Solicitation for Former West Virginia Ordnance Works Mowing Maintenance Services Point Pleasant WV
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award_Synopsis_16-P-0024.pdf | ||
| Figure_22_QualityAssuranceSurveillancePlan.pdf | ||
| Table_2.pdf | ||
| Figures.pdf | ||
| Synopsis_-_WVOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91237-16-T-0010 12-Feb-2016
b. TELEPHONE NUMBER
304.399.6936
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 03 Mar 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912379. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
PATRINA G SINGLETON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, CONTRACTING BRANCH
PATRINA SINGLETON, 502 8TH STREET
HUNTINGTON WV 25701
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
304-399-5281FAX:
TEL: 304-399-6936 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$7.5M
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF64
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91237-16-T-0010
Section SF 1449 - CONTINUATION SHEET
PRICE BREAKOUT SCHEDULE
PRICE BREAKOUT SCHEDULE
MOWING OF VARIOUS SITES AND PERFORMING GROUNDWATER
MONITORING WELL INSPECTION AND REPAIRS
FORMER WEST VIRGINIA ORDNANCE WORKS
POINT PLEASANT, MASON COUNTY, WEST VIRGINIA
BASE PERIOD – DATE OF AWARD THRU 30 SEPTEMBER 2016
Task Description and PWS Section Number Qty Unit Unit Price Total
C-1 Descriptions/Specifications - General 0001 Site Mobilization/Demobilization 1 JOB $ $ 0002 Equipment (see also C-2.3, C-2.3.5 & C-2.5.1) 1 JOB $ $ C-1.16 Submittals 0003 Site Specific AAPP/AHA (see also C-1.7) 1 EA $ $ 0004 Emergency Contacts List 1 EA $ $ 0005 Quality Control Plan (QCP) 1 EA $ $ 0006 Schedule of Activities 1 EA $ $ 0007 Mfg SDS information 1 EA $ $ 0008 Plan/Procedure for Repairing Wells 1 EA $ $ 0009 Well Inspection Report 1 EA $ $
Section C-1 - SUBTOTAL $ C-2 Descriptions/Specifications – Scope of Work 0010 Burning Grounds 4 EA $ $ 0011 TNT Mfg Area, WFH Caps & AFRH Caps 4 EA $ $ 0012 Former RWR, YWR, Barren Area & ESI-8 Asbestos Landfill Cap & Associated Ditches
4 EA $ $
0013 Main Access Road and Paths 4 EA $ $ 0014 Mowing 206 GW Monitoring & Extraction Wells 4 EA $ $ 0015 Vehicles/Trailer (see also C-2.5.1) 1 JOB $ $ 0016 Mowing 5 acres/18,000 linear feet paths/roads 1 JOB $ $ 0017 Red & Yellow Water Res Pump & Treat Bldg Areas
12 EA $ $
0018 RW Reservoir Sedimentation Basin levee & ditches
4 EA $ $
0019 Install Warning Signs and Straighten Posts 5 EA $ $ 0020 GW Monitoring & Extraction Well Repairs 25 EA $ $ 0021 Inspecting 206 Monitoring & Extraction Wells 206 EA $ $
Section C-2 SUBTOTAL $ TOTAL BASE PERIOD COST (Add Sections C-1 & C-2) $
Contractor shall consider all components of this Performance Work Statement including Tables, Figures and Maps in preparing the Bid Schedule.
OPTION YEAR 1 – 1 JANUARY 2017 THRU 30 SEPTEMBER 2017
Task Description and PWS Section number Qty Unit Unit Price Total
C-1 Descriptions/Specifications - General 1001 Site Mobilization/Demobilization 1 JOB $ $ 1002 Equipment (see also C-2.3, C-2.3.5 & C-2.5.1) 1 JOB $ $ C-1.16 Submittals 1003 Site Specific AAPP/AHA (see also C-1.7) 1 EA $ $ 1004 Emergency Contacts List 1 EA $ $ 1005 Quality Control Plan (QCP) 1 EA $ $ 1006 Schedule of Activities 1 EA $ $ 1007 Mfg SDS information 1 EA $ $ 1008 Plan/Procedure for Repairing Wells 1 EA $ $ 1009 Well Inspection Report 1 EA $ $
Section C-1 - SUBTOTAL $ C-2 Descriptions/Specifications – Scope of Work 1010 Burning Grounds 4 EA $ $ 1011 TNT Mfg Area, WFH Caps & AFRH Caps 4 EA $ $ 1012 Former RWR, YWR, Barren Area & ESI-8 Asbestos Landfill Cap & Associated Ditches
4 EA $ $
1013 Main Access Road and Paths 4 EA $ $ 1014 Mowing 206 GW Monitoring & Extraction Wells 4 EA $ $ 1015 Vehicles/Trailer (see also C-2.5.1) 1 JOB $ $ 1016 Mowing 5 acres/18,000 linear feet paths/roads 1 JOB $ $ 1017 Red & Yellow Water Res Pump & Treat Bldg Areas
12 EA $ $
1018 RW Reservoir Sedimentation Basin levee & ditches
4 EA $ $
1019 Install Warning Signs and Straighten Posts 5 EA $ $ 1020 GW Monitoring & Extraction Well Repairs 25 EA $ $ 1021 Inspecting 206 Monitoring & Extraction Wells 206 EA $ $
Section C-2 SUBTOTAL $ TOTAL OPTION YEAR ONE (Add Sections C-1 & C-2) $
Contractor shall consider all components of this Performance Work Statement including Tables, Figures and
