W91236-19-B-0012_0007_-_Amendment_3.pdf

PDF 219 KB Posted

Attached to
DLA Warehouse 4 Docks and Slab Renovation Federal contract opportunity
Solicitation number
W91236-19-B-0012
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

View the file

Other files for this federal contract opportunity

Other files attached to DLA Warehouse 4 Docks and Slab Renovation, newest first.
File Type Posted
Abstract_of_Bid_Submissions_-_DLA_WH4_Dock_and_Slabs_Restoration.pdf PDF
WH-4_Exterior_Door_Image.jpg JPG image
Tab_B_-_Hazardous_Materials_Report.pdf PDF
DLA_WH4_REV100_dwg__08-21-18.pdf PDF
DLA_WH4_REV100_Specs.pdf PDF
19-B-0012_Amendment_2.pdf PDF
19-B-0012_Amendment_1.pdf PDF
W91236-19-B-0012.pdf PDF
Warehouse__4_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to incorporate questions received and answ ers provided via ProjNet.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123619B0012

X 9B. DATED (SEE ITEM 11)

08-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Aug-2019

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

ProjNet: Logged In User Page 2 of 4 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll... 8/6/2019

W9123619B0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 11 00 - SOLICITATION, OFFER & AWARD

SUMMARY OF CHANGES

SECTION 00 11 00 - SOLICITATION, OFFER & AWARD

The required response date/time has changed from 08-Aug-2019 01:00 PM to 13-Aug-2019 01:00 PM.

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

PROJNET QUESTIONS AND ANSWERS

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contracting Officers Report All Inquiries

Project: WH4 Docks and Slabs Review: W91236-19-B- 0012 (00002) (sorted by CommentID ) Displaying 13 inquiries.

Id Discipline Sheet Detail Spec

8099495 Contracting Pg. 23 of 58 N/A N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference: 52.228-1 Bid Guarantee Question: The Bid Bond Form (Standard Form 24), issued by the GSA expires on 7/31/2019, before the closing date of this Solicitation. Will the government still accept this form as a Bid Guarantee for this project?

By: REDACTED On: Jul 18 2019. Forward request by email.

1-0 Evaluation Concurred. The government will accept the Bid Bond Form expiring on 7/31/2019. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Jul 25 2019

1-1 Government Response. Answered. By: Samuel Bolton; CENAO-CT Contracting Office; (757- 201-7883) On: Aug 01 2019

1-2 Government Response. The text below appends or clarifies ALL previous replies.

The government will accept the Bid Bond Form expiring on 7/31/2019. By: Samuel Bolton; CENAO- CT Contracting Office; (757-201-7883) On: Aug 05 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8106676 Mechanical 23 07 00 Thermal Insulation for

Mechanical Systems

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We have read the specification, but we do not understand the intent of the scope. We cannot locate any drawings to establish where insulation is to be placed or a quantity of insulation to assist in securing pricing.

Please identify a true scope of work for this specification and drawings to support the spec so we can identify where the insulation needs replaced and how much.

ProjNet: Logged In User Page 3 of 4

By: REDACTED On: Jul 24 2019. Forward request by email.

1-0 Evaluation For Information Only. Section 23 07 00 is in reference to the horizontal storm piping that is being replaced as indicated on P-103, sheet keynote 3. It is approximately 20 linear ft. of insulation on the horizontal 5" cast iron storm pipe. By: Douglas Richter; Waller Todd & Sadler- Virginia Beach, VA; (757- 417-0140) On: Jul 26 2019

1-1 Government Response. Answered. By: Samuel Bolton; CENAO-CT Contracting Office; (757- 201-7883) On: Aug 01 2019

1-2 Government Response. The text below appends or clarifies ALL previous replies.

Section 23 07 00 is in reference to the horizontal storm piping that is being replaced as indicated on P-103, sheet keynote 3. It is approximately 20 linear ft. of insulation on the horizontal 5" cast iron storm pipe. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 05 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8108018 General NA NA NA Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can you please clarify how many amendments have been released? On FBO it shows two, but they Amendments are labels 0004 and 0005.

By: REDACTED On: Jul 24 2019. Forward request by email.

1-0 Evaluation Concurred. Only two amendments have been released. By: Samuel Bolton;

CENAO-CT Contracting Office; (757-201-7883) On: Jul 25 2019

ProjNet: Logged In User Page 4 of 4

1-1 Government Response. Answered. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 01 2019

1-2 Government Response. The text below appends or clarifies ALL previous replies.

Only two amendments have been released. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201- 7883) On: Aug 05 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8108789 Contracting N/A N/A N/A Comment Classification: UNCLASSIFIED (U)

1. What are the door sizes for overhead and firedogs (no door schedule seen)

By: REDACTED On: Jul 25 2019. Forward request by

1-0 Evaluation Concurred. Interior (Fire) Doors are to be field verified, but are 9'-4"W x 12'-3" H +/-. Exterior Doors shall also be field verified, but the openings are 12'-4"W x 13'-0"H +/-. By: Douglas Richter; Waller Todd & Sadler- Virginia Beach, VA; (757-417-0140) On: Jul 26 2019

1-1 Government Response. Answered. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 01 2019

1-2 Government Response. The text below appends or clarifies ALL previous replies.

