W91236-15-R-0039-0002_-_Drawing_addition_ _Spec_075419_para_2.3_change.pdf

PDF 98 KB Posted

Attached to
Arlington National Cemetery Sand, Salt & Soil Storage
Solicitation number
W91236-15-R-0039
Issued by

About this file

Amendment 0002 - Drawing Addition Spec 07 54 19 para 2.3 change

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add draw ings show ing tree protection around tw o exisiting trees. This amendment w ill also change the language of Specif ication Section 07 54 19 paragraph 2.3. See contiunation page for more specif ics.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Aug-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-15-R-0039

X 9B. DATED (SEE ITEM 11)

03-Aug-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Aug-2015

CODE

NORFOLK, U.S. ARMY CORPS OF ENGINEERS

803 FRONT ST

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-15-R-0039

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 692 29-JUL-2015

Attachment 3 Bid Schedule 1 08-JUL-2015

Attachment 4 Section 08 22 20 10 06-AUG-2015

Attachment 5 Drawings 59 07-AUG-2015 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 692 29-JUL-2015

Attachment 3 Bid Schedule 1 08-JUL-2015

Attachment 4 Section 08 22 20 10 06-AUG-2015

Attachment 5 Drawings 59 07-AUG-2015

Attachment 6 Additional Drawings 7 21-JUL-2015

SECTION 01 10 00 - STATEMENT OF WORK

The following have been added by full text:

SPECIFICATION CHANGE

The wording of Spec Section 07 54 19, paragraph 2.3 would change from:

2.3 Roof Protection Board

Provide glass mat faced gypsum panels ASTM C1177/C1177M fire resistant type, 1/2

- 5/8 inch thick, specifically manufactured for use in roofing applications.

Provide manufacturer's approved fasteners for installation of protection board.

To:

2.3 Roof Protection Board

Provide glass mat faced gypsum panels ASTM C1177/C1177M or ASTM C1278 fire resistant type, 1/2 - 5/8 inch thick, specifically manufactured for use in roofing applications. Provide manufacturer's approved fasteners for installation of protection board.

W91236-15-R-0039

(End of Summary of Changes)