W9123625BA005 - Abstract of Offerors_SIGNED_20250613.pdf
PDF 2 MB Posted
- Solicitation number
- W9123625BA005
About this file
This document is an Abstract of Offers for Construction, specifically for the Norfolk Harbor Southern Branch Maintenance Dredging project (Solicitation Number W9123625BA005). The solicitation involves mechanical dredging of segments of the Elizabeth River's Southern Branch to depths of -41 and -36 feet MLLW, with an estimated 96,200 cubic yards of material to be dredged. Six companies submitted offers: Cashman Dredging & Marine Co, Hampton Roads Leasing, Lake Michigan Contractors, Seaward Marine, Kokosing Industrial Inc, and Weeks Marine.
The total evaluated prices (TEP) for the offers range from $3,015,320.00 to $9,162,500.00, with the lowest bid from Cashman Dredging & Marine Co at $3,433,834.00. The project requires transporting dredged material by barge to the Craney Island Dredged Material Management Area (CIDMMA), with contractors responsible for precise dredging, material placement, spillway operations, and maintaining water quality standards. The solicitation was issued by the U.S. Army Corps of Engineers Norfolk District, with a date issued of 05/07/2025 and an opening date of 06/12/2025, and one amendment was issued prior to the bid submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
Lake Michigan Contractors Seaward Marine
$24.10
$696,900.00 $696,900.00
$2,318,420.00
$3,276,273.00
$1,600,000.00
$17.25
$1,600,000.00
$1,659,450.00
$3,259,450.00
Kokosing Industrial Inc
96,200
$3,015,320.00
$2,460,796.00
$3,150,000.00 $3,150,000.00
$6,012,500.00
$9,162,500.00
| topmostSubform[0]: |
| Page1[0]: |
| ISSUINGOFFICE[0]: USACE NAO-CT |
803 Front Street Norfolk, VA 23510
| PROJECTTITLE[0]: Norfolk Harbor Southern Branch Maintenance Dredging | |
| A7ITEM1[0]: 1 | |
| A7ITEM2[0]: 2 | |
| A7ITEM3[0]: | |
| A7ITEM4[0]: | |
| A7ITEM5[0]: | |
| A7ITEM6[0]: | |
| A7ITEM7[0]: | |
| A7ITEM8[0]: | |
| A7ITEM9[0]: | |
| A7ITEM10[0]: | |
| A7ITEM11[0]: | |
| A7ITEM12[0]: | |
| A7ITEM13[0]: | |
| B71[0]: Mobilization and Demobilization | |
| B72[0]: Maintenance Dredging Southern Branch | |
| B73[0]: | |
| B74[0]: | |
| B75[0]: | |
| B76[0]: | |
| B77[0]: Total Evaluated Price (TEP) | |
| B78[0]: | |
| B79[0]: | |
| B710[0]: | |
| B711[0]: | |
| B712[0]: | |
| B713[0]: | |
| D81[0]: Job | |
| D82[0]: CY | |
| D83[0]: | |
| D84[0]: | |
| D85[0]: | |
| D86[0]: | |
| D87[0]: | |
| D88[0]: | |
| D89[0]: | |
| D810[0]: | |
| D811[0]: | |
| D812[0]: | |
| D813[0]: | |
| C71[0]: 1 | |
| C72[0]: 96,200 | |
| C73[0]: | |
| C74[0]: | |
| C75[0]: | |
| C76[0]: | |
| C77[0]: | |
| C78[0]: | |
| C79[0]: | |
| C710[0]: | |
| C711[0]: | |
| C712[0]: | |
| C713[0]: | |
| E81[0]: $1,023,062.00 | |
| E82[0]: $25.06 | |
| E83[0]: | |
| E84[0]: | |
| E85[0]: | |
| E86[0]: | |
| E87[0]: | |
| E88[0]: | |
| E89[0]: | |
| E810[0]: | |
| E811[0]: | |
| E812[0]: | |
| E813[0]: | |
| F81[0]: $1,023,062.00 | |
| F82[0]: $2,410,772.00 | |
| F83[0]: | |
| F84[0]: | |
| F85[0]: | |
| F86[0]: | |
| F87[0]: $3,433,834.00 | |
| F88[0]: | |
| F89[0]: | |
| F810[0]: | |
| F811[0]: | |
| F812[0]: | |
| F813[0]: | |
| E9NO11[0]: $3,600,000.00 | |
| E9NO12[0]: $2,501,200.00 | |
| E9NO13[0]: | |
| E9NO14[0]: | |
| E9NO15[0]: | |
| E9NO16[0]: | |
| E9NO17[0]: $6,101,200.00 | |
| E9NO18[0]: | |
| E9NO19[0]: | |
| E9NO110[0]: | |
| E9NO111[0]: | |
| E9NO112[0]: | |
| E9NO113[0]: | |
| D9NO11[0]: $3,600,000.00 | |
| D9NO12[0]: $26.00 | |
| D9NO13[0]: | |
| D9NO14[0]: | |
| D9NO15[0]: | |
| D9NO16[0]: | |
| D9NO17[0]: | |
| D9NO18[0]: | |
| D9NO19[0]: | |
| D9NO110[0]: | |
| D9NO111[0]: | |
| D9NO112[0]: | |
| D9NO113[0]: | |
| D9NO21[0]: $750,000.00 | |
| D9NO22[0]: $36.28 | |
| D9NO23[0]: | |
| D9NO24[0]: | |
| D9NO25[0]: | |
| D9NO26[0]: | |
| D9NO27[0]: | |
| D9NO28[0]: | |
| D9NO29[0]: | |
| D9NO210[0]: | |
| D9NO211[0]: | |
| D9NO212[0]: | |
| D9NO213[0]: | |
| E9NO21[0]: $750,000.00 | |
| E9NO22[0]: $3,490,136.00 | |
| E9NO23[0]: | |
| E9NO24[0]: | |
| E9NO25[0]: | |
| E9NO26[0]: | |
| E9NO27[0]: $4,240,136.00 | |
| E9NO28[0]: | |
| E9NO29[0]: | |
| E9NO210[0]: | |
| E9NO211[0]: | |
| E9NO212[0]: | |
| E9NO213[0]: | |
| AMENDMENTSISSUED[0]: 1 | |
| SOLICITATIONNUMBER[0]: W9123625BA005 | |
| pageof[0]: 1 | |
| pages[0]: 2 | |
| NAMEANDTITLE[0]: Stormie Wicks | |
| OFFEROR1[0]: Cashman Dredging & Marine Co | |
| OFFEROR2[0]: Hampton Roads Leasing | |
| BIDSECURITY1[0]: 20% | |
| BIDSECURITY2[0]: 20% | |
| ACKNOWLEDGED1[0]: Yes | |
| ACKNOWLEDGED2[0]: Yes | |
| Signature1[0]: | |
| 2025-06-13T11:02:15-0400 | |
| WICKS.STORMIE.B.1115654078 |
| DATEOPENED[0]: 06/12/2025 |
| DATEISSUED[0]: 05/07/2025 |
| DATESIGNED[0]: 13 JUNE 2025 |
| HIREDLABOR[0]: Off |
| WithoutProfit[0]: 1 |
| IncludingProfit[0]: Off |
| form1[0]: |
| #subform[0]: |
| SOLICITATION[0]: W9123625BA005 |
| page[0]: 2 |
| pages[0]: 2 |
| PROJECT[0]: Norfolk Harbor Southern Branch Maintenance Dredging |
| ITEMNUM1[0]: 1 |
| ESTB1[0]: 1 |
| UNIT1[0]: Job |
| ITEMNUM2[0]: 2 |
| ESTB2[0]: |
| UNIT2[0]: CY |
| ITEMNUM3[0]: |
| ESTB3[0]: |
| UNIT3[0]: |
| ITEMNUM4[0]: |
| ESTB4[0]: |
| UNIT4[0]: |
| ITEMNUM5[0]: |
| ESTB5[0]: |
| UNIT5[0]: |
| ITEMNUM6[0]: |
| ESTB6[0]: |
| UNIT6[0]: |
| ITEMNUM7[0]: TEP |
| ESTB7[0]: |
| UNIT7[0]: |
| ITEMNUM8[0]: |
| ESTB8[0]: |
| UNIT8[0]: |
| ITEMNUM9[0]: |
| ESTB9[0]: |
| UNIT9[0]: |
| ITEMNUM10[0]: |
| ESTB10[0]: |
| UNIT10[0]: |
| ITEMNUM11[0]: |
| ESTB11[0]: |
| UNIT11[0]: |
| ITEMNUM12[0]: |
| ESTB12[0]: |
| UNIT12[0]: |
| ITEMNUM13[0]: |
| EST13[1]: |
| UNIT13[0]: |
| No1[0]: 3 |
| OFFEROR1[0]: |
| BID1[0]: 20% |
| ADMEN1[0]: Yes |
| UN1T1[0]: |
| EST1[0]: |
| UN1T2[0]: |
| EST2[0]: |
| UN1T3[0]: |
| EST3[0]: |
| UN1T4[0]: |
| EST4[0]: |
| UN1T5[0]: |
| EST5[0]: |
| UN1T6[0]: |
| EST6[0]: |
| UN1T7[0]: |
| EST7[0]: |
| UN1T8[0]: |
| EST8[0]: |
| UN1T9[0]: |
| EST9[0]: |
| UN1T10[0]: |
| EST10[0]: |
| UN1T11[0]: |
| EST11[0]: |
| UN1T12[0]: |
| EST12[0]: |
| UN1T13[0]: |
| EST13[0]: |
| No2[0]: 4 |
| OFFEROR2[0]: |
| BID2[0]: 20% |
| ADMEN2[0]: Yes |
| UNITP1[0]: $815,477.00 |
| ESTCOL21[0]: $815,477.00 |
| UNITP2[0]: $25.58 |
| ESTCOL22[0]: |
| UNITP3[0]: |
| ESTCOL23[0]: |
| UNITP4[0]: |
| ESTCOL24[0]: |
| UNITP5[0]: |
| ESTCOL25[0]: |
| UNITP6[0]: |
| ESTCOL26[0]: |
| UNITP7[0]: |
| ESTCOL27[0]: |
| UNITP8[0]: |
| ESTCOL28[0]: |
| UNITP9[0]: |
| ESTCOL29[0]: |
| UNITP10[0]: |
| ESTCOL210[0]: |
| UNITP11[0]: |
| ESTCOL211[0]: |
| UNITP12[0]: |
| ESTCOL212[0]: |
| UNITP13[0]: |
| ESTCOL213[0]: |
| No3[0]: 5 |
| OFFEROR3[0]: |
| BID3[0]: 20% |
| ADMEN3[0]: Yes |
| UNITPRICE1[0]: |
| ESTCOL31[0]: |
| UNITPRICE2[0]: |
| ESTCOL32[0]: |
| UNITPRICE3[0]: |
| ESTCOL33[0]: |
| UNITPRICE4[0]: |
| ESTCOL34[0]: |
| UNITPRICE5[0]: |
| ESTCOL35[0]: |
| UNITPRICE6[0]: |
| ESTCOL36[0]: |
| UNITPRICE7[0]: |
| ESTCOL37[0]: |
| UNITPRICE8[0]: |
| ESTCOL38[0]: |
| UNITPRICE9[0]: |
| ESTCOL39[0]: |
| UNITPRICE10[0]: |
| ESTCOL310[0]: |
| UNITPRICE11[0]: |
| ESTCOL311[0]: |
| UNITPRICE12[0]: |
| ESTCOL312[0]: |
| UNITPRICE13[0]: |
| ESTCOL313[0]: |
| No4[0]: 6 |
| OFFEROR4[0]: Weeks Marine |
| BID4[0]: 20% |
| ADMEN4[0]: Yes |
| UNITCOL41[0]: |
| ESTCOL41[0]: |
| UNITCOL42[0]: $62.50 |
| ESTCOL42[0]: |
| UNITCOL43[0]: |
| ESTCOL43[0]: |
| UNITCOL44[0]: |
| ESTCOL44[0]: |
| UNITCOL45[0]: |
| ESTCOL45[0]: |
| UNITCOL46[0]: |
| ESTCOL46[0]: |
| UNITCOL47[0]: |
| ESTCOL47[0]: |
| UNITCOL48[0]: |
| ESTCOL48[0]: |
| UNITCOL49[0]: |
| ESTCOL49[0]: |
| UNITCOL410[0]: |
| ESTCOL410[0]: |
| UNITCOL411[0]: |
| ESTCOL411[0]: |
| UNITCOL412[0]: |
| ESTCOL412[0]: |
| UNITCOL413[0]: |
| ESTCOL413[0]: |
File details come from the government source that posted it. Updated .