- Mowing, Cleaning, Janitorial and Maintenance Services for J. W. Flannagan and North Fork of Pound Lakes
- Solicitation number
- W91237-16-T-0004
About this file
Solicitation for J.W. Flannagan and North Fork of Pound Lakes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibits.pdf | ||
| W9123716T00040001.pdf | ||
| Synopsis_JWF-NFP_Maint_rev01.pdf | ||
| Synopsis_JWF_NFP_Maint.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91237-16-T-0004 06-Nov-2015
b. TELEPHONE NUMBER
304.399.5046
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 30 Nov 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912379. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ALLISON PACK
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS X
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, CONTRACTING BRANCH
ALLISON PACK, 502 8TH STREET
HUNTINGTON WV 25701-2070
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 304-399-5046 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
7.5M
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF121
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91237-16-T-0004
Section SF 1449 - CONTINUATION SHEET
INSTRUCTIONS TO OFFERORS
This Request for Quote (RFQ) is for an Indefinite Delivery Indefinite Quantity Contract to provide all management, labor, supplies, materials and equipment necessary to perform Mowing, Cleaning and Maintenance services at John W. Flannagan Lake (Dickenson County) and North Fork of Pound Lake, Pound, Virginia (Wise County). All work shall be performed in strict compliance with the attached statement of work and all other terms, clauses and conditions incorporated herein. The base period for this contract will be from date of award through 31 December 2016.
Note: This solicitation contains an option clause to extend the awarded contract for up to four (4) additional one-year periods. The one-year option periods are as follows:
Option Period 1: 01 January 2017 through 31 December 2017 Option Period 2: 01 January 2018 through 31 December 2018 Option Period 3: 01 January 2019 through 31 December 2019 Option Period 4: 01 January 2020 through 31 December 2020
One award will be made from this RFQ. This procurement is 100% set-aside for Small Business, under NAICS code 561730 ($7.5 million average annual receipts for the previous three years).
Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.
There is no bonding requirement for this procurement action.
Quotes will not be accepted for quantities less than the quantities specified in the price breakout schedule. Failure to submit a unit price for all items listed (base year and option years) will be considered as a material deviation from the requirements of the Request for Quote (RFQ) and the quote will be rejected.
Note: Subject to the provisions herein, award will be made as a whole to the lowest priced responsible and responsive offeror.
(a) The Government reserves the right, prior to making an award, to conduct a pre-award survey of the prospective Contractor in order to determine that the Contractor can meet the minimum standards for responsible, prospective Contractors as delineated in the Federal Acquisition Regulation, paragraph 9.104.
The pre-award survey may include but will not be necessarily be limited to the following factors:
(1) Financial resource
(2) Ability to comply with required schedule
(3) Past record of integrity
(4) Past records of performance; and
(5) Ability to meet other qualification and eligibility requirements to receive an award of a contract.
(6) Have the necessary organization and experience
(7) Have the necessary production and resources
(b) Offerors are advised that accomplishment of this survey is a part of the evaluation process and is not to be construed as an indication that an offeror will receive or is in the best position to receive the resultant award.
Submit Offers to: Allison.Pack@usace.army.mil
OR
U.S. Army Corps of Engineers Room 419, ATTN: Allison Pack 502 8th Street Huntington, WV 25701
Quotes are due on the date and time identified on page 1 (box 8) of this solicitation. Electronic submittals may be accepted.
For contractual/technical questions, please contact Allison Pack at 304- 399-5046 or by e-mail at Allison.Pack@usace.army.mil
To set up a site visit, contact the Park Manager at 276-555-8970.
Contract Award
D.1 The contract award will be as a whole to the contractor offering the lowest price, after a determination of responsibility is made by the Contracting Officer and prices are determined to be fair and reasonable (see paragraph D.3). This means that price will be the determining factor considered for award of this contract. “Offeror Quotes” as referred to in this solicitation shall include a completed Price Breakout Schedule as included in this solicitation.
D.2 Content. Offeror quotes and any supporting information shall be specific and complete in every detail and shall contain the information necessary to properly assess the Contractor's capability to perform the specified contract services, D.3 Quoted Prices. The completed Price Breakout Schedule will be reviewed for completeness and compatibility with the estimated price to perform the contract services. Quoted prices will be evaluated for price reasonableness. The Offeror’s price quotation will also be evaluated for proportionality and balance. An Offeror’s price quote may be considered to have unbalanced pricing when it contains line item prices that are significantly over or understated when compared to the estimated cost or competitive pricing. An offer quote may be rejected if the Contracting Officer determines that the lack of balanced pricing poses an unacceptable risk to the Government.
D.4 Overall Price Evaluations. The Government will evaluate quoted prices for award purposes by adding the Offeror’s total price for the base year, to the total prices for all option years. See FAR 52.217-5. Evaluation of pricing of option year periods will not obligate the Government to exercise the option(s). All unit prices shall be inclusive of all costs associated with this contract. For example, there will be no additional payment for supervision, administration, equipment, supplies, profit or other items/services not included on the price breakout schedule.
D.5 Discounts. Prompt payment discounts will not be considered in the evaluation of quotes.
D.6 The Government intends to evaluate price quotes and award a contract without discussions with offerors. Therefore, the offeror's initial quote should contain the offeror's best terms.
D.7 A Government Representative may verify any information provided in the quote to better evaluate the Offerors’ ability to perform.
D.8 Simplified Acquisition procedures are being used per FAR Part 13 and Subpart 13.5.
