W91236-17-B-0006-0001.pdf
PDF 52 KB Posted
- Solicitation number
- W91236-16-B-0007
About this file
W91236-17-B-0006-0001 Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_Bid_Opening-signed.pdf | ||
| W91236-17-B-0006-0003.pdf | ||
| W91236-17-B-0006-0002.pdf | ||
| FINAL_2016_CIRB_PS.pdf | ||
| W91236-17-B-0006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W26GLG62361232
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W91236-17-B-0006 Craney Island Rehandling Basin Maintenance Dredging, Craney Island Rehandling Basin, located in Portsmouth, Virginia is hereby Amended as follow s:
Please see continuation page for list of Bidder Inquiries submitted via ProjNet, and corresponding Government responses, w hich are hereby applicable to this Solicitation and subsequent Contract.
General Decision Number: VA160004 01/08/2016 VA4 is hereby deleted and replaced w ith General Decision Number: VA170001
01/06/2017 VA1.
Please note that the Bid Opening date has NOT changed. Please acknow ledge all amendments in your proposal.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jan-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-17-B-0006
X 9B. DATED (SEE ITEM 11)
15-Dec-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jan-2017
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-17-B-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following have been added by full text:
BIDDER INQUIRIES & ANSWERS SUBMITTED VIA ProjNet
Bidder Inquiry 6780654 Can the Government please provide a list of anticipated projects with Rehandling Basin disposal that will be in progress during the time frame of the Rehandling Basin maintenance dredging?
GOVERNMENT RESPONSE: Current proposed projects/users of the Craney Island Rehandling Basin that have indicated a need or may actively use the facility during this maintenance dredging event include the following:
1. Newport News Shipbuilding
2. Colonnas Shipyard (currently in progress)
Bidder Inquiry 6780657 If determined to be cost-effective, can the Contractor remove material from the Debris Channel by alternate means other than hydraulic dredging and place the material in the Rehandling Basin for hydraulic transport to the Craney Island Disposal Area?
GOVERNMENT RESPONSE: In accordance VWP Individual Permit Number 02-2147, included as part of the solicitation, no double handling of dredged material is allowed.
Bidder Inquiry 6780659 Section 3.9.2 states that the Craney Island Rehandling Basin will continue to accept material during the dredging period. Please provide clarification on acceptance criteria in the event that a scow load is dumped in an area that was previously dredged to grade.
GOVERNMENT RESPONSE: As indicated in Section 35 20 23, paragraph section 3.9.2, the Contractor will be responsible for reporting all dredged-material quantities placed by scow in the Rehandling Basin during dredging operations.
If an after-dredging survey associated with this contract is completed prior to scow dumping, in areas previously dredged to grade, the after-dredging survey will be used for acceptance. If an after-dredging survey is completed subsequent to scow dumping in areas previously dredged to grade, the after-dredging survey and acceptance will be verified considering barge-measure or quantity surveys provided by the permittee(s) placing material into the Rehandling basin.
Bidder Inquiry 6780661 Reference Section 3.9.2. Will incoming scow loads be placed in specific area(s) of the Rehandling Basin? Will the Contractor for this project be able to coordinate with assistance of the Contracting Officer the use of access channels and the placement location of incoming scow loads to maintain the most cost-effective dredging operation?
GOVERNMENT RESPONSE: Answer to both questions is Yes.
Bidder Inquiry 6780664 When does the Government expect to award the above referenced project?
GOVERNMENT RESPONSE: Current expectation is to award the contract as soon as possible, assuming normal business conditions and requirements. By mid-February 2017.
Bidder Inquiry 6780665 What is the expected date of issuance of Notice to Proceed?
GOVERNMENT RESPONSE: Current expectation is to issue the Notice-to-Proceed as soon as possible, assuming normal business conditions and requirements. By late February 2017.
Bidder Inquiry 6780667 Can the Government please provide copies of all Federal, State or local licenses, permits or regulations applicable to the work?
GOVERNMENT RESPONSE: All licenses, permits or regulations applicable to the work are included or referenced within the plans and specifications.
Bidder Inquiry 6780669 Is the Government aware of any requirements of any licenses, permits, regulations or disposal fees that may have an impact on the Contractor's performance or cost for the work required by this solicitation and that are not included or expressly referenced in the specifications?
GOVERNMENT RESPONSE: No.
Bidder Inquiry 6780672 Is the Government aware of any other Federal, State or local licenses, permits or regulations applicable to the work?
If so, please advise the source of such documents.
GOVERNMENT RESPONSE: All licenses, permits or regulations applicable to the work are included or referenced within the plans and specifications.
Bidder Inquiry 6780735 Does the Government intend to award any and all options together with the base dredging items prior to issuing Notice to Proceed?
GOVERNMENT RESPONSE: Pending availability of funds, the Government intends to award optional items together with the base dredging items, prior to issuing the Notice to Proceed.
SECTION 00 73 46 - WAGE DETERMINATION SCHEDULE
The following have been modified:
General Decision Number: VA170001 01/06/2017 VA1
Superseded General Decision Number: VA20160001
State: Virginia
Construction Type: Heavy Dredging
Counties: Virginia Statewide.
