Abstract of Offers (Non-Commercial Supply) - Poe Gate 3 (FINAL).pdf
PDF 388 KB Posted
- Attached to
- Soo Poe Lock Gate 3 Fabrication and Delivery
- Solicitation number
- W911XK26BA022
About this file
This is an Abstract of Offers for a non-commercial supply solicitation issued by the US Army Corps of Engineers, Detroit District for the Soo Poe Gate 3 Fabrication & Delivery project under solicitation number W911XK26BA022. The solicitation was issued on May 11, 2026, opened on June 16, 2026, and includes one amendment. The contracting officer is Lisa M. May.
The base contract requires fabrication and delivery of one miter gate with two leaves and appurtenances, temporary use of delivery barge(s) F.O.B. destination, and final project record documents. Base contract totals range from $12,332,914 to $18,684,207 across the five offerors: Steward Machine Co, Inc., G & G Steel, Inc., Moran Iron Works Inc., Marine Diving Solutions, LLC, and Precision Build Solutions, LLC. Four optional line items are available: Option 1 for two piston rods ($193,563 to $1,764,750), Option 2 for two gate connector assemblies ($138,601 to $694,274), Option 3 for two pintle bases ($152,564 to $1,245,146), and Option 4 for two wall quoin with wall quoin blocks ($533,843 to $1,109,391). Total offers including base and all options range from $14,609,132 to $21,797,679. All offers are priced on a job basis for the specified deliverables and services.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE SIGNED
7A.
ITEM
NO 7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTIT
Y C. UNIT
D. ESTIMATED
AMOUNT C. UNIT
D. ESTIMATED
AMOUNT C. UNIT
D. ESTIMATED
AMOUNT C. UNIT
D. ESTIMATED
AMOUNT C. UNIT
D. ESTIMATED
AMOUNT C. UNIT
D. ESTIMATED
AMOUNT
0001 BASE CONTRACT - FINAL PROJECT RECORD DOCUMENTS 1 JOB $ 32,043.00 JOB $ 10,000.00 JOB $ 20,000.00 JOB $ 15,000.00 JOB $ 794,218.00 JOB $ 20,000.00
BASE CONTRACT - FABRICATE ONE (1) MITER GATE AND
APPURTENANCES
1 JOB $ 16,597,635.00 JOB $ 13,670,807.00 JOB $ 11,570,878.00 JOB $11,521,071.00 JOB $ 13,227,279.00 JOB $ 15,850,207.00
BASE CONTRACT - TEMPORARY USE OF DELIVERY BARGE(S)
F.O.B. DESTINATION
1 JOB $ 127,200.00 JOB $ 551,475.00 JOB $ 118,800.00 JOB $ 429,000.00 JOB $ 155,635.00 JOB $ 262,500.00
BASE CONTRACT - SHIPMENT AND DELIVERY ONE (1) MITER
GATE AND APPURTENANCES
1 JOB $ 782,913.00 JOB $ 1,862,325.00 JOB $ 1,547,400.00 JOB $ 367,843.00 JOB $ 2,925,610.00 JOB $ 2,551,500.00
$ 17,539,791.00 $ 16,094,607.00 $ 13,257,078.00 $12,332,914.00 $ 17,102,742.00 $ 18,684,207.00
0005 OPTION 1 - FINAL PROJECT RECORD DOCUMENTS 1 JOB $ 25,634.00 JOB $ 2,500.00 JOB $ 20,000.00 JOB $ 10,000.00 JOB $ 12,707.00 JOB $ -
0006 OPTION 1 - FABRICATE TWO (2) PISTON ROD 1 JOB $ 1,731,616.00 JOB $ 277,619.00 JOB $ 171,476.00 JOB $ 193,713.00 JOB $ 168,021.00 JOB $ 239,009.00
0007 OPTION 1 - SHIPMENT AND DELIVERY TWO (2) PISTON ROD 1 JOB $ 7,500.00 JOB $ 15,525.00 JOB $ 1,500.00 JOB $ 2,600.00 JOB $ 12,835.00 JOB $ 10,650.00
$ 1,764,750.00 $ 295,644.00 $ 192,976.00 $ 206,313.00 $ 193,563.00 $ 246,659.00
0008 OPTION 2 - FINAL PROJECT RECORD DOCUMENTS 1 JOB $ 6,409.00 JOB $ 2,500.00 JOB $ 20,000.00 JOB $ 10,000.00 JOB $ 25,415.00 JOB $ -
