W911YU-17-R-0005_Pricing_Sheet.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Environmental Consulting Federal contract opportunity
- Solicitation number
- W911YU-17-R-0005
About this file
Pricing Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911YU-17-R-0005_PWS.pdf | ||
| W911YU-17-R-0005_SYNOPSIS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A1-Asbestos Consultant Labor
| PRICE SCHEDULE A1 |
| ASBESTOS CONSULTING LABOR RATES |
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| DESCRIPTION | PRICE PER HOUR |
Support Support Level I - Clerical, word processing, filing, copying, general administration No direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Support | Support Level II - Drafting, project manager's assistant, graphics |
No direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Support | Support Level III - Drafting supervisor, senior word processor, supervisor |
No direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level III | Premium Rate | |||
| Field | Field Level I - Air monitoring, project assistant, site technician: closely supervised |
6+ months of direct experience required
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Field | Field Level II - AHERA Building Inspector/Management Planner: independent collection and analysis of data, report writing; 1+ years of direct experience; | |||
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Field | Field Level III - AHERA Contractor/Supervisor: independent site management, air bulk sample data analysis, report preparation; 2+ years of direct experience; | |||
| Minimum 2 employees required | Standard Rate | |||
| Level III | Premium Rate | |||
| Field | Field Level IV - Project Designer: planning and design of asbestos abatement projects and field activities;2+ years direct experience. AHERA Project Designer training required; Minimum 1 employee required | Standard Rate | ||
| Level IV | Premium Rate | |||
| Professional | Professional Level I - Project Manager: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super required; Minimum 1 employee required | Standard Rate | ||
| Level I | Premium Rate | |||
| Professional | Professional Level II -Program Manager/IH: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super/Proj Design required; No employee requirements | Standard Rate | ||
| Level II | Premium Rate | |||
| Professional | Professional Level III - Principal/PE/CIH: 5+ years of direct experience; AHERA Contractor Supervisor Training Required; | |||
| Minimum 1 employee required | Standard Rate | |||
| Level III | Premium Rate |
A1-Asbestos Abatement Labor
| PRICE SCHEDULE A1 | ||
| ASBESTOS ABATEMENT LABOR RATES | ||
| SOLICITATION ADEQ18-00007515 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Support Level I - Clerical, word processing, filing, general administration; entry level;
No direct experience required.
| 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Support | Support Level II - Drafting, project manager’s assistant, graphics |
No direct experience required
| 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Support | Support Level III - Drafting supervisor, Senior Word Processor |
No direct experience required
| 1 employee required | Standard Rate | |||
| Level III | Premium Rate | |||
| Field | Field Level I - Worker/laborer, closely supervised |
6+ months direct abatement experience; AHERA worker training required
| Minimum 5 employees required | Standard Rate | |||
| Level I | Premium Rate | |||
| Field | Field Level II - Site supervisor: oversees and directs abatement contractor work activities; 2+ years of direct experience AHERA Contractor/Supervisor training required | |||
| Minimum 2 AHERA-trained employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Field | Field Level III - Field supervisor or superintendent: oversees and directs multiple abatement contractor projects; 2+ years of direct experience AHERA Contractor/Supervisor training required. None Required | Standard Rate | ||
| Level III | Premium Rate | |||
| Professional | Professional Level I - Project manager: management of abatement projects, oversees field services, provides bids; 2+ years of direct experience, AHERA Contractor/Supervisor training required; 1 AHERA-trained employee required | Standard Rate | ||
| Level I | Premium Rate | |||
| Professional | Professional Level II -Estimator: provides bids and pricing for abatement jobs; |
2+ years of direct experience AHERA Contractor/Supervisor training required
| 1 Employee Required | Standard Rate | |||
| Level II | Premium Rate | |||
| Professional | Professional Level III - Principal |
5+ years of direct experience;AHERA Contractor/Supervisor training required
| 1 Employee Required | Standard Rate | ||
| Level III | Premium Rate |
A2-Lead Consultant Labor
| PRICE SCHEDULE A2 | ||
| LEAD CONSULTANT LABOR RATES | ||
| SOLICITATION ADEQ18-00007515 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Clerical, word processing, filing, copying, general administration;
No direct experience required;
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Support | Drafting, project manager's assistant, graphics; |
No direct experience required;
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Support | Drafting supervisor, senior word processor, supervisor; |
No direct experience required;
| Minimum 1 employee required | Standard Rate | |||
| Level III | Premium Rate | |||
| Field | Project assistant, site technician: closely supervised. |
3+ months of direct experience
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Field | Inspector: Inspections, post-abatement clearance activities; |
6+ months direct experience, EPA Lead Inspector training required
| Minimum 1 employee required | Standard Rate | |||
| Level II | Premium Rate | |||
| Field | Risk Assessor: Inspections, post abatement clearance, lead hazard screening, risk assessments; 6+ months direct experience; EPA Lead Risk Assessor training required. Minimum 1 employee required | Standard Rate | ||
