W91236-10-R-0006-0001.pdf
PDF 28 KB Posted
- Solicitation number
- W91236-10-R-0006
About this file
W91236-10-R-0006 Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91236-10-R-0006-0002.pdf | ||
| VF101.dwg | DWG drawing | |
| V-GP.dwg | DWG drawing | |
| CS501-50X.dwg | DWG drawing | |
| V-SP.dwg | DWG drawing | |
| CD101.dwg | DWG drawing | |
| CS101.dwg | DWG drawing | |
| W91236-10-R-0006 SOLN .pdf | ||
| W91236-10-R-0006 SOW .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81W3G93084002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001 is hereby issued to:
See attached Continuation Sheet
Point of Contact: Sabrina Tippins sabrina.a.tippins@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Dec-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-10-R-0006
X 9B. DATED (SEE ITEM 11)
03-Dec-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Dec-2009
CODE
USA ENGINEER DISTRICT, NORFOLK
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-10-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
1. Revise second sentence in 3.4 Construction Staging to read as follows:
“The staging area location shall be approved by the Contracting Officer and shown on the Erosion and Sediment Control plans provided by the Contractor.”
2. Delete the last sentence of 3.16.3.7 (“Preferred style is shown in photo on detail sheets in Appendix D”) and replace with:
“Street lights shall be residential in style and compliment the surrounding neighborhood.”
3. The Contractor shall comply with the installation’s General Environmental Controls.
4. Provide CADD drawings, as requested.
General Environmental Controls
1. General: While performing work at Defense Distribution Depot Susquehanna (DDSP), the contractor shall comply with all Federal, State and Local environmental protection laws and regulations, the controls of this document, and all specific requirements stated elsewhere in contract specifications.
2. Environmental Permits: All required permits must be obtained from the appropriate agency and paid for by the contractor. Some examples include, but are not limited to:
a. Installation and/or removal of underground storage tanks prior to the start of work.
b. Well drilling prior to the start of work.
c. Air emissions such as Volatile Organic Compounds (VOCs) and National Emission Standards for Hazardous Air Pollutants (NESHAPS) prior to the start of work
d. Demolition (Asbestos or Non-asbestos) 10 days prior to the start of work.
e. Renovations (Asbestos only) 10 days prior to the start of work.
f. General construction storm water permit prior to the start of work.
3. Archaeological Findings During Construction: There is one known archaeological site noted at DDSP at this time. Should any skeletons, artifacts or other archaeological remains be uncovered, the contractor shall immediately stop work and contact the Contracting Officer’s Representative (COR) for further instructions.
4. Sanitary/Storm Drainage Restrictions: Absolutely no materials are to be disposed of via the sanitary sewage or storm drain systems. Any projects that involve earth disturbance require the use of Pennsylvania stormwater best management practices. This would include things such as filter bags in storm drains, filter fence, and cleaning soil from depot road ways on a daily basis.
5. Discovery of Asbestos Containing Materials (ACM) or Suspect Lead Paint: If the contractor discovers
ACM or suspect lead paint in a DDSP facility during the performance of the contract, work in the area of the ACM shall be immediately cease and the COR shall be notified.
6. Spill Notification: Any spills or releases of hazardous material or waste resulting from the contractors performance shall be reported immediately to Central Dispatch by calling *911 (on facility phones). For reporting spills using an outside phone line (cell phones etc) the emergency number is (717) 770-7777. The contractor is responsible for all cleanup costs. The Contracting Officer may require the contractor to arrange for cleanup action by qualified contractor personnel of subcontractors. Cleanup must be to the satisfaction of the DDSP Environmental Protection Office and meet Federal, State and Local requirements.
7. Discovery of Unidentified Materials or Objects: DDSP has been an active military support base since World
War II. Thus, the potential exists for the discovery of hazardous materials, such as explosives, chemical (gas) weapons and toxic contaminants, during excavation and demolition operations. The following procedure is applicable:
a. Any suspect material found during construction activities shall be assumed hazardous. Excavated soils with unusual appearance or odor shall be considered suspect.
b. Site workers shall immediately secure in a safe condition any equipment being operated and leave the area of the material or object. Do not approach, examine or move the material or object.
c. The discovery shall be reported immediately to the DDSP Fire Department by calling *911. Outside phone line emergency number is (717) 770-7777.
8. Project Storage of Hazardous Materials: The contractor shall notify the COR prior to the on-site storage of any hazardous material (as defined by Title 49, Section 171.8 of the Code of Federal Regulations). Notification shall include the quantity, location and a copy of the Material Safety Data Sheet (MSDS).
9. Refuse Disposal: The use of government dumpsters for disposal of contractor generated non-hazardous waste and refuse (i.e. wood, plastic, etc.) is prohibited. The contractor shall provide containers for disposal of non-hazardous waste and refuse generated as a result of the performance of work.
10. Hazardous Waste Generation and Disposal: Hazardous waste generated in performance of a contract shall be the property of the contractor and shall be removed as part of the contract effort. All costs associated with its accumulation, storage, transportation, treatment and disposal are the responsibility of the contractor. The contractor shall properly accumulate, package, label, store, transport and dispose of all hazardous waste in accordance with all applicable Federal, State and Local regulations and the terms of the contract. The contractor is responsible of ensuring all subcontractors who provide transportation, treatment, storage or disposal services possess the ability to satisfactorily perform in accordance with applicable Federal, State and Local regulations. On-site disposal of hazardous waste, including empty containers that previously contained hazardous materials, is strictly prohibited. In addition, the contractor shall:
a. Notify the COR of the type, quantity and location of the hazardous waste to be accumulated, and obtain control numbers for each hazardous waste container to be used prior to beginning the accumulation of a hazardous waste. Control numbers will be issued by the DDJC Environmental Office by calling
(209) 839-4065
b. Provide advance copies of the completed hazardous waste profile (supported by analysis), land disposal restriction/certification form, and the uniform hazardous waste manifest to the COR for review by the DDJC Environmental Protection Office at least 24 hours prior to shipment of a hazardous waste off-site.
c. Arrange with the COR for the Environmental Office to perform a transportation inspection and certify/sign the uniform hazardous waste manifest at the time of shipment.
d. Agree that any contract shall not be considered complete until all hazardous waste has been disposed of in accordance with Federal, State and Local laws and regulations and the terms the contract.
11. Dust Control/PM10: Airborne particulates, including dust particles, from construction activities and processing and preparation of materials shall be controlled at all times, including weekends, holidays, and hours when work is not in progress. The contractor shall maintain all excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, disposal sites, borrow areas, and all other work areas free from airborne dust which would cause a hazard or nuisance. The use of depot fire hydrants will not be authorized without the consent of the COR
12. Green Products: DDSP promotes the use of green products. Contractors when having a choice are encouraged to select materials for use that have the highest recycled content practicable, are energy saving, bio-based, or are environmentally preferred..
File details come from the government source that posted it. Updated .