AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
AMENDMENT NO. 0002 to W91236-09-R-0042
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-09-R-0042
X 9B. DATED (SEE ITEM 11)
07-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2009
CODE
USA ENGINEER DISTRICT, NORFOLK
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-09-R-0042
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
1. Proposal due date is hereby extended to SEPTEMBER 10, 2009 at 11:00 am. Proposals shall be delivered to U.S. Army Engineer District, Norfolk, 803 Front Street, ATTN: CECT-NAO, Norfolk, VA 23510-1093.
2. ADD Section 01 33 16, Design After Award (attached) to the solicitaiton.
3. ADD the following to the SOW (Dugway):
SECTON 01 10 00 Statement of Work
Section 1.1.3.2 Demolition Requirements
After the third paragraph list of homes to be demolished add the following:
The intent of demolition is to remove as many of the existing residential housing units as annotated in the RFP in order of preference that can be obtained within the project budget after all other project requirements are met with the exception that the first two annotated units for demolition on Colonel’s Hill must be included in the basic bid proposal. The scope of work for the demolition shall be:
1) Remove and abate any and all asbestos related products per guidelines specified herein.
2) Demolish and remove the entire residential unit including foundations, walls, roofs, all concrete slabs, drives, etc.
3) Fill any site voids as a result of demolition with clean backfill and level to match existing finished grade.
4) Maintain existing street paving, curbs, driveway access and sidewalks.
5) Repair and replace any street paving, curb, driveway access and sidewalks damaged as the result of demolition to match existing.
4. The attached CADD drawings are hereby attached to this amendment for your information. These AutoCadd is a version of the survey of Reneau Court.
a. IH 09-31 Dugway Pg Fam Housing
b. IH 09-31 Dugway PG Fam Housing Border
c. IH 09-31 Dugway PH Fam Housing
SECTION 01 33 16
DESIGN AFTER AWARD
(1600 / 1651)
1600/1651
01 33 16-1
SECTION 01 33 16
DESIGN AFTER AWARD
August 20, 2009
1 SUBMISSION OF CONSTRUCTION DRAWINGS, SPECIFICATIONS AND DESIGN
ANALYSES: The contractor shall follow the design submission requirements as listed below. In addition, the contractor shall comply with other design submission requirements as listed and required in other areas of the RFP.
1.1 The following web addresses contain guides and criteria
necessary to support completion of the project design. See Section 01 10 10 for other guides and criteria required for the design and construction of the project.
1.1.1 General Guidance: General guidance is listed on the
Criteria Bulletin Board System (CBBS) page for A-E Firms and Basic Design Package http://cbbs.spk.usace.army.mil/ae.html. A description of submittal content can be found by selecting AE Guide Volume 1, General Instructions - http://cbbs.spk.usace.army.mil/PDF/aeguide/ index.html -- Chapter III.
1.1.2 CADD Standards: The Sacramento District CADD Standards are provided on the CBBS page http://www.spk.usace.army.mil/organizations/cespk-ed/SPKCADD/index.html. The A/E/C CADD Standard developed by The CADD/GIS Technology Center is available at https://tsc.wes.army.mil/
1.1.3 Design Analysis and Drawings Baseline Guidance ER 1110-345- 700 (serves as a baseline guide and may be adjusted if/as noted herein): http://www.usace.army.mil/inet/usace-docs/eng-regs/er1110- 345-700/toc.html
1.1.4 Specifications Baseline Guidance ER 1110-1-8155, Engineer and Design – Specifications:
http://www.usace.army.mil/publications/eng-regs/er1110-1- 8155/entire.pdfl
1.1.5 Unified Facilities Guide Specifications (UFGS) Listing
(UFGS is the required format for the design guide specs):
http://www.wbdg.org/ccb/browse_org.php?o=70. Use the JANUARY 2006 MasterFormat 95 SPECSINTACT DATABASE for this project.
01 33 16-2
1.1.6 Unified Facilities Criteria (UFC):
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4.
1.1.7 Overall Design Site: The CBBS site will offer a pathway to regularly used criteria: http://cbbs.spk.usace.army.mil/index.html
2 Submittal certifications:
2.1 The Contractor shall certify in the design submittal (by
cover letter) that all items submitted in the documents comply with the contract. This shall be provided for each track’s submittals through and including final design submittal. Attached to this letter shall be the signed certifications from each of the independent technical reviewers.