PRICE BREAKOUT SCHEDULE
BASIC CONTRACT PERIOD - AWARD THRU 31 DECEMBER 2016
SECTION C-2 - MOWING SERVICES
Item # Description Est Qty U/M Unit Price Total
John W. Flannagan Reservoir
0001 Below Dam 10 EA $__________ $___________
0002 Damsite/Office 10 EA $__________ $___________
0003 Spillway 10 EA $__________ $___________
0004 Junction 10 EA $__________ $___________
0005 Lower Twin 10 EA $__________ $___________
0006 Pound River 10 EA $__________ $___________
0007 Cranesnest 10 EA $__________ $___________
0008 Dam Abutments 3 EA $__________ $___________
0009 Lower Twin Leach Field and Roadway 3 EA $__________ $___________
0010 Pound River Leach Field and Access Road
3 EA $__________ $___________
0011 Hollow Place Access Road and Compound
3 EA $__________ $___________
0012 Cranesnest Access Road - Rt. 83 to Area 1
3 EA $__________ $___________
0013 Cranesnest Access Road - Area 1 to Area 3
3 EA $__________ $___________
0014 Cranesnest Access Road - Area 3 to Roads End
3 EA $__________ $___________
SECTION C-2 JWF SUBTOTAL $___________
North Fork of Pound Lake
0015 Dam and Downstream 10 EA $__________ $___________
0016 Dam Access Road, Overlook, Office 10 EA $__________ $___________
0017 Left Dam Abutment, Intake Structure 10 EA $__________ $___________
0018 Right Downstream Dam Abutment 3 EA $__________ $___________
0019 Spillway 2 EA $__________ $___________
0020 Spillway Access Road and Trail 10 EA $__________ $___________
0021 "O" Gage Bottom 10 EA $__________ $___________
0022 Overlook Hillside 3 EA $__________ $___________
SECTION C-2 NFP SUBTOTAL $___________
SECTION C-3 - CLEANING SERVICES - RECREATION AREAS
Item # Description Est Qty U/M Unit Price Total
John W. Flannagan Reservoir
0023 Below Dam Level 1 10 EA $__________ $___________
0024 Below Dam Level 2 110 EA $__________ $___________
0025 Damsite Level 3 24 EA $__________ $___________
0026 Spillway Level 3 110 EA $__________ $___________
0027 Lower Twin Level 1 10 EA $__________ $___________
0028 Lower Twin Level 2 80 EA $__________ $___________
0029 Pound River Level 1 10 EA $__________ $___________
0030 Pound River Level 2 80 EA $__________ $___________
0031 Cranesnest Level 1 10 EA $__________ $___________
0032 Cranesnest Level 2 80 EA $__________ $___________
0033 Junction Level 1 5 EA $__________ $___________
0034 Junction Level 2 110 EA $__________ $___________
0035 Policing Dam 6 EA $__________ $___________
SECTION C-3 JWF SUBTOTAL $___________
0036 Dam Access Road and Overlook Level 2
45 EA $__________ $___________
0037 Dam Access Road and Overlook Level 3
10 EA $__________ $___________
0038 Downstream, Intake Structure and Trail 15 EA $__________ $___________
SECTION C-3 NFP SUBTOTAL $___________
SECTION C-4 - JANITORIAL AND POLICING SERVICES FOR OFFICE/VISITOR CENTER
John W. Flannagan Reservoir
0039 Level 1 52 EA $__________ $___________
0040 Level 2 12 EA $__________ $___________
0041 Level 3 2 EA $__________ $___________
SECTION C-4 JWF SUBTOTAL $___________
0042 Level 1 30 EA $__________ $___________
0043 Level 2 6 EA $__________ $___________
0044 Level 3 2 EA $__________ $___________
SECTION C-4 NFP SUBTOTAL $___________
SECTION C-5 - FACILITY REPAIR, MAINTENANCE, OTHER NON ROUTINE WORK
John W. Flannagan Reservoir
0045 Laborer Grounds Maintenance 600 HR $__________ $___________
0046 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
0047 Boat Operator - 16-40' Workboat, 10-150
HP
100 HR $__________ $___________
0048 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
0049 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
0050 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
0051 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
0052 Mower and Operator (42" or Larger, Min 15 HP)
25 HR $__________ $___________
SECTION C-5 JWF SUBTOTAL $___________
0053 Laborer Grounds Maintenance 400 HR $__________ $___________
0054 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
0055 Boat Operator - 16-40' Workboat, 10-150
HP
50 HR $__________ $___________
0056 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
0057 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
0058 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
0059 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
0060 Mower and Operator (42" or Larger, SECTION C-5 NFP SUBTOTAL
SECTION C-6 - DRIFT, DEBRIS AND TRASH REMOVAL
John W. Flannagan Reservoir
0061 Combustible Drift and Debris 100 CY $__________ $___________
0062 Non-Combustible Drift and Debris 100 CY $__________ $___________
SECTION C-6 JWF SUBTOTAL $___________
TOTAL BASE PERIOD $___________
OPTION PERIOD ONE - 01 JANUARY 2017 THRU 31 DECEMBER 2017
SECTION C-2 - MOWING SERVICES
Item # Description Est Qty U/M Unit Price Total
John W. Flannagan Reservoir
1001 Below Dam 10 EA $__________ $___________
1002 Damsite/Office 10 EA $__________ $___________
1003 Spillway 10 EA $__________ $___________
1004 Junction 10 EA $__________ $___________
1005 Lower Twin 10 EA $__________ $___________