OPTION YEAR 2 – 1 JANUARY 2018 THRU 30 SEPTEMBER 2018
C-1 Descriptions/Specifications - General 2001 Site Mobilization/Demobilization 1 JOB $ $ 2002 Equipment (see also C-2.3, C-2.3.5 & C-2.5.1) 1 JOB $ $ C-1.16 Submittals 2003 Site Specific AAPP/AHA (see also C-1.7) 1 EA $ $ 2004 Emergency Contacts List 1 EA $ $ 2005 Quality Control Plan (QCP) 1 EA $ $ 2006 Schedule of Activities 1 EA $ $ 2007 Mfg SDS information 1 EA $ $ 2008 Plan/Procedure for Repairing Wells 1 EA $ $ 2009 Well Inspection Report 1 EA $ $
Section C-1 - SUBTOTAL $ C-2 Descriptions/Specifications – Scope of Work 2010 Burning Grounds 4 EA $ $ 2011 TNT Mfg Area, WFH Caps & AFRH Caps 4 EA $ $ 2012 Former RWR, YWR, Barren Area & ESI-8 Asbestos Landfill Cap & Associated Ditches
4 EA $ $
2013 Main Access Road and Paths 4 EA $ $ 2014 Mowing 206 GW Monitoring & Extraction Wells 4 EA $ $ 2015 Vehicles/Trailer (see also C-2.5.1) 1 JOB $ $ 2016 Mowing 5 acres/18,000 linear feet paths/roads 1 JOB $ $ 2017 Red & Yellow Water Res Pump & Treat Bldg Areas
12 EA $ $
2018 RW Reservoir Sedimentation Basin levee & ditches
4 EA $ $
2019 Install Warning Signs and Straighten Posts 5 EA $ $ 2020 GW Monitoring & Extraction Well Repairs 25 EA $ $ 2021 Inspecting 206 Monitoring & Extraction Wells 206 EA $ $
Section C-2 SUBTOTAL $ TOTAL OPTION PERIOD TWO (Add Sections C-1 & C-2) $
Contractor shall consider all components of this Performance Work Statement including Tables, Figures and
OPTION YEAR 3 – 1 JANUARY 2019 THRU 30 SEPTEMBER 2019
Task Description and PWS Section number
Qty Unit Unit Price Total
C-1 Descriptions/Specifications - General 3001 Site Mobilization/Demobilization 1 JOB $ $ 3002 Equipment (see also C-2.3, C-2.3.5 & C-2.5.1) 1 JOB $ $ C-1.16 Submittals 3003 Site Specific AAPP/AHA (see also C-1.7) 1 EA $ $ 3004 Emergency Contacts List 1 EA $ $ 3005 Quality Control Plan (QCP) 1 EA $ $ 3006 Schedule of Activities 1 EA $ $ 3007 Mfg SDS information 1 EA $ $ 3008 Plan/Procedure for Repairing Wells 1 EA $ $ 3009 Well Inspection Report 1 EA $ $
Section C-1 - SUBTOTAL $ C-2 Descriptions/Specifications – Scope of Work 3010 Burning Grounds 4 EA $ $ 3011 TNT Mfg Area, WFH Caps & AFRH Caps 4 EA $ $ 3012 Former RWR, YWR, Barren Area & ESI-8 Asbestos Landfill Cap & Associated Ditches
4 EA $ $
3013 Main Access Road and Paths 4 EA $ $ 3014 Mowing 206 GW Monitoring & Extraction Wells 4 EA $ $ 3015 Vehicles/Trailer (see also C-2.5.1) 1 JOB $ $ 3016 Mowing 5 acres/18,000 linear feet paths/roads 1 JOB $ $ 3017 Red & Yellow Water Res Pump & Treat Bldg Areas
12 EA $ $
3018 RW Reservoir Sedimentation Basin levee & ditches
4 EA $ $
3019 Install Warning Signs and Straighten Posts 5 EA $ $ 3020 GW Monitoring & Extraction Well Repairs 25 EA $ $ 3021 Inspecting 206 Monitoring & Extraction Wells 206 EA $ $
Section C-2 SUBTOTAL $ TOTAL OPTION PERIOD THREE (Add Sections C-1 & C-2) $
Contractor shall consider all components of this Performance Work Statement including Tables, Figures and
OPTION YEAR 4 – 1 JANUARY 2020 THRU 30 SEPTEMBER 2020
C-1 Descriptions/Specifications - General 4001 Site Mobilization/Demobilization 1 JOB $ $ 4002 Equipment (see also C-2.3, C-2.3.5 & C-2.5.1) 1 JOB $ $ C-1.16 Submittals 4003 Site Specific AAPP/AHA (see also C-1.7) 1 EA $ $ 4004 Emergency Contacts List 1 EA $ $ 4005 Quality Control Plan (QCP) 1 EA $ $ 4006 Schedule of Activities 1 EA $ $ 4007 Mfg SDS information 1 EA $ $ 4008 Plan/Procedure for Repairing Wells 1 EA $ $ 4009 Well Inspection Report 1 EA $ $
Section C-1 - SUBTOTAL $ C-2 Descriptions/Specifications – Scope of Work 4010 Burning Grounds 4 EA $ $ 4011 TNT Mfg Area, WFH Caps & AFRH Caps 4 EA $ $ 4012 Former RWR, YWR, Barren Area & ESI-8 Asbestos Landfill Cap & Associated Ditches
4 EA $ $
4013 Main Access Road and Paths 4 EA $ $ 4014 Mowing 206 GW Monitoring & Extraction Wells 4 EA $ $ 4015 Vehicles/Trailer (see also C-2.5.1) 1 JOB $ $ 4016 Mowing 5 acres/18,000 linear feet paths/roads 1 JOB $ $ 4017 Red & Yellow Water Res Pump & Treat Bldg Areas
12 EA $ $
4018 RW Reservoir Sedimentation Basin levee & ditches
4 EA $ $
4019 Install Warning Signs and Straighten Posts 5 EA $ $ 4020 GW Monitoring & Extraction Well Repairs 25 EA $ $ 4021 Inspecting 206 Monitoring & Extraction Wells 206 EA $ $