2.2 The content of each independent technical reviewer
certification shall include the following statement on his/her company’s letterhead:
2.2.1 I (name of reviewer with title(s)) have completed the
independent technical review for (stage of submittal) of (project name and location) design submittal. Notice is hereby given that all quality control activities, appropriate to the level of risk and complexity inherent in the project, as defined in the Quality Control Plan have been completed. Compliance with the contract, established policy principles and procedures, utilizing justified and valid assumptions, was verified. This included review of assumptions; methods, procedures, and material used in analyses; alternatives evaluated; the appropriateness of data used and level of data obtained; and reasonableness of the results, including whether the product meets the customer's needs consistent with law and existing Army and Corps of Engineers policy. Documentation of the quality control process is attached. Significant concerns and the explanation of their resolution are as follows: (Describe the major technical concerns, possible impact, and resolution)
01 33 16-3
2.3 The “For Construction” submittal for the project, building, and/or site system shall be accompanied with a letter from each key sub-contractor/ supplier having direct construction/materials/ equipment defined within the submittal. The purpose of the letter is to bring together and coordinate the designers and the sub-contractors slated to accomplish the work and the suppliers of the material and equipment. Each sub-contractor and supplier shall briefly state their involvement in the preparation of the submittal, their proposed activity during the design-build contract associated with the contents of the submittal, and state the design is appropriate for their related field and appropriate for their capabilities/expertise. Each letter shall be on the sub-contractor’s/supplier’s letter head and signed by a principal of the firm. Included with these letters shall be the certifications from each of the independent technical reviewers. In addition --- each drawing shall be stamped and signed by the responsible designer and the responsible licensed professional technical reviewer (two signed stamps required on each drawing).
3 Criteria and Deviations
3.1 The criteria specified in this Contract are binding
contract criteria and in case of any conflict, after award, between the Contract and Contractor's submittals, the Contract will govern unless there is a written and signed agreement between the Contracting Officer and the Contractor modifying a specific requirement.
3.2 Contractor’s deviations from the Contract requirements
(shall be defined in a letter submitted to the Contracting Officer with justification, analysis, and detailed cost savings and shall also be presented and highlighted in a separate section in the analysis so it is clear to the reviewer) may be considered by the Government, and where appropriate, may be specifically approved by the Contracting Officer. Deviations from the contract requirements shall not be assumed or considered approved unless contractually approved by the Contracting Officer in writing. Such deviations, when not contractually approved by the Contracting Officer or when subsequently found at any time during the contract, shall be corrected by the Contractor at no additional time or cost to the Government. It is the Contractor’s responsibility to clearly note features/aspects in his design or construction that are deviations to the contract requirements. The Contractor shall not assume silence on such issues by the Government to be a sign of acceptance. The Contractor is cautioned to not work verbally approved adjustments to the contract but rather to work adjustments to the contract in writing with Government personnel having appropriate authority to execute such adjustments to the contract.
01 33 16-4
4 Existing Project/Site Conditions
4.1 The Contractor shall field verify existing project/site
conditions, by means deemed appropriate and necessary for proposal, design, and construction to yield a safe, complete, and useable facility/supporting features for the intended use. The information shall be reflected in the design documents.
5 Specification Number & Drawing File Numbers
5.1 All drawings and all submittal documentation shall be
digitized. Provide all digitized drawing deliverables in AutoDesk AutoCAD software, release 2004 compatible format and provide all other deliverables in MS WORD format. The contractor shall be responsible for design and drawings using computer-aided design and drafting (CADD) and delivering the two dimensional drawings in AutoDesk AutoCAD software, release 2004. The Government will only accept the final product for full operation, and on the target platform specified herein. The target platform is a Pentium 3.0 GHz, 512 MB Ram, and 40 GB Hard Drive with MicroSoft Windows XP operating system. Drawings produced by scanning drawings of record or containing photographic images shall be delivered in a raster format compatible with the target platform AutoCAD electronic digital format. Drawing files shall also be delivered in Portable Document Format (PDF). Media for deliverables shall be Compact Disc. Compact discs shall be furnished in addition to hard copy drawings. Text height for all Design drawings shall be minimum 1/8-inch high.
6 Design Charrette Meeting
6.1 During the third full week following the NTP the Contractor shall conduct a five-day Design Charrette Meeting at Dugway Proving Ground (location & time TBD) with Dugway users to discuss the program requirements, to further develop layout/floor plans, flow patterns, supporting feature locations, utility service connections routings, and Beneficial Occupancy Date. The text height for all Design Charrette drawings shall be minimum 1/8-inch high. The Contractor shall establish the agenda. The Charrette shall be scheduled to begin on a Tuesday (not adjacent to a Monday that is a national holiday) to allow travel on Monday.
6.2 Representing the Contractor shall be the Contractor’s Project Manager and Design/Engineer Team (appropriate disciplines).
01 33 16-5
6.3 The Contractor shall chair the conference. Minimum requirements for the conference are:
6.3.1 The Contractor shall conduct “splinter” meetings and receive immediate input on their initial presentation.
6.3.2 The Contractor shall (on the 4th and 5th days) present their adjusted presentations. A copy of the PowerPoint slides (with adjustments) shall be printed and bound and a copy given to each attendee at the beginning of the presentation. Immediately following the presentation the Contractor shall conduct additional splinter meetings to receive further refinements
6.3.3 The Contractor shall make final adjustments to their
presentation and on the final day make a final presentation to the Dugway Proving Ground's Representative. A copy of the PowerPoint slides (with adjustments) shall be printed and bound and a copy given to each attendee at the beginning of the presentation.
