W91237-16-T-0038.pdf

PDF 400 KB Posted

Attached to
ACS Pour--In-Place Playground Federal contract opportunity
Solicitation number
W91237-16-T-0038
Issued by
Department of the Army Corps of Engineers Engineering District Huntington

About this file

Solicitation for Poured-In-Place Playground for ACS Lake

View the file

Other files for this federal contract opportunity

Other files attached to ACS Pour--In-Place Playground, newest first.
File Type Posted
Exhibits.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALUM CREEK LAKE

R.J. WATTENSCHAIDT

5905 LEWIS CENTER ROAD

LEWIS CENTER OH 43035-9215

TEL: 740-548-6151 FAX:

W81F8E53410372

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W91237-16-T-0038 10-Mar-2016 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

USACE, CONTRACTING BRANCH

ALLISON PACK, 502 8TH STREET

HUNTINGTON WV 25701

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

25-Mar-2016(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

304-399-5046ALLISON PACK

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W91237-16-T-0038

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job ACS Pour-In-Place Playground

FFP

Contractor shall supply and install poured-in-place (PIP) playground safety surface according to attached statement of work below dam recreation area (east playground) at Alum Creek Lake, Lewis Center, OH.

FOB: Destination

PURCHASE REQUEST NUMBER: W81F8E53410372

NET AMT

BID SCHEDULE

Line Item No. Description of Requirement Qty./Unit of Measure Extended Price

0001 Reimbursement of actual cost 1/Job $___________ of payment bond for bids in excess of $35,000.

0002 Labor for installation of poured-in-place playground safety surface at Alum Creek Lake, Lewis Center, OH in accordance with the attached Statement of Work. 1/Job $_____________

0003 Materials and supplies for the installation of poured-in-place playground safety surface at Alum Creek Lake, Lewis Center, OH in accordance with the attached Statement of Work. 1/Job $______________

TOTAL: $____________________

ADDITIONAL INFORMATION

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE.

SEE CLAUSE 52.236-27 FOR ADDITIONAL INFORMATION.

*PLEASE DIRECT ALL QUESTIONS TO ALLISON PACK AT (304) 399-5046 or Allison.Pack@usace.army.mil . ANY INFORMATION RECEIVED AT THE SITE VISIT

WHICH CONFLICTS WITH THIS SOLICITATION SHOULD BE BROUGHT TO THE

ATTENTION OF MRS. PACK. THE SOLICITATION AND RESULTING CONTRACT

SHALL BE THE GOVERNING DOCUMENT IN ALL CASES.

**QUOTES CAN BE E-MAILED TO ALLISON PACK AT Allison.Pack@usace.army.mil

Per FAR 36.204 the estimated price range for this project is between $25,000.00 and $100,000.00.

NOTE 1: In accordance with FAR Part 28.102-1(b)(1), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.

(i) Payment bond

(ii) Irrevocable letter of credit

A Payment Bond or Irrecovable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

The payment made under this provision shall not exceed the amount included for Bid Item 0001 of the bid schedule, which payment shall take into consideration any discounts or rebates to the Contractor from the Surety. FURTHERMORE, THE GOVERNMENT SHALL ONLY

REIMBURSE THE CONTRACTOR THE ACTUAL AMOUNT PAID TO THE SURETY

COMPANY FOR PAYMENT BONDS, LESS ANY DISCOUNTS OR REBATES. AN

INVOICE FROM THE SURETY SHALL BE PROVIDED BEFORE PAYMENT IS MADE.

CONTRACTORS ARE ADVISED THAT BID ITEM 0001 IS ONLY FOR THE COST OF

BONDS. OTHER COSTS SHOULD BE ALLOCATED TO THE REMAINING BID ITEM(S).

NOTE 2: The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following technical factors may be used in evaluating offers and are of equal importance: Experience in the work required (if work is to be performed by a subcontractor, provide the name and necessary credentials, See FAR Clause 52.222-11), capability to perform the work, past performance and schedule control. Technical factors are significantly more important than price.

