This document is an Abstract of Offers for a construction solicitation. The solicitation number is W9123624B5009 and is for the Lynnhaven IIJA Dredging and Debris Removal project. The project involves dredging and placement of approximately 185,000 cubic yards of maintenance material from the Lynnhaven Inlet Federal Navigation Project, including the Entrance Channel, Turning Basin, Side Channel, Channel to Broad Bay, and Narrows Channel. Approximately 175,000 cubic yards of sandy material will be dredged and placed on the nearby Cape Henry Beach shoreline, while 5,000 cubic yards of fine sand will be placed in the Maple Street Upland Placement Site. The solicitation was issued on 3/4/2024 and opened on 4/4/2024, with 0 amendments issued. The government estimate for the work is $21,295,880, with the lowest offer coming in at $3,544,900 from Next Generation Logistics LLC.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
$500,634.00
$10,225,323.00
$279,400.00
$3,985,100.00
$750,138.00
$21,295,880.00
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
$1,193,537.00 $1,193,537.00
$257,500.00 $257,500.00
$2,285,550.00
$61,200.00
$120,000.00 $120,000.00
$3,917,787.00
$4,383,387.00
169,300
13,400
25,400
| topmostSubform[0]: |
| Page1[0]: |
| ISSUINGOFFICE[0]: USACE NAO-CT |
803 Front Street Norfolk, VA 23510
| PROJECTTITLE[0]: Lynnhaven IIJA Dredging & Debris Removal | |
| A7ITEM1[0]: 1 | |
| A7ITEM2[0]: 2 | |
| A7ITEM3[0]: 3 | |
| A7ITEM4[0]: 4 | |
| A7ITEM5[0]: 5 | |
| A7ITEM6[0]: | |
| A7ITEM7[0]: 6 | |
| A7ITEM8[0]: 7 | |
| A7ITEM9[0]: | |
| A7ITEM10[0]: | |
| A7ITEM11[0]: | |
| A7ITEM12[0]: | |
| A7ITEM13[0]: | |
| B71[0]: Mobilization/Demobilization | |
| B72[0]: Maple St. Upland Placement Area Maint. | |
| B73[0]: Dredging Entrance Channel, Turning Basin | |
| B74[0]: Dredging Channel to Broad Bay | |
| B75[0]: Removal of Debris from Channel | |
| B76[0]: Base CLIN Total | |
| B77[0]: Dredging Entrance Channel | |
| B78[0]: Additional Quantities | |
| B79[0]: Option CLINS Total | |
| B710[0]: | |
| B711[0]: Total Evaluated Price (TEP) | |
| B712[0]: | |
| B713[0]: | |
| D81[0]: Job | |
| D82[0]: Job | |
| D83[0]: CY | |
| D84[0]: CY | |
| D85[0]: Job | |
| D86[0]: | |
| D87[0]: CY | |
| D88[0]: CY | |
| D89[0]: | |
| D810[0]: | |
| D811[0]: | |
| D812[0]: | |
| D813[0]: | |
| C71[0]: 1 | |
| C72[0]: 1 | |
| C73[0]: 169,300 | |
| C74[0]: 5,100 | |
| C75[0]: 1 | |
| C76[0]: | |
| C77[0]: 13,400 | |
| C78[0]: 25,400 | |
| C79[0]: | |
| C710[0]: | |
| C711[0]: | |
| C712[0]: | |
| C713[0]: | |
| E81[0]: $3,726,734.00 | |
| E82[0]: $1,747,574.00 | |