Section C-2 SUBTOTAL $ TOTAL OPTION PERIOD FOUR (Add Sections C-1 & C-2) $
Contractor shall consider all components of this Performance Work Statement including Tables, Figures and
INSTRUCTION TO OFFERORS
This Request for Quote (RFQ) is for an Indefinite Delivery Indefinite Quantity Contract to provide all management, labor, supplies, materials and equipment necessary to perform Mowing and Maintenance services at Former West Virginia Ordnance Works, Point
Pleasant, Mason County, West Virginia. All work shall be performed in strict compliance with the attached statement of work and all other terms, clauses and conditions incorporated herein. The base period for this contract will be from date of award through 31 December 2016.
Note: This solicitation contains an option clause to extend the awarded contract for up to four (4) additional one-year periods. The one-year option periods are as follows:
Option Period 1: 01 January 2017 through 31 December 2017 Option Period 2: 01 January 2018 through 31 December 2018 Option Period 3: 01 January 2019 through 31 December 2019 Option Period 4: 01 January 2020 through 31 December 2020
One award will be made from this RFQ.
This procurement is 100% set-aside for Small Business, under NAICS code 561730 ($7.5 million average annual receipts for the previous three years).
The Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.
There is no bonding requirement for this procurement action.
Quotes will not be accepted for quantities less than the quantities specified in the price breakout schedule. Failure to submit a unit price for all items listed (base year and option years) will be considered as a material deviation from the requirements of the Request for Quote (RFQ) and the quote will be rejected.
Note: Subject to the provisions herein, award will be made as a whole to the lowest priced responsible and responsive offeror.
(a) The Government reserves the right, prior to making an award, to conduct a pre-award survey of the prospective Contractor in order to determine that the Contractor can meet the minimum standards for responsible, prospective Contractors as delineated in the Federal Acquisition Regulation, paragraph 9.104. The pre-award survey may include but will not be necessarily be limited to the following factors:
(1) Financial resource
(2) Ability to comply with required schedule
(3) Past record of integrity
(4) Past records of performance; and
(5) Ability to meet other qualification and eligibility requirements to receive an award of a contract.
(6) Have the necessary organization and experience
(7) Have the necessary production and resources
(b) Offerors are advised that accomplishment of this survey is a part of the evaluation process and is not to be construed as an indication that an offeror will receive or is in the best position to receive the resultant award.
Submit Offers to: patrina.g.singleton@usace.army.mil
OR
U.S. Army Corps of Engineers
Room 419, ATTN: Patrina Singleton 502 8th Street Huntington, WV 25701
Quotes are due on the date and time identified on page 1 (box 8) of this solicitation.
Electronic submittals may be accepted.
For contractual/technical questions, please contact Patrina Singleton at 304-399- 6936 or by e-mail at patrina.g.singleton@usace.army.mil.
Offerors are invited to attend a Pre-Quote Conference to be held at the Former West Virginia Ordnance Works, Point Pleasant, WV at 10 am on February 25, 2016. For directions please call Ms. Jo Huff, 304-399-5239.
Questions that Offerors may wish to have answered at the Pre-Work Conference may be directed to:
Patrina Singleton, Contract Specialist US Army Corps of Engineers, Huntington District 502 8th Street Huntington, WV 25701-2070
PHONE: 304-399-6936
Email: patrina.g.singleton@usace.army.mil
Contract Award
D.1 The contract award will be made as a whole to the contractor offering the lowest price, after a determination of responsibility is made by the Contracting Officer and prices are determined to be fair and reasonable (see paragraph D.3). This means that low price will be the determining factor considered for award of this contract. “Offeror Quotes” as referred to in this solicitation shall include a completed Price Breakout Schedule as included in this solicitation.