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company name and credentials/qualifications:

2. Contractors must be registered in the System for Awards Management (SAM) database (www.sam.gov ) to receive an award. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.

3. Provide business DUNS number: ___________________________(phone 800-333-0505 for

DUNS).

4. Provide business CAGE code: ______________________________

5. Tax Identification Number: _________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov . (See Paragraph 2 above)

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote.

The successful offeror will be required to submit this document upon award. The APP must be accepted by the Government Designated Authority prior to the preconstruction conference.

EXAMPLES of the APP may be found at http://www.lrh.usace.army.mil/CT under the General Contracting Information heading.

The contractor that receives this award will have 10 calendar days to provide an Accident Prevention Plan (APP). If this deadline is not met, the contractor will be given a cure notice stating that they will have 10 calendar days to acceptable APP, otherwise the contract will be terminated for cause.

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

INSTALL PLAYGROUND Poured-in-place (PIP) SURFACING IMPACT AREA

EAST PLAYGROUND

Below Dam Recreation Area

Alum Creek Lake

General:

Contractor shall install Poured-in-place (PIP) rubber impact materials to designated playground equipment area of the Alum Creek Lake below Dam Recreation Area to improve public safety and reduce daily Operations and Maintenance costs.

Scope of Work:

Contractor shall supply all labor, tools and equipment necessary to install Poured-in-place (PIP) rubber impact material in accordance with manufacturers recommended standards. All work shall meet ASTM Standard F 1487-01E1 and have 5 year performance warranty. All work will be in compliance with Consumer Product Safety Commission (CPSC) Handbook for Public Playground Safety, ASTM F1487 (Standard Consumer Safety Performance Specifications for Playground Equipment for Public Use) and ABA/ADA Accessibility Guidelines for playgrounds and manufacturers recommendations.

15 days prior to work activities the Contractor shall provide:

Written specifications and installation instructions for materials. Contractor shall provide manufacturers written warranty.

Proof of International Play Equipment Manufacturers Association (IPEMA) certification.

Intermediate inspection will be conducted by Government after each of the following steps:

Remove existing mulch and other materials to make the end result the proper manufactures recommended level for existing equipment. All removed materials shall be disposed of offsite in accordance with federal, state, and local laws and ordinances.

Excavate approximate 6100 sqft area and install compacted stone sub-base. Depth and type of stone base shall be in compliance with the Consumer Product Safety Commission (CPSC) Handbook for Public Playground Safety, ASTM F1487 (Standard Consumer Safety Performance Specifications for Playground Equipment for Public Use) and ABA/ADA Accessibility Guidelines for playgrounds and manufacturers recommendations.

Edges shall be angled and rolled underground to make edge flush with grass.

Install approximately 6100 sqft of GT Impax Aromatic or equivalent Poured-in-place (PIP) rubber surfacing designated for high traffic areas. Material shall be tan color, dual density (2 layer) system using an aromatic polyurethane binder. Material shall be a seamless surface with a wear cap material that is virgin Ethylene Propylene Diene Monomer (EPDM) solid color rubber granules. Depth of surfacing should be in compliance with the Consumer Product Safety Commission (CPSC) Handbook for Public Playground Safety, ASTM F1487 (Standard Consumer Safety Performance Specifications for Playground Equipment for

Public Use) and ABA/ADA Accessibility Guidelines for playgrounds and manufacturers recommendations.

All edges of bonded material shall be rolled under to eliminate tripping hazards.

Contractor shall protect area with fence 72 hours to allow sufficient drying time.

All ground disturbances shall be raked, seeded with KY 31 fescue and straw applied to match original ground contour.

All excavated material, trash or waste material shall be disposed of offsite by contractor in accordance with state, local, laws and ordinances.