| Level III | Premium Rate | |||
| Field | Supervisor Abatement project oversight, occupant protection plans, abatement reports; 6+ months direct experience, EPA Lead Supervisor training required | |||
| Minimum 1 employee required | Standard Rate | |||
| Level IV | Premium Rate | |||
| Field | Project Designer: Occupant protection plans, abatement reports |
6+ mos. of direct experience, EPA Lead Project Designer training required
| Minimum 1 employee required | Standard Rate | |||
| Level V | Premium Rate | |||
| Professional | Project Manager: Supervision of abatement projects, oversees field services; |
2+ years direct experience; AHERA Insp/MP/Cont/Super required;
| Minimum 1 employee required | Standard Rate | |||
| Level I | Premium Rate | |||
| Professional | Project Manager/IH: Supervision of abatement projects, oversees field services; |
2+ years direct experience; AHERA Insp/MP/Cont/Super/Proj Design required;
| No staffing requirement for this position | Standard Rate | |||
| Level II | Premium Rate | |||
| Professional | Principal/PE/CIH: |
5+ years direct experience
| Minimum 1 employee required | Standard Rate | ||
| Level III | Premium Rate |
PRICING FOR ENVIRONMENTAL CONS
PRICE SCHEDULE
SOLICITATION ENVIRONMENTAL CONSULTING BASE YR
DESCRIPTION PRICE
Hazardous materials and waste management plan
• Current plan update for FY18 Measurable Rate
Hazardous materials commodity flow analysis
• Only if requested by GUARNG CFMO Measurable Rate
Hazardous materials site investigation
• To include sampling and analysis of up to 3 samples Measurable Rate
Investigation-derived waste (IDW) characterization & disposal
• Investigation to include sampling and analysis of up to 3 samples
• Disposal cost per 55-gallon drum based on contamination found Measurable Rate
Industrial waste collection and disposal
• To include all petroleum, oil filters, waste rags:
cost per 55-gallon drum for each (note for FY17 utilized 6 to 8- 55 gallon drums for above items, mainly petroleum)
• Used oil / fuels- cost per gallon
• For waste not listed, please provide cost based on type of waste per 55-gallon drum Measurable Rate
Hazardous waste packaging, shipping and disposal
• Paints and solvent- per 55 gallon drum (note for FY17 utilized 3 to 5- 55 gallon drums)
• Batteries (NiCad, Alkaline, Zinc Alkaline)- cost per pound
Measurable Rate
Hazardous Material and Hazardous Waste Services and Supplies
• Oil Absorbent Pads- Cost for 15-20 bales
• Oil Absorbent Booms- Cost for 10-15 bales
• Dry Sweep- Cost for 25- 20 pound bags
Measurable Rate
Conduct training for Unit Environmental Compliance Officers (UECO).
• Minimum 20 personnel (Training will be once a year)
Measurable Rate
Conduct hazardous material / waste training.
• Minimum 20 personnel
Measurable Rate
Conduct emergency spill response training.
Measurable Rate
Recommend, implement, and facilitate corrective actions
• Please provide cost estimate prior to initiation of services.
• Subject to specific recommendation cost of implementation and facilitation.
Measurable Rate
*** Vendors bare responsiblities for all calculations, formulas, etc.
OPTION YR1
PRICE SCHEDULE
SOLICITATION ENVIRONMENTAL CONSULTING OPTION YR 1
DESCRIPTION PRICE
Hazardous materials and waste management plan
• Current plan update for FY18 Measurable Rate
Hazardous materials commodity flow analysis
• Only if requested by GUARNG CFMO Measurable Rate
Hazardous materials site investigation
• To include sampling and analysis of up to 3 samples Measurable Rate
Investigation-derived waste (IDW) characterization & disposal
• Investigation to include sampling and analysis of up to 3 samples
• Disposal cost per 55-gallon drum based on contamination found Measurable Rate
Industrial waste collection and disposal
• To include all petroleum, oil filters, waste rags:
cost per 55-gallon drum for each (note for FY17 utilized 6 to 8- 55 gallon drums for above items, mainly petroleum)
• Used oil / fuels- cost per gallon
• For waste not listed, please provide cost based on type of waste per 55-gallon drum Measurable Rate
Hazardous waste packaging, shipping and disposal
Measurable Rate
Hazardous Material and Hazardous Waste Services and Supplies
• Oil Absorbent Pads- Cost for 15-20 bales
Measurable Rate
Conduct training for Unit Environmental Compliance Officers (UECO).
Measurable Rate
Conduct hazardous material / waste training.
Measurable Rate
Conduct emergency spill response training.
Measurable Rate
Recommend, implement, and facilitate corrective actions
Measurable Rate
OPTION YR2
PRICE SCHEDULE
SOLICITATION ENVIRONMENTAL CONSULTING OPTION YR 2
DESCRIPTION PRICE
Hazardous materials and waste management plan
• Current plan update for FY18 Measurable Rate
Hazardous materials commodity flow analysis
• Only if requested by GUARNG CFMO Measurable Rate
Hazardous materials site investigation
• To include sampling and analysis of up to 3 samples Measurable Rate
Investigation-derived waste (IDW) characterization & disposal
• Investigation to include sampling and analysis of up to 3 samples
• Disposal cost per 55-gallon drum based on contamination found Measurable Rate
Industrial waste collection and disposal
• To include all petroleum, oil filters, waste rags:
cost per 55-gallon drum for each (note for FY17 utilized 6 to 8- 55 gallon drums for above items, mainly petroleum)
• Used oil / fuels- cost per gallon
• For waste not listed, please provide cost based on type of waste per 55-gallon drum Measurable Rate
Hazardous waste packaging, shipping and disposal
Measurable Rate
Hazardous Material and Hazardous Waste Services and Supplies
• Oil Absorbent Pads- Cost for 15-20 bales
Measurable Rate
Conduct training for Unit Environmental Compliance Officers (UECO).
Measurable Rate
Conduct hazardous material / waste training.
Measurable Rate
Conduct emergency spill response training.
Measurable Rate
Recommend, implement, and facilitate corrective actions
Measurable Rate
File details come from the government source that posted it. Updated .