D.2 Content. Offeror quotes and any supporting information shall be specific and complete in every detail and shall contain the information necessary to properly assess the Contractor's capability to perform the specified contract services, D.3 Quoted Prices. The completed Price Breakout Schedule will be reviewed for completeness and compatibility with the estimated price to perform the contract services. Quoted prices will be evaluated for price reasonableness. The Offeror’s price quote will also be evaluated for proportionality and balance. An Offerors’ price quote may be considered to have unbalanced pricing when it contains line item prices that are significantly over or understated when compared to the estimated cost or competitive pricing. An offerers’ quote may be rejected if the Contracting Officer determines that the lack of balanced pricing poses an unacceptable risk to the Government.
D.4 Overall Price Evaluations. The Government will evaluate quoted prices for award purposes by adding the Offerors’ total price for the base year, to the total prices for all option years. See FAR 52.217-5. Evaluation of pricing for option year periods, will not obligate the Government to exercise the option(s). All unit prices shall be inclusive of all costs associated with this contract. For example, there will be no additional payment for supervision, administration, equipment, supplies, profit or other items/services not included on the price breakout schedule.
D.5 Discounts. Prompt payment discounts will not be considered in the evaluation of quotes.
D.6 The Government intends to evaluate price quotes and award a contract without discussions with offerors. Therefore, the offeror's initial quote should contain the offeror's best terms.
D.7 A Government Representative may verify any information provided in the quote to better evaluate the Offerors’ ability to perform.
D.8 Simplified Acquisition procedures are being used per FAR Part 13 and Subpart 13.5.
STATEMENT OF WORK
STATEMENT OF WORK
FOR
MOWING OF VARIOUS LOCATIONS AND PERFORMING GROUNDWATER
MONITORING WELL INSPECTION AND REPAIR
FORMER WEST VIRGINIA ORDNANCE WORKS
POINT PLEASANT, MASON COUNTY, WEST VIRGINIA
CONTRACT NO. W91237-16-T-0010
Prior to submission of the proposal for the performance of this scope of services, the Contractor shall review the Scope and provide comments on any errors, omissions, inconsistencies, new industry standards or procedures which would provide the customer with a better end product.
Please contact the Contracting Officer immediately if you have any suggestions or question.
DESCRIPTION/SPECIFICATIONS
SECTION C-1
General
C-1.1 PROJECT INFORMATION. The former West Virginia Ordnance Works (WVOW) is located on the east bank of the Ohio River in Mason County, West Virginia, approximately six miles north of the city of Point Pleasant which is approximately 55 miles northwest of Charleston and 41 miles northeast of Huntington. The DoD utilized the WVOW from 1942 to 1945 to produce trinitrotoluene (2,4,6-TNT) explosives from toluene, nitric acid, and sulfuric acid, with manufacturing ceasing in 1945. Explosives’ production contaminated the soil and groundwater surrounding the TNT manufacturing and process facilities, wastewater sewer lines, and wastewater holding and discharge holding areas. See the attached Figure 1 for site location and O&M Areas.
C-1.2 PROJECT PURPOSE. Remedial actions at Operable Units (OUs 1, 2 and 3) of the former WVOW included the installation of soil covers and Resource Conservation and Recovery Act (RCRA) soil caps over areas of contaminated soil. Remedial action at the Asbestos Landfill area included the installation of a soil cover over a dumpsite. The soil covers and RCRA caps serve as effective barriers between humans, wildlife, and the contaminated soil. These remedial actions were completed on lands currently managed by the West Virginia Division of Natural Resources as part of the Clifton F. McClintic Wildlife Management Area (MWMA).
Groundwater monitoring wells have also been installed to allow monitoring at the site.
Certain operational and maintenance (O&M) activities are required to maintain the integrity of the soil covers, RCRA caps, and groundwater monitoring wells. These activities include mowing, periodic soil cap repair (e.g. repair eroded areas, re-seed bare areas, etc.), warning sign replacement, ditch maintenance, fallen tree removal, well painting, entrance gate painting, and vegetation control.
Removed from this PWS, are those areas maintained in past contracts such as the former Quonset hut area, the Compost Building Area, Power Distribution Products (PDD) Building Area, and the OU11 Sellite Plant (8 acres). These areas are noted in Figures 3 and 8. Some monitoring wells have been closed, some new wells installed and some wells will no longer be maintained therefore the total wells for inspection and maintenance has changed from past contracts. There have also been additions to this contract that were not scoped in past contracts, this includes mowing/clearing the outfall drainage ditch at the YWR area, mowing the access road from the Burning Grounds to Pond 30, replacing warning signs and posts, and mowing/clearing four rock lined drainage ditches and underdrain at RWR area. See Figures 12c (sign),13c, 14, 14a, 15, 15a.
C-1.3 SCOPE OF WORK. The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the operation and maintenance service at the West Virginia Ordnance Works project, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Figures, Attachments, etc., contained herein or incorporated by reference. Award of a contract does not guarantee that the Government will renew additional Option years under the contract from the Contractor. The Government reserves the right to perform any portion of the services listed below.
Contractor's work and responsibility shall include, but shall not be limited to, all planning, programming, administration and management necessary to assure that all services provided are conducted in accordance with the contact and all applicable laws, regulations, codes, or directives. Contractor shall ensure that all work meets or exceeds critical reliability rates or tolerances specified or included in referenced documents. Contractor shall perform all related Contractor administrative services necessary to perform the work such as supply, procurement, quality control, Contractor financial control, mobilization/demobilization and maintenance of accurate and complete records and files.
It is emphasized that the work described in this contract is a necessary part of the Corps mission.
Much of the work described will be performed in areas open to the public for hunting and fishing. There are also a number of construction contractors that are working, sampling, and maintaining facilities that require access to wells and portions of the project accessed by roads and paths maintained under this SOW. Failure of a Contractor to perform required work, or to provide the work in the required specified time, or to inferior work could risk public health and safety for those working at the project or delay work by other contractors working at the site.
Therefore, it is the intent of the Government to ensure the required services are performed correctly, safely, timely and reliably for a fair and reasonable price. Because of the nature of the work the Government cannot "trade off" contractor non-performance for increased Government liability. Further, due to lack of Government personnel, the Government cannot "trade off" a Contractor's lack of Quality Control for increased Government Quality Assurance.
C-1.4. NEGOTIATION. The purpose of negotiation is to establish a fair and reasonable price for the job under consideration. The Government and Contractor will negotiate toward the most efficient method of work and the number of hours required. The most efficient method is that method of work which accomplishes the job safely, with high quality workmanship and at the lowest price. Once negotiated the Contractor must perform the job using the method of work and line items agreed upon during negotiations.
C-1.5 WORKING HOURS.
a. Normal Working Hours. Normal working hours, except as otherwise specified herein, shall be Sunday through Saturday, 6:00 a.m. to 9:00 p.m EST. Work that interferes with other ongoing functions at the project by the USACE or the McClintic Wildlife Management Area shall be scheduled around normal working hours, as specified by the Contracting Officer. Work may be conducted during federal holidays.
b. Inclement Weather Work. The Contractor shall maintain the schedule of services regardless of inclement weather except when severe conditions make it impracticable or dangerous to perform the work. The Contractor will be notified, by modification to the Contract, of any Contracting Officer determination to extend the performance period due to inclement weather such as disasters or severe storm damage.
C-1.6 CONTRACTOR SUBMITTALS. Unless otherwise specified, the Contractor shall submit the following information to the COR prior to the pre-work conference for this contract:
a. Abbreviated Accident Prevention Plan (AAPP) prior to Notice to Proceed. Activity Hazard
Analysis (AHA) (due prior to starting work). Reference USACE Safety Manual EM385-1-1, March 1, 2015.
b. Emergency Contacts. A prioritized list, including phone numbers, of those persons (generally Contractor Representatives) to call in case of emergencies.
c. Quality Control Plan (QCP) including name(s) of QC inspector(s).
d. Schedule of Activities (due prior to starting work).
e. Manufacturers information and Safety Data Sheets (where applicable) for the paint and primer used at wells and wire mesh used for culverts and herbicide spray to coat cut vegetation.
f. Contractor invoice(s).
g. Plan/Procedure for paint/primer repairs to wells and bollards (due prior to starting work).
Submittals shall be prepared using Microsoft Word®, Excel®, and/or Adobe Acrobat®. The Contractor shall submit drafts of the AAPP/AHA, Schedule of Activities, Emergency Contact List, QCP, and Procedure for paint/primer repairs within 20 calendar days after receipt of Award. The Contractor shall submit drafts of the Groundwater Monitoring and Extraction Well Inspection Report for review by the Government within 20 days after completion of all work.
Following reviews, the Contractor shall respond to review comments and submit the final plans/report for acceptance. Until the AAPP/AHA, Emergency Contract List, QCP and schedule of activities submittal documents have been accepted by the Government no site work may be performed.
The draft AAPP shall be submitted electronically and a hard copy by mail by the Contractor to the COR for review. Once all comments have been resolved to the Government’s satisfaction, the Contractor shall submit the final document with all comments/responses included as appendices. The final document shall include one hard copy and one electronic copy of each document on CD/DVD. Hard copy documents shall be in a three ring white binder with front and spine overlays with the Contract Number, the Site name, and the Year of the contract. Tabs utilized shall be one piece high quality tabs.
All submittals for this Contract shall be sent to the USACE Contract Management office, ATTN:
Shane Hall, 502 8th Street, Huntington, WV 25701 using USACE ENG FORM 4025-R, MAR
95. Any invoices sent to the wrong person or location will not be accepted.
C-1.7 SITE SPECIFIC ABBREVIATED ACCIDENT PREVENTION PLAN and ACTIVITY HAZARD ANALYSIS. The USACE assigns a high priority to safety of the public, its own employees and contract workers, regardless of the task involved. Accordingly, the Contractor shall comply with all provisions of the Occupational Safety and Health Act (OSHA), standards of the current Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, and all other federal, state, and local laws, rules, codes and ordinances. Inspections of the Contractor by the Government will always stress safety.
If the Contractor is found to be in a situation of imminent danger to life or injury, a verbal order stopping all or part of the work, until satisfactory corrective action has been completed will be given.
No part of the time lost as a result of such an order to stop work shall be made the subject of any claims for extension of time or for excess costs or damages sustained by the Contractor. The Contractor will not be paid for work not performed as a result of the stop order.
The Contractor shall ensure reasonable precautions are taken to protect the public, at all times, and to immediately report any potential hazards found to the USACE POC.