| E83[0]: $20.02 | |
| E84[0]: $20.02 | |
| E85[0]: $490,625.00 | |
| E86[0]: | |
| E87[0]: $20.02 | |
| E88[0]: $19.71 | |
| E89[0]: | |
| E810[0]: | |
| E811[0]: | |
| E812[0]: | |
| E813[0]: | |
| F81[0]: $3,726,734.00 | |
| F82[0]: $1,747,574.00 | |
| F83[0]: $3,389,386.00 | |
| F84[0]: $102,102.00 | |
| F85[0]: $490,625.00 | |
| F86[0]: $9,456,421.00 | |
| F87[0]: $268,268.00 | |
| F88[0]: | |
| F89[0]: $768,902.00 | |
| F810[0]: | |
| F811[0]: | |
| F812[0]: | |
| F813[0]: | |
| E9NO11[0]: $1,500,000.00 | |
| E9NO12[0]: $20,000.00 | |
| E9NO13[0]: $1,862,300.00 | |
| E9NO14[0]: $132,600.00 | |
| E9NO15[0]: $30,000.00 | |
| E9NO16[0]: $3,544,900.00 | |
| E9NO17[0]: $160,800.00 | |
| E9NO18[0]: | |
| E9NO19[0]: $440,200.00 | |
| E9NO110[0]: | |
| E9NO111[0]: | |
| E9NO112[0]: | |
| E9NO113[0]: | |
| D9NO11[0]: $1,500,000.00 | |
| D9NO12[0]: $20,000.00 | |
| D9NO13[0]: $11.00 | |
| D9NO14[0]: $26.00 | |
| D9NO15[0]: $30,000.00 | |
| D9NO16[0]: | |
| D9NO17[0]: $12.00 | |
| D9NO18[0]: $11.00 | |
| D9NO19[0]: | |
| D9NO110[0]: | |
| D9NO111[0]: | |
| D9NO112[0]: | |
| D9NO113[0]: | |
| D9NO21[0]: $5,000.000 | |
| D9NO22[0]: $5,000.000 | |
| D9NO23[0]: $29.533 | |
| D9NO24[0]: $29.533 | |
| D9NO25[0]: $5,000.000 | |
| D9NO26[0]: | |
| D9NO27[0]: $29.533 | |
| D9NO28[0]: $29.533 | |
| D9NO29[0]: | |
| D9NO210[0]: | |
| D9NO211[0]: | |
| D9NO212[0]: | |
| D9NO213[0]: | |
| E9NO21[0]: $5,000.000 | |
| E9NO22[0]: $5,000.000 | |
| E9NO23[0]: $5,000.000 | |
| E9NO24[0]: $150,000.00 | |
| E9NO25[0]: $5,000.000 | |
| E9NO26[0]: $5,000.000 | |
| E9NO27[0]: $395,742.00 | |
| E9NO28[0]: | |
| E9NO29[0]: $20,150.000 | |
| E9NO210[0]: | |
| E9NO211[0]: | |
| E9NO212[0]: | |
| E9NO213[0]: | |
| AMENDMENTSISSUED[0]: 0004 | |
| SOLICITATIONNUMBER[0]: W9123624B5009 | |
| pageof[0]: 1 | |
| pages[0]: 2 | |
| NAMEANDTITLE[0]: Stormie Wicks | |
| OFFEROR1[0]: Cottrell Contracting Corp. | |
| OFFEROR2[0]: IZY Freights Logistics LLC | |
| BIDSECURITY1[0]: 20% | |
| BIDSECURITY2[0]: No | |
| ACKNOWLEDGED1[0]: N/A | |
| ACKNOWLEDGED2[0]: N/A | |
| Signature1[0]: | |
| 2024-04-11T08:50:03-0400 | |
| WICKS.STORMIE.B.1115654078 |
| DATEOPENED[0]: 04/04/2024 |
| DATEISSUED[0]: 03/04/2024 |
| DATESIGNED[0]: |
| HIREDLABOR[0]: Off |
| WithoutProfit[0]: Off |
| IncludingProfit[0]: 1 |
| form1[0]: |
| #subform[0]: |
| SOLICITATION[0]: W9123624B5009 |
| page[0]: 2 |
| pages[0]: 2 |
| PROJECT[0]: Lynnhaven IIJA Dredging & Debris Removal |
| ITEMNUM1[0]: 1 |
| ESTB1[0]: 1 |
| UNIT1[0]: Job |
| ITEMNUM2[0]: 2 |
| ESTB2[0]: 1 |
| UNIT2[0]: Job |
| ITEMNUM3[0]: 3 |
| ESTB3[0]: |
