View the file

Other files

File Type Posted
Am_03.pdf PDF
TRADOC 2600-1 scaled.dgn —
Am_02.pdf PDF
bct2 cad files.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX J

Drawings

DRAWING INDEX

BTC II CONCEPTUAL SITE DEVELOPMENT DRAWINGS

G-0-000 COVER SHEET

C-0-001 LEGEND, ABBREVIATIONS, AND

GENERAL NOTES

C-3-000 HAUL ROUTE PLAN

C-4-000 OVERALL SITE LAYOUT

C-6-000 OVERALL SITE UTILITY PLAN

2600 DINING FACILITY STANDARD DESIGN

A-101 OVERALL FLOOR PLAN

A-102 EQUIPMENT PLAN AREA A

A-103 EQUIPMENT PLAN AREA B

A-104 EQUIPMENT PLAN AREA C

A-601 EQUIPMENT SCHEDULE 1

A-602 EQUIPMENT SCHEDULE 1

US Army Corps of Engineers

Savannah District

CONTRACT NO.

SOLICITATION NO. W91236-08-R-0043

FY 08 L.I. 68734

FORT JACKSON - BASIC TRAINING COMPLEX II

FINAL SUBMISSION

CONCEPTUAL SITE DEVELOPMENT

PROJECT

SITE

CEP#4

PROJECT SITE

G-0-000 COVER SHEET

C-0-001 LEGEND, ABBREVIATIONS,

AND GENERAL NOTES

C-3-000 HAUL ROUTE PLAN

C-4-000 OVERALL SITE LAYOUT

C-6-000 OVERALL SITE UTILITY PLAN

CuCuCuCu

D

2 3

C

4 5

A

B

US ARMY CORPS

OF ENGINEERS

SAVANNAH

PLATE

REFERENCE

NUMBER

SHEET

DESIGN FILE:

DATE: TIME: USER: $$DATE $$TIME $$USER

$$DGN

OF 20

2 3

C

4 5

A

B

US ARMY CORPS

OF ENGINEERS

SAVANNAH

PLATE

REFERENCE

NUMBER

SHEET

DESIGN FILE:

DATE: TIME: USER: $$DATE $$TIME $$USER

$$DGN

OF 202

FIRE HYDRANT

SANITARY MANHOLE

STORM DRAIN

FENCE

SD

CIVIL LEGEND

SANITARY SEWER MAIN

EXISTING

STORM DRAINAGE MANHOLE

WATER LINE

PROJECT LIMIT

LIMIT OF DISTURBANCE

CONSTRUCTION ENTRANCE

BUILDING SETBACK

CONTOUR

SPOT ELEVATION

GUARD RAIL

BUILDING

TO BE REMOVED

TO BE RELOCATED

SITE FEATURE REMOVAL

BUILDING REMOVAL

TREE LINE

OVERHEAD ELECTRICAL

UNDERGROUND TELECOMM

EXISTING PAVED DITCH

253 253

TBR

TBRL

SILT FENCE

SSWx

SD

W

SS

ExECxuCu

GAS LINE G

Gx

PROPOSED

C-0-001

253.6 X

DIVERSION DIKE

TREE PROTECTION

TP

WETLAND BOUNDARY

GENERAL NOTES:

1. CONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING

ALL REQUIRED PERMITS PRIOR TO CONSTRUCTION.

2. ALL DESIGN AND STANDARDS SHALL CONFORM TO, INCLUDING

BUT NOT LIMITED TO SAVANNAH DISTRICT DESIGN MANUAL FOR

MILITARY CONSTRUCTION, INSTALLATION DESIGN GUIDELINES

FOR FORT JACKSON, SOUTH CAROLINA DEPARTMENT OF HEALTH

AND ENVIRONMENTAL CONTROL. SOUTH CAROLINA STORM WATER

MANAGEMENT AND SEDIMENT CONTROL HANDBOOK FOR LAND

DISTURBANCE ACTIVITIES.