Due to the limited nature of this work, a Site Safety and Health Officer (SSHO) may be in a collateral duty capacity on low risk tasks. The Contractor shall have at least one person identified as a SSHO on site with First Aid and CPR training. Contractor shall meet all safety requirements of the EM385-1-1, Section 01.A.17 requiring the SSHO have completed the 30-hour OSHA Construction safety class or equivalent. This person shall be tasked as part of their job to oversee and make safety determinations without interference from other project staff and with full corporate support. This person shall have sufficient experience and training to assure they can identify safety issues with and the use of all the Contractor’s equipment.
The SSHO shall:
a. Conduct a brief ‘tool box’ safety discussion prior to work activity.
b. Maintain applicable safety reference material on the job site.
c. Attend any post-award conference, pre-work meetings, and any periodic progress meetings.
d. Implement and enforce accepted Abbreviated Accident Prevention Plan (AAPP) and Activity Hazard Analyses (AHAs).
e. Maintain a list of hazardous substances brought to or used on site and their safety data sheets (SDS).
The Contractor shall prepare a site-specific Abbreviated Accident Prevention Plan as outlined in EM 385-1-1, Appendix A beginning with subparagraph 3.k on page A-10. Contractor must address each element/sub-element in the order they appear in the outline. Any element the contractor feels is not applicable to work under this contract must be listed and a brief explanation provided. Plan must be accepted by the Contracting Officer prior to commencement of any work. Contractors are encouraged to contact the USACE Safety & Occupational Health Office for questions or information regarding the development of contract Accident Prevention Plans. Office hours are Monday-Friday 8:30 a.m. - 4 p.m. Phone number and extensions include (304)399-5039/5032/5326.
The web address for EM 385-1-1 is:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf
(Attached as Figure 16 for your information and use is CESO Checklist A-01, Sept 14. This checklist was developed to assist in the development of a site-specific Abbreviated Accident Prevention Plan. This checklist is provided as a tool for reference only.)
Contractor may use Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs) or Activity Hazard Analysis (AHA) for the purpose of risk assessment. Before beginning each work activity Contractor performing that work activity shall prepare an initial assessment (AHA/JSA/JHA) listing each job step, anticipated hazards, site conditions, equipment, materials, personnel and control measures to be implemented. A Risk Assessment Code (RAC) shall be assigned to each step assessing the level of risk remaining after implementation of controls. Once this process is complete, a RAC will be assigned to the activity as a whole (cannot be lower than the highest step RAC). Residual risk must be communicated to the proper authority for acceptance in order to proceed. It is the Contractor's responsibility to prepare the AHA/JSA/JHA. Analysis with RAC shall be accepted by the KO and discussed with all engaged in the activity including Contractor, subcontractor(s), and on-site government representative prior to commencement of work. Names of Competent Person(s) and Qualified Person(s) required for a particular activity (e.g., mowing, tree removal, fall protection, or other activities specified by OSHA and/or EM 385-1-1) shall be identified and included in the AHA/JSA/JHA and proof of their competency/qualification.
Work crews of two or more must have two people holding current qualifications in First Aid and CPR from the American Red Cross, American Heart Association or a licensed physician.
Training must include a hands-on element and the contractor must maintain an appropriate First Aid kit on site. Single individuals working alone must have current certification in First Aid as a minimum.
Contractor shall employ a minimum of one Competent Person at each worksite to function as the Site Safety and Health Officer (SSHO). The SSHO as a minimum must have completed the 30-hour OSHA Construction or General Industry Safety class or equivalent as specified in EM 385- 1-1 Section 01.A.17.b and have a minimum of 5 years safety experience relative to the work being completed. The SSHO must be on-site at all times work is being performed. (Note:
SSHO qualification requirements may be waived at the discretion of the USACE District Safety & Occupational Health Office for extremely low risk operations.)
C-1.8 ACCIDENT REPORTING. The Contractor shall report all recordable mishaps to the Government’s Designated Authority (GDA) within 24-hours in accordance with EM 385-1-1 Section 01.D. Accidents shall be investigated to determine causal factors and corrective actions shall be implemented. Accidents resulting in days away injuries, days away illnesses, restricted/transfer injuries, property damage of $5,000.00 or more shall be investigated and reported to the GDA using the USACE Accident Investigation Report Form ENG 3394 within 24 hours of the occurrence. See Figure 19.
(1) Immediate notification to the KO is required for all serious accidents:
a. Fatal Injury/illness;
b. Permanent totally disabling injury/illness;
c. Permanent partial disabling injury/illness;
d. One (1) or more persons hospitalized as inpatients as a result of a single occurrence;
e. $500,000 or greater accidental property damage;
f. Three (3) or more individuals become ill or have a medical condition suspected to be related to a site condition, or a hazardous or toxic agent on the site.
The Contractor shall maintain an OSHA Log of Work Related Injuries and Illnesses, OSHA Form 300 and comply with all accident reporting and recordkeeping requirements specified in 29
CFR 1904.39.
In addition to the above, any mishap occurring in any of the following high hazard areas shall be reported immediately to the GDA, investigated and corrective actions implemented.
a. Electrical (includes Arc Flash, electrical shock, etc.);
b. Load Handling Equipment (LHE) or Rigging;
c. Fall-from-Height (any level or other than same surface).
