USACE will use in evaluating the Contractor’s performance.
Outline payment and corrective action procedures.
4. Scope
The Contractor, not the Government, is responsible for all management and quality control actions to meet the terms of the contract. This QASP provides the general guidelines and methods the Government will use to ensure the Contractor provides Services as outlined in the Contractor’s Quality Control Plan.
5. Roles and Responsibilities
a) Procuring Contracting Officer (KO) - A person duly appointed with the authority to enter into, administer and terminate contracts on behalf of the Government. The KO is the only person who can legally commit the Government and only the KO, as the Government’s agent, can modify the contract/order. The KO is the final authority for determining the adequacy of the Contractor’s performance. KO decisions arising under or relating to the contact are final.
Assigned Contracting Officer: Matthew C. Wilson Organization or Agency: Huntington Branch, Rivers Division Telephone: 304-399-5297 Email: Matthew.C.Wilson@usace.army.mil
b) Contract Specialist - The Contract Specialist acts as an acquisition consultant and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .