This document provides information for an Industry Day event regarding a maintenance dredging project at Rudee Inlet in Virginia Beach, Virginia. The U.S. Army Corps of Engineers Norfolk District is seeking qualified firms to perform hydraulic cutterhead dredging of approximately 200,000 cubic yards of predominantly sandy material from the entrance channel, sand trap, and outer deposition basin. Dredged material will be pumped up to one mile for placement on adjacent Resort Beach and Croatan Beach. Interested parties must pre-register by November 10, 2020 to receive webinar and document details for the November 16, 2020 Industry Day, which will provide project scope, safety, and logistical information. A sealed bid solicitation is planned for December 2020, with bid opening in February 2021 and award by March 2021. The estimated period of performance is April through September 2021, with potential beach placement blackout dates.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RUDEE INLET MAINTENANCE DREDGING: INDUSTRY DAY
Norfolk District Operations Branch
16 November 2020
Project location & Conditions Rudee Inlet is located on the Atlantic Coast of Virginia Beach, Virginia between Resort Beach (North) and Croatan Beach (South).
Heavy channel traffic, placement areas on recreational beaches.
Ingress/Egress for Resort Beach at 2nd Street.
Ingress/Egress for Croatan Beach at Atlantic Avenue.
Staging area available near 5th Street for Resort Beach.
Staging Area available at Croatan Point for Croatan Beach.
Croatan Point Dock available for use and Safety area available for spud down.
Lake Wesley not to be used.
Scope of work Maintenance dredging the Entrance Channel, Sand Trap, and Outer Deposition Basin to varying depths, estimated 200,000 CYs.
Scope of work continued…
Maintenance dredging will be performed by cutterhead hydraulic pipeline dredge.
Dredge must be capable for operating in open ocean conditions.
Dredge must weigh a minimum 600,000lbs with ability to pump sand up to 1 mile.
Dredged material is predominantly sand.
Dredged material will be placed on adjacent shorelines, on Resort Beach and Croatan Beach, North and South of the Inlet respectively.
~150k CY Resort Beach (~75 CY/LF) ~50k CY Croatan Beach (~50 CY/LF)
No Environmental restrictions for dredging and placement.
Acquisition Plan
IFB sealed bid, electronic bid submissions with virtual bid opening.
Planned for unrestricted solicitation.
Tentative Schedule Solicitation: DEC 2020 Bid Opening: FEB 2021 Award: MAR 2021
Currently considering up to 150 days as a Period of Performance (POP).
Intended Period of Performance between April – September.
Potential blackout dates of non-dredging and non-placement on Resort Beach during the POP.
Something in the Water Concert (Resort Beach) Memorial Day 4th of July Labor Day
Tentative Bid schedule
| *With the exception of the Jetty protection areas, all depths indicate the required plus-one-foot allowable depth. | ||
| CLIN | DESCRIPTION | QUANTITY (CY) |
| 0001 | Mob/Demob | -- |
| 0002 | Dredging Federal Project – Placement on Resort Beach | |
| - Entrance Channel: -14ft MLLW | ||
| - Entrance Channel Adjacent Sand Trap: -20ft MLLW | ||
| - Sand Trap: -20ft MLLW | ||
| 75,000 | ||
| 0003 | Dredging non-Federal Project – Placement on Resort Beach | |
| - Transition Area: -16ft MLLW | ||
| - Jetty Protection Areas: -14ft MLLW | ||
| 15,000 | ||
| 0004 | Dredging Outer Deposition Basin to -22ft MLLW– Placement on Resort Beach | |
| 50,000 | ||
| 0005 | Dredging Outer Deposition Basin to -22ft MLLW – Placement on Croatan Beach | |
| 50,000 | ||
| 0006 | Cost to perform work without Lake Wesley | -- |
| 0007 | Contracting Officer directed standby time (OPTION) | -- |
Questions/Comments
Questions/Answers will be posted as an amendment to the special announcement afterwards.
Please email comments or additional questions to Contract Specialist, Mrs. Raven Sasser at Raven.D.Sasser@usace.army.mil and copy the Contracting Officer, Mrs. Stormie Wicks at Stormie.B.Wicks@usace.army.mil.