FYI.pdf
PDF 12 MB Posted
- Solicitation number
- W91236-08-R-0047
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am_03.pdf | ||
| TRADOC 2600-1 scaled.dgn | — | |
| Am_02.pdf | ||
| bct2 cad files.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX J
Drawings
DRAWING INDEX
BTC II CONCEPTUAL SITE DEVELOPMENT DRAWINGS
G-0-000 COVER SHEET
C-0-001 LEGEND, ABBREVIATIONS, AND
GENERAL NOTES
C-3-000 HAUL ROUTE PLAN
C-4-000 OVERALL SITE LAYOUT
C-6-000 OVERALL SITE UTILITY PLAN
2600 DINING FACILITY STANDARD DESIGN
A-101 OVERALL FLOOR PLAN
A-102 EQUIPMENT PLAN AREA A
A-103 EQUIPMENT PLAN AREA B
A-104 EQUIPMENT PLAN AREA C
A-601 EQUIPMENT SCHEDULE 1
A-602 EQUIPMENT SCHEDULE 1
US Army Corps of Engineers
Savannah District
CONTRACT NO.
SOLICITATION NO. W91236-08-R-0043
FY 08 L.I. 68734
FORT JACKSON - BASIC TRAINING COMPLEX II
FINAL SUBMISSION
CONCEPTUAL SITE DEVELOPMENT
PROJECT
SITE
CEP#4
PROJECT SITE
G-0-000 COVER SHEET
C-0-001 LEGEND, ABBREVIATIONS,
AND GENERAL NOTES
C-3-000 HAUL ROUTE PLAN
C-4-000 OVERALL SITE LAYOUT
C-6-000 OVERALL SITE UTILITY PLAN
CuCuCuCu
D
2 3
C
4 5
A
B
US ARMY CORPS
OF ENGINEERS
SAVANNAH
PLATE
REFERENCE
NUMBER
SHEET
DESIGN FILE:
DATE: TIME: USER: $$DATE $$TIME $$USER
$$DGN
OF 20
2 3
C
4 5
A
B
US ARMY CORPS
OF ENGINEERS
SAVANNAH
PLATE
REFERENCE
NUMBER
SHEET
DESIGN FILE:
DATE: TIME: USER: $$DATE $$TIME $$USER
$$DGN
OF 202
FIRE HYDRANT
SANITARY MANHOLE
STORM DRAIN
FENCE
SD
CIVIL LEGEND
SANITARY SEWER MAIN
EXISTING
STORM DRAINAGE MANHOLE
WATER LINE
PROJECT LIMIT
LIMIT OF DISTURBANCE
CONSTRUCTION ENTRANCE
BUILDING SETBACK
CONTOUR
SPOT ELEVATION
GUARD RAIL
BUILDING
TO BE REMOVED
TO BE RELOCATED
SITE FEATURE REMOVAL
BUILDING REMOVAL
TREE LINE
OVERHEAD ELECTRICAL
UNDERGROUND TELECOMM
EXISTING PAVED DITCH
253 253
TBR
TBRL
SILT FENCE
SSWx
SD
W
SS
ExECxuCu
GAS LINE G
Gx
PROPOSED
C-0-001
253.6 X
DIVERSION DIKE
TREE PROTECTION
TP
WETLAND BOUNDARY
GENERAL NOTES:
1. CONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING
ALL REQUIRED PERMITS PRIOR TO CONSTRUCTION.
2. ALL DESIGN AND STANDARDS SHALL CONFORM TO, INCLUDING
BUT NOT LIMITED TO SAVANNAH DISTRICT DESIGN MANUAL FOR
MILITARY CONSTRUCTION, INSTALLATION DESIGN GUIDELINES
FOR FORT JACKSON, SOUTH CAROLINA DEPARTMENT OF HEALTH
AND ENVIRONMENTAL CONTROL. SOUTH CAROLINA STORM WATER
MANAGEMENT AND SEDIMENT CONTROL HANDBOOK FOR LAND
DISTURBANCE ACTIVITIES.
3. HOT WATER SUPPLY AND RETURN PIPING SHALL BE RELOCATED
WITHIN A CONCRETE TRENCH.
4. PERMIT APPLICATIONS AND/OR EXCEPTIONS MUST BE SUBMITTED
IN COMPLIANCE WITH SOUTH CAROLINA AIR POLLUTION CONTROL
REGULATION 61-62.
GRADING NOTES:
1. FOR EACH BUILDING, GRADE SHALL BE SLOPED AWAY FROM
THE BUILDING AT A MINIMUM OF 5% FOR THE FIRST 10 FEET.
2. MAXIMUM GRADE SHALL BE 3H:IV.
C-4-000
200’
100’
300’
1" = 100’-0"
50’
2 3
C
4 5
A
B
US ARMY CORPS
OF ENGINEERS
SAVANNAH
PLATE
REFERENCE
NUMBER
SHEET
DESIGN FILE:
DATE: TIME: USER: $$DATE $$TIME $$USER
$$DGN
OF 20
C-6-000
HAMPTON PARKWAY
JENKINS STREET
GENERAL NOTES:
WATER TIE-IN
APPROX.
ARCHEOLOGICAL
38RD539
HOT WATER
SUPPLY AND
RETURN PIPING
TIE-IN
FORCE MAIN
TIE-IN
COLD WATER
SUPPLY AND
RETURN PIPING
TIE-IN
GAS TIE-IN
CEP#4
TEL/COM TIE-IN AT
SOLDIERS SUPPORT
INSTITUTE (SSI)
END OFF-SITE FORCEMAIN,
WATER AND CHILLED WATER
SUPPLY AND RETURN PIPING
ELEC.
TIE-IN
END OFF-SITE
ELECTRICAL,
TEL/COM, GAS,
AND WATER
0 300’
1" = 200’-0"
200’ 400’100’
SOLDIERS SUPPORT INSITUTE
1. CONTRACTOR SHALL OBTAIN APPROPRIATE PERMIT
AND COORDINATE WITH AMERICAN STATES UTILITY
SERVICES FOR CONSTRUCTION OF WATER AND
SEWER LINES.
2. WETLANDS DISTURBANCE SHALL BE PERMITTED
SEPARATELY. ALL APPLICABLE PERMIT APPROVALS
SHALL BE OBTAINED PRIOR TO ANY CONSTRUCTION
ACTIVITIES IN THOSE AREAS.
3. UTILITY ROUTINGS SHOWN ON THESE PLANS ARE
THE RECOMMENDED ROUTING FOR UTILITIES & IS
CONCEPTUAL IN NATURE. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR DEVELOPING A COMPLETE
DESIGNED & DETAILED PLAN FOR THE CONSTRUCTION
OF ALL UTILITIES.
4. CONTRACTOR SHALL COORDINATE WATER AND SANITARY
CONNECTIONS WITH ASUS PRIOR TO CONSTRUCTION.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING UTILITY ROUTINGS WITH ALL
EXISTING FEATURES TO MINIMIZE DISTURBANCE &
DISRUPTION TO FORT JACKSON’S OPERATIONS.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN
AND CONSTRUCTION OF THE LIFT STATION.
NOTE: CONSTRUCTION TO BE COMPLETED BY
BARRACKS CONTRACTOR OUTSIDE OF BATTALION
HEADQUARTER AND DINING FACILITY PROJECT
LIMITS. REFER TO APPENDIX C- EXHIBIT A,
ENTITLED PROJECT LIMITS EXHIBIT FOR
DEMARCATION FOR ALL CONTRACTORS.
FOR INFORMATION ONLY
File details come from the government source that posted it. Updated .