Attachments_W91237-12-R-0011.pdf
PDF 4 MB Posted
- Attached to
- IDC FOR FLOATING PLANT DRILLING SERVICES FOR THE GREAT LAKES AND OHIO RIVER DIVISION, CORPS OF ENGINEERS.
- Solicitation number
- W91237-12-R-0011
About this file
Attachments for Solcitation W91237-12-R-0011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12-R-0011_Floating_Plant_Amend_1.pdf | ||
| 12-R-0011_Floating_Plant_Drilling.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CANADA
NY
PA
VA
MI
MN
WI
IL
IA
OH
IN
KY
MO
AR
TN
MS
AL
GA
SC
NC
WV
MD
NJ
DE
DETROIT
PITTSBURGH
BUFFALO
CHICAGO
AT
LA
N
TI
C
O C
E A
N
LAKE
SUPERIOR
L A
K E
M
IC
H
IG
A N
LAKE
H U
R O
N
LAKE
ERIE
LAKE ONTARIO
CINCINNATI
T T
T
T T
T
T T
T T
TT
TT
T T
T T T
T T T
T
T T
T
T
T T
T
T T
T
T
T T
T T
T
T
T
T T
T
T T
T T
T
T
T
T
T
Opekiska
Fox R
F ox
R
Des Plaines R.
Little Calumet R.
Kankakee R.
Ohio
River
St. Marys River
Rouge R.
St. Clair R.
Detroit R.
Straits of Mackinac
Niagara R.
St. L awrence River
Alle gh en y R
M on on ga he la
R
Ohio
R iv er
Kanawha
R iverRiver
Kentucky
RiverGreen
River
Cumberland
Rive r
Tennessee
LOUISVILLE HUNTINGTON
NASHVILLE
T
T
GREAT LAKES & OHIO RIVER DIVIS ION
US Army Corps o f Engineers
Civil Works Activities November 1998
Detroit District Chicago District Buffalo District Louisville District Huntington District Nashville District Pittsburgh District
DISTRICT BOUNDARIES
Division Headquarters District Headquarters Lock and Dam Dam & Reservoir International Boundary State Boundary Deep Draft Harbors (14 feet) Shallow Draft Harbors
T
KEY
H1RMXBHL
Typewritten Text
H1RMXBHL
Typewritten Text Map 1
CELRH-2093
Y N Y N
Start Finish Y N
FT
Bearing: Distance:
Y N Y N Personnel on site : (names)
Delays in Work:
Hours:
Linear Feet CASING:
Installed by:
Driving___ Drilling___
FT
Energy Rating if Automatic:
Concrete Confined? Linear Feet
Description of Barrel, Manufacturer, Model, Size
Description of Bit, Manufacturer, Serial Number
PRESSURE TESTS Number: Zones Tested: Single/Double Packer:
PIEZOMETER INSTALLATION Tip Depth Top Zone Depth Bottom of Zone Depth
BACKFILL: check after 24 hours for success
Y N Y N Y N
Dozer Time:
Hours:
Signature of Field Inspector:
Hole Location Photo?
Bentonite Balls Bags of Bentonite Bags of Cement
Remarks: Any item requiring Clarification, names of visitors, special instructions from Corps Personnel:
Other Billable Work Items:
Buckets Backfill successful:
Locator Bar Installed?
Standpipe
SOIL SAMPLING
Flushmount
Difficulties:
CORING:
Size:_______ Size: ______ Size: ______
Coring Difficulties: Depths, Remarks, Include Zone of Rod Chatter, Water Loss, Rod Drops, Core Loss, etc.:
Depth Casing First Required:
Depth Groundwater First Encountered:
Depth Water Introduced to Hole:
Size and type of Hammer Used:
Number pushed:
SPT without Hollow Stem Augers:
3" Drive Sampling w/Hollow Stem Augers:
Other: ___________________________ Problems with Heaving - Depths, Solutions, etc.