Interior (Fire) Doors are to be field verified, but are 9'-4"W x 12'-3" H +/-. Exterior Doors shall also be field verified, but the openings are 12'-4"W x 13'-0"H +/-. By: Samuel Bolton; CENAO-CT Contracting Office; (757- 201-7883) On: Aug 05 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8108791 Contracting N/A N/A N/A

2. Can you verify the door count?

Overhead (12)

Firedoor (13)

1-0 Evaluation Concurred. (13) of each type of door is indicated on the plans. By: Douglas Richter; Waller Todd & Sadler- Virginia Beach, VA; (757-417-0140) On: Jul 26 2019

1-1 Government Response. Answered. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 01 2019

1-2 Government Response. The text below appends or clarifies ALL previous replies.

(13) of each type of door is indicated on the plans. By: Samuel Bolton; CENAO-CT Contracting Office; (757- 201-7883) On: Aug 05 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8108793 Contracting N/A N/A N/A

3. Overhead Doors. The specs cover all the types of operation. Operator and Manual. Can you confirm Operation?

1-0 Evaluation Concurred. There are manual and electric operators. Confirm locations with Electrical drawings. By: Douglas Richter; Waller Todd & Sadler- Virginia Beach, VA; (757-417-0140) On: Jul 26

1-1 Government Response. Answered. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 01 2019

1-2

ProjNet: Logged In User Page 5 of 4

Government Response. The text below appends or clarifies ALL previous replies.

There are manual and electric operators. Confirm locations with Electrical drawings. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 05 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8108794 Contracting N/A N/A N/A Comment Classification: UNCLASSIFIED (U)

4. Are these Insulated or Non Insulated door for both types? What are the existing door Like?

By: REDACTED On: Jul 25 2019. Forward request by email.

1-0 Evaluation Concurred. Interior doors do not require insulation, but exterior doors shall be insulated.

Existing doors vary in type. By: Douglas Richter; Waller Todd & Sadler- Virginia Beach, VA; (757-417- 0140) On: Jul 26 2019

1-1 Government Response. Answered. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 01 2019

1-2 Government Response. The text below appends or clarifies ALL previous replies.

Interior doors do not require insulation, but exterior doors shall be insulated. Existing doors vary in type. By:

Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 05 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8108796 Contracting N/A N/A N/A Comment Classification: UNCLASSIFIED (U)

5. Are there any pictures of the existing doors on the inside to tell if they are High Lift, Vertical Lift or Standard 15" Radius tracks?

1-0 Evaluation Concurred. See attached photo. (Attachment: WH-4_Exterior_Door.pdf) By: Douglas Richter; Waller Todd & Sadler- Virginia Beach, VA; (757-417-0140) On: Jul 26 2019

1-1 Government Response. Answered. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 01 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8108797 Contracting HM101-hazardous materials sheet

N/A N/A

Sheet HM101-hazardous materials sheet--Note 5 States existing Paint within Structure has been determined to contain concentrations above laboratory minimum detection. Please provide the Laboratory report Where exactly lead paint is located and or provide the quantity to be removed. We cannot provide a price without this information.

If Removing the lead based Paint , is required for this project , it would add a lot of additional time to the project.

email.

1-0 Evaluation Concurred. See attached Hazmat Report (Attachment: TAB_A_Hazmat_Report.pdf) By:

Douglas Richter; Waller Todd & Sadler- Virginia Beach, VA; (757-417-0140) On: Jul 26 2019

1-1 Government Response. Answered. By: Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 01 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8123057 Other N/A N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are answers to all questions not accessible by all potential bidders?

By: Andy Liu; Structural Engineering Group, INC.; (919-972-1907). On: Aug 02 2019. Forward request by email.

Evaluation not conducted.

Current Request Status: Request Pending

Information for this report is procurement sensitive.

8123367 Contracting 0 0

With lack of answers to the bid inquiry questions, can there be a bid extension so that all bidders have the proper time to review the questions and answers?

By: REDACTED On: Aug 02 2019. Forward request by email.

Evaluation not conducted.

Current Request Status: Request Pending

Information for this report is procurement sensitive.

8125223 Contracting N/A N/A N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can the Superintendent be the SSHO as long as they meet the qualifications?

By: REDACTED On: Aug 05 2019.

Forward request by email.

1-0 Evaluation Concurred. Follow Specifications. By: Douglas Richter; Waller Todd & Sadler- Virginia Beach, VA; (757-417-0140) On: Aug 06 2019

1-1 Government Response. Follow Specifications. By: Samuel Bolton; CENAO-CT Contracting Office; (757- 201-7883) On: Aug 06 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8125226 Contracting N/A N/A N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide required dimensions for new overhead doors and coiling fire doors. There is no schedule available dictating the size of the new doors that are to be installed.

By: REDACTED On: Aug 05 2019.

Forward request by email.

1-0 Evaluation Concurred. Interior (Fire) Doors are to be field verified, but are 9'-4"W x 12'-3" H +/-. Exterior Doors shall also be field verified, but the openings are 12'-4"W x 13'-0"H +/-. By:

Douglas Richter; Waller Todd & Sadler- Virginia Beach, VA; (757-417-0140) On: Aug 06

1-1 Government Response. Interior (Fire) Doors are to be field verified, but are 9'-4"W x 12'-3" H Exterior Doors shall also be field verified, but the openings are 12'-4"W x 13'-0"H +/-. By:

Samuel Bolton; CENAO-CT Contracting Office; (757-201-7883) On: Aug 06 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

(End of Summary of Changes)