3. HOT WATER SUPPLY AND RETURN PIPING SHALL BE RELOCATED

WITHIN A CONCRETE TRENCH.

4. PERMIT APPLICATIONS AND/OR EXCEPTIONS MUST BE SUBMITTED

IN COMPLIANCE WITH SOUTH CAROLINA AIR POLLUTION CONTROL

REGULATION 61-62.

GRADING NOTES:

1. FOR EACH BUILDING, GRADE SHALL BE SLOPED AWAY FROM

THE BUILDING AT A MINIMUM OF 5% FOR THE FIRST 10 FEET.

2. MAXIMUM GRADE SHALL BE 3H:IV.

C-4-000

200’

100’

300’

1" = 100’-0"

50’

2 3

C

4 5

A

B

US ARMY CORPS

OF ENGINEERS

SAVANNAH

PLATE

REFERENCE

NUMBER

SHEET

DESIGN FILE:

DATE: TIME: USER: $$DATE $$TIME $$USER

$$DGN

OF 20

C-6-000

HAMPTON PARKWAY

JENKINS STREET

GENERAL NOTES:

WATER TIE-IN

APPROX.

ARCHEOLOGICAL

38RD539

HOT WATER

SUPPLY AND

RETURN PIPING

TIE-IN

FORCE MAIN

TIE-IN

COLD WATER

SUPPLY AND

RETURN PIPING

TIE-IN

GAS TIE-IN

CEP#4

TEL/COM TIE-IN AT

SOLDIERS SUPPORT

INSTITUTE (SSI)

END OFF-SITE FORCEMAIN,

WATER AND CHILLED WATER

SUPPLY AND RETURN PIPING

ELEC.

TIE-IN

END OFF-SITE

ELECTRICAL,

TEL/COM, GAS,

AND WATER

0 300’

1" = 200’-0"

200’ 400’100’

SOLDIERS SUPPORT INSITUTE

1. CONTRACTOR SHALL OBTAIN APPROPRIATE PERMIT

AND COORDINATE WITH AMERICAN STATES UTILITY

SERVICES FOR CONSTRUCTION OF WATER AND

SEWER LINES.

2. WETLANDS DISTURBANCE SHALL BE PERMITTED

SEPARATELY. ALL APPLICABLE PERMIT APPROVALS

SHALL BE OBTAINED PRIOR TO ANY CONSTRUCTION

ACTIVITIES IN THOSE AREAS.

3. UTILITY ROUTINGS SHOWN ON THESE PLANS ARE

THE RECOMMENDED ROUTING FOR UTILITIES & IS

CONCEPTUAL IN NATURE. THE CONTRACTOR SHALL

BE RESPONSIBLE FOR DEVELOPING A COMPLETE

DESIGNED & DETAILED PLAN FOR THE CONSTRUCTION

OF ALL UTILITIES.

4. CONTRACTOR SHALL COORDINATE WATER AND SANITARY

CONNECTIONS WITH ASUS PRIOR TO CONSTRUCTION.

5. CONTRACTOR SHALL BE RESPONSIBLE FOR

COORDINATING UTILITY ROUTINGS WITH ALL

EXISTING FEATURES TO MINIMIZE DISTURBANCE &

DISRUPTION TO FORT JACKSON’S OPERATIONS.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN

AND CONSTRUCTION OF THE LIFT STATION.

NOTE: CONSTRUCTION TO BE COMPLETED BY

BARRACKS CONTRACTOR OUTSIDE OF BATTALION

HEADQUARTER AND DINING FACILITY PROJECT

LIMITS. REFER TO APPENDIX C- EXHIBIT A,

ENTITLED PROJECT LIMITS EXHIBIT FOR

DEMARCATION FOR ALL CONTRACTORS.

FOR INFORMATION ONLY

File details come from the government source that posted it. Updated .