3" Drive Sampling w/o Hollow Stem Augers:
Directed Installation of Casing:
Undisturbed Sampling:
Size and Type:
Summary of work performed today: (type of drilling, depths, etc.)
Cause:
FIELD SUPERVISOR'S DAILY REPORT
FILL OUT THE FOLLOWING FOR EACH HOLE FOR WHICH DRILLING PROGRESS HAS BEEN MADE EACH DAY
Drilling without sampling:
SPT with Hollow Stem Augers:
Driller Field Supervisor Helper Inspector Qlty Assur. Inspect.
Weather: (must include temp)
Drill Rig: Manufacturer model-company designation
First Last personnel?
Project: Location: Boring Number:
Bearing and Batter:
Boring Moved:
Elevation Change Bearing/Distance from original location
Boring Completed Today?
Shift
Date:
Drillling Contractor: Utilities Checked:
Rights of Entry Checked:
Safety: Hard Hat, Safety Glasses, Steel-toed shoes, and appropriate level of protective equipment worn by all on-site
H1RMXBHL
FIGURE 1
Huntington District Engineering and
Construction Division Geotechnical
Engineering Branch
SUBSURFACE EXPLORATION
INSPECTOR'S SHIFT REPORT OF OPERATION
Plant and Materials Used
Inclinometers Installed:
From To ShiftRight of Entry
Obtained?
Y N N/A
Project:
Inspection Contractor Contract Number Task Order Number
Drilling Contractor Contract Number Task Order Number
Date
Report Number
Inspector's Signature
Boring Number
Drill w/o Sampling
With Hol.
Stem w/o Hol.
Stem 2-in ch Crossing
Construct R oc k
C on cr et e
C on fin ed
C on fin ed
Coring
Pressure Test
Surface Protect.
Rehab Install St an di ng
Fl us h
Piezometer
R oc k
C on cr et e
C on fin ed
Size in. Size in. Size in.
lf lf lf
3-in ch
Directed install.
Casing
Standard Penetration
Undist Sampling lf lf lf lf lf ea ea ea hrslf lf ea lf lf ea ealf lf lf lf lf lf hrs
Total:
lf lf lf ea ea ealf lf lf lflf lf
Pumps: (Manufacturer and model) Other: (Manufacturer and model)
Core Barrel and Bits: (Manufacturer, Model, and size)HoursDrill Rigs: (Manufacturer and model) Drive Hammers: (Size, type, and energy rating) ea ea ealf lf lf lf lf hrs
Drilling Progress: (Include progress of work, cause and extent of delays, excessive core loss, drill chatter, broken cores, movement of hole location and reasons, etc.)
Remarks: (Include verbal instructions given to contractors, names of visitors, driller, and inspectors, weather conditions, and safety violations.)
Mobilization and Demobilization: Surface Displacement Monument:
Confined Drilling, Drain Cleanout:
Pump Tests:
Flagman:Cribbing:
Backhoe: hrs hrs hrs ea ea ea lfhrs
Work Perfomed Today: (Indicate location and description of work performed, depths, and tests performed.)
Other Quantities
Number of Employees Supervisory Dillers Laborers Operators Inspectors Government
Dozer: (Manufacturer and model)
Quantities hrs
H1RMXBHL
Typewritten Text
FIGURE 2
H1RMXBHL
Typewritten Text
H1RMXBHL
Typewritten Text
H1RMXBHL
CLASSIFICATION CLASSIFICATION
TYPE: TYPE:
ENG FORM BAG ENG FORM BAG
1-Oct-65 JAR 1-Oct-65 JAR
CLASSIFICATION CLASSIFICATION
TYPE: TYPE:
ENG FORM BAG ENG FORM BAG
1-Oct-65 JAR 1-Oct-65 JAR
FR
O
M
PROJECT LOCATION
SAMPLE NO.
HOLE NO.
ELEVATION
DISTURBED UNDISTURBED
FROM: TO:DEPTH
FR
O
M
PROJECT LOCATION
HOLE NO.