1006 Pound River 10 EA $__________ $___________
1007 Cranesnest 10 EA $__________ $___________
1008 Dam Abutments 3 EA $__________ $___________
1009 Lower Twin Leach Field and Roadway 3 EA $__________ $___________
1010 Pound River Leach Field and Access Road
3 EA $__________ $___________
1011 Hollow Place Access Road and Compound
3 EA $__________ $___________
1012 Cranesnest Access Road - Rt. 83 to Area 1
3 EA $__________ $___________
1013 Cranesnest Access Road - Area 1 to Area 3
3 EA $__________ $___________
1014 Cranesnest Access Road - Area 3 to Roads End
1015 Dam and Downstream 10 EA $__________ $___________
1016 Dam Access Road, Overlook, Office 10 EA $__________ $___________
1017 Left Dam Abutment, Intake Structure 10 EA $__________ $___________
1018 Right Downstream Dam Abutment 3 EA $__________ $___________
1019 Spillway 2 EA $__________ $___________
1020 Spillway Access Road and Trail 10 EA $__________ $___________
1021 "O" Gage Bottom 10 EA $__________ $___________
1022 Overlook Hillside 3 EA $__________ $___________
John W. Flannagan Reservoir
1023 Below Dam Level 1 10 EA $__________ $___________
1024 Below Dam Level 2 110 EA $__________ $___________
1025 Damsite Level 3 24 EA $__________ $___________
1026 Spillway Level 3 110 EA $__________ $___________
1027 Lower Twin Level 1 10 EA $__________ $___________
1028 Lower Twin Level 2 80 EA $__________ $___________
1029 Pound River Level 1 10 EA $__________ $___________
1030 Pound River Level 2 80 EA $__________ $___________
1031 Cranesnest Level 1 10 EA $__________ $___________
1032 Cranesnest Level 2 80 EA $__________ $___________
1033 Junction Level 1 5 EA $__________ $___________
1034 Junction Level 2 110 EA $__________ $___________
1035 Policing Dam 6 EA $__________ $___________
1036 Dam Access Road and Overlook Level 2
45 EA $__________ $___________
1037 Dam Access Road and Overlook Level 3
10 EA $__________ $___________
1038 Downstream, Intake Structure and Trail 15 EA $__________ $___________
John W. Flannagan Reservoir
1039 Level 1 52 EA $__________ $___________
1040 Level 2 12 EA $__________ $___________
1041 Level 3 2 EA $__________ $___________
1042 Level 1 30 EA $__________ $___________
1043 Level 2 6 EA $__________ $___________
1044 Level 3 2 EA $__________ $___________
John W. Flannagan Reservoir
1045 Laborer Grounds Maintenance 600 HR $__________ $___________
1046 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
1047 Boat Operator - 16-40' Workboat, 10-150
HP
100 HR $__________ $___________
1048 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
1049 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
1050 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
1051 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
1052 Mower and Operator (42" or Larger, Min 15 HP)
1053 Laborer Grounds Maintenance 400 HR $__________ $___________
1054 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
1055 Boat Operator - 16-40' Workboat, 10-150
HP
50 HR $__________ $___________
1056 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
1057 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
1058 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
1059 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
1060 Mower and Operator (42" or Larger, SECTION C-5 NFP SUBTOTAL $ ___________
John W. Flannagan Reservoir
1061 Combustible Drift and Debris 100 CY $__________ $___________
1062 Non-Combustible Drift and Debris 100 CY $__________ $___________
TOTAL OPTION PERIOD ONE $___________
OPTION PERIOD TWO - 01 JANUARY 2018 THRU 31 DECEMBER 2018
Item # Description Est Qty U/M Unit Price Total
John W. Flannagan Reservoir
2001 Below Dam 10 EA $__________ $___________
2002 Damsite/Office 10 EA $__________ $___________
2003 Spillway 10 EA $__________ $___________
2004 Junction 10 EA $__________ $___________
2005 Lower Twin 10 EA $__________ $___________
2006 Pound River 10 EA $__________ $___________
2007 Cranesnest 10 EA $__________ $___________
2008 Dam Abutments 3 EA $__________ $___________
2009 Lower Twin Leach Field and Roadway 3 EA $__________ $___________
2010 Pound River Leach Field and Access Road
3 EA $__________ $___________
2011 Hollow Place Access Road and Compound
3 EA $__________ $___________
2012 Cranesnest Access Road - Rt. 83 to Area 1
3 EA $__________ $___________
2013 Cranesnest Access Road - Area 1 to Area 3
3 EA $__________ $___________
2014 Cranesnest Access Road - Area 3 to Roads End
2015 Dam and Downstream 10 EA $__________ $___________
2016 Dam Access Road, Overlook, Office 10 EA $__________ $___________
2017 Left Dam Abutment, Intake Structure 10 EA $__________ $___________
2018 Right Downstream Dam Abutment 3 EA $__________ $___________
2019 Spillway 2 EA $__________ $___________
2020 Spillway Access Road and Trail 10 EA $__________ $___________
2021 "O" Gage Bottom 10 EA $__________ $___________
2022 Overlook Hillside 3 EA $__________ $___________
John W. Flannagan Reservoir