0009 OPTION 2 - FABRICATE TWO (2) GATE CONNECTOR ASSEMBLY 1 JOB $ 129,192.00 JOB $ 289,077.00 JOB $ 226,620.00 JOB $ 682,560.00 JOB $ 158,138.00 JOB $ 296,943.00
0010 OPTION 2 - SHIPMENT AND DELIVERY TWO (2) GATE CONNECTOR
ASSEMBLY
1 JOB $ 3,000.00 JOB $ 6,750.00 JOB $ 1,500.00 JOB $ 1,714.00 JOB $ 12,835.00 JOB $ 10,650.00
$ 138,601.00 $ 298,327.00 $ 248,120.00 $ 694,274.00 $ 196,388.00 $ 307,593.00
0011 OPTION 3 - FINAL PROJECT RECORD DOCUMENTS 1 JOB $ 6,409.00 JOB $ 2,500.00 JOB $ 20,000.00 JOB $ 10,000.00 JOB $ 31,769.00 JOB $ -
0012 OPTION 3 - FABRICATE TWO (2) PINTLE BASE 1 JOB $ 1,235,137.00 JOB $ 143,314.00 JOB $ 101,288.00 JOB $ 191,586.00 JOB $ 160,608.00 JOB $ 149,028.00
0013 OPTION 3 - SHIPMENT AND DELIVERY TWO (2) PINTLE BASE 1 JOB $ 3,600.00 JOB $ 6,750.00 JOB $ 1,500.00 JOB $ 2,228.00 JOB $ 8,022.00 JOB $ 10,650.00
$ 1,245,146.00 $ 152,564.00 $ 122,788.00 $ 203,814.00 $ 200,399.00 $ 159,678.00
0014 OPTION 4 - FINAL PROJECT RECORD DOCUMENTS 1 JOB $ 6,409.00 JOB $ 2,500.00 JOB $ 20,000.00 JOB $ 10,000.00 JOB $ 25,415.00 JOB $ -
0015 OPTION 4 - FABRICATE TWO (2) WALL QUOIN WITH WALL QUOIN
BLOCK
1 JOB $ 1,072,982.00 JOB $ 567,421.00 JOB $ 760,670.00 JOB $ 981,238.00 JOB $ 495,592.00 JOB $ 871,043.00
0016 OPTION 4 - SHIPMENT AND DELIVERY TWO (2) WALL QUOIN WITH
WALL QUOIN BLOCK
1 JOB $ 30,000.00 JOB $ 21,330.00 JOB $ 7,500.00 JOB $ 3,813.00 JOB $ 12,836.00 JOB $ 28,825.00
$ 1,109,391.00 $ 591,251.00 $ 788,170.00 $ 995,051.00 $ 533,843.00 $ 899,868.00
$ 4,257,888.00 $ 1,337,786.00 $ 1,352,054.00 $ 2,099,452.00 $ 1,124,193.00 $ 1,613,798.00
$ 21,797,679.00 $ 17,432,393.00 $ 14,609,132.00 $14,432,366.00 $ 18,226,935.00 $ 20,298,005.00
Total Amount of All Options Only:
Total Amount of Offer (Base & All Options):
00010001
GENERAL FEATURES - BASE CONTRACT: (1) MITER GATE (2 LEAVES)
GENERAL FEATURES - OPTION 1: TWO (2) PISTON ROD
GENERAL FEATURES - OPTION 2: TWO (2) GATE CONNECTOR ASSEMBLY
GENERAL FEATURES - OPTION 3: TWO (2) PINTLE BASE
Lisa M. May, Contracting Officer
NO. 5
A. OFFEROR:
2. DATE ISSUED PAGE
5/11/2026 1
SIGNATURE
OF PAGES
Soo Poe Gate 3 Fabrication & Delivery X
ABSTRACT OF OFFERS - NON-COMMERCIAL SUPPLY
4. ISSUING OFFICE
US Army Corps of Engineers Detroit District
5. PROJECT TITLE
1. SOLICITATION NUMBER
W911XK26BA022
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NO. 4
A. OFFEROR:
3. DATE OPENED
6/16/2026
NO. 3
A. OFFEROR: A. HIRED LABOR
NO. 1 NO. 2
A. OFFEROR: A. OFFEROR:
9. OFFERS
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
Precision Build Solutions
LLC.
B. AMENDMENTS
ACKNOWLEDGED
B. AMENDMENTS
ACKNOWLEDGED
B. AMENDMENTS
ACKNOWLEDGED
B. AMENDMENTS
ACKNOWLEDGED
G & G Steel, Inc. Moran Iron Works Inc.
Marine Diving Solutions, LLC.
Total Amount of Option 4:
8. GOVERNMENT ESTIMATE
Total Amount of Base:
Total Amount of Option 1:
Total Amount of Option 2:
Total Amount of Option 3:
GENERAL FEATURES - OPTION 4: TWO (2) WALL QUOIN WITH WALL QUOIN BLOCK
B. REASONABLE
CONTRACT (Without Profit)
C. REASONABLE
CONTRACT (Including Profit) 0001
B. AMENDMENTS
ACKNOWLEDGED
Steward Machine Co, Inc.
6. NUMBER OF AMENDMENTS ISSUED
| 2026-06-18T11:02:32-0400 | |
| LISA MAY |
File details come from the government source that posted it. Updated .