C-1.9 DAMAGE REPORTS. All instances where Government materials, supplies, property, and/or equipment are damaged shall be reported immediately to the COR. If the damage is caused by contract employees, a written report of the incident and extent of such damage shall be submitted to the COR, within two (2) calendar days of occurrence.
C-1.10 CONTRACT EMPLOYEES' CONDUCT AND COMPETENCY. All Contractor employees shall conduct themselves in a proper manner at all times. Since the majority of work shall be performed in the presence of the general public, the conduct of all employees is critical and will be monitored. Use of controlled substances or consumption of beer or alcoholic beverages by Contractor employees is strictly prohibited. The Contractor expressly agrees to remove from the site any individual whose continued employment is deemed by the COR to be contrary to the public interest or inconsistent with the best interests of the U. S. Army Corps of Engineers; and, will not use such individual to perform duties or services under this contract.
The COR may require the Contractor to immediately remove from the work site any employee of the Contractor who is incompetent, or who endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform the work. Notification to the Contractor shall be made in person or by telephone promptly and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement shall be made as required.
C-1.11 DAMAGE OR LOSS OF CONTRACTOR'S SUPPLIES AND PROPERTY. The Contractor is responsible for taking the action necessary to protect Contractor supplies, materials and equipment, and the personal property of Contractor employees from loss, damage or theft.
The Government assumes no responsibility for theft, damage, etc., of the above.
C-1.12 ENVIRONMENTAL PROGRAM. The Contractor shall comply with Federal, State, and local laws, regulations and standards regarding environmental protection. All environmental protection matters shall be coordinated with the COR. Payment of fines or penalty charges associated with citations issued by Federal, State or local officials will be paid by the Government. If the citations are issued due to faulty operation or maintenance practices of the Contractor, the Contracting Officer will deduct the fine from any monies due the Contractor. The Contractor shall conduct all operations and maintenance activities in a manner to prevent contamination of Government land and property. The Contractor shall ensure all lubricants, petroleum products, paints, cleaning materials, fuels or any other hazardous substances are not spilled, leaked or disposed of on Government property and are disposed of in accordance with environmental regulations. If spills or contamination occur, the Contractor shall be responsible for cleanup and any associated costs in accordance with Federal, State and Local Law. Such spills shall be reported to the COR immediately.
C-1.13 SUPERVISION. The Contractor shall personally supervise the work, or have a Contractor Representative at the project when work is in progress during work activities. The Contractor Representative(s) shall conduct overall management coordination and be the central point of contact with the Government for performance of all work under the contract. The
Contractor Representative(s) shall have full authority to contractually commit the Contractor for prompt action on all matters pertaining to administration of this contract, and shall be the on-site Contractor employee who is responsible for safety.
In addition to a Contractor Representative(s), the Contractor shall also appoint Quality Control Inspector(s) (QCI) who shall perform the Contractor's Quality Control Program. QCI's shall be responsible for implementing the Contractor's AAPP. All QCI'S shall have the authority to determine for the Contractor when work is ready for Government inspection and to make decisions for the Contractor on re-performance when necessary. The Contracting Officer and Government inspectors will deal directly with the QCIs or Contractor Representatives, for normal day-to-day administration of the contract provisions. The names of all individuals authorized to act on behalf of the Contractor as Contractor Representative(s) or QCI(s) shall be submitted in writing to the COR before work is performed (see Figure 17). The Contractor shall maintain and review with employees copies of contract work requirements, specifications, Activity Hazard Analysis, etc., at the work site areas which relate to each person's work responsibilities, to ensure employees comprehension of a job prior to initiating work.
C-1.14 CONTRACT DISCREPANCY REPORT (CDR). A CDR is a formal document used by the Government to process defects in services (see Figure 18). As initially issued to the Contractor, the CDR describes the discrepancy or problem. The CDR will be discussed with the Contractor or his representative when it is issued. The Contractor shall provide his written legible response on the CDR form within 24 hours of issuance. The Contractor's response must:
a. Identify the cause and corrective action taken, and
b. Identify Contractor action to prevent recurrence.
The COR will evaluate the Contractor's response and take appropriate action, which may include making necessary deductions. Upon finalization of the CDR, the Contractor and the COR must sign the form. The Contractor will be given a copy of the completed form. Should the Contractor not concur with any decision, etc., the Contractor may so state, in writing, and request a final decision by the Contracting Officer. The Contracting Officer monitors all CDRs issued, and CDRs are principle evidence used by the Contracting Officer in determining Government contract actions such as termination or decision not to exercise options.
Any time a CDR is issued, the Contractor or his authorized representative shall be available, in person, or telephone to the COR at the district office to discuss contract work items. If a CDR is issued, mutual effort will be made to resolve any and all problems identified to preclude their recurrence. Failure to provide appropriate Quality Control may result in issuance of a CDR and/or termination of the contract.
C-1.15 QUALITY CONTROL. The Contractor shall establish a quality control program to assure the requirements of the contract are provided as specified. This program must be approved by the KO prior to commencement of any work. One copy of the Contractor's quality control program shall be provided to the COR at least one week prior to the post-award conference. If changes to this program occur, updated copies shall be provided to the KO and COR.