6.3.4 Within two-weeks following the Charrette, the Contractor shall distribute the design Charrette submittal for review and comment per the distribution matrix.
7 Design Quality Control Plan
7.1 The Contractor shall submit the Design Quality Control
(DQC) Plan see Section 01 45 04.00 10 --- also cross reference to portions of this Section (01 33 16) that may have applicable additional design team, minimum qualifications. The Contractor shall correct this plan and re-submit until such time as the Contracting Officer accepts it. The Contracting Officer will not entertain a design charrette until the Contracting Officer accepts this plan.
This plan is extremely important and allows the Government an opportunity to review processes proposed to be used by the Contractor. Since a technical review is no longer conducted on the design deliverables --- review of this plan by the Government helps to ensure steps are taken to reduce risk of error. The Contractor's DQC Plan shall provide and maintain an effective quality control program, which will assure that all services required by this design-build contract are performed and provided in a manner that meets professional design and engineering quality standards. The Contractor shall allow for a 15 WORKING DAY government review period for each submittal of the DQC Plan.
01 33 16-6
7.2 CAUTION: A SUBMITTAL NOT READY FOR A GOV’T QUALITY
ASSURANCE REVIEW WILL WASTE GOV’T RESOURCES AND POSSIBLY DELAY
EXPECTATIONS OF THE CONTRACTOR AT THE CONTRACTOR’S EXPENSE. IT IS
EXTREMELY IMPORTANT EACH SUBMITTAL RECEIVE AN INTERNAL CONTRACTOR
QUALITY CONTROL REVIEW, INDEPENDENT TECHNICAL REVIEW, AND CORRECTIONS
BEFORE SUBMITTING TO THE GOV’T.
7.3 CAUTION: THE GOVT’S QUALITY ASSURANCE REVIEW IS
DESIGNED TO BE A SPOT CHECK --- IT WILL NOT BE A TECHNICAL REVIEW ---
ADEQUATE RESOURCES TO ACCOMPLISH ANYTHING MORE ARE NOT PROVIDED. THE
CONTRACTOR MUST PERFORM QUALITY CONTROL ON ALL SUBMITTALS. THE
CONTRACTOR IS CAUTIONED --- THE GOVERNMENT DOES NOT PLAN TO CONDUCT
TECHNICAL REVIEW OF DESIGN DELIVERABLES SUBMITTED FOR REVIEW. THE
GOVERNMENT REVIEW WILL NOT FOCUS ON THE CALCUALTIONS, CODE
COMPLIANCE, OR ANY OTHER TECHNICAL ASPECT RELATED TO CONTRACT
COMPLIANCE. NEVERTHELESS --- THE GOVERNMENT DOES RESERVE THE RIGHT
TO MAKE SUCH COMMENTS SHOULD THE SITUATION ARISE.
8 Design and Construction Schedule
8.1 The contractor shall have the freedom to establish the
design and construction schedule within contract period of service.
Both design schedule and construction schedule data shall be placed on a single overall schedule to facilitate an overall understanding of the presented logic.
8.1.1 The contractor shall include on the schedule a 15 WORKING day period for the government to conduct a quality assurance compliance review for each submittal.
8.1.2 The contractor shall include on the schedule a 1 calendar day period for a compliance review conference related to each submittal with the exception of the Charrette submittal. These conferences shall not be scheduled during a weekend or holiday or on a day of the week that is adjacent to a day of a weekend or holiday.
This typically will leave Tuesdays, Wednesdays, or Thursdays (except as holidays impact) for these conferences.
8.2 The Contractor shall submit one schedule; consisting of
both the design activities and the construction activities.
8.2.1 The design schedule shall be submitted within the first 20 calendar days after the date of Notice To Proceed. The design schedule shall include all activities associated with the design. On this schedule include as much clarity as can be provided of
01 33 16-7 construction activities with appropriate logic.
8.2.2 The Contractor shall refine the schedule with finalized construction activities not later than 90 calendar days prior to the desired start of the construction activities; which includes any applicable site work. The construction schedule shall contain all activities associated with the design and construction of the project, complete and useable for its intended purpose. Construction performance shall not begin until a 15 calendar day period following the Contracting Officer’s acceptance of the construction schedule has occurred. Re-submittals due to Contractor controlled deficiencies will not constitute a time or cost change to the contract. The Contracting Officer will have 15 WORKING days to conduct review and provide comments to the Contractor for the submittal and each re-submittal. The Contractor is encouraged to discuss deficiencies with the Contracting Officer prior to re-submission.
9 Design Submittal Requirements
9.1 The contractor may be able to follow ‘Fast-tracking’ of
construction, with contracting officer authority to proceed, however this is not a specific project requirement. This would be applied only on portions of the work for which the Government has reviewed the final design submission (on that portion of the work) and all Government review questions/concerns having been satisfactorily addressed by the contractor --- and the Contracting Officer provides authorization to proceed. If this portion of the work is sensitive to weather (heat, cold, rain, snow, wind, or any other weather situation) or any other situation precluding normal construction techniques, the contractor shall also submit to the Contracting Officer a plan to conduct this work (referencing and following industry standards or more stringent government standards) for compliance review. Therefore, construction on this project will not be held due to any typical inclement weather or other scenario conditions as long as the contractor first demonstrates the ability to construct in such condition with the above described plan and the Contracting Officer has provided authorization to proceed.
9.2 The Contractor and Contracting Officer will coordinate meetings with the facility End-User to further discuss the requirements herein.
The Contractor has the responsibility to establish the design of this project in accordance with the contract, including discussions with Dugway Proving Ground Organizations through proper coordination with the Contracting Officer. Such meetings are intended to allow the Contractor an opportunity to discuss, clarify, and obtain an understanding, in a face-to-face setting, on issues, opportunities, or mission restraints still in question. The spirit of this meeting is not intended to adjust the contract in any manner but rather to allow the Contractor/Customer relationship to begin and grow. This meeting can be associated with a partnering session or can be a stand-alone meeting but needs to occur early in the design phase of
01 33 16-8 the contract.
9.3 Design deliverables will be submitted as identified within this section, during the design phase. However, for construction deliverables, refer to Section 01 33 00 for submittals that are required during the construction phase.
9.3.1 Every new construction feature of this project must be
fully designed and ”For Construction” drawings submitted and approved prior to the start of construction for that feature or interfacing features. The contractor shall try to minimize the number of design submittals. The Contractor can submit design deliverables from multiple tracks in the same submittal, when possible.
9.3.2 It’s acceptable to take major areas of the design and put each on a two or three-submittal track but, the contractor shall not have more than two major areas and tracks (plus the Charrette Track), i.e., major area items vs. percent complete for each track:
MAJOR AREA / Submittals � 1 2 3 4 5 Charrette Track 90% Dugway AFH Housing 60% 90%
Where: 60% = Preliminary Design Submittal Compliance Review
Submittal 90% = Charrette track --- or --- Final Design Complete, Fully Coordinated by Contractor, Ready to Build, Compliance Review Submittal
* See Paragraph 1.1.1 above for URL to locate the description of:
60% is equivalent to Preliminary 90% is equivalent to Final
9.4 The contractor shall ensure applicable features of the Final design are developed to a further design level and submitted for compliance review a minimum of two times, but not more than three times. Every project feature shall be submitted in final form. The Contractor shall ensure all details be included in the design documents before start of construction; with exception of those items/features allowed to be submitted at a later date during construction by the Contracting Officer.
9.5 Every design submittal shall include a separately bound Contract Status Booklet of all SF-30 contract modifications executed from contract award date to present on the contract. Included in this booklet shall be a copy of all RFIs submitted and the official clarification/recommendation responses (note --- RFI responses are not contract altering documents). Also include any official document(s) changing the conditions of the contract. This is an important booklet for the reviewers --- it’ll give the reviewer a
01 33 16-9 better understanding as to where the project has been since the contract was authored.
9.6 Each design submittal for review shall be distributed per the distribution matrix.
9.7 Each design submittal shall be completed to the stage/level commensurate with the stage of completion, i.e., 60%/90%, etc. All submittals for review shall be a required submittal. The Contractor shall determine his submittal scenario. For three submittals on a track, follow the distribution matrices below. For two submittals on a track, combine the 1st and 2nd round submittal matrix requirements into the 1st submittal. All of these deliverables shall be stamped "For Compliance Review Only --- %)"; and each sheet of the drawings shall have the same stamp. The back check submittal(s), following the Government reviews of the 90 percent final submittal, shall be packaged and stamped "For Compliance Back Check Review Only
- 90% --- each sheet of the drawings shall be stamped.
9.8 The contractor shall ensure every feature of the design is developed to a further design level on subsequent submittals unless already fully designed. Every project feature shall be submitted in final form.
9.9 Each design submittal shall include a submittal register. This submittal register shall be developed commensurate with the level of the design submittal. The submittal register is further discussed in the RFP.
9.10 The construction submittal shall be stamped “For Construction” — each sheet of the drawings shall be stamped with this statement. In addition, each sheet of the drawings shall be stamped and signed by the valid Registered Engineer or valid Registered Architect responsible for the design shown. Included shall be the certifications from each of the independent technical reviewers. In addition --- each drawing shall also be stamped and signed by the responsible licensed professional technical reviewer (two signed stamps required on each drawing). CRITICAL --- the “For Construction” documents shall not be developed until all DrChecks comments for the related track have been appropriately addressed and cleared back check process and no further comments exist for the track. Then and only then shall the “For Construction” documents be created and distributed.
9.11 Each submittal shall include appropriate drawings, specifications and design analysis including calculations along with other requirements as noted herein and in attachments. The Contractor shall prepare all drawing documents in AutoDesk AutoCAD, release 2004 format. The design drawings and technical specifications shall be dimensioned and specified using English traditional units of measure.
01 33 16-10
9.12 A compact disc of the entire submittal shall be developed and a single copy submitted to each addressee shown in the distribution matrix with each deliverable. It is paramount for all specification sections on the CD to be searchable by either MSWord or Adobe Acrobat --- the specifications shall not be scanned files.
9.13 The Contractor shall use the Unified Federal Guide Specification (UFGS) system to develop appropriate specifications for the design.
The Contractor shall not delete sections of the specifications without first coordinating with the Contracting Officer.
9.14 The Contractor shall follow the A/E/C Cadd Standards version 2.0 for layering, line weights, color assignments, etc., with local modifications, mainly in file naming, since we have base codes published. The other exception to the standards relates to the order of the drawings. The order of the drawings shall be in the following order: GSGCLSAIFMPE = General --- Surveys --- Geotechnical --- Civil --- Structural --- Architectural --- Fire Protection --- Mechanical - -- Plumbing --- Electrical --- Communications.
9.15 The use of shop drawings or continuation/extension of design (design defined, as requiring a design analysis, plans, and specifications) submittals once a design track has been finalized for construction shall not be allowed. The Contractor shall ensure the design is complete in all aspects before construction begins on the related track unless otherwise directed by the Contracting Officer.
10 Compliance Review Comments
10.1 Automated review management system: All review comments shall be processed via the Government program called DrChecks. The Contractor shall prepare for any appropriate comment review conference/meetings, by reviewing the comments in the DrChecks file(s). The Contractor shall print and bind ten (10) copies of comments and distribute them to attendees at the review conference. Unresolved comments/issues at the conference shall be resolved by immediate follow-on action.
Valid comments shall be incorporated. The Contractor shall annotate the DrChecks file prior to the next design submittal. Annotations shall be entered for each comment in DrChecks. Annotations shall explain if the comment is accepted along with what was done and where it was done --- or --- if the comment is denied, an explanation as to why. The Contractor is encouraged to contact the comment maker of any comments not fully understood to enhance the accuracy of the response to the comment.
10.2 Assistance with DrChecks can be received by calling Ms. Laura Haven, DrChecks Administrator, (916) 557-7651. Following contract award, the Contractor will need to contact Ms. Haven to register and receive a login and password.
10.3 The design documents will not be considered 100% complete and
01 33 16-11 ready for construction, until all comments for correction have been incorporated to the Government’s satisfaction and further back check reviews are deemed no longer necessary. Review comments for correction will be based on compliance with the RFP document requirements.
10.4 Each design submittal shall be accompanied with all previous DrChecks files for the project on compact disc in “Word” or .pdf format.
11 Compliance Review Conferences
11.1 All compliance review conferences shall be held at Dugway ---location to be determined prior to each conference.
11.2 The contractor shall be represented at these review conferences by each design discipline and the construction manager as a minimum.
11.3 Each conference shall be planned to occur over a 2.0-day period.
11.4 The Contractor shall prepare for and provide a briefing of the project to a Dugway audience during each compliance comment review conference. This briefing should focus on the functional and Customer mission related features of the project. The briefing will occur within the 2.0-day conference schedule. Overhead slides or other briefing materials are not required or preferred in support of this activity. Already-prepared project drawings, project renderings, and project color boards are the preferred briefing materials.
11.5 The Contractor shall prepare the confirmation notice (meeting minutes) for each conference within 14 calendars following each conference and email a copy to all attendees and stake holders listed on the distribution listing in this section. The confirmation notices shall list all action items discussed along with taskings (Contractor or Gov’t), all issues discussed with decisions, and latest schedule of upcoming events as a minimum.
12 Submittal Considerations
12.1 The contractor is required to begin design by following the design Charrette requirements herein stated --- involving participation of the users and Base Civil Engineer, in addition to the government design management team. The goal of the charrette is an approximate 20% concept design with emphasis on the remodeling/design planning, compatibility, and exterior/interior development. The charrette will produce deliverables including existing contextual photos to identify work to be performed, sketch-form analysis plan, applicable site plan, appropriate layout plans, cross-sections, elevations and details. The contractor is responsible for notifying the Contracting Officer of any requirements identified prior/during the charrette, in excess of the requirements stipulated in the RFP.
01 33 16-12
At the conclusion of the design charrette, the concept design shall be briefed by the contractor to higher Dugway management for general content with the intent to receive an indication of support. The Preliminary, Final and subsequent backcheck submittal formats, will be in accordance with A-E guide references identified under paragraph
1.1.1 (General Guidance).
13 ENVIRONMENTAL PERMITS
13.1 Contractor shall pay for and obtain all permits required for the successful execution of this project. Submittal of the Environmental Permits to the Regulatory Agencies shall be accomplished with coordination of the Contracting Officer and the Dugway Proving Ground Environmental Shop.
14 Safety and Quality Control Considerations
14.1 Since two (2) separate projects are to be performed under this single contract, the contractor is allowed to assign; one (1) QC staff team, one (1) site safety health officer (SSHO) and one (1) project supervisor, to cover both projects.
15 Design Team Qualifications
15.1 After award of the contract, the Contractor shall demonstrate to the Contracting Officer for comment (with resumes and other appropriate documentation) the required qualifications of the following key design-related personnel. Important Note: The resumes must provide sufficient detail and documentation to clearly substantiate that all minimum qualification criteria are met. The Contracting Officer will make final acceptance/non-acceptance of the personnel proposed. Prior to the start of the design charrette meeting the Contractor shall propose and receive acceptance/selection of the entire design team by the Contracting Officer. The independent technical reviewers shall receive acceptance from the Contracting Officer prior to the submittal of the first design submittal following the charrette meeting. The Contractor shall continue to propose qualified design team members until such time as the Contracting Officer determines the individuals meet the minimum qualifications for the related position. The minimum qualifications are:
01 33 16-13 AM-03
15.1.1 Fire Protection Engineer: The Fire Protection Engineer shall be an integral member of the design team and shall be involved in every aspect of the design as it relates to fire protection in accordance with UFC 3-600-01. This includes, but not limited to, building code analysis, life safety code analysis, design of automatic detection and suppression systems, water supply analysis, and a multi-discipline review of the entire project. The Fire Protection Engineer shall also meet, at least one of the following criteria;
15.1.1.1 An engineer having a Bachelor of Science or Master of Science Degree in Fire Protection Engineering from an accredited university engineering program, plus a minimum of 5 years' work experience in fire protection engineering.
15.1.1.2 A registered professional engineer (P.E.) who has passed the National Council of Examiners for Engineering and Surveys (NCEE) fire protection engineering written examination.
15.1.1.3 A registered P.E. in a related engineering discipline with a minimum of 5 years' experience dedicated to fire protection engineering.
15.1.2 Project Site Safety and Health Officer (SSHO): See Section 01 35 29 for related submittals. The SSHO shall meet the following requirements:
15.1.2.1 Attained minimum of 10 years safety work of a progressive nature with at least 5 years of experience on similar projects.
15.1.2.2 Received 30-hour OSHA construction safety class or
equivalent within the last 5 years.
15.1.2.3 Received an average of at least 24 hours of formal safety training each year for the past 5 years.
15.1.2.4 Training for competent person status for at least the following areas of competency: scaffolding; fall protection;
hazardous energy; health hazard recognition, evaluation and control of chemical, physical and biological agents; personal protective equipment and clothing to include selection, use and maintenance;
Utah accredited Supervisor training for LBP and asbestos.
15.1.3 Design Team Discipline Leads (as applicable to project):
15.1.3.1 Structural Engineer: Structural engineer licensed to practice in the State of Utah and with minimum of 5 years design experience in this type of building construction.
01 33 16-14
15.1.3.2 Architect, Civil Engineer, Mechanical Engineer, Electrical Engineer and Other Engineering Disciplines: The design of architectural, structural, mechanical, fire protection, electrical, civil, and other engineering features of the work shall be accomplished, independently reviewed, and approved by engineers, and architects, licensed to practice in their respective professional field in a state or possession of the United States, in Puerto Rico, and the District of Columbia. They each shall have knowledge of local building and seismic codes. The lead designer for each discipline of the design team shall be a licensed professional Engineer/Architect with a minimum of six years experience. The overall Design Team Leader shall be the appropriate discipline, involved in most of the work, on this project.
15.1.4 Independent Technical Reviewers:
15.1.4.1 This team of professionals shall meet the same minimum requirements as the Design Team Discipline Leads.
15.1.5 Design Quality Control Manager: (See Section 01 45 04.00 10):
15.1.5.1 The Design Quality Control Manager shall be a person who has verifiable engineering or architectural design experience and is a registered professional engineer or architect. This individual shall not perform duties listed in paragraph 14.1.2 above.
15.1.6 Design Coordination Manager: (See Section 01 45 04.00 10):
15.1.6.1 The Design Coordination Manager is an employee of the construction contractor. This individual shall be a person who has verifiable engineering or architectural design experience and is a registered professional engineer or architect.
16 Independent Technical Review:
16.1 The Contractor shall include an independent technical review process with reviewers/organizations in the Design Quality Control Plan. The Contractor shall require the design documents for each track deliverable to undergo an independent technical review by engineers, architects, and interior designers licensed to practice in their respective professional field in a state or possession of the United States, in Puerto Rico, and the District of Columbia. These reviews shall be accomplished by other than the key design personnel identified in Paragraph No. 14 above.
16.2 For each track deliverable, the Contractor shall provide a signed certification letter from each independent technical reviewer --- with professional license number. This certification shall document the independent technical review procedure performed (per the approved Design Quality Control Plan) and certify the submittal
01 33 16-15 meets the minimum requirements set forth in the contract.
16.3 For the “For Construction” set of plans and specifications, the Contractor shall provide a signed certification letter from each independent technical reviewer --- with license number. This certification shall document the independent technical review procedure performed (per the approved Design Quality Control Plan) and certify the submittal meets the minimum requirements set forth in the contract. In addition, each drawing in the set shall be stamped and signed by the individual Architect/Engineer responsible for the design on each sheet --- AND --- shall be stamped and signed by the independent technical reviewer responsible for the independent technical review for that sheet and associated specifications. Each drawing sheet shall be stamped and signed twice --- no exceptions.
17 “For Construction” set of Plans and Specifications
16.1 Seven calendar days following the conclusion of all design processing (when all DrChecks comments have been addressed in all DrChecks files associated with all submittal tracks of the design effort) the Contractor shall assemble the comprehensive set of drawings and specifications deliverable (include all data provided in earlier “for construction” documents). This deliverable shall be submitted per the distribution matrix herein.
1st R ou nd
D es ig n
Su bm itt al fo r t hi s
Pr oj ec t F ea tu re (6
Q u a l i t y C o m p l i a n c e
A s s u r a n c e
R e v i e w
S u b m i t t a l
D r C h e c k s c o m m e n t s a s a p p r o p r i a t e f r o m
C h a r r e t t e t o b e a n n o t a t e d p r i o r t o s h i p p i n g t h i s s u b m i t t a
M A J D I S T
R E S
A E
C O N S
B C E A F M C
I n c l u d e c d o f e n t i r e s u b m i t t a l a c h a d d r e s s
D R A W I N G S
A N S I
B
D R A W I N
N S I
D
P E C S C A T A L O G
C U T
E S I G N
A N A L Y S I S
W I T H
C A L C U L A T I O N
C O N T R A C T
S T A T U S
B O O K L
A F T
D D
F O R M
A N D
R E A L
P R O P E R T Y
F O
M
U B M I T T A L
R E G I S T
R T I F I C A T I O N
L E T T E
K
Y
S U B S C O N S U L T S
L E T T E R
O F
I N V O L V E M E
C H E C K S
F I L E
A N N O T A T E D
I N
D R C H E C K
S Y S T E
2nd ou nd
D es ig n
Su bm itt al fo r t hi s
Pr oj ec t F ea tu re
F i n a l
Q u a l i t y C o m p l i a n c e
A s s u r a n c e
R e v i e w
S u b m i t t a r C h e c k s c o m m e n t s f r o m s t
R o u n d s u b m i t t a l h a v e b e n o t a t e d p r i o r t o s h i p p i n g t h i s s u b m i t t a c l u d e c d o f e n t i r e s u b m i t t a l c h a d d r e s s
N A L
D R A W I N
N S I
B
N A L
D R A W I N
N S I
D
E C S C A T A L O G
C U
S I G N
A N A L Y S I S
W I T H
C A L C U L A T I O
N T R A C T
S T A T U S
B O O K L
F O R M
A N D
R E A L
P R O P E R T Y
F O
B M I T T A L
R E G I S T
L E C T R O N I C
W O R D
P R O C E S S I N G
F I L E S
O F
A L L
O T H
R T I F I C A T I O N
L E T T E
K
Y
S U B S C O N S U L T S
L E T T E R
O F
I N V O L V E M E
C H E C K S
F I L E
A N N O T A T E D
I N
D R C H E C K
S Y S T E es ig n
B ac k ch ec k
Su bm itt al
*R ep ea t a s ne ed ed
In cl ud es al l o th er re qu ire m en ts n ot ed
S u b m i t o n l y s h t s p g s f c h a n g e s f o r e a c h s u b m i t t a l c y c l e a l o n g w i t h o t h r d c u m e n t a t i o n n e e d e d b y t h e r e v i e w e r t o c o m p l e t e b a k e c k r C h e c k s c o m m e n t s f r o m p r e v i o u s s u b m i t t a l h a v e n a n n o t a t e d p r i o r t o s h i p p i n g t h i s s u b m i t t a c l u d e c d o f e n t i r e s u b m i t t a l c h a d d r e s s
A W I N
N S I
B
A W I N
N S I
D
E C S C A T A L O G
C U
S I G N
A N A L Y S I S
W I T H
C A L C U L A T I O
F O R M
B M I T T A L
R E G I S T
E C T R O N I C
F I L E S
D R A W I N G S D O C U M E N T S
A U T O C
V E R S I O N
C O M P A T I B L
M O L I T I O N
P L
R T I F I C A T I O N
L E T T E
C H E C K S
F I L E
A N N O T A T E D
I N
D R C H E C K
S Y S T E es ig n
Su bm itt al
(P ro vi de d ay s af te r n ot ifi ca tio n of a ll co m pl ia nc e re vi ew c om m en ts in
D rC he ck s ad eq ua te ly ad dr es se d) c l u d e c d o f e n t i r e s u b m i t t a l t o e a d r e s s
A W
IN
G
S (E a c h d i s c i p l i n e l e a d d r a w i n g s h e e t s h a l l s a m p e d a n d s i g n e d b y t h e r e s p o n s i b l e
P r o f e s s i o n g i n e e r o r
A r c h i t e c t l i c e n s e d t o d o s o i e
G a e t
N S T R U C T I O N
R E A D Y
D R A W I N
N S I
B
N S T R U C T I O N
R E A D Y
D R A W I N
N S I
D
N S T R U C T I O N
R E A D Y
S P E C S C A T A L O G
C U
S I G N
A N A L Y S I S
W I T H
C A L C U L A T I O
F O R M
A N D
R E A L
P R O P E R T Y
F O
E C T R O N I C
C A D D
F I L E S
O F
A L L
D R A W I N G S
A U T O C
V E R S I O N
C O M P A T I B L
B M I T T A L
R E G I S T
E C T R O N I C
W O R D
P R O C E S S I N G
F I L E S
O F
A L L
O T H
R T I F I C A T I O N
L E T T E
Fo r C on st ru ct io n se t (
Pr ov id e da ys a fte r n ot ifi ca tio n of al l c om pl ia nc e re vi ew c om m en ts in a ll
D rC he ck s fil es o n th e pr oj ec t h av e be en a de qu at el y ad dr es se d) c l u d e c d o f e n t i r e s u b m i t t a l c h a d d r e s s
A W
IN
G
S (E a c h d i s c i p l i n e l e a d d r a w i n g s h e e t s h a l l a m p e d a n d s i g n e d b y t h e r e s p o n s i b l e
P r o f e s s i o n g i n e e r o r
A r c h i t e c t l i c e n s e d t o d o s o i e
G a e t c m b i n e a n d c o o r d i n a t e i n t o a s i n g l e d r a w i g d s p e c s e t t h e d r a w i n g s a n d s p e c s s e c t i o n s f o r a a c k
N S T R U C T I O N
D R A W I N
N S I
B
N S T R U C T I O N
D R A W I N
N S I
D
N S T R U C T I O N
S P E C S C A T A L O G
C U
E C T R O N I C
C A D D
F I L E S
O F
A L L
D R A W I N G S
A U T O C
V E R S I O N
C O M P A T I B L E
A N D p d f
F O R M A
F O R M
A N D
R E A L
P R O P E R T Y
F O
S I G N
A N A L Y S I S
W I T H
C A L C U L A T I O s-
B ui lt D ra w in gs
S ub m itt al (P ro vi de ca le nd ar da ys a fte r f in al in sp ec tio n an d pr oj ec t a cc ep ta nc e)
B U I L T
D R A W I N G S p a p e
N S I
D
E C T R O N I C
C A D D
F I L E S
O F
A L L
D R A W I N G S
A U T O C
V E R S I O N
C O M P A T I B L
D A T E D
D D
F O R M
D A T A
A N D
U P D A T E D
P R O P E R
Y
T A
F O R M
S E E
S E C T I O N
B U I L T
D R A W I N G S
M y l a
01 33 16-23
18.2 Distribution and Quantities
01 33 16-31
19 Contractor Processing of DrChecks File
19.1 Unresolved problems will be resolved by immediate
follow-on action at end of conferences. The Contractor shall submit to the Contracting Officer within five (5) calendar days, two (2) copies of a Confirmation Notice for the Compliance Assurance Review Conference summarizing major decision points and issues which requires resolution and the action office.
19.2 On receipt of corrected submittal documents and at
the point at which all comments in the DrChecks System have been adequately addressed (to Sacramento District’s satisfaction), the Sacramento District will provide notification to the Contracting Officer noting that all comments have been addressed.
Withholding payment for unsatisfactory performance shall be made in accordance with CONTRACT CLAUSE, FAR 52.232-5, PAYMENTS UNDER
FIXED-PRICE CONSTRUCTION CONTRACTS.
19.3 The Contractor shall annotate the respective
DrChecks File for each phase of the design showing page or sheet and verse where the correction was made and what the correction consists of — this to assist the reviewers to quickly find the adjustment. These Contractor annotated DrChecks files shall be made on the DrChecks web site before the next submittal is received by the reviewers — therefore action is a part of the submittal requirements.
19.4 The Contractor shall submit corrected submittal
documents (back check) as noted above. Again — the appropriate DrChecks file shall be annotated and ready on the web site on or before the day the reviewers receive the back check submittal.
19.5 The Back check process along with the availability
of the Contractor annotated DrChecks file on the web site shall continue until all comments in the DrChecks file have been adequately addressed to the satisfaction of the Government Reviewers.
--End of Section--