10B0011.pdf

PDF 56 KB Posted

Attached to
RECOVERY - Maintenance Dredging James River Channel, Virginia
Solicitation number
W91236-10-B-0011
Issued by

About this file

Amendment 0001 - Specifications

View the file

Other files

File Type Posted
10-B-0011 Abstract.xlsx XLSX spreadsheet
Attendees List.pdf PDF
10-B-0011.pdf PDF
10-B-0011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W26GLG00228044

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT FOR MAINTENANCE DREDGING AT VARIOUS LOCATIONS, JAMES RIVER, VIRGINIA is amended as follow s.

1. The Bid Schedule is clarif ied as show n on attached.

2. Specif ications are amended as show n on attached.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-May-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-10-B-0011

X 9B. DATED (SEE ITEM 11)

16-Apr-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-May-2010

CODE

USA ENGINEER DISTRICT, NORFOLK

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-10-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SECTION 00 11 00 - SOLICITATION, OFFER & AWARD

BID SCHEDULE

BID SCHEDULE - AMENDMENT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 1 Lump Sum

SCHEDULE I - BASE BID

FFP

FOB: Destination

MILSTRIP: W26GLG00228044

PURCHASE REQUEST NUMBER: W26GLG00228044

TOTAL (Items 0001 through 0011)

UNIT UNIT PRICE MAX AMOUNT

0002 1 Lump

OPTION SCHEDULE II - OPTION YEAR 1

FOB: Destination

TOTAL (Items 1001 through 1011)

UNIT UNIT PRICE MAX AMOUNT

0003 1 Lump

OPTION SCHEDULE III - OPTION YEAR 2

FOB: Destination

TOTAL (Items 2001 through 2011)

TOTAL BASE AND ALL OPTION YEARS $______________________________

BID SCHEDULE ADDENDUM

BASE YEAR

ITEM DESCRIPTION QUANTITY UNIT U/P AMOUNT

0001 Mobilization and

Demobilization 1 JB ___LS___

0002 Mobilization and Demobilization of Additional Pipeline 1 JB ___LS___ _______

0003 Dredging – Lower and Middle James River Shoals 400,000 CY

0004 Dredging Upper James River Shoals, Richmond Deepwater Terminal 50,000 CY

0005 Dredging Upper James River Shoals, Richmond Deepwater Terminal to Hopewell 30,000 CY

0006 Dredging Upper James River Shoals, Richmond Harbor to Richmond

Deepwater Terminal 100,000 CY

0007 Transportation of Plant and Equipment from Designated Mobilization Point to First Dredging Area and Subsequent Areas 100 RIV MI ___ _ __________

0008 Installation and Removal of Additional Pipeline 12,000 LF ___ __________

0009 Dredging – Upper James River Shoals at Pipeline

Lengths Exceeding 7,500 linear feet 25,000 CY ________ __________

0010 Dredging – Lower James

Lengths exceeding 10,000 linear feet 150,000 CY ________ __________

0011 Contracting Officer Directed

Standby Time 1 DAY ___LS___ __________

TOTAL ESTIMATED BID AMOUNT – BASE YEAR $_________

OPTION YEAR 1

ITEM DESCRIPTION QUANTITY UNIT U/P AMOUNT

1001 Mobilization and

1002 Mobilization and of Additional Pipeline 1 JB ___LS___ __________ 1003 Dredging – Lower and Middle James River Shoals 400,000 CY

1004 Dredging Upper James River Shoals, Richmond Deepwater Terminal 50,000 CY

1005 Dredging Upper James River Shoals, Richmond Deepwater Terminal to Hopewell 30,000 CY

1006 Dredging Upper James River Shoals, Richmond Harbor to Richmond Deepwater Terminal 100,000 CY

1007 Transportation of Plant and Equipment from Designated Mobilization Point to First Dredging Area and Subsequent Areas 100 RIV MI ___ __________