2023 Below Dam Level 1 10 EA $__________ $___________
2024 Below Dam Level 2 110 EA $__________ $___________
2025 Damsite Level 3 24 EA $__________ $___________
2026 Spillway Level 3 110 EA $__________ $___________
2027 Lower Twin Level 1 10 EA $__________ $___________
2028 Lower Twin Level 2 80 EA $__________ $___________
2029 Pound River Level 1 10 EA $__________ $___________
2030 Pound River Level 2 80 EA $__________ $___________
2031 Cranesnest Level 1 10 EA $__________ $___________
2032 Cranesnest Level 2 80 EA $__________ $___________
2033 Junction Level 1 5 EA $__________ $___________
2034 Junction Level 2 110 EA $__________ $___________
2035 Policing Dam 6 EA $__________ $___________
2036 Dam Access Road and Overlook Level 2
45 EA $__________ $___________
2037 Dam Access Road and Overlook Level 3
10 EA $__________ $___________
2038 Downstream, Intake Structure and Trail 15 EA $__________ $___________
John W. Flannagan Reservoir
2039 Level 1 52 EA $__________ $___________
2040 Level 2 12 EA $__________ $___________
2041 Level 3 2 EA $__________ $___________
2042 Level 1 30 EA $__________ $___________
2043 Level 2 6 EA $__________ $___________
2044 Level 3 2 EA $__________ $___________
John W. Flannagan Reservoir
2045 Laborer Grounds Maintenance 600 HR $__________ $___________
2046 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
2047 Boat Operator - 16-40' Workboat, 10-150
HP
100 HR $__________ $___________
2048 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
2049 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
2050 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
2051 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
2052 Mower and Operator (42" or Larger, Min 15 HP)
2053 Laborer Grounds Maintenance 400 HR $__________ $___________
2054 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
2055 Boat Operator - 16-40' Workboat, 10-150
HP
50 HR $__________ $___________
2056 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
2057 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
2058 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
2059 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
2060 Mower and Operator (42" or Larger, SECTION C-5 NFP SUBTOTAL
John W. Flannagan Reservoir
2061 Combustible Drift and Debris 100 CY $__________ $___________
2062 Non-Combustible Drift and Debris 100 CY $__________ $___________
TOTAL OPTION PERIOD TWO $___________
OPTION PERIOD THREE - 01 JANUARY 2019 THRU 31 DECEMBER 2019
Item # Description Est Qty U/M Unit Price Total
John W. Flannagan Reservoir
3001 Below Dam 10 EA $__________ $___________
3002 Damsite/Office 10 EA $__________ $___________
3003 Spillway 10 EA $__________ $___________
3004 Junction 10 EA $__________ $___________
3005 Lower Twin 10 EA $__________ $___________
3006 Pound River 10 EA $__________ $___________
3007 Cranesnest 10 EA $__________ $___________
3008 Dam Abutments 3 EA $__________ $___________
3009 Lower Twin Leach Field and Roadway 3 EA $__________ $___________
3010 Pound River Leach Field and Access Road
3 EA $__________ $___________
3011 Hollow Place Access Road and Compound
3 EA $__________ $___________
3012 Cranesnest Access Road - Rt. 83 to Area 1
3 EA $__________ $___________
3013 Cranesnest Access Road - Area 1 to Area 3
3 EA $__________ $___________
3014 Cranesnest Access Road - Area 3 to Roads End
3015 Dam and Downstream 10 EA $__________ $___________
3016 Dam Access Road, Overlook, Office 10 EA $__________ $___________
3017 Left Dam Abutment, Intake Structure 10 EA $__________ $___________
3018 Right Downstream Dam Abutment 3 EA $__________ $___________
3019 Spillway 2 EA $__________ $___________
3020 Spillway Access Road and Trail 10 EA $__________ $___________
3021 "O" Gage Bottom 10 EA $__________ $___________
3022 Overlook Hillside 3 EA $__________ $___________
John W. Flannagan Reservoir
3023 Below Dam Level 1 10 EA $__________ $___________
3024 Below Dam Level 2 110 EA $__________ $___________
3025 Damsite Level 3 24 EA $__________ $___________
3026 Spillway Level 3 110 EA $__________ $___________
3027 Lower Twin Level 1 10 EA $__________ $___________
3028 Lower Twin Level 2 80 EA $__________ $___________
3029 Pound River Level 1 10 EA $__________ $___________
3030 Pound River Level 2 80 EA $__________ $___________
3031 Cranesnest Level 1 10 EA $__________ $___________
3032 Cranesnest Level 2 80 EA $__________ $___________
3033 Junction Level 1 5 EA $__________ $___________
3034 Junction Level 2 110 EA $__________ $___________
3035 Policing Dam 6 EA $__________ $___________
3036 Dam Access Road and Overlook Level 2
45 EA $__________ $___________
3037 Dam Access Road and Overlook Level 3
10 EA $__________ $___________
3038 Downstream, Intake Structure and Trail 15 EA $__________ $___________
John W. Flannagan Reservoir
3039 Level 1 52 EA $__________ $___________
3040 Level 2 12 EA $__________ $___________
3041 Level 3 2 EA $__________ $___________
3042 Level 1 30 EA $__________ $___________
3043 Level 2 6 EA $__________ $___________
3044 Level 3 2 EA $__________ $___________
John W. Flannagan Reservoir
3045 Laborer Grounds Maintenance 600 HR $__________ $___________
3046 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
3047 Boat Operator - 16-40' Workboat, 10-150
HP
100 HR $__________ $___________
3048 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
3049 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
3050 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
3051 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
3052 Mower and Operator (42" or Larger, Min 15 HP)
3053 Laborer Grounds Maintenance 400 HR $__________ $___________
3054 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
3055 Boat Operator - 16-40' Workboat, 10-150
HP
50 HR $__________ $___________
3056 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
3057 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
3058 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
3059 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
3060 Mower and Operator (42" or Larger, John W. Flannagan Reservoir
3061 Combustible Drift and Debris 100 CY $__________ $___________
3062 Non-Combustible Drift and Debris 100 CY $__________ $___________
TOTAL OPTION PERIOD THREE $___________
OPTION PERIOD FOUR - 01 JANUARY 2020 THRU 31 DECEMBER 2020
Item # Description Est Qty U/M Unit Price Total
John W. Flannagan Reservoir
4001 Below Dam 10 EA $__________ $___________
4002 Damsite/Office 10 EA $__________ $___________
4003 Spillway 10 EA $__________ $___________
4004 Junction 10 EA $__________ $___________
4005 Lower Twin 10 EA $__________ $___________
4006 Pound River 10 EA $__________ $___________
4007 Cranesnest 10 EA $__________ $___________
4008 Dam Abutments 3 EA $__________ $___________
4009 Lower Twin Leach Field and Roadway 3 EA $__________ $___________
4010 Pound River Leach Field and Access Road
3 EA $__________ $___________
4011 Hollow Place Access Road and Compound
3 EA $__________ $___________
4012 Cranesnest Access Road - Rt. 83 to Area 1
3 EA $__________ $___________
4013 Cranesnest Access Road - Area 1 to Area 3
3 EA $__________ $___________
4014 Cranesnest Access Road - Area 3 to Roads End
4015 Dam and Downstream 10 EA $__________ $___________
4016 Dam Access Road, Overlook, Office 10 EA $__________ $___________
4017 Left Dam Abutment, Intake Structure 10 EA $__________ $___________
4018 Right Downstream Dam Abutment 3 EA $__________ $___________
4019 Spillway 2 EA $__________ $___________
4020 Spillway Access Road and Trail 10 EA $__________ $___________
4021 "O" Gage Bottom 10 EA $__________ $___________
4022 Overlook Hillside 3 EA $__________ $___________
John W. Flannagan Reservoir
4023 Below Dam Level 1 10 EA $__________ $___________
4024 Below Dam Level 2 110 EA $__________ $___________
4025 Damsite Level 3 24 EA $__________ $___________
4026 Spillway Level 3 110 EA $__________ $___________
4027 Lower Twin Level 1 10 EA $__________ $___________
4028 Lower Twin Level 2 80 EA $__________ $___________
4029 Pound River Level 1 10 EA $__________ $___________
4030 Pound River Level 2 80 EA $__________ $___________
4031 Cranesnest Level 1 10 EA $__________ $___________
4032 Cranesnest Level 2 80 EA $__________ $___________
4033 Junction Level 1 5 EA $__________ $___________
4034 Junction Level 2 110 EA $__________ $___________
4035 Policing Dam 6 EA $__________ $___________
4036 Dam Access Road and Overlook Level 2
45 EA $__________ $___________
4037 Dam Access Road and Overlook Level 3
10 EA $__________ $___________
4038 Downstream, Intake Structure and Trail 15 EA $__________ $___________
John W. Flannagan Reservoir
4039 Level 1 52 EA $__________ $___________
4040 Level 2 12 EA $__________ $___________
4041 Level 3 2 EA $__________ $___________
4042 Level 1 30 EA $__________ $___________
4043 Level 2 6 EA $__________ $___________
4044 Level 3 2 EA $__________ $___________
John W. Flannagan Reservoir
4045 Laborer Grounds Maintenance 600 HR $__________ $___________
4046 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
4047 Boat Operator - 16-40' Workboat, 10-150
HP
100 HR $__________ $___________
4048 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
4049 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
4050 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
4051 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
4052 Mower and Operator (42" or Larger, Min 15 HP)
4053 Laborer Grounds Maintenance 400 HR $__________ $___________
4054 Tractor Operator - Kubota L3830 or Equivalent w/ Attachments
50 HR $__________ $___________
4055 Boat Operator - 16-40' Workboat, 10-150
HP
50 HR $__________ $___________
4056 Dump Truck and Operator (2 Ton or Larger)
50 HR $__________ $___________
4057 Chainsaw and Operator (18" or Larger) 100 HR $__________ $___________
4058 Truck and Operator (1/2 Ton or Larger, 4X4)
50 HR $__________ $___________
4059 Trimmer and Operator (String/Blade, Min
25CC)
100 HR $__________ $___________
4060 Mower and Operator (42" or Larger, John W. Flannagan Reservoir
4061 Combustible Drift and Debris 100 CY $__________ $___________
4062 Non-Combustible Drift and Debris 100 CY $__________ $___________
TOTAL BASE PERIOD, OPTION ONE, OPTION TWO, OPTION THREE
AND OPTION FOUR
STATEMENT OF WORK
JOHN W. FLANNAGAN DAM AND RESERVOIR & NORTH FORK OF POUND LAKE
SERVICES CONTRACT
TABLE OF CONTENTS
Section C-1
GENERAL
SECTION C-1
GENERAL
C-1.1 PROJECT INFORMATION
C-1.2 SCOPE OF WORK
C-1.3 TASK ORDERS
C-1.4 NEGOTIATION
C-1.5 C-1.6
WORKING HOURS
CONTRACTOR SUBMITTALS
C-1.7 PERMITS AND LICENSES
C-1.8 IDENTIFICATION OF CONTRACTOR EMPLOYEES AND VEHICLES
C-1.9 SAFETY AND HEALTH REQUIREMENTS
C-1.10 SECURITY REQUIREMENTS
C-1.11 DAMAGE REPORTS
C-1.12 CONTRACTOR EMPLOYEES’ CONDUCT AND COMPETENCY
C-1.13 DAMAGE OR LOSS OF CONTRACTORS SUPPLIES AND PROPERTY
C-1.14 SUPERVISION
C-1.15 ENVIRONMENTAL PROGRAM
C-1.16 CONTRACTOR DISCREPANCY REPORT (CDR)
C-1.17 MEETINGS
C-1.18 QUALITY CONTROL
C-1.19 QUALITY ASSURANCE
C-1.20 C-1.21 C-1.22
DEFICIENCIES
CONTRACTOR WORK SCHEDULE
EMERGENCY WORK
C-1.23 INTERRUPTIONS TO SYSTEMS
C-1.24 GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT
C-1.25 CONTRACTOR FURNISHED ITEMS
C-1.26 SAFEGUARDING GOVERNMENT PROPERTY
C-1.27 NOTIFICATION OF WORK TO BE DONE
C-1.28 MINIMUM MANPOWER REQUIREMENTS
C-1.29 MINIMUM PERSONNEL QUALIFICATIONS
C-1.30
C-1.31
COOPERATION WITH OTHER CONTRACTORS, LESSEES, AND
VOLUNTEERS
INCLEMENT WEATHER AND HOLIDAY WORK
C-1.32 PREWORK CONFERENCE
C-1.33 C-1.34
REPORTS
APPLICABLE PUBLICATIONS
C-1.35 HOURLY RATES – PRICE PROPOSAL
C-1.36 DEFINITIONS
SECTION C-2
MOWING SERVICES
SECTION C-2
C-2.1 SCOPE OF WORK
C-2.2 GENERAL
C-2.3 WORK TO BE PERFORMED
C-2.4 MOWING CYCLE
C-2.5 C-2.6 C-2.7 C-2.8 C-2.9 C-2.10
PRUNING
TREE AND BRUSH CUTTING
ACCESS ROAD CLEARING
PLANTING OR REPLACING PLANTS
PREVENTION OF LANDSCAPE DEFACEMENT
RESTORATION OF LANDSCAPE DAMAGE
C-2.11 ITEMS TO BE FURNISHED BY THE GOVERNMENT
C-2.12 SUPPLIES TO BE FURNISHED BY THE CONTRACTOR
C-2.13 SERVICE EQUIPMENT
C-2.14 SPECIAL PROVISIONS
C-2.15 SERVICE AREAS
SECTION C-3
CLEANING SERVICES – RECREATION AREAS
SECTION C-3
C-3.1 GENERAL
C-3.2 WORK TO BE PERFORMED
C-3.3 SERVICE EQUIPMENT
C-3.4 SPECIAL PROVISIONS
C-3.5 SUPPLIES TO BE FURNISHED BY THE GOVERNMENT
C-3.6 C-3.7
SUPPLIES TO BE FURNISHED BY THE CONTRACTOR
SERVICE AREAS
SECTION C-4
JANITORIAL AND POLICING SERVICES
SECTION C-4
C-4.1 GENERAL
C-4.2 SERVICE AREAS
C-4.3 C-4.4
WORK TO BE PERFORMED
DEFICIANCIES
C-4.5 SUPPLIES TO BE FURNISHED BY CONTRACTOR
C-4.6 SPECIAL PROVISIONS
C-4.7 SERVICE EQUIPMENT
SECTION C-5
FACILITY REPAIR, MAINTENANCE, AND OTHER NON-ROUTINE WORK
SECTION C-5
C-5.1 GENERAL
C-5.2 NON-ROUTINE WORK
C-5.3 WORK TO BE PERFORMED
C-5.4 SCHEDULE OF WORK
C-5.5 LOCATION OF THE WORK
C-5.6 EQUIPMENT LIST
C-5.7 EQUIPMENT AND SUPPLIES
C-5.8 SPECIAL PROVISIONS
SECTION C-6
DRIFT, DEBRIS, AND TRASH REMOVAL
SECTION C-6
C-6.1 GENERAL
C-6.2 WORK TO BE PERFORMED
C-6.3 SCHEDULE OF WORK
C-6.4 SPECIAL REQUIREMENTS
C-6.5 DRIFT AND DEBRIS REMOVAL REQUIREMENTS
C-6.6 MEASUREMENT METHODS FOR PAYMENT
C-6.7 EQUIPMENT LIST
DESCRIPTION/SPECIFICATIONS
SECTION C-1
General
C-1.1. BACKGROUND. John W. Flannagan Dam & Reservoir is located on Pound River in Dickenson County, Virginia between the towns of Haysi and Clintwood. The project purposes served include flood damage reduction, low-flow augmentation, fish and wildlife conservation, recreation and water supply. Approximate annual visitation to the Corps operated recreation areas is 400,000.
North Fork of Pound Lake is located on North Fork of Pound River near the town of Pound in Wise County, Virginia. The project purposes served include flood damage reduction, recreation, fish and wildlife conservation and water supply. Approximate annual visitation to the Corps operated recreation areas is 135,000.
C-1.2. SCOPE OF WORK. The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform mowing, cleaning, janitorial, and other services at the John W. Flannagan Dam & Reservoir and North Fork of Pound Lake project recreation areas, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. Award of a contract does not guarantee that the Government will order all of the types of services listed under the contract from the Contractor. The Government reserves the right to perform any portion of the services listed.
The quantities listed in the price schedule are approximate and are provided as information only to assist in preparation of quotes. They are not guaranteed and the actual quantities may be more or less than shown. Variation in these estimated quantities shall not be justification for modification of the contract or request for additional payment.
Contractor shall perform all related Contractor administrative services necessary to perform the work such as procurement, quality control, Contractor financial control, and maintenance of accurate and complete records and files.
