This document announces an Industry Day event for the Arlington National Cemetery Southern Expansion Phase II - Operations Complex Project. The U.S. Army Corps of Engineers Norfolk District will host an in-person and virtual Industry Day on June 17, 2022 from 9:00 a.m. to 12:00 p.m. Eastern Time to provide an overview of the upcoming construction project to large and small business contractors. Presentations will include briefs on the overall ANC Southern Expansion Project, the Defense Access Road project, and the ANCSE Phase II Operations Complex. The complex will include an office building, warehouse, maintenance bays, administrative spaces, conference rooms, parking structure, landscaping and utilities. Interested contractors must register by June 13 at www.eventbrite.com/e/usace-industry-day-for-contractors-registration-330753702227 to receive call-in information. There is limited availability for in-person attendance. The event aims to inform contractors and receive feedback to shape the acquisition documents for the project supporting Arlington National Cemetery operations into the future.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.02.09_Industry Day Sign In Sheet 22R2022 06172022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
ARLINGTON NATIONAL CEMETERY SOUTHERN EXPANSION (ANCSE) PHASE II
OPERATIONS COMPLEX
Arlington National Cemetery Program
Prepared by:
Arlington National Cemetery U.S. Army Corps of Engineers, Norfolk District Federal Highway Administration, Eastern Federal Lands
HNTB
17 June 2022
AGENDA
9:00 – 9:10 Opening Remarks Ms. Karen Durham Aguilera
9:10 – 9:25 Introduction and History by COL Austin (ANC)
9:25 – 9:35 Defense Access Road and Phase I Southern Expansion Sean O’Brien (FHWA)
9:35 – 9:45 Overview Operations Complex Phase II Cara Sydnor (USACE)
9:45 – 10:00 Phase II Project Definition Gregg Schwieterman (HNTB)
10:00 – 10:15 Acquisition Procedures Katya Oxley (USACE)
10:15 – 11:15 Question and Answer Session
11:15 – 11:30 Closing Remarks
BIOGRAPHY AND INTRODUCTION
Ms. Karen Durham-Aguilera, SES, P.E., PMP
• Executive Director for the Office of Army Cemeteries and Arlington National Cemetery
• Over 39 years of service in U.S. Army as a DA Civilian including 19 years Senior Executive Service
• Over five years at Arlington National Cemetery
• Primary Responsibilities: Overall responsibility for programs and policy for all Army Cemeteries across the force, and Army National Military Cemeteries, which includes both Arlington National Cemetery and the Soldiers’ and Airmen’s Home National Cemetery. This includes major cemeterial improvements and expansion, such as the Defense Access Road and Southern Expansion Projects at ANC.
Colonel Thomas E. Austin, PE, PMP
• Director of Engineering for Arlington National Cemetery
• Over 28 years of service in U.S. Army
• Nearly three years at Arlington Cemetery and in charge of the Southern Expansion Project
• Primary Responsibilities: Establish project goals, requirements, and guidelines on behalf of Arlington National Cemetery and its stakeholders; develop scope of work; manage budget; guide project execution; de-conflict operations; establish and maintain project schedule; and manage expectations
Arlington is Part of the Fabric of our Nation
“They, and we, are the legacies of an unbroken chain of proud men and women who served their country with honor, who waged war so that we might know peace, who braved hardship so that we might know opportunity, who paid the ultimate price so that we might know freedom.”