DEPTH FROM: TO:
ELEVATION
SAMPLE NO.
DISTURBED UNDISTURBED
REMARKS
DATE INSPECTOR
OF
FR
O
M
PROJECT
SAMPLE NO.
OF
REMARKS
DATE INSPECTOR
DATE INSPECTOR
LOCATION
HOLE NO.
DEPTH FROM: TO:
ELEVATION
DISTURBED UNDISTURBED
REMARKS
DATE INSPECTOR
OF
OF
FR
O
M
PROJECT LOCATION
HOLE NO.
DEPTH FROM: TO:
ELEVATION
SAMPLE NO.
DISTURBED UNDISTURBED
REMARKS
H1RMXBHL
Typewritten Text
FIGURE 3
JAR NUMBER
HOLE NO.
JAR NUMBER
HOLE NO.
THRU
FR
O
M
PROJECT LOCATION
THRU
FR
O
M
PROJECT LOCATION
BOX OF
----CUT LINE------STANDARD BOX LABELS----------CUT LINE----
BOX OF
H1RMXBHL
Typewritten Text
FIGURE 4
H1RMXBHL
Typewritten Text
H1RMXBHL
Typewritten Text
H1RMXBHL
Typewritten Text
H1RMXBHL
Typewritten Text
H1RMXBHL
Typewritten Text
H1RMXBHL
Typewritten Text
SUBSURFACE EXPLORATION SUMMARY SHEET
PROJECT: FEATURE:
Line Priority Boring # Top Bottom Rock Drill D.S. DS DS UD UD Coring Casing Depth Piez. Press Batter Direction Remarks
# Elev Elev Elev w/o Samp w/HS 2" 3" NX 4" 6" Conc. Total Tests
FT. Ft. ! ! ! Ft. Size Ft. ! ! ! Ft. ! Ft. Ea. # Degrees Bearing
Special Instructions: INITIAL: GG GD GS
Inspect Shifts Prepared By:
Mob/Demob : ea. Checked By:
Mileage : mi. Approved By:
Dozer : hrs. Date:
Figure 2
H1RMXBHL
FIGURE 5
TOP OF GROUND
BRASS MARKER(GOV FURNISHED)
FINISHED AND SLOPED TO DRAIN
CONCRETE SURFACE SHALL BE STEEL TROW EL
5.0’
6"
CONCRETE
#4 RESTEEL BAR
MARKER.
AND SUPPLIES EXCEPT BRASS
FOR FURNISHING ALL MATERIALS
CONTRACTOR IS RESPONSIBLE
MONUMENT - FIGURE 17A
SURFACE DISPLACEMENT
NOT TO SCALE
PIPE
PVC SCHEDULE 40
BLACK STEEL OR
TOP O
F G
ROUND
BRASS MARKER(GOV FURNISHED)
FINISHED AND SLOPED TO DRAIN
CONCRETE SURFACE SHALL BE STEEL TROW EL
5.0’
6"
CONCRETE
#4 RESTEEL BAR
MARKER.
AND SUPPLIES EXCEPT BRASS
FOR FURNISHING ALL MATERIALS
CONTRACTOR IS RESPONSIBLE
MONUMENT - FIGURE 17B
SURFACE DISPLACEMENT
CUT
FILL
NOT TO SCALE
PIPE
PVC SCHEDULE 40
BLACK STEEL OR
(Ds-D) 0.1 (Ds-Do)
Obtain readings until:
Preferably until:
READING
NUMBER
TIME OF
READING
ELAPSED
TIME Da Ds D Ds-D AMOUNT OF
WATER USED
(Ds-D) (Ds-Do)
UNIFIED SOIL CLASSIFICATION:
0.37
SHEET: OF
GROUND SURFACE
ELEVATION (GS):
TOP OF RISER EL:
D1
D2 Ds
Do
Da
H2
H1 H0
Tip Elevation:
Ambient Piezometer Level
(Ds-D) (Ds-Do)
PROJECT: PIEZOMETER NO.