It is emphasized that the work described in this contract is a critical part of the Corps mission. The work described shall be performed in public recreation areas. The Corps is committed to "Customer Care" and providing quality professional service.
Work included in this contract generally involves work associated with operation and maintenance of areas at the specified Government projects. However, in special instances the contractor may be issued a task order under this contract for other Huntington District projects within the Commonwealth of Kentucky and within 50 linear miles.
Examples of these special instances may include but are not limited to damaging storms, wildfires, floods, or other time-sensitive maintenance needs. Task orders issued in these circumstances will be negotiated on an individual basis using contract line items from the price breakout schedule.
C-1.3. TASK ORDERS. All work under this contract will be ordered by issuance of individual Task Orders (SF Form 1449, see Exhibit L). No work shall be performed under this contract before an individual Task Order has been issued by the Contracting Officer (KO). The Contracting Officer has three basic ways to order work using this contract: Fixed Price Task Orders, Negotiated Task Orders, Estimated Task Orders. Only the KO, by issuance of a modification, may make any change to a Task Order. The type of Task Order used will be at the discretion of the KO. The Task Order will list those items from the price breakout schedule that are to be performed or used to perform the work, except for negotiated Task Orders.
C-1.4. NEGOTIATION. Task Orders that are to be performed on an hourly basis (e.g., using items from C-5 of the price schedule) will be agreed upon by negotiation between the Contractor and the Contracting Officer.
If the Contractor’s proposal is acceptable, the KO will issue a Task Order. If the contractor’s proposal is considered unacceptable, the KO and the Contractor will attempt to reach a fair and reasonable price through negotiation. If an agreement cannot be reached, the Government reserves the right to obtain services in question by whatever means deemed to be in the best interest of the Government, including use of its own workforce.
The purpose of negotiation is to establish a fair and reasonable price for the job under consideration. The KO and Contractor will negotiate the CLINs and number of hours required. Once negotiated, the Contractor must perform the job using the line items agreed upon during negotiations. Task Orders will be issued for the negotiated price (One Job for Sum) for services listed in Section C-5.
C-1.5. WORKING HOURS.
a. Normal Working Hours. Normal working hours, except as otherwise specified herein, shall be Monday through Friday, 7:30 a.m. to 4:00 p.m. or as specified on the Task Order. Work inside Government buildings or other secured areas shall be performed during the above referenced work hours. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the Contracting Officer Representative (COR). Refer to individual sections of this specification for specific schedules of work.
b. Holiday Work. The ten Federal holidays observed are:
New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday.
When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work shall be scheduled around the above listed Federal holidays except as specified herein or as determined by the Contracting Officer Representative (COR).
Work may be required on holiday periods during heavy visitation, emergencies, or for other reasons as determined by the COR. Additional personnel may be required to handle the additional work load during holiday periods because of heavy visitation.
c. Emergency Working Hours. If applicable, emergency hours will be stated on the Task Order.
d. Inclement Weather Work. The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the KO when severe conditions make it impractical or dangerous to perform the work. The KO will notify the Contractor, by modification to the Task Order, of any change that extends the performance period due to inclement weather.
C-1.6. CONTRACTOR SUBMITTALS. Unless otherwise specified, the Contractor shall submit the following information to the COR prior to the pre-work conference for this contract:
a. Quality Control Plan. A suggested outline for the Contractor’s Quality Control Plan is in Exhibit G
b. Contractor Quality Control Inspector. List of Quality Control Inspectors.
c. Contractor Representatives. List of names of Contractor Representatives.
d. Accident Prevention Plan. Checklist A-02 for the Contractor’s Accident Prevention Plan is in Exhibit D.
See Section C-1.9 for APP requirements.
e. Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor Representatives) to call in case of emergencies.
f. Operators. A list of names of qualified equipment/vehicle operators, including experience, training, and qualification to operate specific equipment.
g. Certificate of Insurance. See Special Contract Requirements.
h. Security Requirements. See C-1.10.
C-1.7. PERMITS AND LICENSES. The Contractor shall, at his own expense, obtain any licenses or permits required to perform the contract. The Contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes.
C-1.8. IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES. The Contractor shall furnish his employees, other than office and clerical personnel, standardized uniforms (work shirt & work pants) with acompany identification on the breast pocket or on the sleeve at the top of the arm, within 30 days after notice of award of the contract. Any employee hired 30 calendar days after award of the Contract shall be in the required uniform within 14 calendar days of the date of hire. Contractor uniforms shall not resemble U.S. Army Corps of Engineers uniforms. Contractor employees and subcontractors shall wear these uniforms at all times they are performing work under this contract. Exceptions may be granted by the COR for short term workers, or during disasters, emergencies, wildfire suppression, or special circumstances specified by the COR. Stained or faded uniforms shall not be worn. Uniform shirts shall be neatly tucked into pants at all times employees are on duty.
All vehicles used by the Contractor to perform work under this contract shall be identified with the company name prominently displayed on the outside of both front doors of each vehicle in a professional manner to provide an attractive and readily visible means of identification.
The Contractor may require his employees to report in their own vehicles to the project, but these personal vehicles must be parked at a site designated by the COR. All vehicles used in performance of work must be marked.
Vehicles used by the Contractor to perform administrative functions such as morning meetings or crew supervision must also be marked.
C-1.9. SAFETY AND HEALTH REQUIREMENTS.
a. General. Contractor shall comply with all Federal, State and Local safety requirements including those specified by the Occupational Safety and Health Act (OSHA) in 29 CRF 1910 General Industry Standard, 1926 Construction Standard and the U.S. Army Corps of Engineers Safety & Health Requirements Manual EM 385-1-1 as currently revised. Where a conflict exists between safety standards/requirements the contractor shall comply with the more stringent requirement. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, any project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.