DREDGING CONSTRUCTION PROJECTS (Excluding HOPPER DREDGING)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017
* ENGI0025-003 10/01/2014
Rates Fringes
Dredging: (Includes Clamshell Dredges, Hydraulic Dredges 20" and Over; Tug Boats) Assistant Fill Placer.......$ 28.22 11.55+a Blaster/Driller.............$ 30.81 12.00+a Boat Operator...............$ 29.01 11.86+a Certified Welder............$ 29.01 11.86+a Cook........................$ 22.68 10.85+a Deckhand....................$ 22.68 10.85+a Derrick Operator............$ 30.81 12.00+a Dozer Operator..............$ 30.81 12.00+a Drag Barge Operator.........$ 28.22 11.55+a Drill Oiler.................$ 22.68 10.85+a
Electrician.................$ 30.81 11.00+a Engineer....................$ 30.81 12.00+a Fill Placer.................$ 28.22 11.55+a Janitor.....................$ 22.68 10.85+a Leverman....................$ 35.63 12.39+a Licensed Boat Operator......$ 29.01 11.86+a Licensed Tug Operator over 1000 HP.....................$ 30.81 12.00+a Mate........................$ 28.22 11.55+a Messman.....................$ 22.68 10.85+a Oiler.......................$ 22.68 10.85+a Operator....................$ 35.63 12.39+a Rodman......................$ 22.68 10.85+a Scowman.....................$ 22.68 10.85+a Shoreman....................$ 22.68 10.85+a Spider/Spill Barge Operator.$ 30.81 12.00+a Steward.....................$ 28.22 11.55+a Timber Fork Operator........$ 30.81 12.00+a Welder......................$ 28.22 11.55+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Good Friday, Labor Day, Thanksgiving Day, Christmas Day, Plus Vacation contribution of 7% of straight time rate multiplied by the total hours worked.
INCENTIVE PAY (Add to Hourly Rate):
Operator (NCCCO license/certification) - $0.50 Licensed Tug Operator over 1000 HP (assigned as master) USCG licensed Master of Towing Vessels (MOTV) - $1.00;
Licensed Boat Operator (assigned as lead boat captain) (USCG licensed boat operator) - $0.50;
Engineer (QMED and Tankerman endoresement or licensed engineer (USCG) - $0.50 Oiler (QMED and Tankerman endorsement) USCG) - $0.50; All classifications (Tankerman endorsement onl) (USCG)- $0.25;
Deckhand or Mater (AB with Lifeboatman endorsement (USCG) - $0.50;
All classifications (Lifeboatman endorsement onl) (USCG) - $0.25; Welder (ABS certification)- $0.50
SUVA1994-008 11/01/1994
Rates Fringes
Dipper Dredges Deckhand....................$ 9.50 2.96+a Engineer....................$ 14.04 2.96+a Handyman....................$ 9.50 2.96+a Launchman...................$ 10.12 2.96+a Mate........................$ 12.39 2.96+a Oiler.......................$ 10.12 2.96+a
Operator....................$ 14.59 2.96+a Rodman......................$ 9.50 2.96+a Scowman.....................$ 9.63 2.96+a Welder......................$ 12.78 2.96+a
Drill Boats Blaster.....................$ 13.69 2.96+a Driller.....................$ 13.69 2.96+a Engineer....................$ 14.18 2.96+a
Hydraulic Dredges Under 20" Carpenter...................$ 13.14 2.96+a Deckhand....................$ 9.50 2.96+a Derrick Operator............$ 13.20 2.96+a Electrician.................$ 13.45 2.96+a Engineer....................$ 14.18 2.96+a Handyman....................$ 9.50 2.96+a Janitor/Porter..............$ 9.50 2.96+a Leverman....................$ 14.53 2.96+a Mate........................$ 12.39 2.96+a Messman.....................$ 9.32 2.96+a Night Cook..................$ 9.50 2.96+a Oiler.......................$ 10.12 2.96+a Rodman......................$ 9.50 2.96+a Second Cook.................$ 9.50 2.96+a Shoreman....................$ 9.32 2.96+a Spider Barge Operator.......$ 12.97 2.96+a Spill Barge Operator........$ 12.97 2.96+a Steward.....................$ 10.42 2.96+a Tug Deckhand................$ 9.50 2.96+a Tug Master..................$ 12.29 2.96+a Tug Mate....................$ 11.76 2.96+a Welder......................$ 12.78 2.96+a
Steward Department (On Dipper Dredges) Cook........................$ 9.27 2.96+a Mess Cook...................$ 8.74 2.96+a Messman and Janitor.........$ 8.61 2.96+a
Tug Boats (Tending Dipper Dredges) Assistant Engineer..........$ 11.75 2.96+a Cook........................$ 9.63 2.96+a Deckhand....................$ 9.37 2.96+a Engineer....................$ 12.96 2.96+a Tug Master..................$ 13.16 2.96+a Tug Mate....................$ 11.87 2.96+a
FOOTNOTES APPLICABLE TO ALL ABOVE CRAFTS:
a. PAID HOLIDAYS AND VACATION:
New Year's Day, Memorial Day, Independence Day, Good Friday, Labor Day, Thanksgiving Day, and Christmas Day; plus vacation contribution of 7% of straight time pay for all hours worked.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)