OBSERVERS: DATE AND TIME:
GROUND SURFACE ELEVATION (GS): TOP OF RISER ELEVATION (TOR):
BOTTOM OF PIEZOMETER ELEVATION: DEPTH FROM TOP OF RISER (Da):
AMBIENT PIEZOMETER LEVEL (Ds):
LOCATION DISCRIPTION: (MAIN DAM, DIKE, UPSTREAM SLOPE, ETC.)
PIEZOMETER TIME LAG TEST
H1RMXBHL
Typewritten Text
FIGURE 18 A
PIEZOMETER TIME LAG TEST (CONTINUED)
FIGURE 29
SHEET: OF
TIME OF
READING
ELAPSED
TIME Da Ds D Ds-D (Ds-D) AMOUNT OF
WATER USED
PIEZOMETER TIME LAG TEST
(Ds-Do)
PROJECT: PIEZOMETER NO.
REMARKS:
READING
NUMBER
FIGURE 19
DRILLER:
RIG TYPE:
DIAMETER OF BORING:
BACKFILL QUANTITIES:
BACKFILL LOG REPORT
PROJECT:
BORING NUMBER:
DATE BACKFILLED:
BACKFILLED BY:
INSPECTOR:
'5,//,1* /2* ',9,6,21 ,167$//$7,21
+ROH 1R�
6+((7
2) 6+((76
��� 6,=( $1' 7<3( 2) %,7
��� '$780 )25 (/(9$7,21 6+2:1 �7%0 RU 06/�
��� 0$18)$&785(56 '(6,*1$7,21 2) '5,//
��� 727$/ 12� 2) 29(5%85'(1 6$03/(6 7$.(1
',6785%(' 81',6785%('
��� 727$/ 180%(5 &25( %2;(6
�� 352-(&7
�� /2&$7,21 �&RRUGLQDWHV RU 6WDWLRQ�
�� '5,//,1* $*(1&<
�� +2/( 12� �$V VKRZQ RQ GUDZLQJ WLWOH
DQG WLWOH QXPEHU�
�� 1$0( 2) '5,//(5
�� ',5(&7,21 2) +2/(
9(57,&$/ ,1&/,1(' '(*� )520 9(57�
�� 7+,&.1(66 2) 29(5%85'(1
�� '(37+ '5,//(' ,172 52&.
�� 727$/ '(37+ 2) +2/(
��� (/(9$7,21 *5281' :$7(5
��� '$7( +2/( 67$57(' &203/(7('
��� (/(9$7,21 723 2) +2/(
��� 727$/ &25( 5(&29(5< )25 %25,1*
��� 6,*1$785( 2) ,163(&725
(/(9$7,21
D
'(37+
E
/(*(1'
F
&/$66,),&$7,21 2) 0$7(5,$/6
�'HVFULSWLRQ�
G
� &25( 5(&29� (5< H
%2; 25 6$03/( 12� I
5(0$5.6
�'ULOOLQJ WLPH� ZDWHU ORVV� GHSWK RI
ZHDWKHULQJ� HWF�� LI VLJQLILFDQW�
J
(1* )250 ���� 35(9,286 (',7,216 $5( 2%62/(7(�
0$5 �� �75$16/8&(17�
+2/( 12�352-(&7
H1RMXBHL
Typewritten Text
H1RMXBHL
FIGURE 20 A
'5,//,1* /2* �&RQW 6KHHW�
(/(9$7,21 723 2) +2/(
+ROH 1R�
352-(&7 ,167$//$7,21 6+((7
2) 6+((76
(/(9$7,21
D
'(37+
E
/(*(1'
F
&/$66,),&$7,21 2) 0$7(5,$/6
�'HVFULSWLRQ�
G
� &25( 5(&29� (5< H
%2; 25 6$03/( 12� I
5(0$5.6
�'ULOOLQJ WLPH� ZDWHU ORVV� GHSWK RI
ZHDWKHULQJ� HWF�� LI VLJQLILFDQW�
J
(1* )250 �����$ �(5 ������������
-81 �� *32 ������������������
+2/( 12�352-(&7
H1RMXBHL
Typewritten Text
FIGURE 20 B
H1RMXBHL
Typewritten Text
TOP
DEPTH
BOTTOM
DEPTH START END INTERVAL
START OF
TEST
END OF
TEST
ORH FORM 2142 Dec 68
SUBSURFACE EXPLORATION PRESSURE TEST DATA
PROJECT: BORING NO.: INSPECTOR: DATE:
FIELD TEST DATA
PUMP CAPACITY: METER TYPE: METER SERIAL NUMBER:
BORING SIZE: TOP OF HOLE ELEVATION: TOP OF ROCK ELEVATION: STATIC WATER LEVEL:
TEST SECTION
GAGE
READING
TIME OF TEST METER READING TOTAL
WATER
GAL/
CU.FT. C.F.M.