The Contractor shall comply with the Occupational Safety and Health Act (OSHA), the Corps of Engineers Manual, EM 385-1-1 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf).
A partial listing of Safety Requirements is in Exhibit E and as otherwise stated herein. Special attention shall be given to the requirements for safety meetings. The Contractor shall inform the COR a minimum of 7 days prior to a Contractor monthly safety meeting, to permit a Government representative to attend.
b. Contractor Accident Prevention Plan (APP). The Contractor shall prepare a site-specific Accident Prevention Plan following the outline provided in EM 385-1-1, Appendix A as a minimum. A checklist is provided in Exhibit D. The contractor shall address each element and sub-element in the outline in the order they appear in Appendix A. Any item from the outline that does not apply must be listed, in its assigned place and a brief explanation of the reason it is not required/provided. The APP shall address any unusual or unique aspects of the project or activity. This plan must be accepted by the Contracting Officer prior to commencement of any work.
Contractors are encouraged to contact the USACE Safety & Occupational Health Office for questions or information regarding the development of contract Accident Prevention Plans. Office hours are Monday-Friday 8:30 a.m. - 4 p.m. at (304)399-5039/5032/5326. The web address for EM 385-1-1 is:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
Note: The contractor shall employ a Site Safety and Health Officer (SSHO) who has completed OSHA 30 hour Construction or General Industry Safety training or its equivalent and has five (5) years experience relative to the work to be performed. SSHO credentials shall be submitted for review and acceptance with the APP. SSHO shall complete a minimum of eight (8) hours of safety training annually.
(1) For Negotiated task orders where the Risk Assessment Code (RAC) of the AHA is high or extremely high risk, the SSHO shall be on-site and have no other duties. Following is a list of jobs normally considered high or extremely high risk (This list is not necessarily all inclusive, each task must be evaluated to determine risk):
Repair buoys
Attach anchors & cables
Drift/Debris cleanup
Work with exposure to hazardous, toxic or radiological waste
Topping trees
Removing/anchoring fallen trees
Remove beaver dams
Alleviate major drainage problems
Bridge decking
Fire Fighting
(2) For limited service contracts, such as park attendant, cleaning, janitorial, routine mowing, general grounds-keeping and low risk negotiated task orders, SSHO responsibilities may be a collateral duty.
The Collateral duty SSHO shall have an OSHA approved 30 hour safety course. Following is a list of jobs normally considered low to moderate risk:
Removing or replacing bulletin boards, signs, barricades, gates, bumpers, curbs, fences & posts
Planting seeds, installing grills, lantern posts, fire rings, & other campground equipment
Repairs to fences, play equipment, game courts, picnic units & shelters.
Boundary marking
Cleaning culverts
Spreading gravel or anchoring picnic tables
Minor landscaping
Routine building maintenance (painting, plumbing, caulking, patching, finishing, sheet rock, floor tile, carpet, etc.
(3) For very low risk jobs and jobs requiring only one person, such as, field walk-over, surface soil sampling or long term water sampling, the SSHO may be collateral duty.
(4) Work crews of two or more must have two people holding current certification in First Aid and CPR from the American Red Cross, American Heart Association or a licensed physician. Training must include a hands-on component that cannot be taken online and the contractor must maintain appropriate First Aid kit on site. Single individuals working alone must have current certification in First Aid as a minimum.
(5) All work that potentially exposes the worker to falls of six feet or more will require the contractor to submit a Site Specific Fall Protection & Prevention Plan in accordance with EM 385-1-1, Section 21.D.
(6) Cranes and hoisting equipment shall be operated only by qualified personnel (operators licensing, physical and drug testing in accordance with EM 385-1-1 Section 16.B). Note: CDL Medical Clearance is not acceptable. Please see attached medical clearance requirements.
(7) Effective November 8, 2010 all “Signalpersons” and “Riggers” shall be qualified. This is a mandatory requirement in accordance with 29 CFR 1926.1400 Regulations. Riggers must be a qualified person for the performance of specified hoisting activities such as during assembly/disassembly, in accordance with OSHA 1926.1404(r)(1) and 1926.1425(c)(3).
(8) Task orders involving potential exposure to Hazardous, Toxic or Radiological Waste shall require development of Site Specific Safety and Health Plan (SSHP) by qualified personnel as specified in EM 385-1-1 Sections 6 and 33.
c. Risk Management Process. The Contractor shall utilize risk management tools such as Activity Hazard
Analysis (AHA), Job Hazard Analyses (JHAs), Job Safety Analyses (JSAs) or similar tools to identify, assess, prioritize risks and develop controls to minimize, monitor and control the probability and/or impact of unfortunate events to an acceptable level. Within each major phase, all activities, tasks or Definable Features of Work (DFOWs) shall be identified that will require an AHA/JSA/JHA. For each work activity, task or DFOW contractor shall prepare the initial AHA/JSA. A Risk Assessment Code (RAC) is assigned to each step, to the risk that remains after controls have been applied (residual risk) a final RAC (cannot be lower than the highest step RAC) shall be assigned. See EM 385-1-1 Section 01.A.14.b. for further guidance or contact the SOHO for assistance. The AHA/JSA/JHA shall be reviewed and accepted by the proper authority in order to proceed with the activity. All on-site employees shall review the accepted AHA/JSA/JHA prior to performing work and during weekly and “Tool Box” safety meetings as appropriate.
1. AHA/JSA shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk.