20-B-2004 Amendment 5 RFI Responses.pdf
PDF 317 KB Posted
- Attached to
- Roof Replacement Bldg 54 Federal contract opportunity
- Solicitation number
- W91236-20-B-2004
About this file
This document contains a contracting officer's report summarizing responses to bidder questions regarding solicitation number W91236-20-B-2004 for roof replacement at Building 54. Key details include:
-
The solicitation is for replacement of the roofing system at Building 54 located at the Defense Logistics Agency in Richmond, Virginia. Questions covered areas of roof construction, project requirements, and specifications.
-
Responses addressed questions on welding versus fastening of decking, lead abatement procedures, phasing of work, protection of interior furnishings, security access and escort requirements, working hours, and clarification of specifications for insulation levels and framing work. Clarification was also provided on storage areas, treatment of existing ceiling tiles, and responsibilities for relocating equipment.
-
Amendments to the solicitation extended the bid due date and clarified scope details based on the questions received. The contract is to be awarded by the Department of the Army Corps of Engineers for the specified 540-day period of performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01.02_Abstract Building 54.pdf | ||
| A.03.27 Solicitation Bldg 54 Amendement 4.pdf | ||
| H.01.01 01 35 26.00 50- Gopvernment Safety Requirements.pdf | ||
| H.01.01 BLDG54 AD101_11_06_18.pdf | ||
| H.01.01 BLDG 54 A-108 REVISED 6-30-20.pdf | ||
| H.01.01 BLDG54AD401_Revised_06_30_20.pdf | ||
| H.01.01 077253 Snow Guards.pdf | ||
| H.01.01 07 22 00 Roof and Deck Insulation.pdf | ||
| A.07.23 Solicitation Bld 54 Amendment 3.pdf | ||
| A.01.23 B54 Solicitation Amendement 2.pdf | ||
| 20-B-2004 Amendment 1.pdf | ||
| 20-B-2004 Bldg 54 Roof.pdf | ||
| H.01.01 - DLA WH54 ROOF REPLACEMENT CORRECTED 100P DRAWINGS.pdf | ||
| B54 SPECIFICATIONS.zip | ZIP file |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
W91236-20-B-2004-Replace Building 54 Roof, DLA, Richmond, VA
Replace the existing Building 54 non-structural w aterproofing systems w ith the exception of the tow er roofs and the cafeteria roof. Work includes roof demolution houl aw ay of demolution materials, roof f lashing, and all incidental w ork necassary to complete this project is hereby modif ied as follow s:
Please see continuation page for full Amendment breakout.
Contracting POC: Allen Scott Brainerd, (757) 201-7668 allen.s.brainerd@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620B2004
X 9B. DATED (SEE ITEM 11)
29-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jul-2020
CODE
USACE, NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123620B2004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 3
UNCLASSIFIED\\FOR OFFICIAL USE
ONLY
Bid Inquiry Contracting
Officers Report
All Inquiries
Project: DSCR Building 54 Roof Review: DSCR Building 54 Roof Bidder
Inquiry(00001) (sorted by CommentID )
Displaying 52 inquiries.
Id Discipline Sheet Detail Spec
8653412 Contracting General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP indicates questions are due 10 days prior to bid, which would be 6/19. However, the site visit was not conducted until 6/17. Please consider allowing one additional week to ask questions arising from the site visit to ensure the most complete and accurate pricing information.
1-1 Government Response. The amendment has been posted to Beta.SAM By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jun 25 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8653425 Contracting General
Due to the site visit being held so close to the bid date, we request that the government extends the proposal due date by at least one week to ensure that contractors have sufficient time to ask questions and the government has adequate time to provide responses, ensuring the best possible pricing.
1-1 Government Response. Amendment 0004 will be issued on 7/2 for the bid closing extension By: Dianne
Grimes; CECT-NAO-M; (7572017839) On: Jul 02 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8653446 Architectural General
Puddle welding the decking poses significant fire and safety hazards especially with regard to the artifacts. Can the contractor use an alternative fastening method, such as a powder actuated fastener or structural metal self tapping screw?
1-1 Government Response. No screws or powder actuated fastener. During welding to the metal roof decking a fire watch shall be in the interior areas of welding. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jun 30 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8653449 Contracting General
Given the nature of the artifacts in the warehouse that per the current drawings are scheduled to remain in place and be protected by the contractor, are there any additional insurance requirements or riders required for this project?
1-1 Government Response. Please refer to the insurance requirements in the solicitation section 00 70 00.
states the minimum insurance requirements. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul
08 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655527 Architectural General
Does all roof work need to be watertight each day considering: 1) there is the metal roof and batt insulation demo;
2.) there is the installation and inspection of metal deck; 3.) there is the installation of multi-ply layers of roof insulation and membrane roofing; 4.) wood blocking to accommodate the new roof insulation?
1-1 Government Response. Refer to sheet A-001 General Notes, Question #1 response is YES. Questions #2 response is YES. Question #3 response is YES. . Questions #4 response is YES By: Dianne
Grimes; CECT-NAO-M; (7572017839) On: Jun 30 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655528 Construction Management Duration
Can the completion date be extended?
1-1 Government Response. The amendment has been posted to Beta.SAM By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jun 25 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655529 Contracting DLA
What are the requirements to get a badge to work at DLA?
1-1 Government Response. To get a base badge, contractor submits a DLA provided form which includes the personal data of the contractor employees to USACE, then USACE (or DSCR) submits the form along with DLA Form 1815 to DSCR Base Security who will then review, approve, and badge those approved.
By:
Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 02 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655530 Fire Protection/Life Safety General
Will the sprinkler system be shut down during demo or bays isolated?
1-1 Government Response. Yes, coordinate with Fire Department in areas where the ceilings have are removed and reinstalled. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 30 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655961 Architectural A108 A1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Detail a1 on A-108 shows an I-beam that could not be located during the site visit. Can you update with new existing conditions?
1-1 Government Response. Sheet A-108 look between column lines 28 and 29 along column line K By:
Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 30 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655962 Architectural General
There is no specific snow rail system specified. Are there any requirements or specs going to be released for this product?
1-2 Government Response. Amendment 0004 will be issued on 7/2 to incorporate the specifications
The snow rail system was designed around Alpine SafeGuard systems. Specification can be provided. By:
Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 07 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655966 Architectural General
Would the owner like to incorporate interior protection into the project to avoid interior disruptions?
1-1 Government Response. The interior protection is covered on sheet A-001, General Note I By: Dianne
Grimes; CECT-NAO-M; (7572017839) On: Jun 30 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655969 Architectural General
Can the deck be screwed in lieu of welded?
1-1 Government Response. No By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 30 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655973 Architectural General
Will the new downspouts need to tie-in to the existing cast iron outlets at ground level?
1-1 Government Response. YES, if one currently exists, the new downspout needs to be tied into the existing cast iron drain By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 30 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8655979 Architectural A108 A1
Can the decking be cut shorter than shown in detail A1 on A-108 to prevent the need for additional fascia and sheet metal?
See attached detail as an example.
1-1 Government Response. No By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 30 2020
Information for this report is procurement sensitive.
8656314 Contracting General
Can the user please provide photographs to the contractor of the facility?
1-2 Government Response. Photos will not be available. By: Dianne Grimes; CECT-NAO-M; (7572017839)
On: Jul 07 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656317 General General
On the bid pricing form, what option shall the drywall replacement and reinstall of ceiling tile be listed?
1-1
Government Response. Remove and replace all GWB ceiling and framing as required to access the areas above indicated on sheet AD401, Notes 5 and 9. By: Dianne Grimes; CECT-NAO-M; (7572017839)
On: Jul 02 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656320 General General
Are there special access requirements for the subcontractors working on this project that need to be obtained?
1-1 Government Response. Contractor employees need to be cleared for long term base access. In addition, contractor employees shall be escorted by government personnel while working inside the building. By:
Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 25 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656322 General General
Will the phased sections of work be occupied while overhead construction is going on?
1-1 Government Response. Spaces in the Warehouse will not be occupied during construction, and relocation by phase will need to be coordinated between the GC and the Contracting Office and the User.
Equipment and/or furniture in spaces will be removed or protected by the User. Built-in components must be protected by the Contractor By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656323 General General
What is the level of protection that is necessary for the existing Furnishings and equipment that is underneath the roofing that is to be replaced?
1-1 Government Response. Refer to sheet A-001 General Notes By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jun 30 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656325 General General
Will the government relocate the furnishings and equipment in the phased areas that work is to take place?
1-1 Government Response. The Navy (building tenant) is expected to relocate some items within reason and with advance notice from USACE and the contractor. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
Jun 25 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656327 General General
What level of escorts will the contractor need to account for while working in secure sections of the facility?
1-1 Government Response. DSCR and end user will coordinate with contractor in areas where escorts are required. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 08 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656329 General General
Is weekend work acceptable?
1-1 Government Response. Expect work Monday through Friday. Occasional weekend work may be allowed depending on need and as long as sufficient advance notice/request is provided by USACE and the contractor. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 25 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656331 General Roof System
Is the roof required to be covered overnight or can the roof areas be left open to the elements?
1-1 Government Response. Nothing in the Contract Documents prevents a Contractor from leaving the roof open at the end of a day. However, Note L/A-001 describes the requirements if moisture does enter the interior spaces. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656334 Construction Management 01 45 00.00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec 01 45 00.00 Quality Control paragraph 3.4.2 says the CQC manager must not be assigned any other duties, but spec section 01 35 26.00 government safety requirements paragraph 1.5.1.1 says the QC manager may also serve as they SSHO. Do we need a separate superintendent, quality control manager and site safety health officer for this project?
1-1 Government Response. EM-285-1-1 (paragraph 01.A.17.a) specifies that the SSHO must be a full time position.
As such, the Quality Control Manager CANNOT simultaneously serve as the SSHO. Therefore, a separate superintendent, quality control manager, and SSHO will be required. By: Dianne Grimes; CECT- NAO-M;
(7572017839) On: Jun 25 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656335 Construction Management General
If the base bid is awarded will the timeframe for this work still be 540 calendar days?
1-1 Government Response. Yes, 540 calendar days is period of performance. By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jul 08 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656336 Construction Management General
If the options are exercised post-award will time extensions to the 540 calendar days be issued?
1-1 Government Response. No time extensions will be issued if options are exercised post award. By:
Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 08 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656337 Structural 05 30 00
Spec section 05 30 00 Steel Decks – paragraph 2.1 Deck units – do the design calculations need to be stamped by an engineer?
1-2 Government Response. No. The specifications do not require engineer's stamp so no changes are needed. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656678 Construction Phasing G002 07 22 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec section 07 22 00 roof and deck insulation paragraph 3.3.1 protection of applied insulation says phased construction is not permitted. Please explain what is meant by phased construction is not permitted as this is a phased project according to sheet G-002 Construction phasing.
1-1 Government Response. Amendment 0004 will be issued and posted to Beta.SAM on 7/2 By: Dianne
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656679 Architectural General
Is there existing metal roof decking in place that will need to be demolished on this project?
1-1 Government Response. There is currently no existing metal decking on the roof system, therefore, no decking will need to be demolished as a part of this project. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656682 Architectural Sheet AD401
Can the user provide a more clear scope of what metal framing needs to be completed per note 9 and details C1, B1 and A1 so we can provide a more accurate bid. We need to estimate quantity of framing material.
1-1 Government Response. Amendment 0004 will be issued and placed on Beta.SAM 7/2 By: Dianne
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656685 Architectural General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Does the user have a place that the ACT tile can be stored during construction or is the contractor to provide storage for ACT?
1-1 Government Response. There is an outside laydown area for contractors to use in the DDRV area of the base (next to "A" Road, near the railroad tracks). Storing the ACT in question inside the building is a possibility as long as it does not interfere with the building tenant's activities. By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jun 25 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656688 Architectural General
Is the contractor required to replace the ACT tile with new ACT tile If the ACT tile is not in good condition to reinstall?
1-1 Government Response. For continuity of pricing, Contractors shall assume that all ACT is suitable for reinstallation. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656692 Architectural General
Please provide a quantity of ACT tile new replacement so all bidders can bid evenly.
1-1 Government Response. For continuity of pricing, Contractors shall assume that all ACT is suitable for reinstallation. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8656693 General General
Will the government provide storage area for the Exhaust fans and Roof top units that need to come down and be reinstalled?
1-1 Government Response. There is an outside laydown area for contractors to use in the DDRV area of the base (next to "A" Road, near the railroad tracks). Storing the units in question inside the building is a possibility as long as it does not interferee with the building tenant's activities. By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jun 25 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8662110 Architectural 07 22 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Due to the site visit being rescheduled and pushed out a week further, will the government grant an extension to allot more time for contractors to submit bids? This extra time would ensure that contractors have enough time to submit questions from what they saw on-sight with enough time prior to job bidding.
1-1 Government Response. The amendment for the extension has been posted to Beta.SAM By: Dianne
Grimes; CECT-NAO-M; (7572017839) On: Jun 25 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8663190 Architectural Roof System
Please confirm if this roof assembly will require a 1/2" coverboard. The written specification states, "Where polyisocyanurate foam board insulation is provided, install 1/2 inch thick glass mat gypsum roof board over top surface of foam board insulation"; however, the drawings provided show only a 1/2" thermal barrier/substrate board and R-30 ISO.
1-1 Government Response. Amendment will be issued and placed on Beta.SAM today
1/2" cover board shall be installed in accordance with Architectural Drawings. We will revise Specifications accordingly. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 02 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8665747 Architectural Section 1.1
Spec Section 1.1 Summary- The last sentence states that the system must meet the requirements of UFC 4-010-01.
However the bid documents do not identify a specific threat. If ATFP Blast mitigation is required for this project will the government be identifying the threat (ie.. standoff distance and pressure/impulse)?
1-1 Government Response. No Spec Section is listed, but assuming Section 08 60 45, and the requirements to meet UFC 4-010-01 will still apply, but the areas of roof/wall replacement are unoccupied/warehouse/storage areas, and Blast mitigation should not apply. By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8665752 Architectural Section 1.1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
If blast mitigation is not required, will 2.4 K. #2 & #3 be removed as to not unnecessarily increase the cost of the required materials?
1-1 Government Response. No Spec Section is listed, but assuming Section 08 60 45, and the requirements to meet UFC 4-010-01 will still apply. The areas of roof/wall replacement are unoccupied/warehouse/storage areas, but the design requirements shown in 2.4.K #2 and #3 shall remain. By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8665755 Architectural Spec Section 2.2.2 Grid Core
Spec Section 2.2.2 Grid Core- The last sentence states "Grid core of panels in office area shall have a minimum 1" thermal break with CRF of 80 by AAMA 1503". However, there are not office areas effecting the translucent panel scope. Furthermore, spec section 2.3.3. Condensation Index Rating- states "the condensation index rating shall be 80 as determined using AAMA 1503". Are thermally broken panels required for this project in any, or all areas?
1-1 Government Response. No Spec Section is listed, but assuming Section 08 60 45, and Thermally broken panels are required for all areas. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8665756 Architectural Spec Section 2.3.2 Panel Fabrication
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec Section 2.3.2 Panel Fabrication- Subsection B states "Assembled panel thickness 4 inches", however the drawings indicate a 2 ¾" system. A 4" panel SYSTEM will not fit inside the 4" steel channel at the head of the openings. Is the intent to use our 2 ¾" system as indicated on the drawings?
1-1 Government Response. No Spec Section is listed, but assuming Section 08 60 45, 4" panel system is the basis of design, and according to Structural drawings, the existing channels will accommodate the 4" panel system. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8665758 Architectural A504
Sheet A-504 states that the existing translucent head steel channel and blocking shall remain to be reused. The head detail does not identify if new trim or channel will be required to accommodate the new translucent panel system.
Please advise if the contractor shall include an allowance to enclose the existing channel to accommodate the new system.
1-1 Government Response. No allowance should be provided, but the comprehensive installation of the offeror's system shall be in the Base Bid proposal. By: Dianne Grimes; CECT-NAO-M; (7572017839)
On:
Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8666776 Contracting none none none
Comment Classification: UNCLASSIFIED (U)
This is a large project that had only one site visit (which was in the rain). For a better understanding of the existing roof construction, could we arrange another site visit to further detail and field verify existing conditions ?
1-1 Government Response. No additional site visits will be scheduled. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 08 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667203 Architectural AD 101
The current set of drawings does not have a Partial floor plan for areas A and B. This should be page AD-101, however the page in it's place is the partial roof demo plan AD-109, which is located in 2 ares in the drawings. Please
Advise.
1-1 Government Response. Amendment will be issued and placed on BETA.SAM 7/2
This may be a printing issue, but sheet AD101 is attached for reference. By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jul 02 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667633 Mechanical General
Is the contractor required to provide temp AC and/ or Temp Heat depending on the season, when the roof area is open to the elements?
1-1 Government Response. This was not a scope requirement. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8671414 Construction Management 67 01 35 26.00 50
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 35 26.00 50 page 3; 1.5.2.1 states "The project Superintendent may also serve as the Quality control
Supervisor and Safety and Health Officer." Please confirm if the superintendent will be allowed to act as multiple roles for the project.
1-1 Government Response. Amendment 0004 will be issued and placed on Beta.SAM on 7/2
A separate superintendant, quality control manager, and SSHO will be required. Amended spec is attached.