Contractor will securely fence area in order to keep visitors out of area while working and between work days. If fence is vandalized, contractor will replace it. Fence will not be removed until work is accepted by Government representative.

Measurements are approximate. A site visit and exact measurements are recommended.

See photo with designated impact area outlined.

Drawings and Exhibits:

Exhibit 1 – Photos of playground Impact Area (attached) Supervision: The contractor shall personally supervise the work or have designated Contractor Representative on site at all time work is being performed under this contract.

Special Considerations: Due to heavy visitation at the Downstream Area work shall be scheduled between the hours of 7:30 am – 4:00 pm, Monday through Friday only, excluding federal holidays.

Work shall begin within 10 calendar days of Notice to Proceed and job is to be completed within 14 calendar days from the start date.

Contractor and Government Equipment Supplies: The contractor shall furnish all personnel, equipment, transportation, disposal, supplies and materials to perform the work. No government equipment or supplies shall be used for this project. Minimum requirements for Personal Protection Equipment (PPE) for all contractor personnel shall include steel-toed safety boots, hard hat, safety glasses or goggles, hearing protection, sleeved shirts, long pants, gloves, and other applicable PPE specified in EM 385-1-1 and Appendix A).

Equipment, Material, and Supply Inspections: All equipment used must meet EM 385-1-1 safety requirements and have all manufacturers’ guards and safety devices.

Contractor Safety Requirements:

A. General. Contractor shall comply with all Federal, State and Local safety requirements including those specified by the Occupational Safety and Health Act (OSHA) in 29 CRF 1910 General Industry Standard, 1926 Construction Standard and the U.S. Army Corps of Engineers Safety & Health Requirements Manual EM 385-1-1 as currently revised at date of solicitation. Where a conflict exists between safety standards/requirements the contractor shall comply with the more stringent requirement. If the Contractor fails or refuses to promptly comply with safety requirements as specified herein, any project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.

B. Contractor Abbreviated Accident Prevention Plan (AAPP). The Contractor shall prepare a site-specific Abbreviated Accident Prevention Plan as outlined in EM 385-1-1, Appendix A beginning with subparagraph 3.k on page A-10. Contractor must address each element/sub-element in the order they appear in the outline. Any element the contractor feels is not applicable to work under this contract must be listed and a brief explanation provided. Plan must be accepted by the Contracting Officer prior to commencement of any work. Contractors are encouraged to contact the USACE Safety & Occupational Health Office for questions or information regarding the development of contract Accident Prevention Plans. Office hours are Monday-Friday 8:30 a.m. - 4 p.m. at (304)399-5039/5032/5326.

The web address for EM 385-1-1 is:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf

(Attached for your information and use is CESO Checklist A-01. This checklist was developed to assist you in the development of a site-specific Abbreviated Accident Prevention Plan. This checklist is provided as a tool only.)

C. Contractor Risk Management Process. Contractor may use Job Safety analyses (JSAs), Job Hazard Analyses (JHAs) or Activity Hazard Analysis (AHA) for the purpose of risk assessment. Before beginning each work activity Contractor performing that work activity shall prepare an initial assessment (AHA/JSA/JHA) listing each job step, anticipated hazards, site conditions, equipment, materials, personnel and control measures to be implemented. A Risk Assessment Code (RAC) shall be assigned to each step assessing the level of risk remaining after implementation of controls. Once this process is complete a RAC will be assigned to the activity as a whole (cannot be lower than the highest step RAC). Residual risk must be communicated to the proper authority for acceptance in order to proceed. It is the Contractor's responsibility to prepare the AHA/JSA/JHA. Analysis with RAC shall be accepted by the GDA and discussed with al engaged in the activity including Contractor, subcontractor(s), and on-site government representative prior to commencement of work. Names of Competent Person(s) and Qualified Person(s) required for a particular activity (e.g., excavation, scaffolding, fall protection, or other activities specified by OSHA and/or EM 385-1-1) shall be identified and included in the AHA/JSA/JHA and proof of their competency/qualification.