The program shall include, but not be limited to the following:
1. An inspection system covering all the services stated in the contract specifications. It shall specify areas to be inspected on both a scheduled or unscheduled basis and the individuals who shall do the inspection. A method of identifying deficiencies in the quality of services performed before the level of performance is unacceptable.
2. A file of all inspections conducted by the Contractor and the corrective actions taken. This documentation shall be available for inspection by the COR upon request.
3. A method of ensuring that employees have full knowledge of work assignments and that appropriate expertise is utilized with each work assignment.
4. A method of coordinating worker activities with the COR , Contracting Officer and/or Inspector. A suggested format for the Contractor Quality Control Plan is contained as Figure 17. Failure to provide appropriate Quality Control may result in issuance of a CDR, and/or termination of the contract.
C-1.16 QUALITY ASSURANCE. The Government will monitor the Contractor's performance in each functional area under this contract and reserves the right to use whatever additional surveillance procedures are deemed appropriate. The Government will monitor the contract to ensure compliance using a Quality Assurance Surveillance Plan (QASP), but reserves the right to alter the plan at its own discretion. The QASP is included as Figure 22 for information purposes only and will not be made part of any resulting contract. As appropriate, calculation of deductions for certain deficiencies will be made using the contract clause entitled "Inspection of Services" located in Section E, in lieu of the payment analysis method described in the QASP.
The Contractor shall notify the technical point-of-contact located in Section C-1 General, Paragraph C-1.21 prior to beginning a mowing event. Following the completion of each mowing event, the Contractor shall notify the same USACE Technical POC. At the time of completion, the USACE Technical POC will conduct a post-work inspection to ensure that work requirements have been met. The Contractor may participate in this inspection. See Section C-1 General, Paragraph C-1.17 for Deficiencies.
C-1.17 DEFICIENCIES.
a. General. If the Contractor fails to perform, or if performance in any area is judged unsatisfactory by the COR, the Government will take corrective action. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no cost to the Government. When the defect in services cannot be corrected by re-performance, or cannot be corrected in the specified time frame, the Contractor is required to respond to a CDR (See Paragraph C-1.14), and deductions will be determined in accordance with Contract Clause entitled "Inspection of Services" located in Section E and in accordance with the Governments QASP.
b. Mowing. Deficiencies for mowing operations are described in detail in Section C-2, Paragraph C-2.2.
c. Corrective Action-If deficiencies are identified through the Quality Assurance Program, the Government must take action to correct those deficiencies using one, or in some cases a combination of , the following:
1. Stop Unsafe Work. The Government will immediately stop work on that portion of the job affected by a safety hazard, until it is corrected.
2. Issue a Stop Work Order. If the KO determines the deficiency is serious, he/she can issue a Stop Work Order.
3. Re-performance by the Contractor. If time permits, the Contracting Officer may require the Contractor to re-perform the service at no cost to the Government.
4. Re-performance by the Government or another Contractor. If time or the contract does not permit re-performance by the Contractor, Government employees or another Contractor may re-perform the service. The actual cost to perform the corrective work will be deducted and/or billed to the Contractor. This action will be used for mowing services not completed within the mowing cycle, except in rare circumstances.
5. Reduced value Deduction. The Government may reduce the Contract price to reflect the reduced value of the services performed. This method is normally used when the work is not performed by the Contractor, Government or another contractor. The amount of the deduction is equal to the value of the service(s) not performed. As appropriate, calculation of deductions for certain deficiencies will be made using approved methods allowed by the contract clause entitled “Inspection of Services” and/or the payment analysis method described in the
QASP.
6. The COR and Contracting Officer may discuss corrective actions with the Contractor to prevent future occurrences.
C-1.18 SAFEGUARDING GOVERNMENT PROPERTY. The Contractor shall cooperate with Government personnel in safeguarding Government property. The Contractor shall be responsible for promptly reporting all acts of vandalism, larceny, or pilferage to Government property to the COR. During the time that the Contractor is on the property, if there are activities on the site not sanctioned by the Government (e.g. ongoing trash dumping, vandalism), abandoned vehicles, or observed damage caused by tampering or vandalism, the Contractor shall contact the USACE immediately as specified in Section C-1 General, Paragraph C-1.21.
C-1.19 SECURITY REQUIREMENTS. All Contractors and subcontractor employee(s) working on this contract who require access in and/or around any Huntington District facilities (i.e. flood control dams, locks and dams, etc.) shall receive authorization to be on our facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Huntington District Security Management Office shall submit contractor(s) information in order to complete the background investigation and make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results provided by the Huntington District Security Management Office of the background investigation. The
Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed a review of such items and determined they can be released.
Contractor’s failure to adhere can result in penalties, fines, or sanctions up to and including contract termination and/or forfeiture of future contract consideration.
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or around all District facilities. The Contractor must also provide the following:
(1) Name of the Contract Specialist with whom he/she is working,
(2) Project Name,
(3) Contract Number and
(4) Task Order Number when applicable.
The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Huntington District Security Management office).
Contractor shall report any changes in personnel or at anytime conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, Security Management Office will make recommendations to the PCO or their Designated Representative.
The Security Management Office cannot give approval due to unfavorable report(s).