| UNIT3[0]: CY |
| ITEMNUM4[0]: 4 |
| ESTB4[0]: 5,100 |
| UNIT4[0]: CY |
| ITEMNUM5[0]: 5 |
| ESTB5[0]: 1 |
| UNIT5[0]: Job |
| ITEMNUM6[0]: BASE |
| ESTB6[0]: |
| UNIT6[0]: |
| ITEMNUM7[0]: 6 |
| ESTB7[0]: |
| UNIT7[0]: CY |
| ITEMNUM8[0]: 7 |
| ESTB8[0]: |
| UNIT8[0]: CY |
| ITEMNUM9[0]: OP |
| ESTB9[0]: |
| UNIT9[0]: |
| ITEMNUM10[0]: |
| ESTB10[0]: |
| UNIT10[0]: |
| ITEMNUM11[0]: TEP |
| ESTB11[0]: |
| UNIT11[0]: |
| ITEMNUM12[0]: |
| ESTB12[0]: |
| UNIT12[0]: |
| ITEMNUM13[0]: |
| EST13[1]: |
| UNIT13[0]: |
| No1[0]: 3 |
| OFFEROR1[0]: Next Generation Logistics LLC |
| BID1[0]: $3,000,000.00 |
| ADMEN1[0]: N/A |
| UN1T1[0]: |
| EST1[0]: |
| UN1T2[0]: |
| EST2[0]: |
| UN1T3[0]: $13.50 |
| EST3[0]: |
| UN1T4[0]: $12.00 |
| EST4[0]: |
| UN1T5[0]: |
| EST5[0]: |
| UN1T6[0]: |
| EST6[0]: |
| UN1T7[0]: $12.00 |
| EST7[0]: $160,800.00 |
| UN1T8[0]: $12.00 |
| EST8[0]: $304,800.00 |
| UN1T9[0]: |
| EST9[0]: $465,600.00 |
| UN1T10[0]: |
| EST10[0]: |
| UN1T11[0]: |
| EST11[0]: |
| UN1T12[0]: |
| EST12[0]: |
| UN1T13[0]: |
| EST13[0]: |
| No2[0]: 4 |
| OFFEROR2[0]: |
| BID2[0]: |
| ADMEN2[0]: |
| UNITP1[0]: |
| ESTCOL21[0]: |
| UNITP2[0]: |
| ESTCOL22[0]: |
| UNITP3[0]: |
| ESTCOL23[0]: |
| UNITP4[0]: |
| ESTCOL24[0]: |
| UNITP5[0]: |
| ESTCOL25[0]: |
| UNITP6[0]: |
| ESTCOL26[0]: |
| UNITP7[0]: |
| ESTCOL27[0]: |
| UNITP8[0]: |
| ESTCOL28[0]: |
| UNITP9[0]: |
| ESTCOL29[0]: |
| UNITP10[0]: |
| ESTCOL210[0]: |
| UNITP11[0]: |
| ESTCOL211[0]: |
| UNITP12[0]: |
| ESTCOL212[0]: |
| UNITP13[0]: |
| ESTCOL213[0]: |
| No3[0]: 5 |
| OFFEROR3[0]: |
| BID3[0]: |
| ADMEN3[0]: |
| UNITPRICE1[0]: |
| ESTCOL31[0]: |
| UNITPRICE2[0]: |
| ESTCOL32[0]: |
| UNITPRICE3[0]: |
| ESTCOL33[0]: |
| UNITPRICE4[0]: |
| ESTCOL34[0]: |
| UNITPRICE5[0]: |
| ESTCOL35[0]: |
| UNITPRICE6[0]: |
| ESTCOL36[0]: |
| UNITPRICE7[0]: |
| ESTCOL37[0]: |
| UNITPRICE8[0]: |
| ESTCOL38[0]: |
| UNITPRICE9[0]: |
| ESTCOL39[0]: |
| UNITPRICE10[0]: |
| ESTCOL310[0]: |
| UNITPRICE11[0]: |
| ESTCOL311[0]: |
| UNITPRICE12[0]: |
| ESTCOL312[0]: |
| UNITPRICE13[0]: |
| ESTCOL313[0]: |
| No4[0]: 6 |
| OFFEROR4[0]: |
| BID4[0]: |
| ADMEN4[0]: |
| UNITCOL41[0]: |
| ESTCOL41[0]: |
| UNITCOL42[0]: |
| ESTCOL42[0]: |
| UNITCOL43[0]: |
| ESTCOL43[0]: |
| UNITCOL44[0]: |
| ESTCOL44[0]: |
| UNITCOL45[0]: |
| ESTCOL45[0]: |
| UNITCOL46[0]: |
| ESTCOL46[0]: |
| UNITCOL47[0]: |
| ESTCOL47[0]: |
| UNITCOL48[0]: |
| ESTCOL48[0]: |
| UNITCOL49[0]: |
| ESTCOL49[0]: |
| UNITCOL410[0]: |
| ESTCOL410[0]: |
| UNITCOL411[0]: |
| ESTCOL411[0]: |
| UNITCOL412[0]: |
| ESTCOL412[0]: |
| UNITCOL413[0]: |
| ESTCOL413[0]: |