H1RMXBHL
FIGURE 21
FIGURE 22
Task Order Number
DAILY SAFETY INSPECTION CHECKLIST FOR CORE DRILL RIGS
GREAT LAKES AND OHIO RIVER DIVISION
HUNTINGTON DISTRICT
SECTION 1 GENERAL INFORMATION
Date Owner/User Contract Number
Type of Equipment
Competent Person Signature Printed Name and Title of Competent Person
SECTION 2 DAILY PRE-OPERATIONAL CHECKLIST
REFERENCE EM 385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL DATED TO YOUR CONTRACT.
EQUIPMENT MUST BE IN FULL COMPLIANCE TO THOSE REQUIREMENTS
1. ARE TWO EMERGENCY KILL SWITCHES AVAILABLE FROM OPERATIONS POSTIONS AND FULLY TESTED AND OPERERABLE? Yes No
2. IS A CURRENT EYEWASH STATION AVAILABLE FOR USE FOR THIS RIG? Yes No N/A
5. ARE FUEL TANKS CLEAR OF EXHAUST AND ELECTRICAL SYSTEMS? Yes No
6. ARE ALL ROTATING, RECIPROCATION, AND MOVING PARTS GUARDED? Yes No
3. IS ADEQUATE RESPIRATORY PROTECTION PROVIDED FOR THIS RIG? Yes No N/A
4. DOES THE RIG HAVE MSDS'S FOR ALL FLUIDS AND SUPPLIES? Yes No
9. IS RIG ON A SECURE FOUNDATION? Yes No
10. DOES RIG HAVE THE REQUIRED FULL 10-B:C FIRE EXTINGUISHER READY AND ACCESSIBLE? Yes No
7. ARE ALL HOT PARTS GUARDED? Yes No
8. HAS THE RIG BEEN MODIFIED FROM THE MANUFACTURERS ORIGINAL CONFIGURATION? (IF SO LETTER FROM MANUFACTURER OR PROFESSIONAL ENGINEER WITH STAMP CONFIRMING SUITABILITY FOR USE IS REQUIRED BEFORE USE.)
