SOW_3D_mapping.pdf
PDF 127 KB Posted
- Attached to
- 3D Mapping Engine Federal contract opportunity
- Solicitation number
- W91215-18-R-0001
About this file
SOW 3D Mapping
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Approved_-_JA__Redacted_for_release.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE CONTRACT STATEMENT OF WORK (SOW)
C-1.0 STATEMENT OF WORK BACKGROUND
The Special Operations Mission Planning Environment (SOMPE) program provides an integrated software suite of mission planning and execution tools for time critical command and control of globally distributed Special Operations Forces (SOF). The SOMPE Program automates time-intensive planning activities and provides enhanced situational awareness capabilities. SOMPE also provides an interoperable environment for adaptive war planning to collaborate, horizontally, vertically and in parallel, the development of the various components of mission plans. SOMPE spans all elements of USSOCOM including the Center for Special
Operations (CSO), Theater Special Operations Commands (TSOCs), Joint Special Operations
Task Force (JSOTF), Joint Special Operations Aviation Components (JSOAC), SOF warfighters and their warfighting platforms. The SOMPE program develops, integrates, fields, trains and sustains advanced software applications. Under this effort, a SOMPE 3-Dimensional (3D)
Mapping engine will be licensed, developed, modernized and sustained to support SOF requirements and technology enhancements.
C-1.1. Task 1 Software Development and Test Support
C-1.2. System/Software Requirements and Architecture Analysis
The Contractor shall document and analyze derived Special Operations mission planning system/software requirements and make implementation recommendations to include architectural approaches for satisfying user requirements/ mission planning needs. The
Contractor shall analyze the Special Operations mission planning architecture as it evolves. The
Contractor shall analyze existing mission planning software and recommend design and architecture enhancements. The Contractor shall also analyze existing software applications for migration to future systems.
C-1.3. Software Development
The Contractor shall develop/enhance/upgrade software modules, components, and/or tools as directed by the Special Operations Mission Planning Office (SOMPO) to include, but not limited to: core mission planning software and 3D. The Contractor shall review, define and document issues regarding software interfaces and implement improvements as directed by SOMPO.
Proposed software modules shall be developed/enhanced using commercially accepted practices.
The Contractor shall develop software tools that are compliant with Government-furnished interface documentation, as required. The Contractor shall provide pre-release (Beta) software prototypes to the Government for analysis and evaluation. All software products shall be designed for maximum code reuse.
C-1.4. Software Testing
The Contractor shall perform Formal Qualification Testing (FQT) for each software product in accordance with Contractor procedures prior to delivery to the Government. Contractor FQT shall assess the software tool’s basic functionality, maturity, reliability and verify that all requirements have been met. The Contractor shall deliver a test report with each software product.
C-1.5. Software Documentation
The Contractor shall provide software documentation as required by the SOMPE Test and
Evaluation Master Plan (TEMP). Such documentation includes, but is not limited to: Software
Requirements Specification (SRS), Software Version Description (SVD) with Release Notes, Software (including executable and source code), Software User’s Manual (SUM) and Software
Test Report (STR). The Contractor shall document software source code using commercially accepted methods. Software documentation shall be upgraded to coincide with platform and/or mission planning upgrades/enhancements.
C-2.1. Task 2 Software Project Management and Maintenance
C-2.2. Software Project Management. The Contractor shall plan, organize, staff, schedule, and manage software efforts using commercially accepted program management practices. The
Contractor shall also coordinate with other developers and interface with the Government as necessary for successful integration. The Contractor shall ensure technical and schedule data flow is maintained between all activities to prevent technical and schedule incompatibilities. The
Contractor shall provide cost, performance and schedule status on a regular basis. This includes regular program reviews detailing all on-going software development/sustainment activities.
C-2.3. Software Sustainment
The Contractor shall maintain/sustain mission planning software modules, components, and/or tools as directed by the SOMPO. The software shall be maintained using commercially accepted practices. The Contractor shall maintain software that is compliant with Government furnished
Interface Control Documents (ICDs), as required. The Contractor shall provide pre-release
(Beta) software to the Government for analysis and evaluation. The maintained software tools shall be designed for maximum code reuse.
C-3.1. Task 3 Software Licensing
C-3.2. Software Licenses and Data rights. The Contractor shall provide software and data in accordance with negotiated licensing with each delivery order.
C-4.0 The Base Contract Data Requirements Lists (CDRLs) listed below apply to this task order:
CDRL TITLE AUTHORITY
A001 Reserved
A002 Software Product Specification (SPS)/Version DI-IPSC-81441A/81442A
Description (SVD)
A003 Software Users Manual (SUM) DI-IPSC-81443A
A004 Software Requirements Specification (SRS) DI-IPSC-81433A
A005 Meeting Minutes/Notes DI-ADMIN-81505
A006 Computer Software Product End Items DI-MCCR-80700
A007 Letter Progress Report DI-MISC-80711A
C-4.1 The software documentation shall be in Contractor format.
C-4.2 The final delivery of all data items shall be in an electronic format on standard media (CD-
ROM/DVD-ROM, etc.). All product documentation items shall be delivered as MS-Office or
PDF compatible files. All source code, data, and project files required to build the product without error on its target system and run automated test without error shall be included in the final deliverable’s project media.
File details come from the government source that posted it.