NOTES:

Work crews of two or more must have two people holding currently qualifications in First Aid and CPR from the American Red Cross, American Heart Association or a licensed physician. Training must include a hands-on element and the contractor must maintain appropriate First Aid kit on site. Single individuals working alone must have current certification in First Aid as a minimum.

The contractor shall employ a Site Safety and Health Officer (SSHO) who has completed OSHA 30 hour Construction or General Industry Safety training or its equivalent and has five (5) years experience relative to the work to be performed. SSHO responsibilities may be collateral duty.

Crane operators, riggers and signal persons shall be trained, licensed and meet the physical and drug testing requirements specified in EM 385-1-1 Section 16.

All electrical work must be completed by a Qualified Person with verifiable credentials as specified in EM 385-1-1, Section 11.A.01.c. Electrical work will require contractor to submit a Control of Hazardous Energy Plan (LOTO) in accordance with EM 385-1- 1, Section 12.

D. Accident/Mishap Reporting: The Contractor shall report all recordable mishaps to the GDA within 24-hours in accordance with EM 385-1-1 Section 01.D. Accidents shall be investigated to determine causal factors and corrective actions shall be implemented. Accidents resulting in: days away injuries, days away illnesses, restricted/transfer injuries, property damage of $5,000.00 or more shall be investigated and reported to the GDA using the USACE Accident Investigation Report Form ENG 3394 within 24 hours of the occurrence.

(1) Immediate notification to the GDA is required for all serious accidents:

a. Fatal Injury/illness;

b. Permanent totally disabling injury/illness;

c. Permanent partial disabling injury/illness;

d. One (1) or more persons hospitalized as inpatients as a result of a single occurrence;

e. $500,000 or greater accidental property damage;

f. Three (3) or more individuals become ill or have a medical condition suspected to be related to a site condition, or a hazardous or toxic agent on the site;

g. USACE aircraft destroyed or missing;

The Contractor shall maintain an OSHA Log of Work Related Injuries and Illnesses, OSHA Form 300 and comply with all accident reporting and recordkeeping requirements specified in 29 CFR 1904.39.

(2) In addition to the above, any mishap occurring in any of the following high hazard areas shall be reported immediately to the GDA, investigated and corrective actions implemented.

a. Electrical (includes Arc Flash, electrical shock, etc.);

b. Uncontrolled Release of Hazardous Energy (includes electrical and non-electrical);

c. Load Handling Equipment (LHE) or Rigging;

d. Fall-from-Height (any level or other than same surface);

e. Underwater Diving

On-Site Public Safety. Work on the contract is immediately adjacent to public recreation facilities. Safety precautions to warn and limit public access shall be addresses in both the AAPP and AHA.

Site Visit Offerors are encouraged to make a site visit by contacting:

Robert J. Wattenschaidt U. S. Army, Corps of Engineers

Alum Creek Lake 5905 Lewis Center Rd.

Lewis Center, OH 43035 740-548-6151

Contractor Submittals. The successful offeror shall provide as a minimum the following documentation. All contractor submittals must be reviewed and accepted by the contracting officer or government designated authority prior to commencement of any work.

A. Abbreviated Accident Prevention Plan B. Activity Hazard Analysis C. Invoice as stated on the contract award.

D. Man-hour report to project office at completion of work E. First Aid and CPR certification F.

DAMAGE REPORTS. All instances where Government materials, supplies, property, and/or equipment are damaged shall be reported immediately to the Resource Manager. When the damage is caused by contract employees, a written report of the incident and extent of such damage shall be submitted to the Resource Manager, within 2 work days (less weekends and holidays) of occurrence. For property damage accidents for $2,000 or more, the Contractor will complete and submit to the Resource Manager a copy of ENG 3394.

CONTRACT EMPLOYEES’ CONDUCT AND COMPETENCY. All contracts employees shall conduct themselves in a proper manner at all times. Since the majority of work shall be performed in the presence of the general public, the conduct of all employees is critical and will be closely monitored. Use of controlled substances or consumption of beer or alcoholic beverages by contract employees is strictly prohibited. The contractor may be required to immediately remove from the work site any employee of the Contractor who is incompetent or who endangers persons or property or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform the work.

CONTRACTOR INVOICE. Contractor shall submit their invoice to:

RESOURCE MANAGER

U. S. Army, Corps of Engineers Alum Creek Lake 5905 Lewis Center Rd Lewis Center, OH 43035

WORKING HOURS. Normal working hours are Monday through Friday 7:30 am to 4:00 pm.

Work inside Government buildings or other secured areas shall be performed during the above referenced work hours. Ten Federal holidays observed are as follows:

New Years Day (January 1st) Martin Luther King Day (3rd Monday in January) President’s Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veteran’s Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)

When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday the preceding Friday is observed as a holiday.

Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours. Work shall be scheduled around the above listed Federal holidays unless approved in advance.

Work shall be performed during daylight hours and days to be worked will be at the discretion of the Resource Manager.

DEFICIENCIES. If the Contractor fails to perform, or if performance in any area is judged unsatisfactory, the Government will take corrective action. If any of the work does not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no cost to the Government.

PRE-CONSTRUCTION CONFERENCE. The Contractor shall attend a pre-construction conference, prior to the initiation of work under this contract. The Contractor’s Accident Prevention Plan and all contractor submittals must be approved prior to this meeting.

ATTACHMENT 1

APPENDIX A

MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLANS

An Accident Prevention Plan (APP) is a safety and health policy and program document. The following areas are typically addressed in an APP, but an APP shall be job-specific and shall also address any unusual or unique aspects of the project or activity for which it is written.

The APP shall interface with the employer’s overall safety and health program, and a copy shall be available on the work site. Any portions of the overall safety and health program that are referenced in the APP shall be included as appropriate. ANSI/ASSE A10.38 should be referenced for Programmatic Issues.

> For LIMITED-SCOPE SERVICE, SUPPLY AND R&D CONTRACTS, for example, mowing (only), park attendant, rest room cleaning, the Contracting Officer and SOHO may allow an ABBREVIATED APP (customized APP requirements and waive the more stringent elements of this section). > See 01.A.11 and Appendix A, paragraph 11.

11. ABBREVIATED APP for LIMITED-SCOPE SERVICE, SUPPLY AND R&D CONTRACTS. If service, supply and R&D contracts with limited scopes are awarded, the contractor may submit an abbreviated Accident Prevention Plan. This APP shall address the following areas at a minimum. If other areas of the EM 385-1-1 are pertinent to the contract, the contractor must assure these areas are addressed as well.

a. Title, signature, and phone number of the plan preparer.

b. Background Information to include: Contractor; Contract number; Project name; Brief project description, description of work to be performed, and location (map); The project description shall provide a means to evaluate the work being done (see AHA requirements in

01.A.13) and associated hazards involved. Contractor’s APP shall address the identified hazards involved and the control measures to be taken.

c. Statement of Safety and Health Policy detailing their commitment to providing a safe and healthful workplace for all employees.

d. Responsibilities and Lines of Authorities – to include a statement of the employer’s ultimate responsibility for the implementation of his SOH program; Identification and accountability of personnel responsible for safety at all levels to include designated site safety and health officer (SSHO) and associated qualifications. The District SOHO will review the qualifications for acceptance.

e. Training - new hire SOH orientation training at the time of initial hire of each new employee and any periodic retraining/recertification requirements.

f. Procedures for job site inspections - assignment of responsibilities and frequency.

g. Procedures for reporting man-hours worked and reporting and investigating any accidents as soon as possible but not more than 24 hours afterwards to the Contracting Officer/Representative (CO/COR). An accident that results in a fatal injury, permanent partial or permanent total disability shall be immediately reported to the Contracting Officer.

h. Emergency Planning. Employees working alone shall be provided an effective means of emergency communication. This may be cellular phone, two-way radio or other acceptable means. The selected means of communication must be readily available and must be in working condition.

i. Drinking Water provisions, toilet and washing facilities.

j. First Aid and CPR training (at least two employees on each shift shall be qualified/certified to administer first aid and CPR) and provision of first aid kit (types/size).

k. Personal Protective Equipment.

