AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT No. 0002 to W91236-10-R-0025, Design and Construction of approximately 800 foot Waterfront Bulkhead and Fendering System at NOAA Marine Operations Center in Norfolk, Virginia is amended as follows:

See Schedule on Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Aug-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-10-R-0025

X 9B. DATED (SEE ITEM 11)

27-Jul-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Aug-2010

CODE

USA ENGINEER DISTRICT, NORFOLK

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-10-R-0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SCHEDULE

1. Refer to Section 00100 Bidding Schedule/Instructions to Bidders, Clause 52.222-23, Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction, Item 5 (e), Delete “Contracting Officer shall insert description of the geographical area where the contract is to be performed, giving the State, county and city.” and replace with “Norfolk, Virginia.”

2. Refer to Section 00700, Contract Clauses, Clause 52.228-1, Bid Guarantee, Item C, Add the following: The amount of the bid guarantee shall be “20” percent of the bid price or “$3,000,000.00”, whichever is less.

3. Refer to Section 00800, Special Contract Requirements, Clause 52.211-10, Commencement, Prosecution and Completion of Work, Delete “from Notice to Proceed.”

4. Refer to Section 00800, Special Contract Requirements, Clause 52.236-4, Physical Data is hereby deleted in its entirety.

5. Refer to Section 00 22 11, Factors for Evaluation, Delete page 3 and 4 and replace with the following attachment.

6. Refer to Section 00 22 11, Factoris for Evaluation, Attachment 9, Letter of Commitment of Deisgn firm or key subcontractors is hereby attached.

7. Contracting Office Point of Contact:

Veronica McGuire, Phone: 757-201-7366, Fax 757-201-7183, Email: veronica.a.mcguire@usace.army.mil.

1. OVERVIEW

The Government is looking for ways to streamline construction, manage labor and other resource constraints in an effort to reduce costs and achieve an aggressive schedule in executing task orders for faster project execution at lower cost, while taking advantage of industry standards, means and methods. In this selection procedure, interested firms or joint venture entities (referred to as ”Offerors”) submit certain specified performance capability proposals, demonstrating their capability to successfully execute the construction under the contract resulting from this solicitation. The Government will evaluate the qualifications in accordance with the criteria described herin and will award a single contract to the Lowest Price Technically Acceptable Offeror. The total evaluated price will include the base and all optional items.

2. GENERAL INSTRUCTIONS

2.1. Proposals should be submitted initially on the most favorable terms from a price and capability standpoint. Do not assume that offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

2.2. Firms formally organized as construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors.

Any legally organized Offeror may submit a proposal.

2.3. Submit the proposal in a tabbed, three-ring binder. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

2.4. Proposal Format

2.4.1. Written materials: 8 ½” x 11” format, using 10 point or larger font size, in bound volumes, using 3-ring binders (except that Pro Forma material and price proposal shall be submitted in a closed manila envelope). Each bound volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein.

2.4.2. The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.

2.4.3. Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).

2.4.4. Number of pages: The proposal shall be limited to a maximum of 250 typewritten pages, includes both volumes. Each side of a double sided page shall constitute one page.

2.4.5. Provide one (1) original and six (6) copies of Volume I (Performance Capability) and one (1) original and one (1) copy of Volume II (Price & Pro Forma Information).

2.5. Joint Venture Proposal Requirements

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively

3. PROPOSAL AND RELATED EVALUATION FACTORS, SUBFACTORS AND ELEMENTS

3.1. VOLUME 1 – PERFORMANCE CAPABILITY

Factor/Sub Factor

Location Description Factor

Weight

FACTOR 1 PERFORMANCE CAPABILITY

Subfactor 1 Vol. 1 TAB A Specialized Experience All factors are rated equal

Subfactor 2 Vol. 1 TAB B Past Performance All factors are rated equal

Subfactor 3 Vol. 1 TAB C ORGANIZATION/TECHNICAL APPROACH All factors are rated equal

Subfactor 4 Vol. 1 TAB D Key Personnel Capabilities and Experience All factors are rated equal

3.2. VOLUME 2 – PRICE AND PRO FORMA INFORMATION

Factor/Sub Factor

Location Description

FACTOR 2 Vol. 2 TAB A Price (Standard Form 1442, Proposal Data Sheet And Contract Line Item Schedule)

All factors are rated equal

NOTE: 8(a) Joint Venture Offeror or Offeror submitting Proposal as HubZone Joint Venture shall submit evidence from Offerors SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist

VOLUME 1 – FACTOR 1 – PERFORMANCE CAPABILITY

SECTION 00 22 11 - ATTACHMENT9

LETTER OF COMMITMENT OF (DESIGN FIRM OR KEY SUBCONTRACTOR)

(USE SUBCONTRATOR’S COMPANY LETTERHEAD)

TO: Contracting Officer SUBJECT: Letter of Commitment for Proposed Contract for ____________________

Dear Sir or Madam:

I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of Proposer), that (insert name of firm) will fulfill the duties of (state role on a project)

Sincerely, (Authorized Subcontractor Official) Date: __________

File details come from the government source that posted it. Updated .