By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 02 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8671433 Construction Management 79 01 35 40.00 50
Please confirm required personnel for project. There are several places in specification that contradict other descriptions. ie: are we to have environmental manager, quality control manager, SSHO, Project superintendent? Can one act as the other etc.? Some places indicate CQC can act as SSHO, others indicated different. Please advise.
1-1 Government Response. A separate environmental manager, superintendent, quality control manager, and
SSHO will be required. Nowhere in section 01 35 40.00 50 is there a contradiction to this. By: Dianne
Grimes; CECT-NAO-M; (7572017839) On: Jul 01 2020
Information for this report is procurement sensitive.
8675759 Specifications 179 02 83 13.00 20
In regards to "Lead In Construction", 1.3.1 Description of Work mentions "For bidding purposes, the contractor shall assume that all existing surface coatings and painted surfaces contain lead, cadmium and chromium for the purpose of complying with 29 CFR 1926.62, 29 CFR 1926.1126, and 29 CFR 1926.1127.
Does the government expect the contractor to asuume and treat this entire metal roof demo as if it contains lead paint?
This could be a significant added cost vs. getting a lead survey, etc.
1-1 Government Response. Bid per documents. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul
02 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8675874 Specifications 220 07 22 00
2.1.2 In spec calls out for R-25 or more in regards to insulation thickness. Keynotes on plans mentions PVC roofing system on R-30 RIGID insulation. Will R-25 be accepted or are we required to at least have R-30?
1-1 Government Response. R-25 is the required minimum. R-30 was provided by design and is subject to review during Shop Drawing phase for compliance. By: Dianne Grimes; CECT-NAO-M; (7572017839)
On: Jul 02 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685940 Architectural AD101, AD401 A1, B1, C1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note 10 plan page AD101, Is it the intent of the government for the contractor to furnish and install new ceiling no matter what, or only to remove and replace if found necessary to demo vinyl faced insulation and existing glass wall panel system?
1-1 Government Response. The intent is to remove and replace if found necessary to demo vinyl faced insulation and existing glass wall panel system. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
Jul 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685957 Architectural AD401 A1, B1, C1
On revised plan page AD401 received via amendment 004, keynote 9 notates a number of trades that will greatly affect cost associated with work. First off, are we required to install new framing and ceiling board, or only if found necessary for roof project demo?(ie: vinyl insulation and glass wall panel system demo). Could the government provide more info for these areas? Possibly provide pictures, or companies that handle the communications, security systems, fire system etc. This will be needed information in order to accurately price due to these areas needing several different subs of different trades and scopes of work.
1-1 Government Response. Refer to sheets RA-101 thru RA-118 for as-built drawings for power, lighting. No existing drawings for communications, security systems, fire system etc. By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jul 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8687335 Architectural 1 1
In response to Q&A 8675874, You answered that one R-value (being R-25) is the minimum requirement, however R-
30 is what has been submitted for design and approval during shop drawing phase. Please clarify if we as contractors are to bid the minimum requirement, or per the design. (R-25 or R-30?)
1-1 Government Response. R-25 is also based on the calculation of the R-value for the aged insulation as stated in 07 22 00, 2.1.2, thus our increase to R-30 in the design documents. (bottom line, in order to achieve the R-25 in the aged calculation, you have to increase your base R-value, so both values are correct). By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8689779 Specifications 238 07 54 19
3.8 states: "the contractor is required to provide an RCI (Registered Roof Observer(RRO)) during all roof related construction activites. The RRO will perform daily oversight and quality control on all roof work"
Can RRO act as Quality control manager?
1-1 Government Response. No, the RRO CANNOT serve simultaneously as the CQC Manager. The RRO must be a third party and is required to be present on the roof during 100% of roof related construction activities. Specification Section 07 54 19 paragraph 3.8.1 requires the RRO to: "submit all plans, schedules, reports, and documentation directly to the Contracting Officer's Representative CONCURRENT with submission to the CQC System Manager." The RRO reports to BOTH the CQC manager and the COR. The
CQC manager has responsibilities in addition to observing the roof construction and as such is not necessarily required to be physically present on the roof during all roof construction activities. The RRO's sole responsibility is observing roof construction and assuring compliance with contract documents, as such, he or she must be physically present on the roof during all roof construction activities. By: Dianne
Grimes; CECT-NAO-M; (7572017839) On: Jul 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE
ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .