RECOVERY - MAINTENANCE DREDGING HOSKINS CREEK, QUEENS CREEK, AND WINTER HARBOR
Solicitation number
W91236-09-B-0012
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
09B0012 - ABSTRACT.pdf PDF
HOSKINS MAPPING SHEET PAGE 7.cal —
HOSKINS MAPPING SHEET PAGE 4.cal —
HOSKINS TITLE SHEET PAGE 1.cal —
HOSKINS MAPPING SHEET PAGE 2.cal —
W9123-09-B-0012.pdf PDF
WH MAPPING SHEET PAGE 2.cal —
QUEENS MAPPING SHEET PAGE 2.cal —
HOSKINS MAPPING SHEET PAGE 6.cal —
QUEENS TITLE SHEET PAGE 1.cal —
ARRA HQWH.maxFR —
WH MAPPING SHEET PAGE 4.cal —
WH MAPPING SHEET PAGE 3.cal —
WH TITLE SHEET PAGE 1.cal —
HOSKINS MAPPING SHEET PAGE 3.cal —
HOSKINS MAPPING SHEET PAGE 5.cal —
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W26GLG91526811

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MAINTENANCE DREDGING, HOSKINS CREEK CHANNEL, ESSEX COUNTY, VIRGINIA; MAINTENANCE DREDGING, QUEENS CREEK, MATHEWS COUNTY, VIRGINIA; AND MAINTENANCE DREDGING, WINTER HARBOR, MATHEWS COUNTY, VIRGINIA

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jul-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-09-B-0012

X 9B. DATED (SEE ITEM 11)

18-Jun-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jul-2009

CODE

USA ENGINEER DISTRICT, NORFOLK

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-09-B-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

AMENDMENT 0001

PART 1 HOSKINS CREEK –

1. SECTION 01 14 00:

a. Page 8, paragraph 1.5.7, line 2, after “dredged.” delete the remainder of the paragraph in its’ entirety.

b. Page 8, paragraph 1.8, in the paragraph header delete “General” and substitute therefore “Layout of Work”.

c. Page 10, paragraph 1.10.1, in the second sentence delete “dredged material is placed in the Basin or”.

d. Page 10, paragraph 1.10.2, in the first sentence delete “dredged material is placed in the Basin or”.

2. SECTION 01 57 20: Page 6 and 7, delete sub-paragraph 1.7.1j and substitute therefore the following new subparagraph:

“j. An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided. The plan must include monitoring and reporting requirements to assure that the control measures are in compliance with the erosion and sediment control plan, Federal, State, and local laws and regulations.”

PART 2 QUEENS CREEK –

a. Page 5, paragraph 1.4, after the last sentence of the paragraph insert the following:

“The Contractor's equipment access/egress into the work area is available from the beach and from locations as described below for the respective placement location. The Government has obtained property easements to allow access/egress to the placement areas as specified below; however, use of such easements and their suitability for the Contractor’s use is the sole responsibility of the Contractor.

The Contractor shall prepare, as a part of his Accident Prevention Plan and Progress Schedule, his proposed methods for gaining access to the workplace by the designated rights-of-way that does not unnecessarily impact convenient and safe access to and from the beach by the public. All roads and other locations used shall be maintained throughout construction and restored to as good condition as existed prior to their use. The locations for access/egress are as follows:

* Southern Placement Site for Stations 31+00 to 43+50

The Contractor may use a 30-foot wide right-of-way to access this placement site from Shore Drive. The 30-foot wide access lane serves a dual purpose boat ramp and community access to the water.

* Western Placement Site for Stations 16+00 to 30+00

The Contractor may use a 20-foot wide right-of-way to access this placement site from Virginia State Route 626.”

b. Page 8, delete paragraph 1.5.7 in its’ entirety and substitute therefore the following new paragraph:

“Leased and public oyster grounds and tidal wetlands are present in the project dredging area and are depicted on the contract drawings. As part of the Contractor's responsibility to layout the work, the boundaries of the oyster beds in the vicinity of the work areas shall be marked in the field by the licensed Professional Engineer or Surveyor. The boundary points shall be physically located with stakes or pipe and marked with orange flagging prior to dredging operations. These markings shall be maintained during the duration of dredging and placement operations in the vicinity of these areas and removed upon completion of the scheduled work. The locations shown for the oyster grounds are based on information furnished by the Virginia Marine Resources Commission. In order to avoid damage to oyster grounds, the Contractor shall not allow personnel or the operation of plant and attendant vessels across the bounds of the public and private leased oyster and shellfish grounds, except as approved by the Contracting Officer. To the maximum extent practical, the Contractor's work operations over and in the vicinity of the oyster grounds shall be at high tide.”

c. Page 8, paragraph 1.8, in the paragraph header delete “General” and substitute therefore “Layout of

d. Page 10, paragraph 1.10.1, in the second sentence delete “dredged material is placed in the Basin or”.

e. Page 10, paragraph 1.10.2, in the first sentence delete “dredged material is placed in the Basin or”.

2. SECTION 01 57 20: Page 6 and 7, delete sub-paragraph 1.7.1j and substitute therefore the following new subparagraph:

“j. An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided. The plan must include monitoring and reporting requirements to assure that the control measures are in compliance with the erosion and sediment control plan, Federal, State, and local laws and regulations.”

PART 3 WINTER HARBOR –

a. Page 8, delete paragraph 1.5.7 in its’ entirety and substitute therefore the following new paragraph:

“Leased and public oyster grounds and tidal wetlands are present in the project dredging area and are depicted on the contract drawings. As part of the Contractor's responsibility to layout the work, the boundaries of the oyster beds in the vicinity of the work areas shall be marked in the field by the licensed Professional Engineer or Surveyor. The boundary points shall be physically located with stakes or pipe and marked with orange flagging prior to dredging operations. These markings shall be maintained during the duration of dredging and placement operations in the vicinity of these areas and removed upon completion of the scheduled work. The locations shown for the oyster grounds are based on information furnished by the Virginia Marine Resources Commission. In order to avoid damage to oyster grounds, the Contractor shall not allow personnel or the operation of plant and attendant vessels across the bounds of the public and private leased oyster and shellfish grounds, except as approved by the Contracting Officer. To the maximum extent practical, the Contractor's work operations over and in the vicinity of the oyster grounds shall be at high tide.”

b. Page 8, paragraph 1.8, in the paragraph header delete “General” and substitute therefore “Layout of

c. Page 10, paragraph 1.10.1, in the second sentence delete “dredged material is placed in the Basin or”.

d. Page 10, paragraph 1.10.2, in the first sentence delete “dredged material is placed in the Basin or”.

2. SECTION 01 57 20: Page 6 and 7, delete sub-paragraph 1.7.1j and substitute therefore the following new subparagraph:

“j. An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided. The plan must include monitoring and reporting requirements to assure that the control measures are in compliance with the erosion and sediment control plan, Federal, State, and local laws and regulations.”

3. SECTION 35 20 23:

a. Page 5, paragraph 3.1.3, line 15, after “…(NOS) elevations” insert “, including the half foot marked elevation at each respective foot markings”.

b. Page 6, paragraph 3.1.5, line 6, after the second sentence insert “Dredged material shall be placed no deeper than 1 foot to 1.5 feet from the intertidal zone to the back beach.”

Contractors are strongly advised to bid the solicitation, specifications, and plans as posted unless changed via an Amendment.

Contracting Point of Contact:

Tracey J. Hughes 803 Front Street Norfolk, VA 23510 757-201-7131