1008 Installation and Removal of

1009 Dredging – Upper James

7,500 linear feet 25,000 CY ________ __________

1010 Dredging – Lower James

10,000 linear feet 150,000 CY ________ __________

1011 Contracting Officer

Standby Time 1 DAY ___LS___ __________

TOTAL ESTIMATED BID AMOUNT – OPTION YEAR 1 ___________

OPTION YEAR 2

ITEM DESCRIPTION QUANTITY UNIT U/P AMOUNT

2001 Mobilization and

2002 Mobilization and of Additional Pipeline 1 JB ___LS___ ____________

2003 Dredging – Lower and Middle James River Shoals 400,000 CY ___

2004 Dredging Upper James River Shoals, Richmond Deepwater Terminal 50,000 CY ___

2005 Dredging Upper James River Shoals, Richmond Deepwater Terminal to Hopewell 30,000 CY

2006 Dredging Upper James River Shoals, Richmond Harbor to Richmond

Deepwater Terminal 100,000 CY

2007 Transportation of Plant and Equipment from Designated Mobilization Point to First Dredging Area and Subsequent Areas 100 RIV MI ______ ___________

2008 Installation and

Removal of

2009 Dredging – Upper James River Shoals at Pipeline

7,500 linear feet 25,000 CY ________ _________

2010 Dredging – Lower James

10,000 linear feet 150,000 CY ________ _________

2011 Contracting Officer

Standby Time 1 DAY ___LS___ _________

TOTAL ESTIMATED BID AMOUNT – OPTION YEAR 2 $__________

TOTAL ESTIMATED BID AMOUNT –

BASE + ALL OPTION YEARS $ ____

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

AMENDED SPECIFICATIONS

TECHNICAL SPECIFICATIONS:

1. TECHNICAL SPECIFICATIONS, second page, Table of Contents:

a. Change title of SECTION 35 20 40 to read “HISTORIC BANK HEIGHT

INFORMATION FROM PREVIOUS JAMES RIVER TASK ORDER

DREDGING CONTRACTS”

2. SECTION 01 14 00, SPECIAL WORK CONDITIONS:

a. Page 7, paragraph 1.5.4, second sentence, delete the word “within” and insert “a minimum of” in its place.

b. Page 9, paragraph 1.6.7, delete the third sentence and replace with “The boundary points shall be physically located with 1 inch diameter steel pipe and marked with orange flagging or orange buoys, as directed by the Contracting Officer, prior to dredging operations.”

3. SECTION 01 22 00, MEASUREMENT AND PAYMENT:

a. Page 4, paragraph 1.2.3, change title of paragraph to read “Payment Item No.

0004, 1004 and 2004 Dredging Upper James River Shoal, Richmond Deepwater Terminal”

b. Page 4, paragraph 1.2.3, change title of paragraph to read “Payment Item No.

0005, 1005 and 2005 Dredging Upper James River Shoals, Richmond Deepwater Terminal to Hopewell”

c. Page 5, paragraph 1.2.4, change title of paragraph to read “Payment Item No.

0006, 1006 and 2006 Dredging Upper James River, Richmond Harbor to Richmond Deepwater Terminal”

4. SECTION 01 35 00, GOVERNMENTAL SAFETY REQUIREMENTS:

a. Page 5, delete paragraph 1.5.1.2 in its entirety.

5. SECTION 01 35 26, GOVERNMENTAL SAFETY REQUIREMENTS:

a. Page 8, SECTION 1.12, delete the word “PLAN” from the title.

6. SECTION 35 20 40, HISTORIC BANK HEIGHT INFORMATION FROM

PREVIOUS JAMES RIVER TASK ORDER DREDGING CONTRACTS AND MAPS

OF CHANNELS ON JAMES RIVER:

a. Page 1, change title of SECTION to read “HISTORIC BANK HEIGHT

INFORMATION FROM PREVIOUS JAMES RIVER TASK ORDER

DREDGING CONTRACTS”

b. Page 1, Section Table of Contents, PART 1 GENERAL, change title of contents of 1.1 to read “Historic Bank Height Information and Payment Clarification”

c. Page 2, paragraph 1.1, change title of paragraph to read “Historic Bank

Height Information and Payment Clarification”

d. Page 2, paragraph 1.1, delete the fifth sentence in its entirety.

7. SECTION 35 20 23, DREDGING:

a. Page 4, paragraph 3.1.2, delete the third sentence and replace with “The markings shall be physically located with minimum 1 inch diameter steel pipe marked with orange flagging or other appropriate markings, as approved by the Contracting Officer, prior to dredging operations, placed in the immediate work areas only, and promptly removed as the work areas are accepted by the Government.”