(1) WORK CLOTHING - Minimum Requirements. Employees shall wear clothing suitable for the weather however minimum requirements for work shall be short-sleeve shirt, long pants (excessively long or baggy pants are prohibited) and leather work shoes. If analysis determines that safety-toed (or other protective) footwear is necessary (i.e., mowing, weedeating, chain saw use, etc), they shall be worn.

(2) Eye and Face Protection. Eye and face protection shall be worn as determined by an analysis of the operations being performed HOWEVER, all involved in chain saw use, chipping, stump grinding, pruning operations, grass mowing, weed eating and blowing operations shall be provided safety eyewear (Z87.1) as a minimum.

(3) Hearing Protection. Hearing protection must be worn by all those exposed to high noise activities (to include grass mowing and trimming, chainsaw operations, tree chipping, stump grinding and pruning).

(4) Head Protection. Hard hats shall comply with ANSI Z89.1 and shall be worn by all workers when a head hazard exists. At a minimum, hard hats shall be worn when performing activities identified in (2) above.

(5) High Visibility Apparel shall comply with ANSI/ISEA 107, Class 2 requirements at a minimum and shall be worn by all workers exposed to vehicular or equipment traffic.

(6) Protective Leg chaps shall be worn by all chainsaw operators.

(7) Gloves of the proper type shall be worn by persons involved in activities that expose the hands to cuts, abrasions, punctures, burns and chemical irritants.

(8) If work is being performed around water and drowning is a hazard, PFDs must be provided and worn as appropriate.

l. Machine Guards and safety devices. Lawn maintenance equipment must have appropriate guards and safety devices in place and operational.

m. Hazardous Substances. When any hazardous substances are procured, used, stored or disposed, a hazard communication program must be in effect and MSDSs shall be available at the worksite. Employees shall have received training in hazardous substances being used. When the eyes or body of any person may be exposed to corrosives, irritants or toxic chemicals, suitable facilities for quick drenching or flushing of the eyes and body shall be provided within 10 seconds of the worksite.

n. Traffic control shall be accomplished in accordance with DOT’s MUTCD.

o. Control of Hazardous Energy (Lockout/Tagout). Before an employee performs any servicing or maintenance on any equipment where the unexpected energizing or startup of the equipment could occur, procedures must be in place to ensure adequate control of this energy.

p. Driving, working on (i.e., working with equipment/mowers) while on slopes, working from/in boats/skiffs, etc shall also be considered and dealt with accordingly.

SECURITY REQUIREMENTS All Contractor and subcontractor employees working on this contract who require access in or around Huntington District facilities (i.e. flood control dams plants, navigation locks, etc.) shall receive a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD-12). The Huntington District Security Management Office (SMO) will complete the background investigation and make the final determination of an employee’s suitability for work on Government property. The SMO and has the right to deny any contractor or subcontractor employee from working on a contract based on results of the background investigation. The Government, Contractor, and sub-contractors shall not permit any employee access to drawings, records, photos, sites, or projects until the Huntington District Security Management Office has approved them. The Contractor is responsible for meeting this requirement. Contractor’s failure to adhere to this can result in penalties, fines, or sanctions up to and including contract termination and or forfeiture of future contract consideration.

Contractors shall submit a complete investigation package for each contractor and subcontractor employee to the Huntington District Security Management Office within ten (10) working days after award of any contract, OR prior to the individual being permitted unescorted access in or around all District facilities. The documents listed below are required:

SF-85, Questionnaire for Non-sensitive Positions (See http://www.opm.gov/forms/ to print form) FD-258, Contractor Fingerprint Card (one card for digital prints, 2 for ink prints) (Note: a trained/qualified individual must take prints; ORI block on FD-258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by contacting the Huntington District Security Management Office) Contractor shall report any change(s) in personnel at least 5 working days prior to individual(s) needing access to the site. The Contractor shall provide the same information as listed above for any new employees.

Following submission of paperwork the Huntington District Security Management Office will conduct an initial criminal check based on the information provided. If there are no issues, SMO will provide approval via email to the Contractor and the Contracting Officer or their Designated Representative. If the SMO cannot give approval due to unfavorable report(s), it will notify the Contracting Officer and the Designated Representative; the KO will contact the Contractor. The Government will not provide a reason for disapproval; it will be up to the Contractor and or its employee to investigate the employee’s background information.

Foreign Nationals The Contractor shall provide the package listed above, as well as additional materials noted below, for all non-U.S. citizens who have lived in the United States for at least three years. The Contractor is to expect additional time in the approval process for all foreign nationals due to the level of review and elevation of the review to Headquarters Staff to accomplish. All non-U.S.

citizens, including permanent residents, must comply with the following paragraph:

In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Huntington District Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States, and has authority to work and/or attend school in the U.S. Such documentation shall include at least one of the following a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc. A cleared federal employee shall escort foreign nationals at all times unless otherwise approved in writing by the Huntington District Security Management Office.

In order to assure forms are properly completed, and to minimize time delays, Contractor is encouraged to work closely with the Huntington District Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor/subcontractor from beginning work. No subcontractor shall submit forms directly to the Huntington District Security Management Office; these documents shall come through the Prime Contractor.

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Huntington District Security Management Office by phone, letter, or email at the following numbers/addresses:

CELRH-SM

502 Eighth Street Huntington, WV 25701

Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil

Access and General Protection/Security Policy and Procedures – All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representatives). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as required by DOD, HQDA and/or local policy. In addition to the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

E-Verify. The Contractor must prescreen Candidates using the E-verify Program http://www.dhs.gov/E‐Verify website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than three (3) business days after the initial contract award.

Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something).The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training."

INSURANCE VERIFICATION

Contractor shall provide the Contracting Officer with written proof that all insurance required by State and Local Governments have been acquired for the time period covered under this contract.

No further insurance requirements will be imposed by the Corps of Engineers for this contract.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

WAGE RATES

General Decision Number: OH160096 02/19/2016 OH96

Superseded General Decision Number: OH20150096

State: Ohio

Construction Type: Building

County: Delaware County in Ohio.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 01/22/2016 3 02/05/2016 4 02/19/2016

ASBE0008-010 07/01/2015

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 29.40 14.77

BROH0055-006 06/01/2015

Rates Fringes

BRICKLAYER.......................$ 28.12 15.80

BROH0055-007 07/01/2015

Rates Fringes

TILE FINISHER....................$ 25.76 4.79

TILE SETTER......................$ 26.31 4.79

CARP0200-003 06/01/2014

Rates Fringes

CARPENTER (Soft Floor Layer and Floor Laying - Hardwood Floors Only).....................$ 25.57 13.25

ELEC0038-004 04/28/2014

Rates Fringes

ELECTRICIAN (HVAC/Temperature Controls Installation Only)......$ 36.78 19.72

FOOTNOTES;

a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;

Labor Day; Thanksgiving Day; & Christmas Day

b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service

ELEC0683-004 06/02/2014

Rates Fringes

ELECTRICIAN (Low Voltage Wiring Only).....................$ 24.88 8.97

ELEC0683-007 06/02/2014

Rates Fringes

ELECTRICIAN (Excludes Installation of HVAC/Temperature Controls and Low Voltage Wiring)..............$ 30.85 15.85

ELEV0037-003 01/01/2016

Rates Fringes

ELEVATOR MECHANIC................$ 42.03 29.985+a+b

PAID HOLIDAYS:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.

