This abstract of offers document summarizes two bids received in response to Solicitation Number W9123623B5000 for the Norfolk Harbor and Channels Navigation Improvement, Atlantic Ocean Channel (AOC) Phase I project located in Hampton Roads, Virginia. The Department of the Army Corps of Engineers Engineering District Norfolk seeks dredging and placement services at a designated ocean dredged material disposal site, as well as live sea turtle rehabilitation services at three levels of care. Both bids included the required 20% bid security and acknowledged all amendments to the solicitation. Pricing and estimated amounts are provided for each line item for both The Dutra Group bid and the Manson bid, including mobilization, dredging and placement quantities, containment area earthwork, and sea turtle rehabilitation services.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
4. ISSUING OFFICE
USAGE NAO-CT
803 Front Street Norfolk, VA 23510
5. PROJECT TITLE
Atlantic Ocean Channel (AOC) Phase 1 Project
6. NUMBER OF AMENDMENTS ISSUED
7A.
ITEM
'NO:
7B. DESCRIPTION OF OFFERED ITEM
Mobilization/DemobiIization
Dredging with Placement at DNODS
Turtle Trawling
Live Turtle Rehabilitation - Level 1
Live Sea Turtle Rehabilitation - Level 2
Live Sea Turtle Rehabilitation - Level 3
Mobilization/Demobilization (OPTION)
Containment Area Earthwork IN CIDMMA
Dredging ST 1880+00 to ST 1978+00
Dredging ST 1880+00 to ST 1978+00
Dredging ST 1880+00 to ST 1978+00
Live Turtle Rehabilitation - Level 1
Live Sea Turtle Rehabilitation - Level 2
7C.EST.
QUANTITY
2,424,700
1,437,100
500,100
487,500
1. SOLICITATION NUMBER
W9123623B5000
I CERTIFY that I have opened,read, and recorded on this abstract all offers received in response to this solicitation.
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E,and F)
D
D
D.
UNIT
JOB I
CY|
DAY I
JOB]
JOB I
JOB I
JOB)
JOB I
CY|
CY|
CY|
JOB]
JOB I
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
E. UNIT
PRICE
2,036,286.00 |
5.43|
11,445.001
1,335.001
13,849.001
54,262.00 |
2,417,980.001
695,185.001
14.77|
6.39|
11.44 I
1,335.001
13,849.001
F. ESTIMATED
AMOUNT
2,036,286.00
13,166,121.00
114,450.00
1,335.00
13,849.00
54,262.00
2,417,980.00
695,185.00
21,225,967.00
3,195,639.00
5,577,000.00
1,335.00
13,849.00
2. DATE ISSUED
12/02/2022
3. DATE OPENED
02/06/2023
PAGE OF
1 | 4 PAGES
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
Eartha D. Garrett l^h^d^^ W}^w-^ SLGNATU8E ' . // u
ML S~. ^f^k
DATE SIGNED
^i :hb ^3
9.OFFERS
NO. 1
A. OFFEROR
THE DUTRA GROUP
B. BID SECURITY (Type and amount)
20%
C. AMENDMENTS ACKNOWLEDGED"
YES
D. UNIT
PRICE
9,100,000.001
8.001
5,000.001
1,400.001
14,000.001
55,000.00]
1,300,000.001
3,300,000.001
14.00|
14.00|
14.00|
1,300.00]
14,000.00)
E. ESTIMATED
AMOUNT
9,100,000.00
19,397,600.00
50,000.00
1,400.00
14,000.00
55,000.00
1,300,000.00
3,300,000.00
20,119,400.00
7,001,400.00
6,825,000.00
1,300.00
14,000.00
N0.2
A.OFFEROR
MANSON
B. BID SECURITY (Type and amount)
20%
C. AMENDMENTS ACKNOWLEDGED
YES
D. UNIT
PRICE
6,575,000.00]
11.501
6,000.001
5,000.001
20,000.001
100,000.001
1,850,000.001
1,250,000.001
14.001
14.00|
14.00|
5,000.001
20,000.00)
E. ESTIMATED
AMOUNT
6,575,000.00
27,884,050.00
60,000.00
5,000.00
20,000.00
100,000.00
1,850,000.00
1,250,000.00
20,119,400.00
7,001,400.00
6,825,000.00
5,000.00
20,000.00
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
CONTINUATION SHEET
fc?<?I?TLE
3. CONTRACT ITEMS
A.
ITEM
NO.
TOTAL |
B.
ESTIMATED
QUANTITY
c.
UNIT
JOB
DAY
DAY
1. SOLICITATION NUMBER
W9123623B5000
PAGE OF
2 4 PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
NO.:
\.OFFEROR
IGE
3. BID SECURITY (Type and amount)
^. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
54,262.00
60,260.00
2,162.00
E. ESTIMATED
AMOUNT
54,262.00
301,300.00
64,860.00
48,933,680
NO.: 1
\. OFFEROR
DUTRA
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
55,000.00
35,000.00
2,300.00
E. ESTIMATED
AMOUNT
55,000.00
175,000.00
69,000.00
67,478,100
NO.: 2
A.OFFEROR
MANSON
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
100,000.00
150,000.00
3,000.00
E. ESTIMATED
AMOUNT
100,000.00
750,000.00
90,000.00
72,654,850
NO.:
A.OFFEROR
B. BID SECURIT/ (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
AUTHORIZED FOR LOCAL REPRODUCTION
OPTIONAL FORM 1419A (11-88)
4. ISSUING OFFICE
USAGE NAO-CT
803 Front Street Norfolk, VA 23510
5. PROJECT TITLE
Atlantic Ocean Channel (AOC) Phase 1 Project
6. NUMBER OF AMENDMENTS ISSUED
7A.
ITEM
NO.
7B. DESCRIPTION OF OFFERED ITEM
Mobilization/Demobilization
Dredging with Placement at DNODS
Turtle Trawling
Live Turtle Rehabilitation - Level 1
Live Sea Turtle Rehabilitation - Level 2
Live Sea Turtle Rehabilitation - Level 3
Mobilization/DemobiIization (OPTION)
Containment Area Earthwork IN CIDMMA
Dredging ST 1880+00 to ST 1978+00
Dredging ST 1880+00 to ST 1978+00
Dredging ST 1880+00 to ST 1978+00
Live Turtle Rehabilitation - Level 1
Live Sea Turtle Rehabilitation - Level 2
7C.EST.
QUANTITY
2,424,700
1,437,100
500,100
487,500
I. SOLICITATION NUMBER
k/V9123623B5000
I CERTIFY that I have opened,read, and recorded on this abstract all offers received in response to this solicitation.
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E,and F)
D
D
D.
UNIT
JOB I
CY|
DAY)
JOB]
JOB I
JOB I
JOB I
JOB I
CY|
CY|
CY|
JOB]
JOB I
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
E. UNIT
PRICE
2,036,286.001
5.43|
11,445.00
1,335.00
13,849.001
54,262.00 |
2,417,980.001
695,185.00
14.77|
6.39|
11.44
1,335.001
13,849.001
F. ESTIMATED
AMOUNT
2,036,286.00
13,166,121.00
114,450.00
1,335.00
13,849.00
54,262.00
2,417,980.00
695,185.00
21,225,967.00
3,195,639.00
5,577,000.00
1,335.00
13,849.00
2. DATE ISSUED
12/02/2022
3. DATE OPENED
02/06/2023
PAGE OF
3 | 4 PAGES
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
Eartha D. Garrett ) (Lorh^d/S^ 4%^-.
SIGNATURE ,, U u'
SOH^^L A
DATE SIGNED
-^ <hJo M^
9.OFFERS
NO. 1
A.OFFEROR
GREAT LAKES DREDGE & DOCK
B. BID SECURITY (Type and amount)
20%
C. AMENDMENTS ACKNOWLEDGED
/ES
D. UNIT
PRICE
8,875,000.001
44,008,305.001
8,130.001
1,350.00]
15,000.001
56,000.001
4,970,000.001
2,985,000.001
13.28|
22.65|
22.95|
1,350.00)
15,000.001
E. ESTIMATED
AMOUNT
8,875,000.00
106,706,937,133,501
81,300.00
1,350.00
15,000.00
56,000.00
4,970,000.00
2,985,000.00
19,084,688.00
11,327,265.00
11,188,125.00
1,350.00
15,000.00
N0.2
A.OFFEROR
k/VEEKS MARINE B. BID SECURITY (Type and amount)
20%
C. AMENDMENTS ACKNOWLEDGED
YES
D. UNIT
PRICE
8,250,000.00]
18.50|
6,000.001
5,000.00]
20,000.001
75,000.00]
4,500,000.001
3,000,000.001
22.00|
22.00|
22.00|
5,000.00]
20,000.001
E. ESTIMATED
AMOUNT
8,250,000.00
44,856,950.00
60,000.00
5,000.00
20,000.00
75,000.00
4,500,000.00
3,000,000.00
31,616,200.00
11,002,200.00
10,725,000.00
5,000.00
20,000.00
AUTHORIZED FOR LOCAL REPRODUCTION
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (H-88)
CONTINUATION SHEET
X'?aCTeTTLE
3. CONTRACT ITEMS
A.
ITEM
NO.
TOTAL |
B.
ESTIMATED
QUANTITY
c.
UNIT
JOB
DAY
DAY
1. SOLICITATION NUMBER
W9123623B5000
PAGE OF
4 4 PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
NO.: 3
\. OFFEROR
IGE
B. BID SECURITY (Type and amount)
C.-AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
54,262.00
60,260.00
2,162.00
E. ESTIMATED
AMOUNT
54,262.00
301,300.00
64,860.00
48,933,680
NO.: 4
A. OFFEROR
GREAT LAKES DREDGE AND
D B. BID SECURITY (Type and amount)
20%
C. AMENDMENTS ACKNOWLEDGED
YES
D. UNIT
PRICE
56,000.00
250,000.00
2,350.00
E. ESTIMATED
AMOUNT
56,000.00
1,250,000.0
70,500.00
103984883
NO.: 4
A.OFFEROR
WEEKS MARINE
B. BID SECURITY (Type and amount)
20%
C. AMENDMENTS ACKNOWLEDGED
YES
D. UNIT
PRICE
75,000
200,000.00
2,500.00
E. ESTIMATED
AMOUNT
75,000.00
1,000,000.0
75,000.00
115285350
NO.:
A.OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
AUTHORIZED FOR LOCAL REPRODUCTION
OPTIONAL FORM 1419A (11-£
File details come from the government source that posted it. Updated .