The President’s Memorial Day Address Memorial Amphitheater Arlington National Cemetery May 25, 2009
ANC - Connecting Visitors to a Rich History
24-30 Funeral/Day
• ~6000 Interments/Year
• National Observances:
• Memorial Day
• Veterans Day
• Wreaths Across America
• Historic Tours
• Congressional Engagements
• ~200 Distinguished Visitor
Wreath Ceremonies
• ~400 Honor Flight Buses
• ~3100 Wreath Laying
Ceremonies
Over 3M Visitors a Year Open 365 Days
Distinguished Visitor/ Public Events
Webinars, Lectures, Blogs, And Display Room Tours
Physical Interpretation Plan Online Educational Modules
Tomb of the Unknown Centennial
International, National, & Local Photographers & Film Crews
Responses to Queries
Education and Interpretation Program
Hundreds of Engagements with Congress and the Media
A continuous challenge to strike a balance:
Funeral services (private) & a National Shrine (public)
Past Cemetery Expansions
Southern Expansion Started 2021 Completed 2027 (planned) 50 Additional Acres Total 37 Acres of Interment Space 80,000(+) Interment Spaces
Millennium Expansion Started 2013 Completed 2018 27 Acres 27,282 Interment Spaces
Columbarium Courts 1-9 Incrementally constructed from 1980-2013
Defense Access Road and Southern Expansion
Existing
Southgate Road
ANC
ANC Operations Complex
Air Force Memorial
Columbia Pike
Pentagon South
Parking
Proposed
New
Air Force Memorial
ANC
Operations Complex
Garage
Future 9/11 Memorial
Visitor Education
Center
Columbarium
In-ground interments
Existing cemetery Existing cemetery
Defense Access Roads
• Realign Columbia Pike and shorten South Joyce Street
• Redesign the Columbia Pike and VA 27 interchange
• Remove Southgate Road and create a new section of South Nash
Street
• Provide a dedicated 10’ wide bi-directional bike trail as well as 8’ sidewalks on both sides of Columbia Pike
• Phase 1 of Southern Expansion (Tunnel and 5 Retaining Walls)
Southern Expansion
• Adds approximately 50 acres to ANC
• Adds 80K(+) burial opportunities
• Seamlessly integrates the Air Force Memorial (AFM)
• Adds pedestrian access to ANC/AFM via Columbia Pike
• Adds public parking garage across from entrance
• Moves the Operations Complex south of Columbia Pike
Fo xc ro ft
H ei gh ts
So ut h N as h
Defense Access Road and Southern Expansion
Existing
Southgate Road
ANC
ANC Operations Complex
Air Force Memorial
Columbia Pike
Pentagon South
Parking
Proposed
New
Air Force Memorial
ANC
Operations Complex
Garage
Future 9/11 Memorial
Visitor Education
Center
Columbarium
In-ground interments
Existing cemetery Existing cemetery
Project Phasing
• DAR and Southern Expansion Phase 1 Ongoing Now
• SE Ph1 – 5 Retaining Walls, Tunnel Under Columbia Pike, and Rough
Grading of South Parcel
• Remainder of Southern Expansion separated into two contracts due to inflation and material cost risk
• SE Ph2 - Ops Complex, Parking Garage, Vehicle Screening, Freedman’s
Gate, Access Roads
• SE Ph3 – Burial Sections, AF Memorial Integration, Pedestrian Screening
Facility, Columbarium Courts
Fo xc ro ft
H ei gh ts
So ut h N as h
Cemetery Expansion Complete
~2027
Sep 22:
Ph 2: Ops Complex
Solicitation
Spring 2023:
Ph 2: Ops Complex Construction Award
Mar 23: DAR South Parcel
Complete
(FHWA)
Sean O’Brien
• Construction Operations Engineer for the Defense Access Roads (DAR) Project
• Over 16 years of Federal Service with Eastern Federal Lands Highway Division (EFLHD)
• Nearly three years with DAR project
• Primary Responsibilities: Main point of contact for EFLHD’s delivery of the DAR portion of the ANC Southern Expansion. Overseeing the DAR construction contract and partnering with USACE and ANC in coordination with Southern Expansion
DEFENSE ACCESS ROAD PHASE I
DEFENSE ACCESS ROAD PHASE I
DEFENSE ACCESS ROAD PROJECT PHASE I
DEFENSE ACCESS ROAD PHASE I PROGRESS PHOTOS
Photo 1 – RW-3 Shaft Installation
Photo 2 – MOT setup on Southgate Rd
Photo 3 – Arlington County Waterline along Columbia Pike
Cara Y. Sydnor, PMP
• Program Integrator for the Arlington National Cemetery Southern Expansion (ANCSE) Project
• Over 20 years of Federal Service
• Four years managing the Southern Expansion Project since 2018
• Primary Responsibilities : Ensure numerous internal and external stakeholders’ efforts are synchronized and coordinated to facilitate this monumental transformation
FUTURE PROGRAM
Operations Complex
PROJECT OVERVIEW PHASE II
Gregg Schwieterman, AIA
• Project Manager for the Arlington National Cemetery Southern Expansion Project
• Senior Project Manager at HNTB with over 20 years of experience
• Over a decade of experience working with Arlington National Cemetery
• Primary Responsibilities: Main point of contact for design team on the Southern Expansion Project. Overseeing the design and partnering with USACE and ANC on the delivery of Southern Expansion
PHASE II
PHASE IIA
PHASE IIA – OPERATIONS COMPLEX
PHASE IIA – OPERATIONS COMPLEX
PHASE IIA – OFFICE BUILDING
PHASE IIA – OFFICE BUILDING
OFFICE - GROUND FLOOR OFFICE - UPPER FLOOR
PHASE IIA – MAINTENANCE BUILDING
PHASE IIA – MATERIAL STORAGE BUILDING
PHASE IIA – WAREHOUSE BUILDING
PHASE IIA – PARKING GARAGE
PHASE IIA – PARKING GARAGE
PHASE IIA – ACCESS CONTROL POINT
PHASE IIA – ACCESS CONTROL POINT
PHASE II
PHASE IIB
PHASE IIB – ROADWAY
PHASE IIB – GRADING AND DRAINAGE
STORM DRAIN
PHASE IIB – SUPPORTING UTILITIES
COMMUNICATIONS
DOMESTIC WATER
PHASE IIB – BOUNDARY/RETAINING WALLS
BOUNDARY WALL
Katya Oxley
• USACE Norfolk District Contracting Chief
• Over 11 years of Federal service and three years as the Contracting Officer of the Southern Expansion Project
• Primary Responsibilities: Contracting Officer for this acquisition, responsible for planning and coordinating all aspects of design and construction acquisition, to include pre-award and post-award activities in support of this project.