Yes No
13. HAS SITE BEEN CLEARED FOR UNDERGROUND UTILIITIES? Yes No
14. IF EQUIPPED WITH OUTRIGGERS ARE THEY FULLY EXTENDED AND IN USE PER MANUFACTURERS RECOMMENDATIONS? Yes No N/A
11. IS THE MANUAL FOR THE DRILL RIG WITH THE RIG OR ON-SITE? Yes No
12. HAVE OVERHEAD ELECTRICAL HAZARDS BEEN IDENTIFIED AND CLEARED IN ACCORDANCE WITH EM 385-1-1? Yes No
17. IS THE REVERSE ALARM IN OPERATING CONDITION AND FUNCTIONING WHEN BACKING? Yes No N/A
18. ARE HAND HOLDS AND/OR RAILING IN GOOD CONDITION? Yes No N/A
15. ARE WHEELS CHOCKED WITH ADEQUATE CHOCKS? Yes No N/A
16. ARE THERE ANY BENT OR OTHERWISE DAMAGED STRUCTURAL MEMBERS? Yes No
21. ARE A MINIMUM OF TWO (2) CREW MEMBERS CURRENTLY CERTIFIED IN CPR AND FIRST AID? Yes No
22. IS THERE A SLIP RING PRESENT ON THE JOB SITE? (IF SO IT MUST IMMEDIATELY BE REMOVED FROM THE SITE.) Yes No
19. DO EXTRA FUEL CONTAINERS MEET SAFETY REQUIREMENTS? Yes No
20. IS A FIRST AID KIT MEETING EM 385-1-1 REQUIREMENTS AVAILABLE? Yes No
25. IS THE CATHEAD FREE OF ROPE WEAR GROVES, BURRS, OR OTHER SIGNS OF PHYSICAL DAMAGE? Yes No N/A
26. ARE THE FOLLOWING MOTOR VEHICLE FEATURES IN WORKING ORDER:
FRONT AND REAR DIRECTIONAL SIGNALS, TWO HEADLIGHTS, TWO TAIL LIGHTS, HORN.
27. ARE BRAKES, BOTH SERVICE AND PARKING, IN GOOD OPERATING CONDITION?
N/A
N/A
23. ARE ALL HOOKS, SHEAVES, SHEAVE PINS, GUIDES, SAFETY CLIPS, AND OTHER FITTINGS IN GOOD CONDITION? Yes No
24. ARE RUNNING LINES ADEQUATELY GUARDED TO PREVENT CONTACT BY PERSONNEL? Yes No N/A
N/A28. IS THE WINDOW GLASS FREE OF CRACKS, BREAKS, AND OTHER DAMAGE?
Yes No
Yes No
Yes No
H1RMXBHL
FIGURE 23 A
REMARKS:
| Field Supervisor's Daily Report |
| Inspector's Daily Report.pdf |
| Standard Jar Label |
| Standard Sample Box Label.pdf |
| Drilling summary sheet sample.pdf |
| Piezometer/Uplift Cell Installation Report |
| Piezometer Lag Time Test |
| NX core box detail figure 6 |
| 4" core box detail figure 7 |
| 6" core box detail figure 8 |
| Piezometer Assembly figure 9 |
| Single Piezometer Installation Detail Rock Fill figure 10 |
| Single Piezometer Installation Foundations through Embankment Figure 11 |
| Double Piezometer Installation Detail Impervious Fill on Rock Figure 12 |
| Single Peizometer Installation Detail Impervious Fill Figure 13 |
| Piezometer Cover Detail Standard Installation Figure 14 |
| Peizometer Cover Detail Standard Installation Square Riser Figure 15 |
| Flush Mount Piezometer Detail Figure 16 |
| Backfill Log Report Figure 19 |
| Piezo Lag time Sheet 1.pdf |
| Piezometer Time Lag Test page 1 |
| Pressure Test Sheet.pdf |
| Pressure Test Sheet |
| FIGURE 17A FORMS AND DRAWINGS.pdf |
| Geotechnical figures and forms 2011 |
| References |
| Design Model, PW_WORKDIR:dms32369 |
| G-BSAD_4.dgn |
| FIGURE 17B FORMS AND DRAWINGS.pdf |
| Geotechnical figures and forms 2011 |
| References |
| Design Model, PW_WORKDIR:dms32369 |
| G-BSAD_4.dgn |
| piezo lag time test master.pdf |
| Piezometer Time Lag Test page 1 |
| Piezometer Time Lag Test (Cont) |
| Piezo Lag time Sheet 1.pdf |
| Piezometer Time Lag Test page 1 |
| Drill Rig Inspection Form.pdf |
| Daily Drill Rig Inspection Form |
File details come from the government source that posted it. Updated .