ENGI0018-041 05/01/2015

Rates Fringes

POWER EQUIPMENT OPERATOR

Bobcat/Skid Steer/Skid Loader; Concrete Pump;

Crane.......................$ 33.04 14.25 Bulldozer...................$ 32.92 14.25 Oiler.......................$ 25.24 14.25

ENGI0066-048 06/01/2014

Rates Fringes

POWER EQUIPMENT OPERATOR

Grader/Blade................$ 31.02 17.51 Mechanic....................$ 31.52 17.51

IRON0172-005 06/01/2015

Rates Fringes

IRONWORKER, REINFORCING..........$ 28.12 19.14

IRON0550-009 05/01/2015

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 26.66 18.36

LABO0423-003 06/01/2014

Rates Fringes

LABORER

Mason Tender - Brick & Cement/Concrete.............$ 23.89 9.75

PAIN1275-001 11/01/2015

Rates Fringes

PAINTER (Spray)..................$ 25.20 11.26

PLUM0189-005 06/01/2013

Rates Fringes

PIPEFITTER.......................$ 34.08 20.06

SFOH0669-009 07/01/2013

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 32.52 19.09

* SHEE0024-028 06/01/2015

Rates Fringes

SHEET METAL WORKER (Excludes HVAC Duct and Unit Installation)....................$ 27.41 19.08

SUOH2012-077 08/29/2014

Rates Fringes

ABATEMENT WORKER: ASBESTOS

(Removal from Ceilings, Floors, and Walls)...............$ 22.74 9.25

CARPENTER (Acoustical Ceiling Installation Only)...............$ 24.17 8.61

CARPENTER (Excluding Floor Laying - Hard Wood Floors, Soft Floor Laying, and Acoustical Ceiling Installation)....................$ 28.52 8.59

CEMENT MASON/CONCRETE FINISHER...$ 26.07 12.34

DRYWALL FINISHER/TAPER...........$ 20.44 4.75

DRYWALL HANGER AND METAL STUD

INSTALLER........................$ 21.15 3.75

GLAZIER..........................$ 22.60 11.02

IRONWORKER, STRUCTURAL...........$ 26.52 16.23

LABORER: Common or General......$ 29.24 5.17

LABORER: Landscape & Irrigation.......................$ 13.74 0.00

LABORER: Pipelayer..............$ 23.98 8.58

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 27.26 9.80

OPERATOR: Forklift..............$ 22.79 12.76

OPERATOR: Loader................$ 29.66 12.61

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 30.28 13.29

OPERATOR: Roller................$ 28.83 12.72

PAINTER (Brush and Roller).......$ 24.97 0.00

PLUMBER..........................$ 25.28 6.87

ROOFER...........................$ 25.24 11.38

SHEET METAL WORKER (HVAC Duct and HVAC Unit Installation Only)............................$ 26.26 15.77

TRUCK DRIVER: Dump (All Types)...$ 24.32 11.73

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 30-SEP-2016 1 ALUM CREEK LAKE

R.J. WATTENSCHAIDT

5905 LEWIS CENTER ROAD

LEWIS CENTER OH 43035-9215

740-548-6151 FOB: Destination

9655AJ

Section G - Contract Administration Data

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2015

52.204-16 Commercial and Government Entity Code Reporting JUL 2015 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity APR 2015 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-50 Combating Trafficking in Persons MAR 2015 52.222-55 Minimum Wages Under Executive Order 13658 JAN 2015 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-27 Prompt Payment for Construction Contracts MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984

52.244-6 Subcontracts for Commercial Items DEC 2015 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-1 Termination For Convenience Of The Government (Fixed