ACQUISITION PROCEDURES
SOURCE SELECTION PROCESS
The Government intends to award a firm fixed priced contract to the responsible offeror whose proposal conforms to the terms of the Request for Proposal (RFP), is determined fair and reasonable, and offers the best overall value to the Government as determined through a Best Value Trade-off, Source Selection Process. The Project will be solicited using the Bifurcated/Two step approach. The solicitation will be full and open procurement. First step will include 100% pre-final design documents.
The Contracting Officer anticipates that the solicitation will include the following evaluation factors:
Step 1: Factor 1 – Past Performance Factor 2 – Project Approach
Step 2: Factor 3 – Small Business Participation Plan Factor 4 – Price Factor
The relative order of importance of evaluation factors is Non-price Factors 1 and 2 are of equal importance to each other and each is more important than Factor 3. All non-price factors (1, 2, and 3) when combined will be approximately equal to price.
ACQUISITION PROCEDURES CONTINUED
SOLICITATION SCHEDULE
Pre-Solicitation: 15 calendar days
Bifurcated Solicitation:
• Step 1 – 30 calendar days; anticipated to be issued 10 Aug 2022
• Step 2 – 45 calendar days; anticipated to be issued 07 Nov 2022
Award: ~7 months from initial solicitation
Notice to Proceed: ~4 weeks following award
Project construction timeline: Spring 2023 – Spring 2025
SUBMISSIONS
The Pre-solicitation Notice will be posted to SAM.gov and the Solicitation Notice will be posted to PIEE. The SAM.gov website will direct you to PIEE to see the full Solicitation Notice, its attachments, and all associated amendments. Proposals must be submitted through the PIEE Solicitation module for consideration. An Offeror is required to be registered in SAM when submitting an offer or quotation per FAR Provision 52.204-7 – System for Award Management. Processing time should be taken into consideration when registering.
QUESTIONS / DISCUSSIONS
For more information, reach out to: ancsouthernexpansion@usace.army.mil
CLOSING REMARKS
BACKUP
| ARLINGTON NATIONAL CEMETERY SOUTHERN EXPANSION (ANCSE) Phase ii OPERATIONS COMPLEX �� |
| agenda |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Defense access road PHASE I |
| Defense access road PHASE I |
| Defense Access Road Project Phase I |
| Defense Access Road Project Phase I |
| Defense Access Road Project Phase I |
| Defense Access Road Project Phase I |
| DEFENSE ACCESS ROAD Phase I PROGRESS photos |
| biography and introduction |
| Future Program |
| Project overview PHASE II |
| Slide Number 22 |
| PHASE II |
| PHASE IIA |
| PHASE IIA – Operations Complex |
| PHASE IIA – Operations Complex |
| PHASE IIA – OFFICE BUILDING |
| PHASE IIA – OFFICE BUILDING |
| PHASE IIA – Maintenance building |
| PHASE IIA – Material storage building |
| PHASE IIA – Warehouse building |
| PHASE IIA – parking garage |
| PHASE IIA – parking garage |
| PHASE IIA – access control point |
| Slide Number 35 |
| PHASE II |
| Slide Number 37 |
| Slide Number 38 |
| Slide Number 39 |
| Slide Number 40 |
| Slide Number 41 |
| Slide Number 42 |
| �biography and introduction |
| ACQUISITION PROCEDURES |
| ACQUISITION PROCEDURES CONTINUED |
| Slide Number 46 |
| Slide Number 47 |
| Slide Number 48 |
| Slide Number 49 |
| Slide Number 50 |
| Slide Number 51 |
| Slide Number 52 |
| Slide Number 53 |
| Slide Number 54 |
| Slide Number 55 |
File details come from the government source that posted it. Updated .